| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01383616 ↗ | 20 EAST 35TH STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 11/17/2026 | Filer DAO STUDIOS LLC | interior renovation of residential unit on the 6th floor. no change to use, occupancy, or egress. |
| M01305361 ↗ | 30 EAST 10TH STREET MANHATTAN | Alteration | Permit Issued | 01/08/2026 | 11/09/2026 | Owner MATTHEW ADAM PROPERTIES Filer I & L CONSULTING, INC. | REMOVE AND INSTALL PLUMBING FIXTURES APT # 9N/10N , AS PER PLANS SUBMITTED HEREWITH. |
| M01431711 ↗ | 25 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 08/27/2026 | Owner THE LOVETT GROUP | Interior work related to the installation of an electric non-venting washer and dryer on the 5th floor in Apt 5G. The work includes General… |
| M01200747 ↗ | 160 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 04/29/2025 | 08/14/2026 | Design A2 ARCHITECT, PC Owner THE LOVETT GROUP Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2B ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01116685 ↗ | 300 WEST 108TH STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 07/02/2026 | Design BO LEE ARCHITECT PC | RENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTM… |
| M01187782 ↗ | 239 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/03/2025 | 06/01/2026 | Design ANDREW KATZ ENGINEERS Owner BROWN HARRIS STEVENS | STEEL REINFORCEMENT OF A STEEL COLUMN |
| Name | Projects together | Most recent |
|---|---|---|
| Ronald Nemec Architect | 6 | 06/23/2025 |
| A2 Architect | 2 | 02/20/2026 |
| BO Lee Architect | 2 | 12/05/2024 |
| CES Engineering | 2 | 03/28/2024 |
| Conklin Costantin Architects | 2 | 05/15/2026 |
| Ethelind Coblin Architect | 2 | 03/22/2023 |
| Haynes Architecture | 2 | 09/11/2025 |
| Michael A Labbe | 2 | 05/22/2025 |
| Andrew Katz Engineers | 1 | 02/11/2026 |
| Ann Krsul Architecture | 1 | 10/09/2025 |
| Aura Architecture | 1 | 12/02/2021 |
| Emtg Consultants | 1 | 04/09/2024 |
| Eric Worcester Architect | 1 | 11/02/2021 |
| Etna Consulting Structural Engineering | 1 | 02/11/2026 |
| Future Made Architecture | 1 | 06/22/2026 |
| Geiger Engineering | 1 | 07/08/2021 |
| Gillen - Konuk Architecture | 1 | 03/18/2024 |
| Grafede Architecture | 1 | 07/22/2024 |
| Kendall Engineering | 1 | 08/25/2023 |
| Kinetic Services Engineering | 1 | 11/01/2023 |
| Kit Middleton Architect | 1 | 06/22/2023 |
| M.B. Architectural Design | 1 | 02/08/2024 |
| Mariana Riobom Architecture | 1 | 03/05/2026 |
| Michael Davis Architects | 1 | 06/08/2026 |
| OI Architecture + Design | 1 | 07/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Calcoe Associates | 7 | 06/08/2026 |
| M&M Construction Spec | 3 | 07/20/2026 |
| SJB Interiors | 3 | 06/22/2026 |
| R.J.C. Mechanical | 2 | 03/18/2024 |
| VDJ Construction | 2 | 09/11/2025 |
| Dennis O'Leary Construction | 1 | 03/05/2026 |
| K.J. Remodeling of NY | 1 | 06/06/2023 |
| Martany Tile | 1 | 04/09/2024 |
| Rael Maintenance | 1 | 06/22/2023 |
| TMS & Son Plumbing | 1 | 06/22/2026 |
| Ultan Interiors | 1 | 01/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Brown Harris Stevens | 3 | 02/11/2026 |
| Akam Associates | 2 | 12/29/2022 |
| The Lovett Group | 2 | 07/20/2026 |
| AJ Clarke Real Estate | 1 | 03/05/2026 |
| CPW Terrace Trust | 1 | 03/28/2024 |
| Douglas Elliman Property Management | 1 | 06/08/2026 |
| Hillman Housing | 1 | 12/22/2022 |
| Hoffman Management | 1 | 01/07/2022 |
| Magic Touch Brooklyn | 1 | 06/23/2025 |
| Matthew Adam Properties | 1 | 05/15/2026 |
| VallotKarp Consulting | 1 | 10/09/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Clarke Construction Consultants | 6 | 06/23/2025 |
| I & L Consulting | 4 | 05/15/2026 |
| Anthony Morali Architect | 2 | 03/22/2023 |
| Code | 2 | 04/09/2024 |
| J. Callahan Consulting | 2 | 03/28/2024 |
| J.A. Expediting | 2 | 02/20/2026 |
| Jam Consultants | 2 | 06/08/2026 |
| Adam Maiser | 1 | 12/02/2021 |
| Anzalone Architecture | 1 | 07/26/2021 |
| Boyd Consulting | 1 | 08/25/2023 |
| Dao Studios | 1 | 06/22/2026 |
| Katz Architecture & Project Management | 1 | 02/11/2026 |
| Kit Middleton Architect | 1 | 06/22/2023 |
| MK Exp | 1 | 03/05/2026 |
| Municipal Building Consultants | 1 | 11/01/2023 |
| Outsource Consultants | 1 | 07/19/2022 |
| Resolution Expediting | 1 | 10/09/2025 |
| Severino Associates | 1 | 02/08/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01383616 ↗ | 20 EAST 35TH STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 11/17/2026 | Filer DAO STUDIOS LLC | interior renovation of residential unit on the 6th floor. no change to use, occupancy, or egress. |
| M01305361 ↗ | 30 EAST 10TH STREET MANHATTAN | Alteration | Permit Issued | 01/08/2026 | 11/09/2026 | Owner MATTHEW ADAM PROPERTIES Filer I & L CONSULTING, INC. | REMOVE AND INSTALL PLUMBING FIXTURES APT # 9N/10N , AS PER PLANS SUBMITTED HEREWITH. |
| M01431711 ↗ | 25 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 08/27/2026 | Owner THE LOVETT GROUP | Interior work related to the installation of an electric non-venting washer and dryer on the 5th floor in Apt 5G. The work includes General… |
| M01200747 ↗ | 160 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 04/29/2025 | 08/14/2026 | Design A2 ARCHITECT, PC Owner THE LOVETT GROUP Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2B ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01116685 ↗ | 300 WEST 108TH STREET MANHATTAN | Alteration | Permit Issued | 12/05/2024 | 07/02/2026 | Design BO LEE ARCHITECT PC | RENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTM… |
| M01187782 ↗ | 239 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/03/2025 | 06/01/2026 | Design ANDREW KATZ ENGINEERS Owner BROWN HARRIS STEVENS | STEEL REINFORCEMENT OF A STEEL COLUMN |
| M01327187 ↗ | 2109 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 05/15/2026 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 1120 ON THE 11TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01335242 ↗ | 103 EAST 75TH STREET MANHATTAN | Alteration | Permit Issued | 01/09/2026 | 04/16/2026 | Design Michael Davis Architects Owner Douglas Elliman Property Management Filer JAM CONSULTANTS, INC. | PLUMBING WORK FOR RENOVATION IN APARTMENT 4/5RE |
| B01105127 ↗ | 69 3RD STREET BROOKLYN | Alteration | Signed-off | 10/23/2024 | 04/08/2026 | Design RONALD NEMEC ARCHITECT PC Owner MAGIC TOUCH BKLYN LLC | COMBINATION OF APTS FILED UNDER TPPN 3/97. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01302597 ↗ | 310 WEST 72ND STREET MANHATTAN | Alteration | Signed-off | 10/17/2025 | 01/26/2026 | Filer MK EXP | REPLACEMENT OF EXISTING MINI-SPLIT UNITS AND ASSOCIATED CONDENSING UNITS, AND INSTALLATION OF NEWMINI-SPLIT SYSTEMS AND CONDENSING UNITS AS … |
| M01280752 ↗ | 325 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 10/24/2025 | Design Haynes Architecture PC | Proposed minor demolition within dwelling unit and proposed alterations to Unit # 122 on the 12th floor. New bedroom, walls, doors, kitchen … |
| M01172717 ↗ | 2 HORATIO STREET MANHATTAN | Alteration | Signed-off | 05/22/2025 | 08/13/2025 | Design MICHAEL A LABBE Filer I & L CONSULTING, INC. | Remove and install plumbing fixtures in apartment 10G, on 10th floor. as per plans submitted herewith. General const. filed under separat… |
| M01197229 ↗ | 370 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 04/11/2025 | 05/19/2025 | Design ANN KRSUL ARCHITECTURE, LLC Owner VallotKarp Consulting | Plumbing work filed in conjunction with the renovation of an existing dwelling unit as per plans. Architectural and mechanical work filed un… |
| M01116405 ↗ | 360 EAST 72ND STREET MANHATTAN | Alteration | Signed-off | 11/25/2024 | 04/14/2025 | Design MICHAEL A LABBE | REMOVE AND REPLACE PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. |
| M01027810 ↗ | 333 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/09/2024 | 04/01/2025 | Design EMTG CONSULTANTS INC Filer CODE LLC | THE SCOPE OF WORK CONSIST OF THE INSTALLATION OF THE NEW NATURAL GAS, SANITARY, SANITARY VENT, AND WATER DISTRIBUTION PIPING FOR THE RENOVAT… |
| M01062256 ↗ | 350 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 07/22/2024 | 08/22/2024 | Design GRAFEDE ARCHITECTURE, PLLC | remove existing bathroom: lav, tub and toilet as noted in the drawing. Install new bathroom: Lav, tub , and toilet as noted in the proposed … |
| M01055618 ↗ | 170 WEST 76TH STREET MANHATTAN | Alteration | Signed-off | 06/14/2024 | 07/22/2024 | Filer I & L CONSULTING, INC. | REPLACE AND RELOCATE NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RENOVATION OF UNIT 302/402 ON THE 3RD AND 4TH FLOOR . G.C. WAS FILED UNDE… |
| M00947785 ↗ | 7 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2023 | 02/22/2024 | Design RONALD NEMEC ARCHITECT PC Owner BROWN HARRIS STEVENS | PLUMBING FIXTURES IN 4CD FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00969295 ↗ | 875 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2023 | 01/05/2024 | Design Haynes Architecture PC | Proposed Plumbing work within unit 11B on the 11th floor. Replacement, relocation and proposed plumbing fixtures. No change to use, egress o… |
| M00643435 ↗ | 211 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 09/06/2022 | 12/05/2023 | Design CES ENGINEERING LLC Owner CPW TERRACE TRUST | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00760709 ↗ | 2150 BROADWAY MANHATTAN | Alteration | Signed-off | 06/27/2022 | 10/26/2023 | Design KIT MIDDLETON ARCHITECT P.C. | REPLACEMENT OF ONE-SHOWER, THREE-LAV, TWO-WC ONE-TUB, ONE-SINK-RES, ONE-DISHWASHER. REMOVAL OF ONE-COOKING EQUIP-RES. RELOCATION OF FOUR SPR… |
| B00505239 ↗ | 712 MONROE STREET BROOKLYN | Alteration | Signed-off | 05/04/2021 | 05/25/2023 | PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH | |
| M00783281 ↗ | 333 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/22/2023 | 05/04/2023 | Plumbing fixture work in apartment 71/72 at 7th floor. No change to use, egress or occupancy. | |
| M00853867 ↗ | 360 EAST 72ND STREET MANHATTAN | Alteration | Signed-off | 04/18/2023 | 05/01/2023 | Design S.M. BERGER ARCHITECTURE PC Filer JAM CONSULTANTS, INC. | PLUMBING WORK ASSOCIATED WITH APT COMBINATION of 1104 and 1105 AS PER PLANS FILED HEREWITH. |
| M08054754 ↗ | 644 BROADWAY MANHATTAN | Alteration | Signed-off | 02/15/2023 | 04/11/2023 | Design RONALD NEMEC ARCHITECT PC | PLUMBING FIXTURES IN APT 8W FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M08052582 ↗ | 7 WEST 92ND STREET MANHATTAN | Alteration | Signed-off | 12/29/2022 | 03/21/2023 | Owner AKAM ASSOCIATES, INC. | Plumbing work at 2nd floor apartment #25 to accommodate renovation. No change to use egress or occupancy. |
| M07995791 ↗ | 500 GRAND STREET MANHATTAN | Alteration | Signed-off | 12/16/2022 | 01/25/2023 | Design RONALD NEMEC ARCHITECT PC Owner AKAM ASSOCIATES, INC. | PLUMBING FIXTURES IN BUILDING A APT 9A. NO CHANGE TO USE, OCCUPANCT OR EGRESS |
| M00580446 ↗ | 175 WEST 73RD STREET MANHATTAN | Alteration | Signed-off | 01/05/2022 | 10/06/2022 | Design RONALD NEMEC ARCHITECT PC Owner HOFFMAN MANAGEMENT | PLUMBING FIXTURES IN APT 5G FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00701693 ↗ | 470 WEST 24TH STREET MANHATTAN | Alteration | Signed-off | 05/06/2022 | 09/01/2022 | Design M.B. ARCHITECTURAL DESIGN Filer SEVERINO ASSOCIATES, INC | Plumbing Work as per Construction Drawings. |
| M00608396 ↗ | 1155 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2021 | 05/04/2022 | Design AURA ARCHITECTURE D.P.C. Filer ADAM MAISER | Installation and modification of plumbing fixtures at existing residence 6N on floor 007. Plumbing work. there is to be no change of use, oc… |
| M00670455 ↗ | 77 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 04/06/2022 | Design RONALD NEMEC ARCHITECT PC | PLUMBING FIXTURES AND COMBINATION OF APTS W211 & 212 FILED UNDER TPPN3/97 IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGR… |
| B00522750 ↗ | 104 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 07/06/2021 | 03/28/2022 | Design POVERO and COMPANY | PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00498242 ↗ | 930 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2021 | 03/28/2022 | Design CES ENGINEERING LLC | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00549399 ↗ | 46 WEST 71ST STREET MANHATTAN | Alteration | Signed-off | 07/26/2021 | 03/28/2022 | Design BO LEE ARCHITECT PC | REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH RENOVATION OF MULTI-DWELLING COOPERATIVE DWELLING AS SHOWN ON … |
| M00552086 ↗ | 1199 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2021 | 03/28/2022 | Design GEIGER ENGINEERING, PC Owner BROWN HARRIS STEVENS Filer I & L CONSULTING, INC. | INSTALL, REPLACE AND RELOCATE PLUMBING FIXTURES IN APARTMENT 18D ON THE 18 FLOOR. IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER AP… |
| M00566545 ↗ | 1 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 01/05/2022 | 03/28/2022 | Design KENDALL ENGINEERING PC Filer BOYD CONSULTING, INC | Filing plumbing work in conjunction with interior renovation application. No change to use, egress or occupancy |
| M00623134 ↗ | 201 WEST 70TH STREET MANHATTAN | Alteration | Signed-off | 11/02/2021 | 03/28/2022 | Design ERIC WORCESTER ARCHITECT | REPLACE SINK, REMOVE AND CAP GAS STOVE. |
| X00378841 ↗ | 5511 FIELDSTON ROAD BRONX | Alteration | Signed-off | 08/03/2020 | 03/28/2022 | Filer CODE LLC | Minor renovation of existing two-family home on the 1st and 2nd floors. Plumbing work. No change in use, occupancy or egress. |