← Back
Predominantly retail with other uses
10-15 43 AVENUE
QUEENS · Long Island City-Hunters Point · BIN 4624724
💬 Discuss this project
2023Year Built
3Stories
K4Building Class
M1-5AZoning
7,123 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: INCEPTION REALTY, LLC · 4,377 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Roof61p · 1 filing · 20 docs
Floor 3Under Construction61p · 3 filings · 20 docs
Floor 261p · 2 filings · 20 docs
Floor 158p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOJO LIC HOLDINGS6207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2022$2.5M—10-15 43RD AVENUE CORP. → INCEPTION REALTY, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DITTA MALITO CONSTRUCTIO*General Contractor1707/08/2026
EMPIRE STATE ELECTL CORPElectrical303/22/2026
NY TENT, LLCGeneral Contractor207/03/2026
PERCIBALLI INDUSTRIES INC.General Contractor203/21/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
STANDARD PLBG SVS LLCPlumbing107/08/2026
SHEELIN CONCRETE CONTRACTGeneral Contractor107/08/2026
NEPTUNE MECHANICAL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864905/10/2024
NEW AGE ENGINEERING PLLC77461104/19/2024
Building Lifecycle
All (162)Filed (23)Permit Issued (14)Signed Off (8)Violation (2)Inspection (9)Objection (76)Special Inspection (30)
10/28/2025
Permit issued — Structural
Q01121360-I1-ST
07/29/2025
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
07/18/2025
Filed — No Work
Q00898405-P3
06/30/2025
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
10/29/2024
Objection resolved — Addressed
10/25/2024
Objection raised — Other
10/23/2024
Permit issued — Structural
Q01121360-I1-ST
10/16/2024
Filed — Alteration
Q01121360-I1
10/16/2024
Filed — No Work
Q00898405-P2
10/10/2024
Special inspection requirement — Public Assembly Emergency Lighting
JUAN GOMEZ
06/25/2024
Signed off — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-S5
05/30/2024
Signed off — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-S3
05/29/2024
Signed off — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-S6
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JUAN GOMEZ
05/20/2024
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
05/20/2024
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
05/20/2024
Special inspection requirement — Final
JUAN GOMEZ
05/20/2024
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
05/20/2024
Special inspection requirement — Masonry
JUAN GOMEZ
05/20/2024
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
05/14/2024
Signed off — Alteration
FILING HEREWITH FOR CC APPLCATION RELATED TO BPP FILING 440764969 AND NB APPLICATION Q00741431.
Q00852408-I1
05/10/2024
Filed — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-A2
05/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/06/2024
Signed off — Alteration
FILING HEREWITH FOR CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION Q00741431. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
Q00809671-I1
05/06/2024
Special inspection requirement — Masonry
JUAN GOMEZ
05/06/2024
Special inspection requirement — Final
JUAN GOMEZ
05/06/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JUAN GOMEZ
05/06/2024
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
05/06/2024
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
05/06/2024
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
05/06/2024
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
04/30/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/26/2024
Permit issued — Curb Cut
Q00852408-I1-CC
04/23/2024
Special inspection requirement — Maintenance information
JUAN GOMEZ
04/23/2024
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
04/23/2024
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
04/23/2024
Special inspection requirement — Fenestration areas
JUAN GOMEZ
04/23/2024
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
04/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
04/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
04/23/2024
Special inspection requirement — Lowest Floor Elevation
JUAN GOMEZ
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
04/23/2024
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
04/23/2024
Special inspection requirement — Metering
JUAN GOMEZ
04/23/2024
Special inspection requirement — Subgrade Inspections
JUAN GOMEZ
04/19/2024
Filed — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-A1
03/22/2024
Signed off — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-S4
03/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/22/2024
Objection raised — Other
02/22/2024
Objection resolved — Addressed
02/07/2024
Filed — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-P8
01/30/2024
Filed — New Building
Structural work related to a new 2 story building as per plans.
Q00741431-P6
01/29/2024
Objection resolved — Addressed
01/29/2024
Objection resolved — Addressed
01/26/2024
Objection resolved — Addressed
01/25/2024
Objection resolved — Addressed
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedNY TENT, LLC10/28/2025
DOB NOWStructuralPermit IssuedNY TENT, LLC10/23/2024
DOB NOWCurb CutSigned-offSHEELIN CONCRETE CONTRACT04/26/2024
DOB NOWGeneral ConstructionPermit IssuedDITTA MALITO CONSTRUCTIO*10/25/2023
DOB NOWMechanical SystemsSigned-offNEPTUNE MECHANICAL INC07/21/2023
DOB NOWMechanical SystemsSigned-offDITTA MALITO CONSTRUCTIO*06/30/2023
DOB NOWGeneral ConstructionPermit IssuedDITTA MALITO CONSTRUCTIO*06/20/2023
DOB NOWPlumbingSigned-offA&H PLUMBING,LLC06/20/2023
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP06/20/2023
DOB NOWConstruction FenceSigned-offDITTA MALITO CONSTRUCTIO*03/17/2023
DOB NOWFoundationSigned-offDITTA MALITO CONSTRUCTIO*03/15/2023
DOB NOWSupport of ExcavationSigned-offDITTA MALITO CONSTRUCTIO*03/15/2023
DOB NOWStructuralSigned-offDITTA MALITO CONSTRUCTIO*03/15/2023
DOB NOWConstruction FenceSigned-offPERCIBALLI INDUSTRIES INC.01/20/2023
1 project · most recent 05/10/2024
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/10/2024Permit IssuedDITTA MALITO CONSTRUCTIO*Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PMFY-P06NBMU-ER5 27,000 BTU · Vrf Indoor ×6
PUHY-EP120TNU-A 135,000 BTU · Vrf Outdoor ×6
PLFY-EP12NEMU-E 13,500 BTU · Vrf Indoor ×4
PLFY-EP24NEMU-E 27,000 BTU · Vrf Indoor ×4
PVFY-48NA-MU-E1 54,000 BTU · Vrf Indoor ×4
PK-FY-P06NLMU-E 6,700 BTU · Vrf Indoor ×2
PLFY-EP06NEMU-E 6,700 BTU · Vrf Indoor ×2
PMFY-P08NBMU-ER5 9,000 BTU · Vrf Indoor ×2
PVFY-P24NA-MU-E1 27,000 BTU · Vrf Indoor ×2
Ventilation
Mitsubishi Electric PEFY-P36NMHU-E-OA 40,000 BTU · Vrf Indoor ×4
PEFY-P48NMHU-E-OA 54,000 BTU · Vrf Indoor ×2
Big Ass Fans ESSENCE 34,046 CFM · Exhaust Fan ×4
Greenheck 090G 855 CFM · Exhaust Fan ×2
Panasonic F-0511VK2 50 CFM · Exhaust Fan ×2
Refrigeration
Kramer KFH300L44DA 24,730 BTU · Refrigeration Unit ×4
1 project · most recent 05/10/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/10/2024Signed-offSTANDARD PLBG SVS LLCGas, Storm, Water/Sanitary
4 projects · most recent 04/01/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
04/01/2024CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
08/15/2023CompleteDIFAZIO ELECTRIC NY, INCGeneral Wiring
06/19/2023CompleteEMPIRE STATE ELECTL CORP—
06/19/2023CompleteEMPIRE STATE ELECTL CORPHVAC Wiring
1 project · most recent 05/10/2024
Steel Concrete Masonry
FiledStatusContractorScope
05/10/2024Permit IssuedDITTA MALITO CONSTRUCTIO*Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/30/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
07/29/2025Public Assembly Emergency LightingJUAN GOMEZprogress
06/30/2025Public Assembly Emergency LightingJUAN GOMEZprogress
10/10/2024Public Assembly Emergency LightingJUAN GOMEZprogress
05/20/2024FinalJUAN GOMEZprogress
05/20/2024Structural Steel - DetailsJUAN GOMEZspecial
05/20/2024Structural Steel - High Strength BoltingJUAN GOMEZspecial
05/20/2024Post-installed AnchorsJUAN GOMEZspecial
05/20/2024Structural Steel - WeldingJUAN GOMEZspecial
05/20/2024MasonryJUAN GOMEZspecial
05/20/2024Concrete - Cast-In-PlaceJUAN GOMEZspecial
05/06/2024Concrete - Cast-In-PlaceJUAN GOMEZspecial
05/06/2024MasonryJUAN GOMEZspecial
05/06/2024Post-installed AnchorsJUAN GOMEZspecial
05/06/2024Structural Steel - DetailsJUAN GOMEZspecial
05/06/2024Structural Steel - High Strength BoltingJUAN GOMEZspecial
05/06/2024Structural Steel - WeldingJUAN GOMEZspecial
05/06/2024FinalJUAN GOMEZprogress
04/23/2024Fenestration air leakageJUAN GOMEZenergy_progress
04/23/2024Electrical motors and elevatorsJUAN GOMEZenergy_progress
04/23/2024Fenestration areasJUAN GOMEZenergy_progress
04/23/2024Interior lighting powerJUAN GOMEZenergy_progress
04/23/2024Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
04/23/2024Lowest Floor ElevationJUAN GOMEZprogress
04/23/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
04/23/2024Subgrade InspectionsJUAN GOMEZspecial
Latest 25 of 119.
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
08/25/2026Q00809671-I1Request digital key ↗
08/24/2026Q00852408-I1Request digital key ↗
08/22/2026Q00741431-P2Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/23/2026Q00898381-I1Request digital key ↗
08/21/2026Q00898405-P2Request digital key ↗
08/21/2026Q00898405-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
03/25/2024440764969Open ↗
12/12/2023440764969Open ↗
08/24/2023440764969Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/11/2024440764969Open ↗
09/11/2023440764969Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
07/10/2023440764969Open ↗
03/23/2023440764969Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications143
▸DOB NOWProgress Inspector Seal & Signature89
09/02/2026Q00741431-P3Open ↗
09/02/2026Q00741431-P3Open ↗
09/02/2026Q00741431-P3Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/02/2026Q00741431-P3Open ↗
09/02/2026Q00741431-P3Open ↗
09/02/2026Q00741431-P3Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026Q00809671-I1Open ↗
08/24/2026Q00852408-I1Open ↗
08/23/2026Q00898381-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/18/2023440764969Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2023440764969Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
04/15/2024440764969Open ↗
09/11/2023440764969Open ↗
05/10/2023440764969Open ↗
▸BISSTREET TREES SITE PLAN1
08/30/2024440764969Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00741431-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00741431-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00741431-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00741431-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCURB CUT (CC) SIGNOFF1
08/30/2024440764969Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION6
06/11/2024440764969Open ↗
04/15/2024440764969Open ↗
12/28/2023440764969Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/18/2023440764969Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/22/2026Q00741431-P5Open ↗
08/15/2026Q00741431-P3Open ↗
08/15/2026Q00741431-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 12
08/21/2026Q00898405-I1Open ↗
08/21/2026Q00898405-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00741431-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00741431-S2Open ↗