← Back
BuildNYC
Elevator cooperative
The Dakota
1 WEST 72ND STREET · BIN 1028637
💬 Discuss this project
1884Year Built
9.5Stories
D4Building Class
R10AZoning
309,608 sfGross Floor Area
83Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: Dakota Inc (the) · 40,866 sf lot · 7.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installation4 filings
RoofNew chimney liner for existing wood burning fireplaceUnder Construction7p · 7 filings · 20 docs
PenthouseUnit PHCUnder Construction6p · 3 filings · 20 docs
Floor 10Under Construction1p · 1 filing · 20 docs
Floor 9Interior partition and demolition workUnder Construction3 filings · 20 docs
Floor 88th floor partition construction3p · 3 filings
Floor 7Unit 7A, Unit 7B8p · 3 filings · 5 docs
Floor 6System scaffold work platformUnder Construction3p · 3 filings · 12 docs
Floor 51 filing · 6 docs
Floor 4Mechanical piping and HVAC controlsUnder Construction4p · 3 filings · 20 docs
Floor 3Tavistock Trust, LLCUnder Construction8p · 4 filings · 4 docs
Floor 22p · 1 filing
Floor 11p · 1 filing
BasementAguirre-Sacasa/Stiff Storage5p · 2 filings · 20 docs
Sub-BasementAguirre-Sacasa/Stiff Storage1 filing
Site & exteriorFacade repairs and brickwork4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Dakota25803/22/2026
Tavistock Trust3107/08/2026
Dekota Realty203/21/2026
Brown, Harris, Stevens103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Agouti Construction Consulting3903/21/2026
Maryclare Nepogoda403/21/2026
Burnham Nationwide703/21/2026
MK Associates2403/21/2026
AE Design Solution1603/21/2026
J A Expediting1003/21/2026
Socotec103/21/2026
J.A.M. Associates603/21/2026
JM Zoning203/21/2026
Expedition NYC203/21/2026
Code1203/21/2026
Expedia Building Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Traditional LineGeneral Contractor2810/04/2026
V. Disalvo Contracting CoGeneral Contractor1707/08/2026
Nova Construction ServiceScaffold1307/08/2026
Lma GroupGeneral Contractor807/08/2026
Nova Construction ServiceGeneral Contractor507/08/2026
S&H PlumbingPlumbing507/08/2026
C-Squared ContractingGeneral Contractor407/08/2026
Alklem PlumbingPlumbing407/08/2026
Walter J.grande P & HPlumbing407/08/2026
Donato PlumbingPlumbing307/08/2026
Melville Heating & Air CondGeneral Contractor303/21/2026
The Metro GroupGeneral Contractor303/21/2026
N-Marseni ContractingGeneral Contractor207/08/2026
HI-Tech Wiring Electrical ServicesElectrical203/22/2026
K & G Electric CoElectrical203/21/2026
The Metro Group ElectricElectrical203/21/2026
Attractive Lighting ElectricalElectrical203/22/2026
Vlora Design & BuildersGeneral Contractor204/09/2026
Perfectaire CoGeneral Contractor104/09/2026
Scordio ConstructionGeneral Contractor107/19/2026
Flue TechGeneral Contractor107/25/2026
Allied ArborcraftGeneral Contractor107/08/2026
Warren Ostroff ElectricElectrical103/21/2026
APEX+B ElectricalElectrical103/21/2026
King Hoist & ScaffoldingScaffold107/08/2026
Etech ElectricalElectrical103/21/2026
R-2 ElectricElectrical103/22/2026
Associated MechanicalPlumbing107/08/2026
Hampton ElectricalElectrical103/21/2026
Nice PlumbingPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Banner ElectricElectrical103/22/2026
Linden Marshall ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Prof. Engineering9709308/19/2026
Thomas A. Fenniman Architects260307/24/2026
New Age Engineering7746107/14/2026
H. A. Bader Consultants2332105/14/2026
Thornton Tomasetti5418104/22/2026
Bwarchitects3914311/14/2025
Group-S5216508/20/2025
Integrity Consulting Service666207/08/2025
Vincent J. Liotta P. E1974206/16/2025
ADS Special Inspections1270404/07/2025
IP Group2542603/12/2025
Charles G Michel Engineering2871112/13/2024
Beasley Chin & Hunderman1238510/16/2024
Eugene Khananov Architect2816210/09/2024
Jack Green Associates422505/15/2024
Esnyc Consulting4099205/14/2024
CES Engineering1277204/23/2024
New York Engineering Associates851104/04/2024
Autographic Co1579311/08/2023
Chen Engineering Services1826102/23/2022
MK Architecture476202/13/2022
Certified Testing Laborat396610/12/2021
Building Lifecycle
All (300)Filed (70)Permit Issued (71)Signed Off (40)Facade (FISP) (1)Violation (5)Inspection (29)Objection (54)Special Inspection (30)
09/17/2026
Permit issued — Mechanical Systems
M01296946-S2-MS
09/08/2026
Objection resolved — Addressed
09/03/2026
Permit issued — General Construction
M00977737-I1-GC
09/03/2026
Permit issued — Mechanical Systems
M00977737-S1-MS
09/02/2026
Objection raised — Scope
08/25/2026
Signed off — Alteration
Interior structural modifications related to apartment renovations, including new lintels and localized brick/masonry repairs, as per plans filed herewith. No change in use, egress or occupancy.
M01296946-S5
08/19/2026
Filed — Alteration
Provide new Mitsubishi air conditioning system indoor equipment and reconnect to existing distribution ductwork for apartment cooling. Outdoor unit work is being conducted under a separate application.
M01425757-I1
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Nixon
08/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
Eric Nixon
08/18/2026
Special inspection requirement — Maintenance information
Eric Nixon
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Eric Nixon
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Eric Nixon
07/24/2026
Filed — Alteration
INSTALLATION OF NEW SAFETY RAILING AT ROOF LEVEL AND ASSOCIATED ROOF COVERING REPLACEMENT. NO CHANGE TO USE, EGRESS, OCCUPANCY OR BULK.
M01420496-I1
07/23/2026
Permit issued — General Construction
M01368173-I1-GC-CX
07/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/23/2026
Special inspection requirement — Post-installed Anchors
Thomas Fenniman
07/17/2026
Permit issued — Mechanical Systems
M01424850-I1-MS
07/14/2026
Filed — Alteration
INSTALL NEW CHIMNEY LINER FOR EXISTING WOOD BURNING FIREPLACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01368173-I1
07/09/2026
Filed — Alteration
Provide central air-conditioning system and humidification for the apartment. #67
M01424850-I1
07/02/2026
Special inspection requirement — Mechanical Systems
Eric Nixon
07/02/2026
Special inspection requirement — Post-installed Anchors
Eric Nixon
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Nixon
07/02/2026
Special inspection requirement — Final
Eric Nixon
07/01/2026
Special inspection requirement — Maintenance information
Eric Nixon
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Eric Nixon
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Eric Nixon
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Nixon
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Nixon
07/01/2026
Special inspection requirement — Permanent certificate
Eric Nixon
06/30/2026
Special inspection requirement — Mechanical Systems
Eric Nixon
06/30/2026
Special inspection requirement — Final
Eric Nixon
06/22/2026
Special inspection requirement — Final
Thomas Fenniman
06/03/2026
Objection resolved — Addressed
06/02/2026
Filed — Alteration
INSTALLATION OF (1) 12 TON MITSUBISHI CONDENSING UNIT ON PREFAB CURB RAILS.
M01381837-I1
06/01/2026
Signed off — Alteration
EXTERIOR FACADE REPAIRS & MAINTENANCE INCLUDING ROOF LEVEL BULKHEADS & CHIMNEYS AND AIRSHAFT WALLS.
M01025731-I1
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2026
Permit issued — General Construction
M01395372-I1-GC
05/28/2026
Objection raised — Other
05/14/2026
Filed — Alteration
Minor interior renovation to apartment #PHC. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M01395372-I1
05/05/2026
Permit issued — Structural
M01296946-S5-ST
05/01/2026
Filed — Alteration
INSTALLATION OF (2) 12 TON MITSUBISHI CONDENSING UNIT ON PREFAB CURB RAILS.
M01381846-I1
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
04/30/2026
Special inspection requirement — Final
Christian Ricci
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Christian Ricci
04/22/2026
Filed — Alteration
Interior structural modifications related to apartment renovations, including new lintels and localized brick/masonry repairs, as per plans filed herewith. No change in use, egress or occupancy.
M01296946-S5
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/15/2026
Special inspection requirement — Maintenance information
04/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/15/2026
Special inspection requirement — Maintenance information
04/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01085938-I1
04/01/2026
Signed off — Alteration
INSTALL OF TWO (2) NEW BOILERS WITH NATURAL GAS BURNERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01025161-S2
04/01/2026
Signed off — Alteration
INSTALL OF TWO (2) NEW BOILERS WITH NATURAL GAS BURNERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01025161-S1
04/01/2026
Signed off — Alteration
INSTALL OF TWO (2) NEW BOILERS WITH NATURAL GAS BURNERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01025161-I1
03/09/2026
Signed off — Alteration
Installation of a convenience door between dwelling units 71 & 72 as per plans filed herewith. No change to use egress or occupancy.
M01063031-I1
02/04/2026
Signed off — Alteration
ALTERATION OF (2) BATHROOMS IN APARTMENT 51 AS PER PLANS. RELATED PLUMBING WORK AS PER PLANS.
M00960811-I1
01/20/2026
Permit issued — General Construction
M01063031-I1-GC
12/10/2025
Signed off — Alteration
M01085936-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTraditional Line09/17/2026
DOB NOWGeneral ConstructionPermit IssuedTraditional Line09/03/2026
DOB NOWMechanical SystemsPermit IssuedTraditional Line09/03/2026
DOB NOWGeneral ConstructionPermit IssuedFlue Tech07/23/2026
DOB NOWMechanical SystemsPermit IssuedScordio Construction07/17/2026
DOB NOWGeneral ConstructionPermit IssuedN-Marseni Contracting05/28/2026
DOB NOWStructuralSigned-offTraditional Line05/05/2026
DOB NOWGeneral ConstructionSigned-offV. Disalvo Contracting Co01/20/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing12/04/2025
DOB NOWGeneral ConstructionPermit IssuedTraditional Line11/19/2025
DOB NOWMechanical SystemsSigned-offPerfectaire Co10/17/2025
DOB NOWGeneral ConstructionSigned-offVlora Design & Builders09/24/2025
DOB NOWMechanical SystemsPermit IssuedTraditional Line09/08/2025
DOB NOWGeneral ConstructionPermit IssuedTraditional Line09/08/2025
DOB NOWStructuralSigned-offTraditional Line09/08/2025
DOB NOWSupported ScaffoldSigned-offNova Construction Service08/21/2025
DOB NOWGeneral ConstructionSigned-offNova Construction Service08/18/2025
DOB NOWSidewalk ShedSigned-offNova Construction Service08/06/2025
DOB NOWGeneral ConstructionSigned-offV. Disalvo Contracting Co03/26/2025
DOB NOWBoiler EquipmentSigned-offAlklem Plumbing03/10/2025
DOB NOWPlumbingSigned-offAlklem Plumbing03/07/2025
DOB NOWMechanical SystemsPermit IssuedMelville Heating & Air Cond02/25/2025
DOB NOWPlumbingSigned-offP.S.I. Mechanical02/07/2025
DOB NOWGeneral ConstructionSigned-offN-Marseni Contracting02/06/2025
DOB NOWPlumbingSigned-offWalter J.grande P & H12/04/2024
DOB NOWPlumbingSigned-offS&H Plumbing11/27/2024
DOB NOWMechanical SystemsSigned-offV. Disalvo Contracting Co11/20/2024
DOB NOWGeneral ConstructionSigned-offV. Disalvo Contracting Co11/18/2024
DOB NOWStructuralSigned-offTraditional Line10/01/2024
DOB NOWMechanical SystemsPermit IssuedTraditional Line10/01/2024
DOB NOWGeneral ConstructionPermit IssuedTraditional Line10/01/2024
DOB NOWGeneral ConstructionSigned-offVlora Design & Builders09/23/2024
DOB NOWSupported ScaffoldSigned-offNova Construction Service09/20/2024
DOB NOWGeneral ConstructionSigned-offNova Construction Service09/17/2024
DOB NOWSidewalk ShedSigned-offNova Construction Service08/13/2024
DOB NOWGeneral ConstructionSigned-offThe Metro Group05/13/2024
DOB NOWStructuralSigned-offV. Disalvo Contracting Co05/13/2024
DOB NOWPlumbingSigned-offAlklem Plumbing04/25/2024
DOB NOWBoiler EquipmentSigned-offAlklem Plumbing04/25/2024
DOB NOWGeneral ConstructionSigned-offV. Disalvo Contracting Co04/04/2024
+ 60 more permits on file
6 projects · most recent 08/19/2026
Others Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026——Others
Other
Mitsubishi Electric PVFY-P30NAMU-E1 30,000 BTU · Vrf Indoor ×2
PVFY-P36NAMU-E1 36,000 BTU · Vrf Indoor ×1
PVFY-P54NAMU-E1 54,000 BTU · Vrf Indoor ×1
07/14/2026Permit IssuedFlue TechOthers
Other
Lifetime Chimney Supply RWV 1 BTU · Chimney ×1
07/09/2026Permit IssuedScordio ConstructionOthers
Other
Mitsubishi Electric PVFY-P18NAMU-E1 18,000 BTU · Vrf Indoor ×2
PVFY-P24NAMU-E1 24,000 BTU · Vrf Indoor ×1
PVFY-P27NAMU-E4 27,000 BTU · Vrf Indoor ×1
PVFY-P30NAMU-E1 30,000 BTU · Vrf Indoor ×1
06/02/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric CITYMULTY PUHY-EP144TNU-A(-BS) 160,000 BTU · Vrf Outdoor ×1
05/01/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric CITYMULTY PUHY-EP144TNU-A(-BS) 160,000 BTU · Vrf Outdoor ×2
12/18/2024Permit IssuedMelville Heating & Air CondAir Conditioning Systems
Cooling
Task TGC021TWEC-30K-3024 29,900 BTU · Condensing Unit ×2
2 projects · most recent 04/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2026Permit IssuedDonato PlumbingGas, Water/Sanitary
12/18/2024Signed-offP.S.I. MechanicalGas, Water/Sanitary
25 projects · most recent 10/06/2026
General Wiring Boiler Controls
FiledStatusContractorScope
10/06/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
09/10/2026CompleteR-2 ElectricGeneral Wiring
06/25/2026Permit IssuedMWB ElectricGeneral Wiring
02/17/2026Permit IssuedEtech ElectricalGeneral Wiring
02/12/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
12/18/2025Permit IssuedThe Metro Group ElectricGeneral Wiring
12/03/2025Permit IssuedR-2 ElectricGeneral Wiring
09/11/2025CompleteMaximum ElectricBoiler Controls
04/24/2025CompleteEtech ElectricalGeneral Wiring
04/18/2025CompleteThe Metro Group ElectricGeneral Wiring
02/05/2025CompleteAttractive Lighting ElectricalGeneral Wiring
02/05/2025CompleteAttractive Lighting Electrical—
12/10/2024CompleteAttractive Lighting Electrical—
06/05/2024CompleteThe Metro Group ElectricGeneral Wiring
04/23/2024CompleteKopp ElectricGeneral Wiring
2 projects · most recent 04/22/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/22/2026Permit IssuedTraditional LineSteel, Concrete, Masonry
04/07/2025Permit IssuedTraditional LineSteel
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/18/2026HVAC-R and service water heating equipmentEric Nixonenergy_progress
08/18/2026Duct leakage testing, insulation and designEric Nixonenergy_progress
08/18/2026HVAC-R and service water piping design and insulationEric Nixonenergy_progress
08/18/2026HVAC-R and service water heating system controlsEric Nixonenergy_progress
08/18/2026Maintenance informationEric Nixonenergy_progress
07/23/2026Post-installed AnchorsThomas Fennimanspecial
07/23/2026Tenant Protection Plan Compliance—special
07/02/2026FinalEric Nixonprogress
07/02/2026Fire-Resistant Penetrations and JointsEric Nixonspecial
07/02/2026Post-installed AnchorsEric Nixonspecial
07/02/2026Mechanical SystemsEric Nixonspecial
07/01/2026HVAC-R and service water heating equipmentEric Nixonenergy_progress
07/01/2026HVAC-R and service water piping design and insulationEric Nixonenergy_progress
07/01/2026Permanent certificateEric Nixonenergy_progress
07/01/2026Maintenance informationEric Nixonenergy_progress
07/01/2026Energy Code Compliance InspectionsEric Nixonprogress
07/01/2026HVAC-R and service water heating system controlsEric Nixonenergy_progress
06/30/2026Mechanical SystemsEric Nixonspecial
06/30/2026FinalEric Nixonprogress
06/22/2026FinalThomas Fennimanprogress
04/30/2026FinalChristian Ricciprogress
04/30/2026Energy Code Compliance InspectionsChristian Ricciprogress
04/30/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
04/20/2026HVAC-R and service water piping design and insulation—energy_progress
04/20/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 150.
▾Documents — 1,831 on file (BIS + DOB NOW)
▸Plans & Drawings83
▸DOB NOWPlans/Sketch78
09/03/2026M00532403-I1Request digital key ↗
09/03/2026M00533736-I1Request digital key ↗
09/03/2026M00533736-P1Request digital key ↗
Showing 3 of 78 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00253864-P1Request digital key ↗
09/05/2026M00303158-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00175328-I1Request digital key ↗
▸Applications & Permits400
▸BISWORK PERMIT APPLICATION178
11/20/2024104236783Open ↗
10/22/2019123814989Open ↗
Showing 2 of 178 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION147
12/06/2024104236783Open ↗
12/04/2024104236783Open ↗
09/25/2024123015316Open ↗
Showing 3 of 147 on file for this type
▸DOB NOWLPC Approval/Permit74
09/02/2026M00652742-S1Open ↗
09/01/2026M00647344-I1Open ↗
09/01/2026M00647344-S3Open ↗
Showing 3 of 74 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications467
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION180
03/25/2020122794486Open ↗
03/25/2020122794486Open ↗
12/09/2019122794486Open ↗
Showing 3 of 180 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature85
09/05/2026M00253864-I1Open ↗
09/03/2026M00532403-I1Open ↗
09/03/2026M00559440-I1Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature75
09/23/2026M01025161-S2Open ↗
09/19/2026M00710144-I1Open ↗
09/19/2026M00652742-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWProgress Inspector Seal & Signature66
09/23/2026M01025161-S2Open ↗
09/19/2026M00710144-I1Open ↗
09/19/2026M00652742-I1Open ↗
Showing 3 of 66 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment129
▸BISSELF-CERT PLUMBING NOTICE34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISEQUIPMENT USE PERMITS29
10/01/2025140384297Open ↗
05/20/2025121951619Open ↗
05/20/2025121951619Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
09/27/2019123253843Open ↗
Showing 1 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
05/20/2025121951619Open ↗
05/20/2025121951619Open ↗
06/26/2024123104050Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes18
08/30/2019123814989Open ↗
Showing 1 of 18 on file for this type
▸DOB NOWTenant Protection Plan5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos123
▸DOB NOWDEP ACP-5: Asbestos Assessment Report71
09/03/2026M00532403-I1Open ↗
09/03/2026M00559440-P1Open ↗
09/03/2026M00559440-I1Open ↗
Showing 3 of 71 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)37
08/30/2019123814989Open ↗
Showing 1 of 37 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026M01025731-I1Open ↗
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/07/2021140836665Open ↗
Showing 1 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/01/2025140384297Open ↗
04/09/2021140836665Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY23
12/04/2024104236783Open ↗
05/29/2024121027441Open ↗
05/29/2024121027441Open ↗
Showing 3 of 23 on file for this type
▸BISMECHANICAL SYSTEMS4
10/01/2025140384297Open ↗
09/20/2024120632422Open ↗
05/29/2024121027441Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
09/17/2024120632422Open ↗
05/29/2024121027441Open ↗
04/19/2024123814989Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
03/28/2025121951619Open ↗
09/18/2024123015316Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
03/28/2025121951619Open ↗
09/18/2024123015316Open ↗
▸Approvals, Objections & Sign-offs186
▸BISLANDMARKS APPROVAL63
03/25/2020122794486Open ↗
10/07/2019123814989Open ↗
10/04/2019123814989Open ↗
Showing 3 of 63 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST57
10/01/2025140384297Open ↗
04/02/2025121951619Open ↗
12/09/2024104236783Open ↗
Showing 3 of 57 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION22
05/21/2025121951619Open ↗
10/14/2020123207635Open ↗
Showing 2 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLANDMARKS SIGNOFF12
10/01/2025140384297Open ↗
04/02/2025121951619Open ↗
09/25/2024120632422Open ↗
Showing 3 of 12 on file for this type
▸BISFINAL8
10/01/2025140384297Open ↗
04/01/2025121951619Open ↗
04/01/2025121951619Open ↗
Showing 3 of 8 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
11/20/2024104236783Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL (MH) SIGNOFF2
10/01/2025140384297Open ↗
10/01/2025140384297Open ↗
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership107
▸BISCOST AFFIDAVIT95
12/09/2024104236783Open ↗
09/18/2024123015316Open ↗
05/15/2024121027441Open ↗
Showing 3 of 95 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW310
10/01/2025140384297Open ↗
03/28/2025121951619Open ↗
09/23/2024120632422Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms168
▸BISEFILING COVER SHEET58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISADDITIONAL INFORMATION58
04/02/2021123406466Open ↗
03/24/2021140836665Open ↗
03/10/2020122794486Open ↗
Showing 3 of 58 on file for this type
▸BISBOROUGH INTAKE FORM42
11/20/2024104236783Open ↗
03/25/2020122794486Open ↗
03/19/2020123207635Open ↗
Showing 3 of 42 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents31
▸DOB NOWProof of Historic Building16
09/01/2026M00647344-I1Open ↗
09/01/2026M00647344-P2Open ↗
Showing 2 of 16 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type