| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00537736 ↗ | 609 PARK AVENUE BROOKLYN | New Building | Permit Issued | 07/01/2021 | 09/29/2026 | The existing parking lot and underground oil tanks will be demolished and removed from the site. The sidewalk in front of the boiler buildi… |
| X00764819 ↗ | 10-01 HAZEN STREET BRONX | Alteration | Permit Issued | 06/30/2022 | 09/15/2026 | Structural alterations at the 1st floor & roof level for proposed renovation of Dormitory 4A/4B; related work as per plans. No proposed chan… |
| Q00818135 ↗ | 93-06 63 DRIVE QUEENS | Alteration | Permit Issued | 01/25/2023 | 09/01/2026 | WATER INFILTRATION PREVENTION, PARTIAL FACADE REPAIRS, AND PARTIAL INTERIOR FINISH UPGRADE. |
| S00648614 ↗ | 62 TRAVIS AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/17/2021 | 08/24/2026 | REPLACE NON WORKING CHILLERS AT ROOF TOP MECHANICAL PENTHOUSE, PROVIDE EMERGENCY LIGHTING THROUGHOUT AND CORRIDOR LIGHTING AT BASEMENT LEVE… |
| S08046240 ↗ | 62 TRAVIS AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/05/2022 | 08/24/2026 | FILING ON CONTRACTOR'S BEHALF FOR 246 LF OF CONSTRUCTION FENCES AT PS 72R: CHAIN LINK WITH DEBRIS NETTING |
| Q00938460 ↗ | 58-75 56 STREET QUEENS | Alteration | Permit Issued | 10/06/2023 | 07/30/2026 | INSTALLATION OF UNDERPINNING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00537736 ↗ | 609 PARK AVENUE BROOKLYN | New Building | Permit Issued | 07/01/2021 | 09/29/2026 | The existing parking lot and underground oil tanks will be demolished and removed from the site. The sidewalk in front of the boiler buildi… |
| X00764819 ↗ | 10-01 HAZEN STREET BRONX | Alteration | Permit Issued | 06/30/2022 | 09/15/2026 | Structural alterations at the 1st floor & roof level for proposed renovation of Dormitory 4A/4B; related work as per plans. No proposed chan… |
| Q00818135 ↗ | 93-06 63 DRIVE QUEENS | Alteration | Permit Issued | 01/25/2023 | 09/01/2026 | WATER INFILTRATION PREVENTION, PARTIAL FACADE REPAIRS, AND PARTIAL INTERIOR FINISH UPGRADE. |
| S00648614 ↗ | 62 TRAVIS AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/17/2021 | 08/24/2026 | REPLACE NON WORKING CHILLERS AT ROOF TOP MECHANICAL PENTHOUSE, PROVIDE EMERGENCY LIGHTING THROUGHOUT AND CORRIDOR LIGHTING AT BASEMENT LEVE… |
| S08046240 ↗ | 62 TRAVIS AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/05/2022 | 08/24/2026 | FILING ON CONTRACTOR'S BEHALF FOR 246 LF OF CONSTRUCTION FENCES AT PS 72R: CHAIN LINK WITH DEBRIS NETTING |
| Q00938460 ↗ | 58-75 56 STREET QUEENS | Alteration | Permit Issued | 10/06/2023 | 07/30/2026 | INSTALLATION OF UNDERPINNING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| Q00677183 ↗ | 93-06 63 DRIVE QUEENS | Alteration | Permit Issued | 02/11/2022 | 07/01/2026 | PS 139Q - REPLACE 12 ROOFTOP HVAC UNITS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q08004026 ↗ | 222-22 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 10/16/2022 | 06/08/2026 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 295Q AT 222-14 JAMAICA AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN … |
| B00849071 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Permit Issued | 03/24/2023 | 05/18/2026 | K104_Replace concrete slab at courtyard areaway. |
| Q00344331 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 05/11/2020 | 04/24/2026 | mechanical work at queens college for boiler plant replacement |
| Q08046420 ↗ | 105-00 62 AVENUE QUEENS | Alteration | Permit Issued | 11/29/2022 | 04/16/2026 | Replace HVAC units located on the ground floor, 1st Floor, 2nd Floor Roof and Main Roof. |
| M01089047 ↗ | 681 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 08/15/2024 | 04/13/2026 | Remove existing steel dunnage, catwalk and handrails. Install new steel dunnage, catwalk and handrails. New roof slab openings for ductwork. |
| M01089098 ↗ | 904 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/19/2024 | 04/13/2026 | Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels. |
| Q08004047 ↗ | 222-22 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 10/21/2022 | 04/07/2026 | INSTALLATION OF NEW SIDEWALK SHED FOR PS 295Q AT 222-14 JAMAICA AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG… |
| S00568622 ↗ | 67 INNIS STREET STATEN ISLAND | Alteration | Permit Issued | 08/11/2021 | 04/03/2026 | Replace existing air handling units, exhaust fans, return fan, VAV boxes, unit ventilators and fan coil units . Balance airflows in existing… |
| B00591883 ↗ | 111 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 09/24/2021 | 04/01/2026 | The parking lot South of Park Avenue will be extended to the maintenance access road within the Marcy Houses complex. This will require the… |
| B00674023 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Permit Issued | 02/04/2022 | 03/31/2026 | K104_Remove and replace existing unit ventilators, exhaust fans, and supply air ductwork. Provide new unit ventilators, heating and ventilat… |
| M00958423 ↗ | 16 CLARKSON STREET MANHATTAN | Alteration | Permit Issued | 11/13/2023 | 03/31/2026 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR HS 560M AT 16 CLARKSON STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN … |
| Q00969369 ↗ | 93-06 63 DRIVE QUEENS | Alteration | Permit Issued | 12/26/2023 | 03/27/2026 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 139Q AT 93-06 63RD DRIVE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE U… |
| 302573971BIS | 9021 5 AVENUE BROOKLYN | — | ISSUED | 04/17/2024 | 03/27/2026 | BL, MH, OT, PL |
| 421902631BIS | 58-75 56 STREET QUEENS | — | ISSUED | 02/29/2024 | 03/26/2026 | MH, OT, PL |
| Q00623043 ↗ | 58-75 56 STREET QUEENS | Alteration | Permit Issued | 11/02/2021 | 03/23/2026 | Selective removals of existing ventilation system. Provide new Ventilation system. |
| Q00921290 ↗ | 58-75 56 STREET QUEENS | Alteration | Permit Issued | 09/14/2023 | 03/23/2026 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 09Q AT 58-74 57 STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE… |
| Q00921311 ↗ | 58-75 56 STREET QUEENS | Alteration | Permit Issued | 09/25/2023 | 03/23/2026 | INSTALLATION OF PIPE SCAFFOLD FOR PS 09Q AT 58-74 57 STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR O… |
| 240229052BIS | 1451 WASHINGTON AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/10/2026 | MH, PL |
| 240229061BIS | 1451 WASHINGTON AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/10/2026 | MH, PL |
| 240229070BIS | 1285 WASHINGTON AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/10/2026 | MH, PL |
| 240229089BIS | 1285 WASHINGTON AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/10/2026 | MH, PL |
| Q08051927 ↗ | 10 AVENUE QUEENS | Alteration | Permit Issued | 03/31/2023 | 03/05/2026 | HVAC WORK AT 154TH PUMPING STATION. NYC DEP CAPITAL PROJECT WP-269 PS-DES-2. |
| X08050265 ↗ | 560 EAST 233 STREET BRONX | Alteration | Permit Issued | 03/31/2023 | 03/05/2026 | Installation of HVAC equipment for 233rd Street Pumping Station NYC DEP Capital Project WP-269 PS-DES-2. |
| 500876778BIS | 46 REID AVENUE STATEN ISLAND | — | ISSUED | 07/09/2021 | 03/03/2026 | MH, OT, PL |
| Q00601601 ↗ | 222-22 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 10/12/2021 | 12/30/2025 | EXTERIOR MASONRY, PARAPETS AND ROOF |
| B00959859 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Permit Issued | 11/21/2023 | 12/18/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 104K AT 9115 5TH AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE … |
| B00875465 ↗ | 111 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 07/08/2023 | 12/10/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 586 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS,… |
| B00875466 ↗ | 21 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 07/08/2023 | 12/10/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 603 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS,… |
| B00875469 ↗ | 609 PARK AVENUE BROOKLYN | Alteration | Permit Issued | 07/08/2023 | 12/10/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 609 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS… |
| 240228909BIS | 1309 PARK AVENUE BRONX | — | ISSUED | 12/21/2020 | 12/08/2025 | MH, PL |
| 240228972BIS | 3603 3 AVENUE BRONX | — | ISSUED | 12/16/2020 | 12/08/2025 | MH, PL |
| M00909667 ↗ | 203 WEST 114 STREET MANHATTAN | Alteration | Permit Issued | 08/22/2023 | 11/18/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 215 WEST 114TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, … |
| M00755575 ↗ | 203 WEST 114 STREET MANHATTAN | Alteration | Permit Issued | 06/13/2022 | 11/10/2025 | Remove and replace existing mechanical housekeeping pads in the cellar and third floors ( 7 ) in total. |
| S08052871 ↗ | 67 INNIS STREET STATEN ISLAND | Alteration | Permit Issued | 12/15/2022 | 11/10/2025 | FILING ON CONTRACTOR'S BEHALF FOR 8'H CONSTRUCTION FENCES: 217 LF |
| 402895319BIS | 112 BEACH 29 STREET QUEENS | — | ISSUED | 10/08/2015 | 11/06/2025 | BL, FB, FS, MH, OT, PL |
| M01091743 ↗ | 681 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 08/15/2024 | 11/03/2025 | HUNTER COLLEGE NORTH BUILDING. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M01093704 ↗ | 904 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 09/05/2024 | 11/03/2025 | HUNTER COLLEGE WEST BUILDING. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 240229007BIS | 1410 WASHINGTON AVENUE BRONX | — | ISSUED | 12/16/2020 | 11/03/2025 | MH, PL |
| B00933587 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Permit Issued | 09/14/2023 | 10/28/2025 | K104-NEW LIGHTING IN THE BOILER ROOM IN CONJUNCTION WITH BOILER APPLICATION 302573971. |
| 104214137BIS | 16 CLARKSON STREET MANHATTAN | — | ISSUED | 06/14/2024 | 10/28/2025 | MH, OT, PL, SP |
| 421899878BIS | 58-75 56 STREET QUEENS | — | ISSUED | 02/29/2024 | 10/28/2025 | OT |
| 103652085BIS | 3 PARK AVENUE MANHATTAN | — | ISSUED | 10/22/2021 | 09/12/2025 | FS, MH, OT, PL, SD, SP |
| 240228981BIS | 3603 3 AVENUE BRONX | — | ISSUED | 06/05/2020 | 06/26/2025 | BL, MH, PL |
| 520371605BIS | 2800 VICTORY BOULEVARD STATEN ISLAND | — | ISSUED | 04/09/2021 | 06/18/2025 | PL |
| M01035662 ↗ | 2238 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/05/2024 | 04/24/2025 | PROVIDE NEW COOLING TOWER TO REPLACE THE EXISTING, INCLUDING APPURTENANCES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01192222 ↗ | 1307 FULTON AVENUE BRONX | Alteration | Signed-off | 03/21/2025 | 04/18/2025 | Remove the existing chiller, install a new replacement chiller, repair any defective or missing pipe insulation, and install a new heat trac… |
| 240229016BIS | 1410 WASHINGTON AVENUE BRONX | — | ISSUED | 04/14/2021 | 04/02/2025 | MH, PL |
| B01000106 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Permit Issued | 02/18/2024 | 03/27/2025 | 104K- SUPPORT OF EXCAVATION PLANS HEREWITH BEING FILED FOR THE INSTALLATION OF FOUNDATION WATERPROOFING |
| Q00974601 ↗ | 105-00 62 AVENUE QUEENS | Alteration | Signed-off | 12/27/2023 | 03/25/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 220Q AT 62-10 108 STREET, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE U… |
| B00875472 ↗ | 21 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 07/08/2023 | 03/17/2025 | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 532 FLUSHING AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGR… |
| 240229043BIS | 1451 WASHINGTON AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/14/2025 | MH, PL |
| 421764200BIS | 63-30 KISSENA BOULEVARD QUEENS | — | ISSUED | 01/19/2021 | 03/13/2025 | OT |
| 240228954BIS | 3603 3 AVENUE BRONX | — | ISSUED | 12/16/2020 | 12/09/2024 | MH, PL |
| 240228963BIS | 3603 3 AVENUE BRONX | — | ISSUED | 12/16/2020 | 12/09/2024 | MH, PL |
| 240228464BIS | 1309 PARK AVENUE BRONX | — | ISSUED | 10/28/2020 | 11/01/2024 | MH, PL |
| 421902640BIS | 113-02 89 AVENUE QUEENS | — | ISSUED | 10/12/2021 | 10/28/2024 | EQ, FS, MH, PL |
| Q00983295 ↗ | 93-06 63 DRIVE QUEENS | Alteration | Signed-off | 01/19/2024 | 09/03/2024 | INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANC… |
| 104213806BIS | 2589 ADAM C POWELL BLVD MANHATTAN | — | ISSUED | 06/09/2023 | 06/06/2024 | MH, OT, PL |
| 520285165BIS | 2800 VICTORY BOULEVARD STATEN ISLAND | — | ISSUED | 05/09/2018 | 05/13/2024 | MH, OT, PL |
| Q01006852 ↗ | 90-37 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 03/28/2024 | 05/09/2024 | PROVIDE NEW AIR-COOLED CHILLER TO REPLACE THE EXISTING. |
| X00764829 ↗ | 10-01 HAZEN STREET BRONX | Alteration | Permit Issued | 06/30/2022 | 03/26/2024 | Structural alterations at the 1st floor & roof level for proposed locker room upgrades; related work as per plans. No proposed change in bui… |
| B00974789 ↗ | 9021 5 AVENUE BROOKLYN | Alteration | Signed-off | 01/08/2024 | 03/22/2024 | PS 104K, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION… |
| Q00823889 ↗ | 222-22 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 02/12/2023 | 03/19/2024 | INSTALLATION OF DEBRIS CHUTE FOR PS 295Q AT 222-14 JAMAICA AVENUE, QUEENS AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGR… |
| B00963931 ↗ | 21 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 12/06/2023 | 03/15/2024 | PROPOSED CONVERSION OF AN EXISTING BASKETBALL COURT INTO A TEMPORARY PARKING FACILITY FOR 23 CARS (21 & 2 HANDICAP SPACES). PROVIDE NEW CONC… |
| 240228936BIS | 3603 3 AVENUE BRONX | — | ISSUED | 03/01/2021 | 03/12/2024 | MH, PL |
| 240229025BIS | 1410 WASHINGTON AVENUE BRONX | — | ISSUED | 03/02/2021 | 03/12/2024 | MH, PL |
| 240229034BIS | 1410 WASHINGTON AVENUE BRONX | — | ISSUED | 03/02/2021 | 03/12/2024 | MH, PL |
| 240228892BIS | 1309 PARK AVENUE BRONX | — | ISSUED | 03/03/2021 | 03/07/2024 | MH, PL |
| 320987893BIS | 2895 BEDFORD AVENUE BROOKLYN | — | ISSUED | 02/02/2017 | 12/18/2023 | MH, OT, PL |
| B00251134 ↗ | 13 42 STREET BROOKLYN | Alteration | Signed-off | 05/27/2021 | 11/16/2023 | Mechanical work filed in conjunction with Alt-2 # 340703288, no change to use, egress or occupancy under this filing. |
| 421899583BIS | 63-25 MAIN STREET QUEENS | — | ISSUED | 02/24/2023 | 11/16/2023 | MH, OT |
| B00251901 ↗ | 4100 1 AVENUE BROOKLYN | Alteration | Signed-off | 07/26/2021 | 11/13/2023 | Mechanical work filed in conjunction with Alt-2 # 340711260 Installation of electric unit heaters and supply air fan for loading dock and El… |
| 240228918BIS | 1309 PARK AVENUE BRONX | — | ISSUED | 10/19/2020 | 11/08/2023 | MH, PL |
| 240228927BIS | 1309 PARK AVENUE BRONX | — | ISSUED | 10/13/2020 | 11/08/2023 | MH, PL |
| X00764834 ↗ | 10-01 HAZEN STREET BRONX | Alteration | Permit Issued | 07/07/2022 | 10/17/2023 | Structural alterations at the roof level for proposed upgrades to existing locker rooms and HVAC systems; related work as per plans. No prop… |
| X00764817 ↗ | 10-01 HAZEN STREET BRONX | Alteration | Permit Issued | 06/30/2022 | 07/06/2023 | Mechanical systems alterations on the 1st floor & mezzanine for proposed renovation of Central Program Unit 6A; related work as per plans. |
| X00613125 ↗ | 660 WEST 235 STREET BRONX | Alteration | Signed-off | 10/28/2021 | 04/24/2023 | Remove parts of mechanical system and reinstall as necessary for repairs throughout the building. |
| 421305037BIS | 110 PARSONS BOULEVARD QUEENS | — | ISSUED | 06/20/2017 | 03/13/2023 | EQ, PL |
| 321417365BIS | 2946 BEDFORD AVENUE BROOKLYN | — | ISSUED | 02/02/2017 | 12/30/2022 | MH, OT, PL |
| 123385675BIS | 181 CONVENT AVENUE MANHATTAN | — | ISSUED | 11/16/2018 | 12/22/2022 | MH, OT, PL |
| 500876732BIS | 644 BLOOMINGDALE ROAD STATEN ISLAND | — | ISSUED | 01/06/2021 | 11/15/2022 | MH |
| Q00348003 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 05/11/2020 | 11/10/2022 | mechanical work |
| M00604050 ↗ | 2095 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/04/2021 | 02/17/2022 | JS 117M, INSTALLATION OF AN EMERGENCY TEMPORARY MOBILE BOILER TRAILER AND A 5000 GALLON OIL TANK (LLW # 128239) SUBMITTING ON BEHALF OF CONT… |
| S00385113 ↗ | 101 WARREN STREET STATEN ISLAND | Alteration | Signed-off | 08/17/2020 | 12/22/2021 | R049_Proposed Mechanical Work is to remove and replace exhaust fans located on the Roof of the building. |
| S00385591 ↗ | 60 FOOTE AVENUE STATEN ISLAND | Alteration | Signed-off | 08/17/2020 | 12/22/2021 | R035_Proposed Mechanical Work is to remove and replace Roof exhaust fan and utility exhaust fan located on the Roof and Kitchen of the build… |
| M00385573 ↗ | 2 EDGECOMBE AVENUE MANHATTAN | Alteration | Signed-off | 08/18/2020 | 12/10/2021 | Modification to HVAC system to remove and replace motors and fans in existing units as shown on plans. No change in use, egress or occupancy… |
| Q00631781 ↗ | 222-05 56 AVENUE QUEENS | Alteration | Signed-off | 11/19/2021 | 12/02/2021 | structural work for framing at queens borough community college |
| S00382095 ↗ | 281 BRADLEY AVENUE STATEN ISLAND | Alteration | Signed-off | 08/14/2020 | 11/17/2021 | Install (1) ductless DX split system for MDF room. No change to use egress or occupancy. |
| 421927197BIS | 94-24 GUY R BREWER BLVD QUEENS | — | ISSUED | 11/27/2019 | 10/18/2021 | MH, OT, PL |
| 421587321BIS | 110 PARSONS BOULEVARD QUEENS | — | ISSUED | 08/26/2020 | 10/04/2021 | OT |
| 421764219BIS | 222-05 56 AVENUE QUEENS | — | ISSUED | 09/30/2021 | 09/30/2021 | OT |
| Q00537833 ↗ | 222-05 56 AVENUE QUEENS | Alteration | Signed-off | 07/01/2021 | 09/15/2021 | FILING FOR MECHANICAL WORK FOR QBCC CENTRAL CHILLERPLANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OROCCUPANCY |
| Q00187940 ↗ | 222-05 56 AVENUE QUEENS | Alteration | Signed-off | 08/15/2019 | 03/22/2021 | FILING FOR MECHANICAL WORK FOR QCC CENTRAL CHILLERPLANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OROCCUPANCY |
| Name | Jobs together | Most recent |
|---|---|---|
| AK CONSULTING SERVICES, INC | 16 | 09/26/2025 |
| GENESYS ENGINEERING | 4 | 02/17/2026 |
| LAKHANI & JORDAN | 4 | 06/23/2026 |
| RAJNIKANT DOSHI | 4 | 06/23/2026 |
| STV INCORPORATED | 4 | 03/13/2025 |
| URBAHN ARCHITECTS | 4 | 06/23/2026 |
| PRINCETON ENGINEERING SERVICES, PC | 3 | 11/17/2022 |
| IAQ SYSTEMS INC | 2 | 08/06/2024 |
| LIZARDOS ENGINEERING | 2 | 08/03/2026 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 04/26/2023 |
| LYN STAAR ENGINEERING, P.C. | 2 | 03/31/2023 |
| NYMS CONSULTING, LLC | 2 | 06/04/2024 |
| OVE ARUP & PARTNERS PC | 2 | 03/03/2025 |
| SEAN P. CUNNINGHAM PE, PC | 2 | 12/15/2022 |
| SGVA | 2 | 09/05/2024 |
| SHENOY ENGINEERING, P.C. | 2 | 01/17/2025 |
| YSRAEL A. SEINUK, P.C. | 2 | 08/03/2026 |
| ALBERT ARONOV ARCHITECT | 1 | 01/17/2025 |
| BGM ENGINEERING | 1 | 07/11/2024 |
| BLADYKAS ENGINEERING, P.C. | 1 | 10/16/2025 |
| DI DOMENICO + PARTNERS LLP | 1 | 08/06/2024 |
| GANNETT FLEMING | 1 | 12/09/2021 |
| HERITAGE ARCHITECTURE | 1 | 09/03/2024 |
| JRS ARCHITECT, PC | 1 | 10/16/2025 |
| MATRIX NEW WORLD ENGINEERING | 1 | 01/08/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| PADILLA CONSTRUCTION SERV | 4 | 06/23/2026 |
| ASHLAR MECHANICAL CORP | 3 | 08/03/2026 |
| FIREQUEST CORP | 3 | 06/23/2026 |
| CHAMPION COMBUSTION CORP | 2 | 06/04/2024 |
| EAGLE 1 MECHANICAL, INC | 2 | 08/03/2026 |
| FORSYTHE P&H CORP | 2 | 10/16/2025 |
| KEL-TECH CONSTRUCTION INC | 2 | 08/15/2023 |
| V. C. VITANZA SONS INC | 2 | 01/17/2025 |
| AGEE HEATING SERVICE CORP | 1 | 01/17/2025 |
| CIVETTA MECHANICAL, LLC | 1 | 01/17/2025 |
| FORSYTHE PLBG & HTG. CORP | 1 | 08/06/2024 |
| R&A CONSTR SERVICES INC | 1 | 10/21/2022 |
| STAR CONSTRUCTION IND INC | 1 | 09/23/2025 |
| VITAL PLUMBING, INC | 1 | 11/03/2023 |
| YORK SCAFFOLD EQUIPMENT C | 1 | 03/11/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 10 | 06/11/2025 |
| NYC SCHOOL CONSTRUCTION | 9 | 10/16/2025 |
| NYC Housing Authority | 6 | 01/17/2025 |
| NYCSCA | 6 | 06/13/2025 |
| DASNY | 5 | 11/19/2021 |
| NYC DEPARTMENT OF CORRECTION | 4 | 06/23/2026 |
| NEW YORK CITY DEPT. OF ENVIRONMENTA | 2 | 03/31/2023 |
| NYC ECONOMIC DEVELOPMENT CORP | 2 | 03/03/2025 |
| NYCHA | 2 | 01/08/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| AK CONSULTING SERVICES, INC | 12 | 06/13/2025 |
| ARCHETYPE CONSULTANTS, INC. | 4 | 06/23/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/13/2025 |
| HAZEN & SAWYER, P.C. | 2 | 03/31/2023 |
| LIZARDOS ENGINEERING ASSOCIATES | 2 | 08/03/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 11/19/2021 |
| STV INCORPORATED | 2 | 03/28/2023 |
| ALBERT ARONOV ARCHITECT | 1 | 12/02/2021 |
| BLADYKAS ENGINEERING, P.C. | 1 | 10/16/2025 |
| DOBAN ARCHITECTURE | 1 | 11/03/2023 |
| HERITAGE ARCHITECTURE | 1 | 09/03/2024 |
| IAQ SYSTEMS INC | 1 | 08/06/2024 |
| JMV ASSOCIATES LLC | 1 | 07/11/2024 |
| LGML GROUP | 1 | 08/15/2023 |
| LORING CONSULTING ENGINEERS, INC, | 1 | 07/22/2022 |
| NY CONTRACTING & SAFETY CONSULTING | 1 | 12/05/2022 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 1 | 09/14/2023 |
| SHENOY ENGINEERING, P.C. | 1 | 01/08/2024 |