One story - permanent living quarter
10-07 138 PLACE
QUEENS · BIN 4100938
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R1-2Zoning
2,306 sfGross Floor Area
1Units
One story - permanent living quarter · 6,040 sf lot · 0.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2025$970K—Private party → Private party$421/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADNAN ENGINEERING, P.C.808/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAIBAY CONSTRUCTION MGNTGeneral Contractor607/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADNAN ENGINEERING, PC6814507/02/2026
Building Lifecycle
All (61)Filed (8)Permit Issued (4)Signed Off (1)Objection (18)Special Inspection (30)
08/08/2026
Filed — Alteration CO
PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION Q01316940-I1
Q01316940-P2
08/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/08/2026
Special inspection requirement — Maintenance information
07/09/2026
Signed off — Alteration
REPAIR TO STRENGTHEN THE EXISTING FOUNDATION BY ADDING NEW HELICAL PILES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01308710-I1
07/08/2026
Permit issued — Structural
Q01316940-S3-ST
07/07/2026
Permit issued — General Construction
Q01316940-I1-GC
07/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Adnan Aljuamily
07/07/2026
Special inspection requirement — Final
Adnan Aljuamily
07/07/2026
Special inspection requirement — Structural Steel - Details
Adnan Aljuamily
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adnan Aljuamily
07/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Adnan Aljuamily
07/07/2026
Special inspection requirement — Structural Steel - Welding
Adnan Aljuamily
07/02/2026
Filed — Alteration CO
PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION Q01316940-I1
Q01316940-P1
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/09/2026
Special inspection requirement — Maintenance information
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/13/2026
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Adnan Aljuamily
04/13/2026
Special inspection requirement — Post-installed Anchors
Adnan Aljuamily
04/13/2026
Special inspection requirement — Final
Adnan Aljuamily
04/13/2026
Special inspection requirement — Footing and Foundation
Adnan Aljuamily
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adnan Aljuamily
03/29/2026
Filed — Alteration
REPAIR TO STRENGTHEN THE EXISTING FOUNDATION BY ADDING NEW HELICAL PILES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01308710-P1
03/29/2026
Filed — Alteration CO
PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION Q01316940-I1
Q01316940-S3
03/29/2026
Special inspection requirement — Footing and Foundation
Adnan Aljuamily
03/29/2026
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Adnan Aljuamily
03/29/2026
Special inspection requirement — Post-installed Anchors
Adnan Aljuamily
03/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adnan Aljuamily
03/29/2026
Special inspection requirement — Final
Adnan Aljuamily
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Addressed
03/16/2026
Objection raised — Zoning
03/16/2026
Objection raised — Structural
02/17/2026
Permit issued — Foundation
Q01308710-I1-FO
02/05/2026
Objection raised — Admin
01/06/2026
Permit issued — Construction Fence
Q01320551-I1-FN
01/03/2026
Filed — Alteration CO
PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION Q01316940-I1
Q01316940-S1
01/02/2026
Objection resolved — Addressed
01/02/2026
Objection resolved — Addressed
12/16/2025
Objection raised — Scope
12/16/2025
Objection raised — Other
12/16/2025
Objection raised — Admin
12/16/2025
Objection raised — Zoning
11/22/2025
Objection resolved — Addressed
11/22/2025
Objection resolved — Addressed
11/22/2025
Objection resolved — Addressed
11/19/2025
Filed — Alteration CO
PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION Q01316940-I1
Q01316940-I1
11/18/2025
Filed — Alteration
Q01320551-I1
11/15/2025
Objection raised — Scope
11/15/2025
Objection raised — Other
11/15/2025
Objection raised — Structural
11/10/2025
Special inspection requirement — Exterior lighting power
Adnan Aljuamily
11/10/2025
Special inspection requirement — Fenestration areas
Adnan Aljuamily
11/10/2025
Special inspection requirement — Lighting controls
Adnan Aljuamily
11/10/2025
Special inspection requirement — Insulation placement and R values
Adnan Aljuamily
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSAIBAY CONSTRUCTION MGNT07/08/2026
DOB NOWGeneral ConstructionPermit IssuedSAIBAY CONSTRUCTION MGNT07/07/2026
DOB NOWFoundationSigned-offSAIBAY CONSTRUCTION MGNT02/17/2026
DOB NOWConstruction FencePermit IssuedSAIBAY CONSTRUCTION MGNT01/06/2026
1 project · most recent 08/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/08/2026——Gas, Water/Sanitary
2 projects · most recent 08/08/2026
Steel Concrete
FiledStatusContractorScope
08/08/2026Permit IssuedSAIBAY CONSTRUCTION MGNTSteel, Concrete
03/29/2026Signed-offSAIBAY CONSTRUCTION MGNT2 scope_items
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/08/2026Fire-Resistant Penetrations and Joints—special
08/08/2026HVAC-R and service water heating system controls—energy_progress
08/08/2026HVAC-R and service water heating equipment—energy_progress
08/08/2026HVAC-R and service water piping design and insulation—energy_progress
08/08/2026Maintenance information—energy_progress
07/07/2026Concrete - Cast-In-PlaceAdnan Aljuamilyspecial
07/07/2026FinalAdnan Aljuamilyprogress
07/07/2026Structural Steel - DetailsAdnan Aljuamilyspecial
07/07/2026Structural Stability – Alterations of existing buildingsAdnan Aljuamilyspecial
07/07/2026Structural Steel - High Strength BoltingAdnan Aljuamilyspecial
07/07/2026Structural Steel - WeldingAdnan Aljuamilyspecial
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026Maintenance information—energy_progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026Fire-Resistant Penetrations and Joints—special
04/13/2026Helical Piles Foundation (BB # 2014-020)Adnan Aljuamilyspecial
04/13/2026Post-installed AnchorsAdnan Aljuamilyspecial
04/13/2026FinalAdnan Aljuamilyprogress
04/13/2026Footing and FoundationAdnan Aljuamilyprogress
04/13/2026Structural Stability – Alterations of existing buildingsAdnan Aljuamilyspecial
03/29/2026Footing and FoundationAdnan Aljuamilyprogress
03/29/2026Helical Piles Foundation (BB # 2014-020)Adnan Aljuamilyspecial
03/29/2026Post-installed AnchorsAdnan Aljuamilyspecial
03/29/2026Structural Stability – Alterations of existing buildingsAdnan Aljuamilyspecial
Latest 25 of 39.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026Q01320551-I1Request digital key ↗
08/18/2026Q01316940-P2Request digital key ↗
08/18/2026Q01316940-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026Q01316940-I1Open ↗
08/13/2026Q01316940-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026Q01316940-I1Open ↗
08/13/2026Q01316940-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01316940-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q01308710-P1Open ↗
09/01/2026Q01308710-P1Open ↗
08/28/2026Q01308710-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q01308710-P1Open ↗
09/01/2026Q01308710-P1Open ↗
09/01/2026Q01308710-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026Q01320551-I1Open ↗
08/18/2026Q01316940-I1Open ↗
08/18/2026Q01316940-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01316940-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01316940-P2Open ↗
08/18/2026Q01316940-I1Open ↗
08/18/2026Q01316940-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01308710-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial1
08/13/2026Q01316940-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01316940-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01316940-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01316940-I1Open ↗
▸DOB NOWTR5H Test Report1
08/15/2026Q01308710-I1Open ↗