← Back
Prison, jail, house of detention
10-01 HAZEN STREET
BRONX · BIN 2109479
💬 Discuss this project
1933Year Built
6Stories
Y3Building Class
C8-2Zoning
5,519,372 sfGross Floor Area
1Units
LL97 Covered11 Open Violations 0 unresolved · 11 paperwork only ▸
Prison, jail, house of detention · Owner of record: NYC DEPARTMENT OF CORRECTIONS · 17,825,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof116p · 2 filings · 20 docs
Floor 384p · 2 filings · 20 docs
Floor 293p · 2 filings · 20 docs
Floor 1127p · 2 filings · 20 docs
Cellar114p · 2 filings · 20 docs
Filed — no permit issued20p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF CORRECTION2407/08/2026
DEPARTMENT OF CORRECTIONS1803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAHN ARCHITECTS306/23/2026
CONSULTING ENGINEERS COLLABORATIVE,208/18/2022
LAKHANI & JORDAN408/15/2022
DAVID ZISKIND106/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PADILLA CONSTRUCTION SERVICESGeneral Contractor807/08/2026
FIREQUEST CORPFire Protection207/08/2026
INFINITY CONTRACTING SERVGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061006/23/2026
Building Lifecycle
All (79)Filed (10)Permit Issued (8)Violation (31)Special Inspection (30)
06/23/2026
Filed — Alteration
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.
X00764834-P1
05/01/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/17/2023
Permit issued — General Construction
X00764834-I1-GC
04/28/2023
Permit issued — Mechanical Systems
X00764834-S1-MS
11/03/2022
Permit issued — Plumbing
X00764823-S3-EW-SP
11/03/2022
Permit issued — General Construction
X00764834-I1-GC
11/03/2022
Permit issued — General Construction
X00764823-I1-GC
11/03/2022
Permit issued — Plumbing
X00764834-S2-EW-SP
11/03/2022
Permit issued — Structural
X00764823-S1-ST
11/02/2022
Permit issued — Structural
X00764834-S3-ST
08/18/2022
Filed — Alteration
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.
X00764834-S3
08/17/2022
Filed — Alteration
Mechanical systems alterations on the 1st thru 3rd floors and cellar level for proposed renovation of Young Adult Program Spaces; related work as per plans.
X00764823-S1
08/16/2022
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/15/2022
Filed — Alteration
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.
X00764834-S2
08/15/2022
Filed — Alteration
Mechanical systems alterations on the 1st thru 3rd floors and cellar level for proposed renovation of Young Adult Program Spaces; related work as per plans.
X00764823-S3
08/11/2022
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/11/2022
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/04/2022
Filed — Alteration
Mechanical systems alterations on the 1st thru 3rd floors and cellar level for proposed renovation of Young Adult Program Spaces; related work as per plans.
X00764823-S2
08/04/2022
Filed — Alteration
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.
X00764834-S1
08/03/2022
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
08/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/07/2022
Filed — Alteration
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.
X00764834-I1
07/07/2022
Filed — Alteration
Mechanical systems alterations on the 1st thru 3rd floors and cellar level for proposed renovation of Young Adult Program Spaces; related work as per plans.
X00764823-I1
07/06/2022
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
07/06/2022
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/06/2022
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
06/27/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
06/27/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
06/23/2021
Filed — Alteration
HEREWITH FILING OF GENERAL CONSTRUCTION FOR CIVIL WORK TO REPAIR SIDEWALKS AND ADAACCESIBLE RAMP AS PER DRAWINGS FILED HEREIN.
X00538171-I1
06/23/2021
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
06/11/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
06/11/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
09/19/2018
Violation issued (ECB, closed)
Elevators
09/19/2018
Violation issued (ECB, closed)
Elevators
09/19/2018
Violation issued (ECB, closed)
Elevators
09/19/2018
Violation issued (ECB, closed)
Elevators
09/19/2018
Violation issued (ECB, closed)
Elevators
09/06/2017
Violation issued (ECB, closed)
Elevators
08/30/2017
Violation issued (ECB, closed)
Elevators
01/06/2015
Violation issued (ECB, closed)
Elevators
01/06/2015
Violation issued (ECB, closed)
Elevators
01/06/2015
Violation issued (ECB, closed)
Elevators
01/06/2015
Violation issued (ECB, closed)
Elevators
01/06/2015
Violation issued (ECB, closed)
Elevators
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES10/17/2023
DOB NOWMechanical SystemsPermit IssuedINFINITY CONTRACTING SERV04/28/2023
DOB NOWPlumbingPermit IssuedFIREQUEST CORP11/03/2022
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES11/03/2022
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES11/03/2022
DOB NOWPlumbingPermit IssuedFIREQUEST CORP11/03/2022
DOB NOWStructuralPermit IssuedPADILLA CONSTRUCTION SERVICES11/03/2022
DOB NOWStructuralPermit IssuedPADILLA CONSTRUCTION SERVICES11/02/2022
BISOTISSUEDAWL INDUSTRIES INC06/20/2023
BISOTISSUEDAWL INDUSTRIES INC06/27/2022
BISOTISSUEDAWL INDUSTRIES INC07/07/2021
BISOTISSUEDA.B.C.D. CONSTRUCTION COR02/14/2021
BISOTISSUEDAWL INDUSTRIES INC02/03/2021
BISOTISSUEDA.B.C.D. CONSTRUCTION COR07/31/2020
BISOTISSUEDAWL INDUSTRIES INC01/30/2020
BISOTISSUEDA.B.C.D. CONSTRUCTION COR10/01/2019
BISMHISSUEDFRAMAN MECHANICAL INC01/07/2019
BISMHISSUEDFRAMAN MECHANICAL INC01/07/2019
BISOTISSUEDFRAMAN MECHANICAL INC01/24/2018
BISMHISSUEDFRAMAN MECHANICAL INC01/24/2018
BISOTISSUEDA.B.C.D. CONSTRUCTION COR09/20/2017
BISMHISSUEDFRAMAN MECHANICAL INC08/16/2017
BISOTISSUEDA.B.C.D. CONSTRUCTION COR07/27/2017
BISMHISSUEDFRAMAN MECHANICAL INC03/10/2017
BISMHISSUEDAWL INDUSTRIES INC06/30/2016
BISMHISSUEDAWL INDUSTRIES INC06/30/2015
BISMHISSUEDAWL INDUSTRIES INC07/01/2014
BISMHISSUEDAWL INDUSTRIES INC07/02/2013
BISMHISSUEDAWL INDUSTRIES INC06/15/2012
BISMHISSUEDAWL INDUSTRIES INC11/15/2011
1 project · most recent 08/17/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2022Permit IssuedPADILLA CONSTRUCTION SERVAir Conditioning Systems
Cooling
Aaon RNA-011-C-0-3 115,000 BTU · Rooftop Unit ×10
Trane RAUJC30 286,000 BTU · Split System ×10
1 project · most recent 08/17/2022
Sprinkler System
FiledStatusContractorScope
08/17/2022Permit IssuedFIREQUEST CORPSprinkler System
1 project · most recent 08/17/2022
Water/Sanitary
FiledStatusContractorScope
08/17/2022——Water/Sanitary
2 projects · most recent 08/17/2022
Steel Concrete
FiledStatusContractorScope
08/17/2022Permit IssuedFIREQUEST CORPSteel
06/23/2021——Concrete
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
05/01/2026FinalGEORGE GHEBRYALprogress
05/01/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/16/2022Post-installed AnchorsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - WeldingGEORGE GHEBRYALspecial
08/16/2022Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
08/16/2022Structural Steel - DetailsGEORGE GHEBRYALspecial
08/11/2022Sprinkler SystemsGEORGE GHEBRYALspecial
08/11/2022Sprinkler SystemsGEORGE GHEBRYALspecial
08/03/2022Duct leakage testing, insulation and designGEORGE GHEBRYALenergy_progress
08/03/2022Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
08/03/2022Maintenance informationGEORGE GHEBRYALenergy_progress
08/03/2022HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
08/03/2022HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
08/03/2022Shutoff dampersGEORGE GHEBRYALenergy_progress
08/03/2022HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/19/2022FinalGEORGE GHEBRYALprogress
07/19/2022FinalGEORGE GHEBRYALprogress
07/19/2022Mechanical SystemsGEORGE GHEBRYALspecial
07/19/2022FinalGEORGE GHEBRYALprogress
07/19/2022Mechanical SystemsGEORGE GHEBRYALspecial
07/06/2022Lighting controlsGEORGE GHEBRYALenergy_progress
07/06/2022Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
07/06/2022Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/06/2022Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/06/2022Interior lighting powerGEORGE GHEBRYALenergy_progress
Latest 25 of 33.
▾Documents — 327 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026X00538171-I1Request digital key ↗
08/24/2026X00764823-P1Request digital key ↗
08/24/2026X00764823-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION32
08/14/2023240251927Open ↗
04/06/2020240248763Open ↗
10/28/2019240248763Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION19
02/03/2021240248763Open ↗
01/30/2020240248763Open ↗
01/07/2019220558947Open ↗
Showing 3 of 19 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/19/2019240248763Open ↗
▸Seals & Professional Certifications92
▸DOB NOWProgress Inspector Seal & Signature29
09/19/2026X00764823-I1Open ↗
09/19/2026X00764823-I1Open ↗
09/19/2026X00764823-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/19/2026X00764823-I1Open ↗
09/12/2026X00764823-S1Open ↗
09/12/2026X00764823-S1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/06/2020240248763Open ↗
10/22/2019240248763Open ↗
06/08/2017220600918Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026X00538171-I1Open ↗
08/24/2026X00764823-S3Open ↗
08/24/2026X00764823-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
06/08/2017220600918Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
06/11/2019240252070Open ↗
04/18/2019240251927Open ↗
04/18/2019240252089Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
05/03/2017440398393Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/08/2017220600918Open ↗
11/09/2016220558938Open ↗
11/09/2016220558947Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
05/03/2017440398393Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
08/15/2019240252070Open ↗
07/28/2019240252034Open ↗
06/28/2019240252034Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/08/2017220600918Open ↗
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/11/2019240252070Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
04/23/2019440540149Open ↗
06/08/2017220600918Open ↗
11/09/2016220558947Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/24/2026X00764823-S3Open ↗
08/24/2026X00764823-I1Open ↗
08/24/2026X00764823-S1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
06/24/2022240251927Open ↗
06/11/2019240252070Open ↗
04/16/2019240252034Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/16/2017220558938Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
03/16/2021440398393Open ↗
11/18/2020220558947Open ↗
11/18/2020220558938Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
06/08/2017220600918Open ↗
06/08/2017220600918Open ↗
11/09/2016220558938Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/16/2021440398393Open ↗
11/18/2020220558947Open ↗
11/18/2020220558938Open ↗
▸BISNYCECC ANALYSIS3
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
05/03/2017440398393Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
05/03/2017440398393Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
05/03/2017440398393Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/03/2017440398393Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY19
06/24/2022240251927Open ↗
06/24/2022240251927Open ↗
03/16/2021440398393Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/24/2022240251927Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
08/06/2019240252070Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/03/2017440398393Open ↗
▸BISMASONRY1
05/03/2017440398393Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/24/2022240251927Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/03/2017440398393Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/24/2026X00764823-P1Open ↗
08/24/2026X00764823-P2Open ↗
08/24/2026X00764823-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/24/2026X00764823-S3Open ↗
08/24/2026X00764834-P1Open ↗
08/13/2026X00764823-S2Open ↗
Showing 3 of 12 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)4
05/21/2019240251927Open ↗
04/23/2019440540149Open ↗
03/19/2019240248763Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/08/2017220600918Open ↗
11/09/2016220558938Open ↗
11/09/2016220558947Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/18/2021440398393Open ↗
11/23/2020220558938Open ↗
11/23/2020220558947Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
03/18/2021440398393Open ↗
▸BISACPE Objection Review Request1
10/29/2019240252034Open ↗
▸BISFINAL1
05/03/2017440398393Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00538171-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
03/16/2021440398393Open ↗
11/18/2020220558947Open ↗
11/18/2020220558938Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION13
04/06/2020240248763Open ↗
08/06/2019240252070Open ↗
07/22/2019240252034Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
05/20/2019240252070Open ↗
04/23/2019440540149Open ↗
04/18/2019240251927Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
06/08/2017220600918Open ↗
06/08/2017220600918Open ↗
11/09/2016220558938Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
04/06/2020240248763Open ↗
10/22/2019240248763Open ↗
08/20/2019240248763Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/30/2020240248763Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
05/03/2017440398393Open ↗