| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01238768 ↗ | 742 10 AVENUE MANHATTAN | Alteration | Permit Issued | 08/03/2025 | 07/17/2026 | Owner NEW YORK PUBLIC LIBRARY Contractor WEST NEW YORK RESTORATION OF CT Filer CSR EXPEDITERS | Miscellaneous brick repair and replacement of cracked. spalled and displaced bricks, repoint deteriorated mortar joints and repair/replace b… |
| B00558279 ↗ | 35 UNDERHILL AVENUE BROOKLYN | Alteration | Permit Issued | 08/20/2021 | 03/20/2026 | Contractor DEMARI SERVICES INC | Filing herewith application for facade leak repairs as per drawings submitted herewith. No change in use, egress or occupancy. |
| M01314927 ↗ | 50 SUTTON PLACE SOUTH MANHATTAN | Alteration | Permit Issued | 12/02/2025 | 01/08/2026 | Contractor AM&G WATERPROOFING LLC | STRUCTURAL REPAIRS TO INCLUDE BUT NOT LIMITED TO CONCRETE WORK AND WATERPROOFING IN EXISTING PARKING GARAGE. NO CHANGE TO EGRESS, USE, OR OC… |
| M01090549 ↗ | 100 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/08/2024 | 10/31/2025 | Contractor STRUCTURAL PRESERV SYSTEM | PROPOSED REPAIR TO EX. FAC+ ROF TO INCLUDE, BUT NOT LIMITED TO, REPAIR OR ALUMINUM FRAMED WINDOWS, CRACKS IN MORTAR JOINTS + BRICKS. CHIMNEY… |
| M01025011 ↗ | 490 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/20/2024 | 06/27/2025 | Contractor LO SARDO GENERAL CONTRACTORS | New waterproofing, topping slab, and granite curb at Broome Street and Broadway. Clean and paint metal tread plates, and column panels. New … |
| M01157618 ↗ | 240 EAST 38 STREET MANHATTAN | Alteration | Signed-off | 05/07/2025 | 06/11/2025 | Contractor PAUL CHARLTON | Structural modifications to repair loading dock as shown on plans filed herewith. No change in egress, occupancy, or use. |
| Name | Projects together | Most recent |
|---|---|---|
| WJE ENGINEERS & ARCHITECTS, P.C. | 39 | 06/08/2026 |
| WISS, JANNEY, ELSTNER ASSOCIATES | 5 | 05/22/2024 |
| MG ENGINEERING D.P.C. | 2 | 03/04/2022 |
| BW ARCHITECTS | 1 | 07/08/2025 |
| IP GROUP | 1 | 07/08/2025 |
| SOCOTEC, INC. | 1 | 04/02/2025 |
| TPG ARCHITECTURE, LLP | 1 | 03/16/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURAL PRESERV SYSTEM | 4 | 07/18/2025 |
| CLUNE CONSTRUCTION CO LP | 3 | 05/22/2024 |
| NICHOLSON & GALLOWAY, INC | 3 | 03/25/2024 |
| PLAZA CONSTRUCTION LLC | 3 | 06/12/2023 |
| SKYLINE RESTORATION INC | 3 | 07/18/2025 |
| ASK CONTRACTING CORP | 2 | 11/23/2021 |
| DEMARI SERVICES INC | 2 | 01/18/2024 |
| POFI CONSTRUCTION CORP | 2 | 05/17/2024 |
| POLER CONTRACTING INC | 2 | 03/09/2022 |
| V. DISALVO CONTRACTING CO | 2 | 07/08/2025 |
| WEST NEW YORK RESTORATION | 2 | 06/08/2026 |
| AM&G WATERPROOFING LLC | 1 | 12/02/2025 |
| BENJAMIN CONSTRUCTION COR | 1 | 08/17/2022 |
| BEST NY CONTRACTING INC | 1 | 10/07/2021 |
| C & D RESTORATION INC | 1 | 02/23/2023 |
| CENTRAL CONSTRUCTION MANA | 1 | 06/23/2022 |
| D&B COUSINS CONSTRUCTION | 1 | 05/25/2022 |
| DNA CONTRACTING LLC | 1 | 06/09/2025 |
| DONATO, INC | 1 | 03/04/2022 |
| HARBOR RESTORATION SERVIC | 1 | 03/11/2024 |
| INTER RENOVATION INC | 1 | 02/06/2024 |
| LDJ CONTRACTING LLC | 1 | 05/24/2022 |
| LO SARDO GENERAL CONTRACT | 1 | 05/20/2024 |
| MALATESTA PALADINO, INC | 1 | 08/03/2023 |
| MCG CONSTRUCTION LLC | 1 | 01/31/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| BANYAN STREET CAPITAL LLC | 6 | 03/29/2024 |
| AKAM ASSOCIATES, INC. | 3 | 07/18/2025 |
| CUSHMAN & WAKEFIELD | 3 | 11/23/2021 |
| ACTA REALTY CORP. | 1 | 05/24/2022 |
| BROWN HARRIS STEVENS RESIDENTIAL MA | 1 | 02/06/2024 |
| DAVID H.KOCH THEATER | 1 | 04/21/2021 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 1 | 03/09/2022 |
| EDUCATIONAL HOUSING SERVICES | 1 | 05/25/2022 |
| IMPACT REAL ESTATE MANAGEMENT | 1 | 10/07/2021 |
| JENNIE REALTY LLC | 1 | 07/10/2024 |
| LADIES MILE LLC | 1 | 08/03/2023 |
| MACY'S INC. | 1 | 10/03/2024 |
| MHP REAL ESTATE SERVICES | 1 | 03/16/2021 |
| NEW YORK PUBLIC LIBRARY | 1 | 06/08/2026 |
| SEBASTIAN CAPITAL INC | 1 | 02/23/2023 |
| SOUL CIRCUS, INC. | 1 | 08/31/2021 |
| TAINO TOWERS | 1 | 01/10/2024 |
| TAVISTOCK TRUST, LLC | 1 | 12/07/2023 |
| THIRD CHURCH OF CHRIST SCIENTIST, N | 1 | 01/22/2020 |
| VII 444 MADISON LESSEE, LLC C/O WAT | 1 | 03/11/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BURNHAM NATIONWIDE INC | 10 | 07/08/2025 |
| RIZZO GROUP | 8 | 03/29/2024 |
| EMPIRE CITY CONSULTANTS, INC. | 4 | 07/10/2024 |
| OUTSOURCE CONSULTANTS, INC. | 3 | 06/09/2025 |
| CONSTRUCTION PERMIT SERVICES | 2 | 07/18/2025 |
| A1 EXPEDITING SERVICE CORP. | 1 | 08/31/2021 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 07/08/2025 |
| CAESAR BUSTAMANTE, AIA | 1 | 10/03/2024 |
| CSR EXPEDITERS | 1 | 06/08/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 05/24/2022 |
| WALTER T. GORMAN, PE, PC | 1 | 08/03/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01238768 ↗ | 742 10 AVENUE MANHATTAN | Alteration | Permit Issued | 08/03/2025 | 07/17/2026 | Owner NEW YORK PUBLIC LIBRARY Contractor WEST NEW YORK RESTORATION OF CT Filer CSR EXPEDITERS | Miscellaneous brick repair and replacement of cracked. spalled and displaced bricks, repoint deteriorated mortar joints and repair/replace b… |
| B00558279 ↗ | 35 UNDERHILL AVENUE BROOKLYN | Alteration | Permit Issued | 08/20/2021 | 03/20/2026 | Contractor DEMARI SERVICES INC | Filing herewith application for facade leak repairs as per drawings submitted herewith. No change in use, egress or occupancy. |
| M01314927 ↗ | 50 SUTTON PLACE SOUTH MANHATTAN | Alteration | Permit Issued | 12/02/2025 | 01/08/2026 | Contractor AM&G WATERPROOFING LLC | STRUCTURAL REPAIRS TO INCLUDE BUT NOT LIMITED TO CONCRETE WORK AND WATERPROOFING IN EXISTING PARKING GARAGE. NO CHANGE TO EGRESS, USE, OR OC… |
| M01090549 ↗ | 100 11 AVENUE MANHATTAN | Alteration | Signed-off | 08/08/2024 | 10/31/2025 | Contractor STRUCTURAL PRESERV SYSTEM | PROPOSED REPAIR TO EX. FAC+ ROF TO INCLUDE, BUT NOT LIMITED TO, REPAIR OR ALUMINUM FRAMED WINDOWS, CRACKS IN MORTAR JOINTS + BRICKS. CHIMNEY… |
| M01025011 ↗ | 490 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/20/2024 | 06/27/2025 | Contractor LO SARDO GENERAL CONTRACTORS | New waterproofing, topping slab, and granite curb at Broome Street and Broadway. Clean and paint metal tread plates, and column panels. New … |
| M01157618 ↗ | 240 EAST 38 STREET MANHATTAN | Alteration | Signed-off | 05/07/2025 | 06/11/2025 | Contractor PAUL CHARLTON | Structural modifications to repair loading dock as shown on plans filed herewith. No change in egress, occupancy, or use. |
| M00948443 ↗ | 121 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 05/20/2025 | 06/09/2025 | Contractor TOWER SERVICES INC | Facade Repairs as per plans filed herewith. No change in use, egress or occupancy under this ALT2 application |
| M01092789 ↗ | 441 7 AVENUE MANHATTAN | Alteration | Permit Issued | 10/03/2024 | 05/05/2025 | Owner MACY'S Contractor PLATINUM MAINTENANCE SRVC Filer CAESAR BUSTAMANTE, AIA | Repairs to the facade to address Unsafe parapet conditions at north elevation. There is no change in egress, use or occupancy. |
| M01078846 ↗ | 333 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 07/23/2024 | 04/04/2025 | Design SOCOTEC, INC. Owner AKAM ASSOCIATES, INC. Contractor STRUCTURAL PRESERV SYSTEM | Installation of Temporary Shoring as per plans filed herewith. |
| M01105181 ↗ | 621 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2024 | 03/18/2025 | Contractor SKYLINE RESTORATION INC | Facade work as per plans filed herewith. |
| M00981790 ↗ | 209 SULLIVAN STREET MANHATTAN | Alteration | Signed-off | 01/18/2024 | 03/14/2025 | Contractor DEMARI SERVICES INC | Garage repairs as per plans filed herewith. No change of use, egress or occupancy. |
| M00935985 ↗ | 121 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/03/2023 | 12/04/2024 | Design IP GROUP Contractor V. DISALVO CONTRACTING CO | Renovations to existing apt. #26. Work to include non-structural demolition, general construction & finishes, replacement of 1 window in mod… |
| Q01072682 ↗ | 44-02 11 STREET QUEENS | Alteration | Signed-off | 07/10/2024 | 09/18/2024 | Owner JENNIE REALTY LLC Contractor PHOENIX SUTTON STR INC | Filing herewith drawings indicating facade repair work. No change in use, egress or occupancy under this application. |
| M00689425 ↗ | 333 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 04/26/2022 | 07/31/2024 | Owner AKAM ASSOCIATES, INC. Contractor STRUCTURAL PRESERV SYSTEM | FILING FOR MASONRY REPAIRS ON ALL ELEVATIONS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M01041644 ↗ | 43 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 05/17/2024 | 07/29/2024 | Contractor POFI CONSTRUCTION CORP | Filing herewith structural plans to indicate structural work as shown on plans. There will be no change of use, occupancy or egress under th… |
| M00689399 ↗ | 333 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 04/26/2022 | 07/22/2024 | Owner AKAM ASSOCIATES, INC. Contractor STRUCTURAL PRESERV SYSTEM | FILING FOR MASONRY REPAIRS ON ALL ELEVATIONS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M01021691 ↗ | 2 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/22/2024 | 06/21/2024 | Contractor CLUNE CONSTRUCTION CO LP | INSTALLATION OF TEMPORARY SHORING FOR 1ST FLOOR RAMP AS PER PLANS FILED HEREWITH. |
| M00997938 ↗ | 1000 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/25/2024 | 05/08/2024 | Contractor NICHOLSON & GALLOWAY, INC. | GARAGE SPACE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M01013013 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/29/2024 | 04/17/2024 | Contractor NUCOR CONSTRUCTION CORP Filer RIZZO GROUP | Structural modifications on the 4th and 40th floors (Faherty Brand) as per plans. No change to Use, Egress, or Occupancy. |
| M00990030 ↗ | 920 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2024 | 03/13/2024 | Contractor INTER RENOVATION INC Filer BURNHAM NATIONWIDE INC | Structural modifications to include column repairs located at the cellar |
| M00967937 ↗ | 2391 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/10/2024 | — | Owner TAINO TOWERS | — |
| M00814052 ↗ | 380 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 03/08/2023 | 12/11/2023 | Contractor NICHOLSON & GALLOWAY, INC. | Filing herewith facade repairs. No change in use, egress or occupancy. |
| M00738594 ↗ | 55 JOHN STREET MANHATTAN | Alteration | Permit Issued | 05/25/2022 | 06/01/2023 | Contractor D&B COUSINS CONSTRUCTION Filer BURNHAM NATIONWIDE INC | Filing herewith application for sidewalk repairs as per plans submitted herewith. No change in use, egress or occupancy. |
| M00863199 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 05/15/2023 | 05/25/2023 | Contractor OCGP LLC | Slab infill at old stair between the 32nd to 33rd floors as per plans. No change to use, egress or occupancy. |
| M08014976 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 11/01/2022 | 05/18/2023 | Contractor PLAZA CONSTRUCTION LLC Filer RIZZO GROUP | Structural modifications (Amenity Space) as per plans. No change to use, egress or occupancy. |
| M00862252 ↗ | 43 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 05/02/2023 | 05/04/2023 | Owner LADIES MILE LLC Contractor MALATESTA PALADINO, INC Filer WALTER T. GORMAN, PE, PC | Proposed existing boiler room and oil-Tank room shoring work, all as per plans, no change to use, occupancy or egress. |
| M00858800 ↗ | 444 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2023 | 05/01/2023 | Contractor CLUNE CONSTRUCTION CO LP | Structural modifications taking place on the 13th and 14th floors as per plans filed herewith. No change in use, egress or occupancy. |
| M00804689 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 01/31/2023 | 02/13/2023 | Contractor CLUNE CONSTRUCTION CO LP Filer RIZZO GROUP | Structural work associated with condenser water modifications on the 33rd floor (Stroock) as per plans. No change to use, egress or occupan… |
| M00686303 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/04/2022 | 02/09/2023 | Design MG ENGINEERING D.P.C. Contractor METRO FIRE PROTECTION INC Filer RIZZO GROUP | Modifications to the existing sprinkler system on the 1st floor (RPZ Project) as per plans. No change to use, egress or occupancy. |
| M00754902 ↗ | 415 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/06/2022 | 01/10/2023 | Owner SEBASTIAN CAPITAL Contractor C D RESTORATION Filer BURNHAM NATIONWIDE INC | Filing herewith application for facade repairs as per plans submitted. No change in use, egress or occupancy. |
| M08033665 ↗ | 121 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 11/09/2022 | 12/09/2022 | Owner TAVISTOCK TRUST, LLC Contractor V. DISALVO CONTRACTING CO Filer BURNHAM NATIONWIDE INC | Filing herewith application for minor structural work pertaining to apartment renovations. |
| M00793596 ↗ | 656 1 AVENUE MANHATTAN | Alteration | Signed-off | 08/17/2022 | 09/20/2022 | Contractor BENJAMIN CONSTRUCTION COR | NYU Langone Health - FACADE REPAIR ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00649640 ↗ | 25 BROADWAY MANHATTAN | Alteration | Signed-off | 05/24/2022 | 08/01/2022 | Owner ACTA REALTY CORP. Contractor LDJ CONTRACTING | MISCELLANEOUS ROOF REPAIR AND STRUCTURAL WORK AT 4TH FLOOR ROOF SETBACK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY U… |
| B00722549 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 05/17/2022 | 07/22/2022 | Contractor POFI CONSTRUCTION CORP | Filing herewith repairs to the existing loading bay including gen. construction and structural work as per plans filed herewith. No change t… |
| M00742548 ↗ | 370 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 06/23/2022 | 07/21/2022 | Contractor CENTRAL CONSTRUCTION MANAGEMENT | Structural work to include shoring as per plans being filed |
| X00730030 ↗ | 815 HUTCHINSON RVR PKWY BRONX | Alteration | Signed-off | 05/25/2022 | 07/12/2022 | Contractor MCG CONSTRUCTION LLC | It is proposed to repair/replace expansion joints on open space/roof deck as shown on plans. No change of use, egress or occupancy. |
| M00530241 ↗ | 444 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2021 | 06/09/2022 | Contractor HARBOR RESTORATION SERVIC Filer RIZZO GROUP | Structural modifications taking place on GRD and CEL as per plans filed herewith. No change to use, egress or occupancy. |
| M00686129 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/07/2022 | 06/09/2022 | Contractor PLAZA CONSTRUCTION LLC Filer RIZZO GROUP | Structural modifications for new platform as per plans. No change to use, egress or occupancy. |
| M00686256 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/04/2022 | 05/16/2022 | Design MG ENGINEERING D.P.C. Contractor DONATO PLUMBING GROUP INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the cellar and 1st floors (RPZ project) as per plans. No change to use, egress or occupanc… |
| M00686219 ↗ | 1 SUTTON PLACE SOUTH MANHATTAN | Alteration | Permit Issued | 03/09/2022 | 04/22/2022 | Contractor POLER CONTRACTING INC Filer BURNHAM NATIONWIDE INC | Filing herewith application for general construction and structural work as per plans submitted herewith. No change in sue, egress or occupa… |
| Q00584153 ↗ | 117-05 MERRICK BOULEVARD QUEENS | Alteration | Signed-off | 08/31/2021 | 02/22/2022 | Owner SOUL CIRCUS, INC. | Construction of temporary structures (157.5-foot diameter Performance Tent, 53 feet by 92 feet Concessions Tent, 33 feet by 33 feet Box Offi… |
| M00497954 ↗ | 1 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 04/21/2021 | 02/04/2022 | Contractor POLER CONTRACTING INC Filer BURNHAM NATIONWIDE INC | GENERAL CONSTRUCTION TO INCLUDE NEW TERRACE DOOR , STAIRS INSTALLATION AND STRUCTURAL MODIFICATIONS TO AN EXISTING RESIDENTIAL APARTMENT LOC… |
| M00464451 ↗ | 105 WEST 62 STREET MANHATTAN | Alteration | Permit Issued | 04/21/2021 | 12/27/2021 | Owner DAVID H.KOCH THEATER Contractor NICHOLSON & GALLOWAY, INC. Filer BURNHAM NATIONWIDE INC | Filing herewith application for facade repairs as per plans submitted. No change in use, egress or occupancy. |
| M00591505 ↗ | 339 EAST 58 STREET MANHATTAN | Alteration | Permit Issued | 10/07/2021 | 12/01/2021 | Contractor BEST NY CONTRACTING INC Filer BURNHAM NATIONWIDE INC | Filing herewith application for facade repair as per drawings submitted herewith. No change in use , egress and occupancy. |
| M00594054 ↗ | 380 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/23/2021 | 11/30/2021 | Owner CUSHMAN & WAKEFIELD, INC Contractor ASK CONTRACTING CORP | Filing herewith plans to indicate the removal of existing ladders and masonry repairs, installation of new steel structural framing to suppo… |
| M00501175 ↗ | 380 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/22/2021 | 06/08/2021 | Owner CUSHMAN & WAKEFIELD, INC Contractor ASK CONTRACTING CORP | FILING HEREWITH STRUCTURAL PLANS TO INDICATE STRUCTURAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER T… |
| M00470901 ↗ | 180 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/16/2021 | 05/12/2021 | Design TPG ARCHITECTURE, LLP Owner MHP REAL ESTATE SERVICES Contractor PLAZA CONSTRUCTION LLC Filer RIZZO GROUP | Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 11th floor as per plans. No ch… |
| B00413277 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 10/22/2020 | 01/12/2021 | Owner CUSHMAN AND WAKEFIELD Contractor SKYLIGHT DEVELOPMENT, INC | Filing herewith plans indicating structural work to repair existing compactor bays by removing existing concrete and steel and replacing wit… |
| M00278029 ↗ | 583 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/22/2020 | 04/22/2020 | Contractor A. PETER LUGER CONST INC | Filing herewith drawings indicating minor structural work on the roof for new dunnage installation and removal existing dunnage. No change i… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/08/2026 | Structural Steel - Details | 742 10 AVENUE | Collin Melton | special |
| 05/28/2026 | Structural Steel - Welding | 742 10 AVENUE | Young Suh | special |
| 05/28/2026 | Final | 742 10 AVENUE | LYNNE VU | progress |
| 07/25/2025 | Final | 333 EAST 30 STREET | Michelle Dallhoff | progress |
| 07/25/2025 | Masonry | 333 EAST 30 STREET | JAMES TRIANO | special |
| 07/25/2025 | Masonry | 333 EAST 30 STREET | JAMES TRIANO | special |
| 07/25/2025 | Final | 333 EAST 30 STREET | Michelle Dallhoff | progress |
| 06/12/2025 | Final | 333 EAST 30 STREET | Withdrawn | progress |
| 06/12/2025 | Masonry | 333 EAST 30 STREET | JAMES TRIANO | special |
| 06/12/2025 | Final | 333 EAST 30 STREET | Withdrawn | progress |
| 06/12/2025 | Masonry | 333 EAST 30 STREET | JAMES TRIANO | special |
| 06/09/2025 | Concrete - Cast-In-Place | 240 EAST 38 STREET | Collin Melton | special |
| 06/09/2025 | Post-installed Anchors | 240 EAST 38 STREET | Collin Melton | special |
| 06/09/2025 | Final | 240 EAST 38 STREET | Collin Melton | progress |
| 04/01/2025 | Final | 333 EAST 30 STREET | JOHN COCCA JR. | progress |
| 04/01/2025 | Tenant Protection Plan Compliance | 333 EAST 30 STREET | — | special |
| 04/01/2025 | Structural Steel - Details | 333 EAST 30 STREET | JAMES TRIANO | special |
| 04/01/2025 | Structural Stability – Alterations of existing buildings | 333 EAST 30 STREET | JAMES TRIANO | special |
| 10/17/2024 | Masonry | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Structural Steel - Details | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Structural Stability – Alterations of existing buildings | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Structural Steel - Welding | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Post-installed Anchors | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Mastic and Intumescent Fire-resistant Coatings | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 10/17/2024 | Final | 121 CENTRAL PARK WEST | Dziugas Reneckis | progress |
| 10/16/2024 | Mastic and Intumescent Fire-resistant Coatings | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 09/24/2024 | Final | 121 CENTRAL PARK WEST | Dziugas Reneckis | progress |
| 09/24/2024 | Structural Steel - Welding | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 09/24/2024 | Structural Steel - Details | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 09/24/2024 | Structural Stability – Alterations of existing buildings | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 09/24/2024 | Post-installed Anchors | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 09/24/2024 | Masonry | 121 CENTRAL PARK WEST | Dziugas Reneckis | special |
| 08/20/2024 | Structural Stability – Alterations of existing buildings | 441 7 AVENUE | JAMES TRIANO | special |
| 08/07/2024 | Final | 441 7 AVENUE | Michelle Dallhoff | progress |
| 08/02/2024 | Masonry | 100 11 AVENUE | Collin Melton | special |
| 08/02/2024 | Tenant Protection Plan Compliance | 100 11 AVENUE | ALEXIS SCHLESSINGERMAN | special |
| 08/02/2024 | Final | 100 11 AVENUE | Joseph Caputo | progress |
| 08/02/2024 | Preliminary | 100 11 AVENUE | Joseph Caputo | progress |
| 06/28/2024 | Concrete - Cast-In-Place | 44-02 11 STREET | Collin Melton | special |
| 06/28/2024 | Post-installed Anchors | 44-02 11 STREET | Collin Melton | special |
| 06/28/2024 | Preliminary | 44-02 11 STREET | COREY GLASER | progress |
| 06/28/2024 | Structural Stability – Alterations of existing buildings | 44-02 11 STREET | Collin Melton | special |
| 06/26/2024 | Final | 44-02 11 STREET | COREY GLASER | progress |
| 04/26/2024 | Sprayed fire-resistant materials | 43 WEST 23 STREET | Collin Melton | special |
| 04/26/2024 | Structural Steel - Details | 43 WEST 23 STREET | Collin Melton | special |
| 04/26/2024 | Structural Steel - Welding | 43 WEST 23 STREET | Collin Melton | special |
| 04/25/2024 | Final | 43 WEST 23 STREET | Collin Melton | progress |
| 04/25/2024 | Structural Stability – Alterations of existing buildings | 43 WEST 23 STREET | Collin Melton | special |
| 04/19/2024 | Post-installed Anchors | 2 PARK AVENUE | Collin Melton | special |
| 04/19/2024 | Structural Stability – Alterations of existing buildings | 2 PARK AVENUE | Collin Melton | special |