← Back
Office with commercial, 7-19 stories
1 WEST 37 STREET
MANHATTAN · BIN 1015969
💬 Discuss this project
1912Year Built
13Stories
O6Building Class
M1-9A/R12Zoning
63,433 sfGross Floor Area
9Units
LL97 Covered2 Open Violations ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: ESSILORLUXOTTICA USA INC. · 4,938 sf lot · 12.85 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof1p · 1 filing · 3 docs
Floor 112p · 1 filing · 8 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEXTORE1404/09/2026
ESSILORLUXOTTICA USA INC.103/22/2026
LUXOTTICA U S HOLDINGS4903/22/2026
DWECK ASSOC.203/22/2026
DWECK 37TH ST ASSOCIATION103/22/2026
LUXOTTICA303/22/2026
1 W 37 LLC103/22/2026
1 WEST 37TH LLC303/21/2026
1 W 37TH1403/21/2026
1 W 37TH ST403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2016$73.0M—1W37TH LLC → LUXOTTICA U.S. HOLDINGS CORP.$1,151/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS103/31/2025
SALVATOR A. CARADONNA JR.211/17/2022
SILMAN109/15/2021
MG ENGINEERING D.P.C.208/12/2021
WILLIAM F. RYAN, JR. P.E. PC210/29/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC603/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
BURNHAM NATIONWIDE INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GARY BLANKOPHElectrical303/21/2026
NATIONAL MAINTENANCEScaffold207/08/2026
FIT FABRICATIONElectrical103/21/2026
IDEAL ELEC & HVAC CO INCElectrical103/22/2026
JOHN MILIOTIElectrical103/21/2026
JOSEPH VITALEElectrical103/21/2026
COGEN ELEC'L SERVICES,INCElectrical103/22/2026
LAWRENCE J. LEVINEFire Protection103/21/2026
METRO FIRE PROTECTION INCFire Protection107/08/2026
20/20 GENERAL CONTRACTINGGeneral Contractor104/09/2026
BACKUS GROUP LLCGeneral Contractor104/09/2026
JCT DEVELOPMENT NY INCGeneral Contractor104/09/2026
VITALE, JOSEPHElectrical103/21/2026
DORKIN, MARTINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123103/31/2025
Z & T ENGINEERING, P.C.591109/15/2021
AK ENGINEERING PC678208/12/2021
Building Lifecycle
All (106)Filed (8)Permit Issued (6)Signed Off (5)Facade (FISP) (15)Violation (60)Inspection (1)Special Inspection (11)
05/16/2025
Signed off — Alteration
M01185049-I1
04/22/2025
Permit issued — General Construction
M01185049-I1-GC
03/31/2025
Filed — Alteration
M01185049-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/2023
Violation issued (FDNY_NOV, closed)
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2023
Signed off — Alteration
M08040426-I1
01/13/2023
Violation issued (FDNY_NOV, closed)
11/29/2022
Permit issued — Sign
M08040426-I1-SG
11/17/2022
Filed — Alteration
M08040426-I1
11/15/2022
Signed off — Alteration
ERECT (1) NON-ILLUMINATED WALL SIGN ON 2ND FLOOR. ERECT D/F ILLUMINATED BLADE SIGN ON 1ST & 2ND FLS. SIGNS ARE ACCESSORY TO LUXOTTICA. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00183781-I1
06/28/2022
Signed off — Alteration
Sprinkler Modification of existing sprinkler system for floors 4, 6-11 AS PER DRAWINGS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M00541219-I1
02/10/2022
Cycle 9 facade report submitted
02/08/2022
Cycle 9 facade report signed — SAFE
01/13/2022
Cycle 9 facade inspection completed
11/16/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2021
Filed — Alteration
Related structural support for roof dunnage and outdoor accessory office space as per drawings filed herewith. No changes to use, egress or occupancy.
M00217885-I1
08/15/2021
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/12/2021
Filed — Alteration
Sprinkler Modification of existing sprinkler system for floors 4, 6-11 AS PER DRAWINGS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M00541219-P1
08/04/2021
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/30/2021
Permit issued — Sprinklers
M00541219-I1-EW-SP
07/23/2021
Filed — Alteration
Sprinkler Modification of existing sprinkler system for floors 4, 6-11 AS PER DRAWINGS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M00541219-I1
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2021
Violation issued (FDNY_NOV, closed)
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2020
Permit issued — Construction Fence
M00420848-I1-FN
10/29/2020
Filed — Alteration
Installation of exterior storefront construction barricade. No Change to Use, Occupancy Group, or Egress.
M00420848-I1
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2020
Signed off — Alteration
M00341098-I1
04/16/2020
Permit issued — Construction Fence
M00341098-I1-FN
04/10/2020
Filed — Alteration
M00341098-I1
02/03/2020
Special inspection requirement — Masonry
Fei Zeng
12/09/2019
Violation issued (ECB, closed)
Construction
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/27/2019
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
08/27/2019
Special inspection requirement — Structural Steel - Details
Fei Zeng
08/27/2019
Special inspection requirement — Structural Steel - Welding
Fei Zeng
08/27/2019
Special inspection requirement — Final
Fei Zeng
08/27/2019
Special inspection requirement — Structural Steel - High Strength Bolting
Fei Zeng
08/27/2019
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
08/27/2019
Special inspection requirement — Post-installed Anchors
Fei Zeng
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/02/2019
Permit issued — Sign
M00183781-I1-SG
06/25/2019
Filed — Alteration
ERECT (1) NON-ILLUMINATED WALL SIGN ON 2ND FLOOR. ERECT D/F ILLUMINATED BLADE SIGN ON 1ST & 2ND FLS. SIGNS ARE ACCESSORY TO LUXOTTICA. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00183781-I1
06/21/2019
Special inspection requirement — Final
SALVATOR CARADONNA
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2018
Violation issued (ECB, closed)
Construction
10/26/2018
Violation issued (ECB, closed)
Elevators
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2017
Cycle 8 facade report submitted
05/15/2017
Cycle 8 facade report signed — SWARMP
05/11/2017
Cycle 8 facade inspection completed
05/04/2017
Violation issued (FDNY_NOV, closed)
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2017
Cycle 8 facade report submitted
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBACKUS GROUP04/22/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC11/29/2022
DOB NOWSprinklersSigned-offMETRO FIRE PROTECTION INC07/30/2021
DOB NOWConstruction FencePermit Issued20/20 GENERAL CONTRACTING10/30/2020
DOB NOWConstruction FenceSigned-offJCT DEVELOPMENT NY INC04/16/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC07/02/2019
BISPLISSUEDPAR PLUMBING CO., INC02/23/2023
BISPLISSUEDPAR PLUMBING CO., INC02/23/2023
BISOTISSUEDSCHIMENTI CONSTRUCTION CO06/29/2021
BISOTISSUEDSCHIMENTI CONSTRUCTION CO06/29/2021
BISOTISSUEDSCHIMENTI CONSTRUCTION CO06/15/2020
BIS—ISSUEDUNITY CONSTRUCTION GROUP03/03/2020
BISPLISSUEDLCS PLUMBING&CONSULT INC02/04/2020
BISPLISSUEDLCS PLUMBING&CONSULT INC02/04/2020
BISOTISSUEDUNITY CONSTRUCTION GROUP06/11/2019
BISMHISSUEDUNITY CONSTRUCTION GROUP06/11/2019
BISEQISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISMHISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISMHISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISMHISSUEDUNITY CONSTRUCTION GROUP06/10/2019
BISSPISSUEDMETRO FIRE PROTECTION INC01/24/2019
BISPLISSUEDLCS PLUMBING&CONSULT INC01/11/2019
BISMHISSUEDUNITY CONSTRUCTION GROUP01/08/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP01/08/2019
BISOTISSUEDUNITY CONSTRUCTION GROUP12/06/2018
BISMHISSUEDUNITY CONSTRUCTION GROUP12/06/2018
BISPLISSUEDAWS MECHANICAL II LLC10/24/2018
BISOTISSUEDUNITY CONSTRUCTION GROUP06/15/2018
BISOTISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISOTISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISEQISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISOTISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISMHISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISMHISSUEDUNITY CONSTRUCTION GROUP06/12/2018
BISMHISSUEDCONSTRUCTION ONE INC05/30/2018
BISOTISSUEDCONSTRUCTION ONE INC05/30/2018
BISMHISSUEDCONSTRUCTION ONE INC05/30/2018
+ 16 more permits on file
7 projects · most recent 12/13/2023
General Wiring Lighting
FiledStatusContractorScope
12/13/2023Permit IssuedRAINBOW ELECTRIC CO., INCGeneral Wiring
07/03/2019CompleteROBERT S. COVELLO—
04/18/2019Permit IssuedIDEAL ELEC & HVAC CO INCGeneral Wiring
10/03/2018Permit IssuedIDEAL ELEC & HVAC CO INCGeneral Wiring
05/09/2018Permit IssuedIDEAL ELEC & HVAC CO INCLighting
02/09/2018Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
02/06/2018Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
1 project · most recent 09/15/2021
Steel
FiledStatusContractorScope
09/15/2021——Steel
1 project · most recent 10/29/2020
Fence
FiledStatusContractorScope
10/29/2020Permit Issued20/20 GENERAL CONTRACTINGFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/16/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/15/2021Sprinkler SystemsAri Kamospecial
08/04/2021Sprinkler SystemsAri Kamospecial
02/03/2020MasonryFei Zengspecial
08/27/2019Structural Stability – Alterations of existing buildingsFei Zengspecial
08/27/2019Structural Steel - DetailsFei Zengspecial
08/27/2019Structural Steel - WeldingFei Zengspecial
08/27/2019FinalFei Zengprogress
08/27/2019Structural Steel - High Strength BoltingFei Zengspecial
08/27/2019Concrete - Cast-In-PlaceFei Zengspecial
08/27/2019Post-installed AnchorsFei Zengspecial
06/21/2019FinalSALVATOR CARADONNAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
LuxotticaRetailFloor 1
Project M00183781 Alteration · LOC Issued · 06/25/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 827 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
09/03/2026M00541219-P1Request digital key ↗
09/03/2026M00541219-I1Request digital key ↗
09/01/2026M08040426-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00341098-I1Request digital key ↗
09/04/2026M00420848-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00183781-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00217885-I1Request digital key ↗
▸Applications & Permits200
▸BISPLAN / WORK APPROVAL APPLICATION108
03/17/2023122185492Open ↗
02/09/2023123234687Open ↗
02/09/2023123234678Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION92
02/24/2023123234678Open ↗
02/24/2023123234687Open ↗
02/17/2023123234678Open ↗
Showing 3 of 92 on file for this type
▸Seals & Professional Certifications136
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
06/25/2021122734871Open ↗
03/11/2020122738582Open ↗
02/24/2020121841622Open ↗
Showing 3 of 72 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
12/03/2019123410914Open ↗
Showing 1 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
12/02/2020122734871Open ↗
12/03/2019123410914Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00183781-I1Open ↗
09/05/2026M00341098-I1Open ↗
09/03/2026M00541219-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00541219-I1Open ↗
08/24/2026M00541219-P1Open ↗
08/23/2026M00217885-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00183781-I1Open ↗
08/23/2026M00217885-I1Open ↗
▸Trade Schedules & Equipment87
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISEQUIPMENT USE PERMITS29
03/27/2023123234687Open ↗
03/27/2023123234687Open ↗
03/27/2023123234687Open ↗
Showing 3 of 29 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
03/27/2023123234687Open ↗
03/27/2023123234687Open ↗
03/27/2023123234678Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
02/27/2020123299867Open ↗
Showing 1 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
12/13/2022123234678Open ↗
02/04/2022122734871Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
12/13/2022123234678Open ↗
02/04/2022122734871Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos42
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00183781-I1Open ↗
09/03/2026M00541219-I1Open ↗
09/03/2026M00541219-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/03/2019123410914Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00217885-I1Open ↗
▸Energy Compliance68
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
12/19/2019123410914Open ↗
12/19/2019123410914Open ↗
Showing 2 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/23/2023123234678Open ↗
03/23/2023123234687Open ↗
03/23/2023122185492Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
01/10/2022122239274Open ↗
01/10/2022122239274Open ↗
11/23/2021123410914Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
02/04/2022122734871Open ↗
11/23/2021123410914Open ↗
11/22/2021123355207Open ↗
Showing 3 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER4
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/07/2022122734871Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING CONTROLS4
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/07/2022122734871Open ↗
Showing 3 of 4 on file for this type
▸BIS* HVAC INSULATION AND SEALING3
12/27/2022123234678Open ↗
12/13/2022123234687Open ↗
02/04/2022122734871Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION3
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/04/2022122734871Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/13/2022123234687Open ↗
12/13/2022122185492Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/13/2022122185492Open ↗
▸BISFENESTRATION AREAS1
12/13/2022122185492Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/13/2022122185492Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/13/2022122185492Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY24
03/23/2023123234678Open ↗
03/23/2023123234687Open ↗
01/10/2022122239274Open ↗
Showing 3 of 24 on file for this type
▸BISMECHANICAL SYSTEMS3
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/04/2022122734871Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/04/2022123410914Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
12/13/2022123234687Open ↗
12/13/2022122185492Open ↗
12/13/2022123234678Open ↗
▸BIS* EXIT SIGNS1
02/07/2022122734871Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/13/2022123234687Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
02/04/2022123410914Open ↗
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
03/24/2023123234687Open ↗
03/23/2023123234678Open ↗
02/08/2022122734871Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER7
02/24/2023123234678Open ↗
02/24/2023123234687Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL4
03/23/2023123234678Open ↗
03/23/2023123234687Open ↗
02/04/2022123410914Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership58
▸BISCOST AFFIDAVIT51
03/23/2023123234678Open ↗
03/23/2023123234687Open ↗
03/23/2023122185492Open ↗
Showing 3 of 51 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
02/08/2022122734871Open ↗
11/23/2021123410914Open ↗
11/22/2021123355207Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms115
▸BISADDITIONAL INFORMATION42
01/07/2022122239274Open ↗
01/07/2022122239274Open ↗
01/15/2021122239274Open ↗
Showing 3 of 42 on file for this type
▸BISBOROUGH INTAKE FORM36
02/24/2023123234678Open ↗
02/24/2023123234687Open ↗
02/17/2023123234687Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING COVER SHEET33
12/03/2019123410914Open ↗
Showing 1 of 33 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents6
▸BISMAINTENANCE INFORMATION3
12/13/2022123234687Open ↗
12/13/2022123234678Open ↗
02/07/2022122734871Open ↗
▸BISSHUTOFF DAMPERS2
12/13/2022123234678Open ↗
02/04/2022122734871Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type