| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01215762 ↗ | 157-37 12 ROAD QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/16/2025 | 07/14/2026 | Contractor ARTISTIC DESIGN CORP | HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 2 STORY + CELLAR, 1 FAMILY BUILDING. FULL GUT RENOVATION. NEW PARTITIONS, FINISHES, DOORS, W… |
| Q01316940 ↗ | 10-07 138 PLACE QUEENS | Alteration CO | Permit Issued | 11/19/2025 | 07/08/2026 | Design ADNAN ENGINEERING, P.C. Contractor SAIBAY CONSTRUCTION MGNT | PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION … |
| Q01229217 ↗ | 70-26 72 PLACE QUEENS | Alteration | Permit Issued | 05/27/2025 | 06/23/2026 | Design GRAFEDE ARCHITECTURE, PLLC Contractor MOKEN HOME IMPROVEMENT Filer QUNCIE WILLIAMS | HEREWITH FILLING FOR FOUNDATION WORK TO PROVIDE A NEW EXTERIOR FOOTING FOR STEEL POSTS (EXPOSURE 3). NO CHANGE IN USE, EGRESS OR OCCUPANCY.… |
| Q01079290 ↗ | 34 CENTER DRIVE QUEENS | Alteration CO | Permit Issued | 08/02/2024 | 06/02/2026 | Design MB ARCHITECT PC Contractor ADVANCE CONSTR AND AV SYS | Proposed Vertical and Horizontal Enlargement (addition of 2nd floor) and Renovation of an Existing Single Family House. |
| M01017179 ↗ | 141 MADISON STREET MANHATTAN | Alteration | Permit Issued | 03/14/2024 | 05/14/2026 | Design KNF SERVICES CROP Contractor AVENUE CONTRACTING INC | Plumbing work for installation of new toilet, shower, lavatory, urinal, utility sink and washer on 2nd floor for renovation of exist. 2 Stor… |
| B01303045 ↗ | 837 60 STREET BROOKLYN | Alteration | Permit Issued | 10/28/2025 | 05/11/2026 | Design LAM ENGINEER PC Owner PXP 60st LLC Contractor LIONHEART CONSTRUCTION CO | PROPOSED TO REPLACE PARAPET WALLS AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| ADNAN ENGINEERING, P.C. | 19 | 08/08/2026 |
| JLS DESIGNS | 2 | 06/19/2026 |
| KNF SERVICES CORP | 2 | 03/28/2023 |
| KNF SERVICES CROP | 2 | 04/29/2026 |
| LAM ENGINEER PC | 2 | 10/28/2025 |
| MB ARCHITECT PC | 2 | 03/09/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 1 | 08/06/2026 |
| EXL STRUCTURAL CONSULTANTS | 1 | 10/22/2021 |
| FRANK J QUATELA ARCHITECT P.C | 1 | 07/16/2025 |
| GINO O. LONGO, ARCHITECT | 1 | 11/16/2023 |
| GRAFEDE ARCHITECTURE, PLLC | 1 | 08/06/2026 |
| INFINITY DESIGN CONSULTANT INC | 1 | 07/07/2022 |
| OAMS ARCHITECTURAL DESIGN P.L.L.C. | 1 | 06/19/2024 |
| PALETTE ARCHITECTURE | 1 | 06/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| NYCMC CORP | 3 | 04/29/2026 |
| SAFE WAY CONSTRUCTION COR | 3 | 06/11/2025 |
| SAIBAY CONSTRUCTION MGNT | 3 | 08/08/2026 |
| ARTISTIC DESIGN CORP | 2 | 06/19/2026 |
| GI ENDURANT LLC | 2 | 07/11/2025 |
| LIONHEART CONSTRUCTION CO | 2 | 10/28/2025 |
| ADRIANO PLMBG & HTG CORP | 1 | 06/19/2026 |
| ADVANCE CONSTR AND AV SYS | 1 | 08/07/2025 |
| AQUEDUCT MECHANICAL CORP | 1 | 08/07/2025 |
| ARIES CONSTRUCTION CO,INC | 1 | 06/19/2026 |
| AVENUE CONTRACTING INC | 1 | 04/29/2026 |
| CASA GRANDE CONSTRUCTION | 1 | 04/02/2025 |
| CATALANO PLBG & HTG INC | 1 | 02/10/2023 |
| GREEN CASTLE A MGMT CORP | 1 | 11/16/2023 |
| ILG MECH SERVICES, INC | 1 | 04/29/2026 |
| ILG MECH SERVICES,INC | 1 | 04/29/2026 |
| JADA PLUMBING & HTG LLC | 1 | 04/13/2024 |
| JS CONCRETE & MASONRY LLC | 1 | 11/16/2023 |
| K-LASH CONSTRUCTION CORP | 1 | 07/07/2022 |
| KANARIS CONTRACTING CORP | 1 | 06/30/2025 |
| MOKEN HOME IMPROVEMENT | 1 | 08/06/2026 |
| ORIENTAL AIR TRANSPORT SERVICE | 1 | 06/19/2024 |
| POINT H. REALTY CORP | 1 | 05/08/2024 |
| PRO CON GROUP INC | 1 | 01/17/2026 |
| ROCK E SMALL PLBG&HTG INC | 1 | 03/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ARAS PROPERTIES | 3 | 06/11/2025 |
| NYC DEPARTMENT OF ENVIRONMENTAL PRO | 3 | 04/29/2026 |
| BIH Y WU TRUST | 1 | 07/28/2025 |
| Casa Grande Construction LLC | 1 | 04/02/2025 |
| Charter Communications | 1 | 12/27/2019 |
| JCIAMPA COMPANY | 1 | 03/23/2022 |
| K-LASH CONSTRUCTION CORP | 1 | 07/07/2022 |
| MESTOUSIS ENTERPRISES | 1 | 05/08/2024 |
| ORIENTAL AIR TRANSPORT SERVICE | 1 | 06/19/2024 |
| PXP 60st LLC | 1 | 10/28/2025 |
| RSB PROPERTIES LLC | 1 | 11/16/2023 |
| SUMMIT RIDGE ENERGY | 1 | 07/11/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| JLS DESIGNS | 3 | 06/19/2026 |
| PNP MANAGEMENT AND CONSULTING INC | 3 | 04/29/2026 |
| GINO O. LONGO R.A. | 1 | 11/16/2023 |
| LIQUID DESIGN STUDIO & ASSOCIATES | 1 | 10/28/2025 |
| Manetta architecture design pllc | 1 | 07/16/2025 |
| N AND N CONSULTANT CORP. | 1 | 06/28/2022 |
| QUNCIE WILLIAMS | 1 | 08/06/2026 |
| THE GREEN STUDIO | 1 | 07/07/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01215762 ↗ | 157-37 12 ROAD QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/16/2025 | 07/14/2026 | Contractor ARTISTIC DESIGN CORP | HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 2 STORY + CELLAR, 1 FAMILY BUILDING. FULL GUT RENOVATION. NEW PARTITIONS, FINISHES, DOORS, W… |
| Q01316940 ↗ | 10-07 138 PLACE QUEENS | Alteration CO | Permit Issued | 11/19/2025 | 07/08/2026 | Design ADNAN ENGINEERING, P.C. Contractor SAIBAY CONSTRUCTION MGNT | PROPOSED PARTIAL 3RD FLOOR ADDITION AND INTERIOR RENOVATIONS TO A EXISTING 1 FAMILY DWELLING. IN CONJUNCTION WITH ARCHITECTURAL APPLICATION … |
| Q01229217 ↗ | 70-26 72 PLACE QUEENS | Alteration | Permit Issued | 05/27/2025 | 06/23/2026 | Design GRAFEDE ARCHITECTURE, PLLC Contractor MOKEN HOME IMPROVEMENT Filer QUNCIE WILLIAMS | HEREWITH FILLING FOR FOUNDATION WORK TO PROVIDE A NEW EXTERIOR FOOTING FOR STEEL POSTS (EXPOSURE 3). NO CHANGE IN USE, EGRESS OR OCCUPANCY.… |
| Q01079290 ↗ | 34 CENTER DRIVE QUEENS | Alteration CO | Permit Issued | 08/02/2024 | 06/02/2026 | Design MB ARCHITECT PC Contractor ADVANCE CONSTR AND AV SYS | Proposed Vertical and Horizontal Enlargement (addition of 2nd floor) and Renovation of an Existing Single Family House. |
| M01017179 ↗ | 141 MADISON STREET MANHATTAN | Alteration | Permit Issued | 03/14/2024 | 05/14/2026 | Design KNF SERVICES CROP Contractor AVENUE CONTRACTING INC | Plumbing work for installation of new toilet, shower, lavatory, urinal, utility sink and washer on 2nd floor for renovation of exist. 2 Stor… |
| B01303045 ↗ | 837 60 STREET BROOKLYN | Alteration | Permit Issued | 10/28/2025 | 05/11/2026 | Design LAM ENGINEER PC Owner PXP 60st LLC Contractor LIONHEART CONSTRUCTION CO | PROPOSED TO REPLACE PARAPET WALLS AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01070228 ↗ | 104-18 37 DRIVE QUEENS | Alteration | Permit Issued | 06/28/2024 | 04/08/2026 | Design MB ARCHITECT PC Contractor URENA CONST & DESIGN INC | Plumbing Work in Conjunction with application Q01070228-I1 |
| X01320271 ↗ | 930 ZEREGA AVENUE BRONX | Alteration | Permit Issued | 11/20/2025 | 03/04/2026 | Design ADNAN ENGINEERING, P.C. Contractor PRO CON GROUP INC | Filing Alt-St filing in conjunction with JOB # X01320271-I1 for Partial 2nd Floor Horizontal Enlargement, on an Existing 2 Story Building a… |
| Q01308710 ↗ | 10-07 138 PLACE QUEENS | Alteration | Signed-off | 10/26/2025 | 02/17/2026 | Design ADNAN ENGINEERING, P.C. Contractor SAIBAY CONSTRUCTION MGNT | REPAIR TO STRENGTHEN THE EXISTING FOUNDATION BY ADDING NEW HELICAL PILES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00674458 ↗ | 27 PERRY STREET MANHATTAN | Alteration | Signed-off | 02/22/2022 | 10/10/2025 | Design ADNAN ENGINEERING, P.C. Contractor SUBITO BUILDERS GROUP INC | ST scope: Install dunnage connecting to existing dunnage supporting AC units at roof. No interior work, work at roof.No change to egress ,us… |
| Q00895709 ↗ | 83-19 116 STREET QUEENS | Alteration | Signed-off | 07/26/2023 | 09/18/2025 | Design ADNAN ENGINEERING, P.C. Owner ARAS PROPERTIES Contractor SAFE WAY CONSTRUCTION COR | PROPOSED WORK FOR NEW WALKING SURFACES & HANDICAPPED ACCESSIBLE CONCRETE RAMP IN BASEMENT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.RAISE EXISTI… |
| Q01245782 ↗ | 19-79 STEINWAY STREET QUEENS | Alteration | Signed-off | 06/30/2025 | 07/23/2025 | Design ADNAN ENGINEERING, P.C. Contractor KANARIS CONTRACTING CORP | HEREWITH FILLING FOR STRUCTURAL WORK TO PROVIDE A NEW OPENINGS IN THE EXTERIOR FRONT WALL (EXPOSURE 1). PROVIDE NEW LINTELS/BEAMS WITH TEMP… |
| X01231937 ↗ | 1755 SEWARD AVENUE BRONX | Alteration | Signed-off | 05/29/2025 | 07/21/2025 | Design ADNAN ENGINEERING, P.C. Contractor SAIBAY CONSTRUCTION MGNT | REPAIRING EXTERIOR WALL & PARAPET ACCORDING TO EMERGENCY DECLARATION OP32NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01068223 ↗ | 145-50 6 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 06/20/2024 | 05/21/2025 | Design JLS DESIGNS Contractor ARTISTIC DESIGN CORP Filer JLS DESIGNS | PROPOSED VERTICAL AND HORIZONTAL 2 STORY EXTENSION TO A 2 STORY RESIDENCE. |
| Q01048542 ↗ | 56-01 39 AVENUE QUEENS | Alteration | Signed-off | 06/05/2024 | 05/14/2025 | Design LAM ENGINEER PC Owner BIH Y WU TRUST Contractor LIONHEART CONSTRUCTION CO | PROPOSED EXTERIOR STRUCTURAL WORK, REPLACE STEEL LINTELS, BRICKS, AND PARAPET WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01204581 ↗ | 25-53 90 STREET QUEENS | Alteration | Signed-off | 04/02/2025 | 04/14/2025 | Design ADNAN ENGINEERING, P.C. Contractor CASA GRANDE CONSTRUCTION | Provide temporary shoring for the damaged roof as shown in the plan. Work already completed as per the emergency work request from Departmen… |
| B01031108 ↗ | 1323 AVENUE I BROOKLYN | Alteration | Signed-off | 04/13/2024 | 01/03/2025 | Design ADNAN ENGINEERING, P.C. Contractor JADA PLUMBING & HTG LLC | INSTALLING 3 NEW WASHING MACHINES & 3 ELECTRIC DRYERS. AND REPAIRING CEILING AND WALL PENETRATIONS WITH 1 HRS GYPSUM BOD. PATCHED AND PAINTE… |
| Q01027217 ↗ | 175-41 148 STREET QUEENS | Alteration | Signed-off | 05/01/2024 | 12/03/2024 | Contractor VENUS GENERAL CONSTRUCT* | APPLICATION HEREWITH FILED TO SUPERSEDE JOB# 400700041 TO EXPAND AN EXISTING LOADING DOCK. NO CHANGE IN USE OR OCCUPANCY. |
| X00885836 ↗ | 1250 OAK POINT AVENUE BRONX | Alteration | Signed-off | 06/08/2023 | 09/12/2024 | Design ADNAN ENGINEERING, P.C. Owner MESTOUSIS ENTERPRISES Contractor POINT H. REALTY CORP | REMOVING WOOD FRAME PORTION AND REDUCING BULK. |
| X00951565 ↗ | 3000 MIDDLETOWN ROAD BRONX | Alteration | Signed-off | 10/24/2023 | 01/31/2024 | Design ADNAN ENGINEERING, P.C. Owner RSB PROPERTIES LLC Contractor GREEN CASTLE A MGMT CORP Filer GINO O. LONGO R.A. | Emergency work, Temporary shoring to support exterior wall damaged by car crash, Vacate order VIO23-02869 |
| Q00855108 ↗ | 143-25 84 DRIVE QUEENS | Alteration | Signed-off | 04/18/2023 | 07/10/2023 | Design ADNAN ENGINEERING, P.C. Owner ARAS PROPERTIES Contractor SAFE WAY CONSTRUCTION COR | installation of accessible ramp in open space and garage |
| Q00818450 ↗ | 107 AVENUE QUEENS | Alteration | Signed-off | 01/26/2023 | 07/07/2023 | Design KNF SERVICES CORP Contractor NYCMC CORP | Filing for NYCDEP BWSO-JOC'S IN-HOUSE Routine Facility upgrading project to built a new Open Space Concrete Spoil & Debris management pad. … |
| Q00675857 ↗ | 38-13 23 STREET QUEENS | Alteration | Signed-off | 03/23/2022 | 06/20/2023 | Design ADNAN ENGINEERING, P.C. Owner JCIAMPA COMPANY Contractor VEZANDIO CONTRACTING CORP | SUPPORT WALL ABOVE NEW OPENINGS WITH STEEL FRAMEINCLUDING COLUMNS AND BEAMS AS WELL AS WALL REPAIRACCORDING TO VIOLATION # VIO21-01858 |
| X00851069 ↗ | 930 ZEREGA AVENUE | Alteration | Signed-off | 03/28/2023 | 04/26/2023 | Design KNF SERVICES CORP Contractor NYCMC CORP | Filing for NYCDEP BWSO-JOC'S IN-HOUSE Routine Facility upgrading project to build a new Open Space Concrete Spoil & Debris management pad. P… |
| S00558291 ↗ | HYLAN BOULEVARD STATEN ISLAND | Alteration CO | Permit Issued | 09/03/2021 | 02/10/2023 | Design JLS DESIGNS Owner SUMMIT RIDGE ENERGY Contractor GI ENDURANT LLC Filer JLS DESIGNS | Installation of battery storage cabinets, transformers, switchgear, site fence on grade. This is filed as a Small Electric Utility, Zoning U… |
| X00604317 ↗ | GUNTHER AVENUE BRONX | Alteration | Signed-off | 10/22/2021 | 02/10/2023 | Design EXL STRUCTURAL CONSULTANTS Contractor GI ENDURANT LLC Filer JLS DESIGNS | Prepare site and install structural concrete pads for Battery energy storage system filed under separate application |
| B00755955 ↗ | 460 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2022 | 08/16/2022 | Design PALETTE ARCHITECTURE Owner ARAS PROPERTIES Contractor SAFE WAY CONSTRUCTION COR Filer N AND N CONSULTANT CORP. | FILING HEREWITH APPLICATION FOR MINOR REPOINTING OF FACADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| S00760198 ↗ | 23 LYON PLACE STATEN ISLAND | Alteration | Permit Issued | 07/07/2022 | 07/13/2022 | Owner K-LASH CONSTRUCTION CORP Contractor K-LASH CONSTRUCTION CORP Filer THE GREEN STUDIO | Renovation of the existing one family house as per plan. No change to use, egress or occupancy under this application. |
| X00648895 ↗ | 1522 PAULDING AVENUE BRONX | Alteration | Signed-off | 12/17/2021 | 05/13/2022 | Design ADNAN ENGINEERING, P.C. Contractor WJ PROFESSIONAL EXPEDITIN | APPLICATION FILED TO REMOVE VIOLATION# 021821CCER01DY, AND FOR REPARATION OF DAMAGED EXISTING 3 STORY, 3 FAMILY BUILDING. SISTER EXISTING JO… |
| X00729515 ↗ | 1522 PAULDING AVENUE BRONX | Alteration | Signed-off | 05/03/2022 | 05/05/2022 | Design ADNAN ENGINEERING, P.C. Contractor CATALANO PLBG & HTG INC | plumbing work in conjunction with GC X00648895 |
| X00650415 ↗ | 1503 HOE AVENUE BRONX | Alteration | Signed-off | 12/18/2021 | 01/07/2022 | Design ADNAN ENGINEERING, P.C. Contractor VAN NEST CONSTRUCTION | REMOVING EXISTING RUBBLE (SHORT)RETAINING WALL AND INSTALLING A NEW CMU RETAINING WAL. |
| S00287658 ↗ | 100 CABLE WAY STATEN ISLAND | Alteration | Filed — no permit on record | 12/27/2019 | — | Design ADNAN ENGINEERING, P.C. Owner Charter Communications | — |
| X00230950 ↗ | 795 EAST 161 STREET BRONX | Alteration | Filed — no permit on record | 10/19/2019 | — | Design ADNAN ENGINEERING, P.C. | — |
| Building | Filings | Most Recent |
|---|---|---|
| 10-07 138 PLACE ↗ | 5 | 07/02/2026 |
| 70-26 72 PLACE ↗ | 2 | 06/16/2026 |
| 145-50 6 AVENUE ↗ | 4 | 06/01/2026 |
| 930 ZEREGA AVENUE ↗ | 3 | 01/17/2026 |
| 104-18 37 DRIVE ↗ | 2 | 12/23/2025 |
| 837 60 STREET ↗ | 1 | 10/28/2025 |
| 56-01 39 AVENUE ↗ | 3 | 07/28/2025 |
| 157-37 12 ROAD ↗ | 1 | 07/16/2025 |
| HYLAN BOULEVARD ↗ | 5 | 07/11/2025 |
| 19-79 STEINWAY STREET ↗ | 1 | 06/30/2025 |
| 83-19 116 STREET ↗ | 2 | 06/11/2025 |
| 1755 SEWARD AVENUE ↗ | 1 | 05/29/2025 |
| 25-53 90 STREET ↗ | 1 | 04/02/2025 |
| 34 CENTER DRIVE ↗ | 2 | 03/09/2025 |
| 141 MADISON STREET ↗ | 3 | 12/06/2024 |
| 175-41 148 STREET ↗ | 1 | 06/19/2024 |
| 1250 OAK POINT AVENUE ↗ | 2 | 05/08/2024 |
| 1323 AVENUE I ↗ | 1 | 04/13/2024 |
| 3000 MIDDLETOWN ROAD ↗ | 2 | 11/16/2023 |
| 143-25 84 DRIVE ↗ | 2 | 07/27/2023 |
| 930 ZEREGA AVENUE ↗ | 1 | 03/28/2023 |
| 1522 PAULDING AVENUE ↗ | 4 | 02/10/2023 |
| 107 AVENUE ↗ | 1 | 01/26/2023 |
| 23 LYON PLACE ↗ | 1 | 07/07/2022 |
| 460 ATLANTIC AVENUE ↗ | 1 | 06/28/2022 |
| 38-13 23 STREET ↗ | 1 | 03/23/2022 |
| 27 PERRY STREET ↗ | 1 | 02/22/2022 |
| 1503 HOE AVENUE ↗ | 3 | 01/05/2022 |
| GUNTHER AVENUE ↗ | 1 | 10/22/2021 |
| 100 CABLE WAY ↗ | 1 | 12/27/2019 |
| 795 EAST 161 STREET ↗ | 1 | 10/19/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/30/2026 | HVAC-R and service water piping design and insulation | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Permanent certificate | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Fenestration and door U-factor and product ratings | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | HVAC-R and service water heating equipment | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Fenestration air leakage | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Interior lighting power | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | HVAC-R and service water heating system controls | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Insulation placement and R values | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Ventilation and air distribution system | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Air barrier - visual inspection | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Electric vehicle service equipment requirements | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Fenestration areas | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Air barrier — testing | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Duct leakage testing, insulation and design | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Maintenance information | 145-50 6 AVENUE | JOSEPH SULTANA, JR | energy_progress |
| 07/30/2026 | Energy Code Compliance Inspections | 145-50 6 AVENUE | JOSEPH SULTANA, JR | progress |
| 07/30/2026 | Footing and Foundation | 145-50 6 AVENUE | JOSEPH SULTANA, JR | progress |
| 07/30/2026 | Preliminary | 145-50 6 AVENUE | JOSEPH SULTANA, JR | progress |
| 07/30/2026 | Fire-Resistance Rated Construction | 145-50 6 AVENUE | JOSEPH SULTANA, JR | progress |
| 07/30/2026 | Final | 145-50 6 AVENUE | JOSEPH SULTANA, JR | progress |
| 07/30/2026 | Structural Stability – Alterations of existing buildings | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Exterior Insulation and Finish Systems (EIFS) | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Excavations - Sheeting, Shoring, and Bracing | 145-50 6 AVENUE | Adnan Aljuamily | special |
| 07/30/2026 | Concrete - Cast-In-Place | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Mechanical Systems | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Subsurface Investigations (Borings/Test Pits) | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/30/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 07/07/2026 | Structural Steel - Welding | 10-07 138 PLACE | Adnan Aljuamily | special |
| 07/07/2026 | Concrete - Cast-In-Place | 10-07 138 PLACE | Adnan Aljuamily | special |
| 07/07/2026 | Final | 10-07 138 PLACE | Adnan Aljuamily | progress |
| 07/07/2026 | Structural Steel - Details | 10-07 138 PLACE | Adnan Aljuamily | special |
| 07/07/2026 | Structural Stability – Alterations of existing buildings | 10-07 138 PLACE | Adnan Aljuamily | special |
| 07/07/2026 | Structural Steel - High Strength Bolting | 10-07 138 PLACE | Adnan Aljuamily | special |
| 06/17/2026 | Concrete - Cast-In-Place | 70-26 72 PLACE | Adnan Aljuamily | special |
| 06/17/2026 | Structural Stability – Alterations of existing buildings | 70-26 72 PLACE | Adnan Aljuamily | special |
| 06/17/2026 | Post-installed Anchors | 70-26 72 PLACE | Adnan Aljuamily | special |
| 06/17/2026 | Final | 70-26 72 PLACE | Adnan Aljuamily | progress |
| 06/17/2026 | Footing and Foundation | 70-26 72 PLACE | Adnan Aljuamily | progress |
| 06/14/2026 | Structural Stability – Alterations of existing buildings | 70-26 72 PLACE | — | special |
| 06/14/2026 | Post-installed Anchors | 70-26 72 PLACE | — | special |
| 06/11/2026 | Concrete - Cast-In-Place | 70-26 72 PLACE | Adnan Aljuamily | special |
| 06/11/2026 | Final | 70-26 72 PLACE | Adnan Aljuamily | progress |
| 06/11/2026 | Footing and Foundation | 70-26 72 PLACE | Adnan Aljuamily | progress |
| 04/28/2026 | Concrete - Cast-In-Place | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 04/28/2026 | Excavations - Sheeting, Shoring, and Bracing | 145-50 6 AVENUE | Adnan Aljuamily | special |
| 04/28/2026 | Exterior Insulation and Finish Systems (EIFS) | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 04/28/2026 | Mechanical Systems | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |
| 04/28/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 145-50 6 AVENUE | JOSEPH SULTANA, JR | special |