| X00883722 ↗ | 715 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 09/30/2026 | Owner Douglaston Development Contractor VIEW 360 CONSTRUCTION INC Filer JM ZONING, LLC. | GENERAL CONSTRUCTION (GC) AND EARTHWORK (EA) RELATED TO RENOVATION OF OUTSIDE PREMISES (OSP); SCOPE OF WORK INCLUDES PAVING, CONCRETE CURBS … |
| B01379260 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Permit Issued | 03/27/2026 | 09/18/2026 | Contractor SIGNATURE CONSTRUCTION GROUP | STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH, NO CHANGE IN USE EGRESS OR OCCUPANCY, |
| B01387227 ↗ | 3002 FT HAMILTON PARKWAY BROOKLYN | Alteration CO | Permit Issued | 04/20/2026 | 09/14/2026 | Contractor WESBUILT CONSTRUCTION MAN Filer JM ZONING, LLC. | Playground equipment installation. |
| M01400417 ↗ | 55 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 05/12/2026 | 09/09/2026 | Contractor EMPIRE PROP PARTNERS LLC* Filer DOMANI CONSULTING | PROVIDE A NEW CONVIENANCE STAIR FROM 5TH FLOOR TO PENTHOUSE LEVEL |
| M01184444 ↗ | 112 WEST 88 STREET MANHATTAN | Alteration | Permit Issued | 03/12/2025 | 09/08/2026 | Contractor AQUEDUCT MECHANICAL CORP Filer DHD ARCHITECTURE, PC | Replace, relocate and remove plumbing fixtures on the basement and 1st floor. Plumbing work. No change in use, occupancy or egress. |
| M01434550 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 09/03/2026 | Owner Parkview Financial Contractor TRITON CONSTRUCTION CO., Filer METROPOLIS GROUP INC | FILING HEREWITH ALTERATIONS TO THE EXISTING NEW STEEL FRAMED STRUCTURE. NEW STAIR OPENING IN THE 7TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE … |
| Person | Filings | Most recent |
|---|---|---|
| BRADFORD KIEFER | 100 | 08/10/2026 |
| Heather Schuster | 35 | 09/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CANY ARCHITECTURE & ENGINEERING DPC | 6 | 05/12/2026 |
| DAGHER ENGINEERING PLLC | 6 | 05/12/2026 |
| SLM ARCHITECTURE, P.C. | 6 | 05/12/2026 |
| EP ENGINEERING LLC | 4 | 08/24/2026 |
| LOCI ARCHITECTURE PLLC | 4 | 09/14/2026 |
| STUDIOS ARCHITECTURE | 4 | 07/02/2026 |
| DERIVE ENGINEERS | 3 | 08/11/2026 |
| GEA CONSULTING ENGINEERS | 3 | 08/19/2026 |
| ANCORA ENGINEERING, PLLC | 2 | 08/12/2026 |
| COSENTINI ASSOCIATES | 2 | 07/02/2026 |
| DHD ARCHITECTURE DESIGN PLLC | 2 | 05/13/2026 |
| FMC ENGINEERING | 2 | 08/24/2026 |
| FNA ENGINEERING SERVICES PC | 2 | 09/14/2026 |
| GENSLER | 2 | 08/24/2026 |
| GEODESIGN INC. PC | 2 | 05/10/2024 |
| HILL WEST ARCHITECTS | 2 | 02/02/2026 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 05/13/2025 |
| LANGAN ENGINEERING | 2 | 01/06/2026 |
| MEYERS+ ENGINEERS | 2 | 11/18/2025 |
| MG ENGINEERING D.P.C. | 2 | 01/22/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 2 | 03/17/2026 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 07/08/2025 |
| ABSRD Architecture PLLC | 1 | 04/28/2026 |
| ANDREW KATZ ENGINEERS | 1 | 05/27/2026 |
| ASDA ARCHITECTURE + DESIGN | 1 | 04/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| VIEW 360 CONSTRUCTION INC | 6 | 05/12/2026 |
| DUAL FUEL COMPANY LLC | 5 | 05/12/2026 |
| DUAL FUEL PLUBING & HTING | 5 | 05/12/2026 |
| HISPANIC ENTERPRISES INC | 5 | 05/12/2026 |
| INPRO PLUMBING CORP | 5 | 05/12/2026 |
| J.E. LEVINE BUILDER INC | 5 | 05/12/2026 |
| PRESS BUILDERS INC | 5 | 08/19/2026 |
| SIGNATURE CONSTRUCTION GR | 4 | 06/25/2026 |
| TRITON CONSTRUCTION CO., | 4 | 07/31/2026 |
| BLDG INCORPORATED | 3 | 12/08/2025 |
| CELTIC GENERAL CONTRACT | 3 | 06/01/2023 |
| HLB CONSTRUCTION CORP | 3 | 07/07/2026 |
| JRM CONSTRUCTION MGMT LLC | 3 | 07/02/2026 |
| KG SPRINKLER CORP | 3 | 02/02/2026 |
| STEVEN DUBNER LANDSCAPING | 3 | 01/06/2026 |
| WESBUILT CONSTRUCTION MAN | 3 | 09/14/2026 |
| ADVANCED PLUMBING MECH | 2 | 08/07/2025 |
| AMM GEN'L CONTRACTING INC | 2 | 06/23/2026 |
| BEDROCK MECHANICAL INC | 2 | 06/25/2026 |
| CERTIFIED OF N.Y. INC | 2 | 01/22/2026 |
| DARBY CONSTRUCTION SVC LL | 2 | 03/17/2026 |
| DONATO PLUMBING, INC | 2 | 07/07/2026 |
| ELYSIUM CONSTRUCTION INC | 2 | 12/20/2022 |
| EMPIRE PROP PARTNERS LLC* | 2 | 05/12/2026 |
| G.N.T. MECHANICAL LLC | 2 | 02/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| DOUGLASTON DEVELOPMENT | 6 | 05/12/2026 |
| Met Tower Owner | 4 | 01/08/2025 |
| 35 Remsen Owner LLC | 3 | 07/07/2026 |
| JOSEPH P. DAY REALTY | 3 | 05/29/2025 |
| THE MOINIAN GROUP | 3 | 04/10/2026 |
| CV PARTNERS | 2 | 05/13/2025 |
| ORSID NEW YORK | 2 | 11/18/2025 |
| ROCKLYN ASSET CORP | 2 | 06/27/2023 |
| ROSE ASSOCIATES | 2 | 08/24/2026 |
| Riverside Center Building 5 Owner L | 2 | 02/02/2026 |
| SETON EDUCATION PARTNERS | 2 | 12/22/2023 |
| 111 Wall GC LLC | 1 | 08/24/2026 |
| 26 W. 9TH STREET LLC | 1 | 01/15/2025 |
| 393 WEST BROADWAY CORP. | 1 | 07/01/2026 |
| 63 Wall Street Owner, LLC | 1 | 07/08/2025 |
| 67 Kent Ave, LLC | 1 | 03/30/2026 |
| 866 THIRD AVENUE CONDO | 1 | 06/15/2023 |
| ABINGTON PROPERTIES | 1 | 11/18/2025 |
| ACTA REALTY CORP. | 1 | 05/16/2023 |
| ALLIED PARTNERS RESIDENTIAL MGMT. | 1 | 05/27/2026 |
| Abramson Brothers Inc | 1 | 08/19/2026 |
| BLDG | 1 | 04/16/2022 |
| CBRE | 1 | 12/23/2025 |
| CLINY | 1 | 02/21/2023 |
| COMJEM ASSOCIATES LTD | 1 | 09/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 15 | 09/14/2026 |
| RIZZO GROUP | 8 | 07/02/2026 |
| METROPOLIS GROUP INC | 6 | 07/31/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 6 | 07/01/2026 |
| DOMANI CONSULTING | 5 | 05/12/2026 |
| DVA Advisors | 5 | 08/24/2026 |
| WILLIAM VITACCO ASSOCIATES | 5 | 08/24/2026 |
| WALTER T. GORMAN, PE, PC | 4 | 05/29/2025 |
| ANTHONY MORALI ARCHITECT PLLC | 3 | 06/23/2026 |
| GEORGE E. BERGER & ASS. LLC | 3 | 07/07/2026 |
| JAM CONSULTANTS, INC. | 3 | 01/15/2025 |
| OUTSOURCE CONSULTANTS, INC. | 3 | 06/25/2026 |
| DHD ARCHITECTURE, PC | 2 | 05/13/2026 |
| EAST COAST EXPEDITING | 2 | 04/10/2026 |
| NORTHEAST EXPEDITING LLC | 2 | 06/10/2025 |
| VADEM BRODSKY | 2 | 07/07/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 08/07/2025 |
| ADAM MAISER | 1 | 12/19/2024 |
| ADVANCED BUILDERS SERVICES | 1 | 03/04/2026 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 08/13/2024 |
| ARCHETYPE CONSULTANTS, INC. | 1 | 06/15/2023 |
| BMB BUILDING CONSULTING INC. | 1 | 07/11/2025 |
| C/O ROSE ASSOCIATES, INC. | 1 | 08/24/2026 |
| CCA CONSTRUCTION CONSULTING ASSOCIA | 1 | 02/21/2023 |
| CONSTRUCTION PERMIT SERVICES | 1 | 05/27/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00883722 ↗ | 715 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 09/30/2026 | Owner Douglaston Development Contractor VIEW 360 CONSTRUCTION INC Filer JM ZONING, LLC. | GENERAL CONSTRUCTION (GC) AND EARTHWORK (EA) RELATED TO RENOVATION OF OUTSIDE PREMISES (OSP); SCOPE OF WORK INCLUDES PAVING, CONCRETE CURBS … |
| B01379260 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Permit Issued | 03/27/2026 | 09/18/2026 | Contractor SIGNATURE CONSTRUCTION GROUP | STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH, NO CHANGE IN USE EGRESS OR OCCUPANCY, |
| B01387227 ↗ | 3002 FT HAMILTON PARKWAY BROOKLYN | Alteration CO | Permit Issued | 04/20/2026 | 09/14/2026 | Contractor WESBUILT CONSTRUCTION MAN Filer JM ZONING, LLC. | Playground equipment installation. |
| M01400417 ↗ | 55 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 05/12/2026 | 09/09/2026 | Contractor EMPIRE PROP PARTNERS LLC* Filer DOMANI CONSULTING | PROVIDE A NEW CONVIENANCE STAIR FROM 5TH FLOOR TO PENTHOUSE LEVEL |
| M01184444 ↗ | 112 WEST 88 STREET MANHATTAN | Alteration | Permit Issued | 03/12/2025 | 09/08/2026 | Contractor AQUEDUCT MECHANICAL CORP Filer DHD ARCHITECTURE, PC | Replace, relocate and remove plumbing fixtures on the basement and 1st floor. Plumbing work. No change in use, occupancy or egress. |
| M01434550 ↗ | 3 SAINT MARKS PLACE MANHATTAN | Alteration | Permit Issued | 07/31/2026 | 09/03/2026 | Owner Parkview Financial Contractor TRITON CONSTRUCTION CO., Filer METROPOLIS GROUP INC | FILING HEREWITH ALTERATIONS TO THE EXISTING NEW STEEL FRAMED STRUCTURE. NEW STAIR OPENING IN THE 7TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE … |
| X00883757 ↗ | 715 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 08/27/2026 | Owner Douglaston Development Contractor JLM AND S ENTERPRISES LLC Filer JM ZONING, LLC. | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00883765 ↗ | 710 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 08/26/2026 | Owner Douglaston Development Contractor VIEW 360 CONSTRUCTION INC Filer JM ZONING, LLC. | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01300953 ↗ | 30 BROAD STREET MANHATTAN | Alteration CO | Permit Issued | 10/27/2025 | 08/21/2026 | Owner Rose Associates Contractor VEMA GROUP LLC Filer DVA Advisors | Conversion and Enlargement of Existing Commercial Building to Residential. |
| M00961645 ↗ | 66 EAST 79 STREET MANHATTAN | Alteration CO | Permit Issued | 05/06/2024 | 08/07/2026 | Contractor RRP PLUMBING CORP | Residential plumbing fixture work in unit 2N. Swap locations of washer/dryer with shower at apartment 1S. |
| B01174333 ↗ | 115 OAK STREET BROOKLYN | Alteration CO | Permit Issued | 02/11/2025 | 07/28/2026 | Contractor DI MARTINI Filer METROPOLIS GROUP INC | Tie piers at foundation in conjunction with structural and general construction work filed as part of the AltCO and renovation, as per plans… |
| B01363682 ↗ | 3002 FT HAMILTON PARKWAY BROOKLYN | Alteration | Permit Issued | 03/29/2026 | 07/15/2026 | Contractor WESBUILT CONSTRUCTION MAN Filer JM ZONING, LLC. | THE PROJECT CONSISTS OF STRUCTURAL WORK IN CONJUNCTION WITH THEINTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR O… |
| M01223041 ↗ | 419 PARK AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 09/04/2025 | 07/13/2026 | Contractor PRESS BUILDERS INC Filer DOMANI CONSULTING | Filing for the installation of a combined sprinkler and standpipe system in conjunction with M01223041 I1. |
| M01257331 ↗ | 391 WEST BROADWAY MANHATTAN | Alteration | Permit Issued | 05/01/2026 | 07/13/2026 | Owner 393 West Broadway Corp Contractor PRESERV BLD RESTOR MGT IN | STRUCTURAL WORK TO REPAIR THE EXISTING SIDEWALK VAULT FRAMING PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01376668 ↗ | 630 3 AVENUE MANHATTAN | Alteration | Permit Issued | 03/27/2026 | 07/10/2026 | Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Structural modifications taking place on the 1st and 19th floors as per plans filed herewith. No change in use, egress or occupancy. |
| X00883754 ↗ | 715 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 06/23/2026 | Owner Douglaston Development Contractor VIEW 360 CONSTRUCTION INC Filer JM ZONING, LLC. | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| S01269015 ↗ | 1232 HYLAN BOULEVARD STATEN ISLAND | Alteration | Permit Issued | 10/14/2025 | 06/09/2026 | Contractor CENTURION COMPANIES INC Filer ROBERT S. SCHNITZER | Support of excavation plans includes timber box sheeting, shoring, and open cut berms for installing new footings for new canopy structure a… |
| M01312468 ↗ | 333 WEST 52 STREET MANHATTAN | Alteration CO | Permit Issued | 11/21/2025 | 06/02/2026 | Owner Abramson Brothers Inc Contractor PRESS BUILDERS INC Filer DVA Advisors | Conversion of existing commercial building to residential. |
| M01223653 ↗ | 419 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 05/28/2025 | 06/01/2026 | Contractor PRESS BUILDERS INC Filer DOMANI CONSULTING | MODIFICATION OF THE EXISTING SPRINKLER SYSTEM TO RELOCATE THE SPRINKLER RISER IN COMPLIANCE WITH NFPA 13 AND THE NYC BUILDING CODE. NO CHANG… |
| M01181534 ↗ | 6 HARRISON STREET MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 05/29/2026 | Contractor PRESS BUILDERS INC | SUPPORT FOR NEW ADA LIFT FROM 1ST TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| B00908351 ↗ | 35 REMSEN STREET BROOKLYN | Alteration CO | Permit Issued | 08/02/2023 | 05/21/2026 | Owner 35 Remsen Owner LLC Contractor HLB CONSTRUCTION CORP Filer VADEM BRODSKY | SUBSEQUENT FILING FOR PLUMBING WORK |
| M01090552 ↗ | 17 BATTERY PLACE MANHATTAN | Alteration CO | Permit Issued | 09/24/2024 | 04/14/2026 | Owner THE MOINIAN GROUP Contractor AMM GEN'L CONTRACTING INC Filer EAST COAST EXPEDITING | Structural for work for new stair opening in conjunction with eating or drinking establishment tenant fitout. |
| M01354217 ↗ | 630 3 AVENUE MANHATTAN | Alteration | Permit Issued | 03/12/2026 | 04/09/2026 | Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Structural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy. |
| X00883774 ↗ | 740 BEACH AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 04/07/2026 | Owner Douglaston Development Contractor VIEW 360 CONSTRUCTION INC Filer JM ZONING, LLC. | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01369737 ↗ | 67 KENT AVENUE BROOKLYN | Alteration | Permit Issued | 03/30/2026 | 04/06/2026 | Owner 67 Kent Ave, LLC Contractor GE 2A CONSTRUCTION | FILING FOR FACADE RESTORATION TO RESOLVE VIOLATION#111925CPI30101SB AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01366728 ↗ | 285 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/27/2026 | 04/01/2026 | Contractor TURNER CONSTRUCTION COMPANY Filer RIZZO GROUP | Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egr… |
| M01134969 ↗ | 17 BATTERY PLACE MANHATTAN | Alteration | Permit Issued | 05/16/2025 | 03/31/2026 | Owner THE MOINIAN GROUP Contractor PLESCIA CONSTR & DEV LLC Filer EAST COAST EXPEDITING | REMOVAL AND INSTALLATION OF NON-BEARING EXTERIOR STOREFRONT AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR… |
| M01380738 ↗ | 30 BROAD STREET MANHATTAN | Alteration | Filed — no permit on record | 03/31/2026 | — | Owner Rose Associates Filer DVA Advisors | — |
| B00959801 ↗ | 422 40 STREET BROOKLYN | Alteration CO | Permit Issued | 11/13/2023 | 03/26/2026 | Contractor MONACO GROUP USA INC | Replacement of plumbing system to include domestic water heating, piping distribution, storm and sanitary disposal systems to accommodate re… |
| Q01357404 ↗ | 301 BEACH 67 STREET QUEENS | Alteration | Permit Issued | 03/16/2026 | 03/26/2026 | Owner OCEAN WAY 3 Contractor DARBY CONSTRUCTION SVC LL Filer DVA Advisors | Structural work as shown on the plans |
| M01319677 ↗ | 500 5 AVENUE MANHATTAN | Alteration | Permit Issued | 12/18/2025 | 03/24/2026 | Owner CUSHMAN AND WAKEFIELD Contractor EASY GROUP CONTRACTING IN Filer NYCCODE LLC | Structural scope associated with the renovation of the terrace on the 21C/22M floor in compliance with the BB 2018-002. No change of use, eg… |
| M01334389 ↗ | 285 5 AVENUE MANHATTAN | Alteration | Permit Issued | 01/21/2026 | 03/17/2026 | Contractor CERTIFIED OF N.Y. INC Filer RIZZO GROUP | Structural modifications taking place on the Cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy |
| M01365309 ↗ | 440 10 AVENUE MANHATTAN | Alteration | Signed-off | 03/04/2026 | 03/16/2026 | Owner MADISON REALTY CAPITAL Contractor NEW WORLD DESIGN BLDG INC | Structural worktype hereby filed for joist repair at the first floor of a 5-story building. |
| M01143715 ↗ | 146 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 01/08/2025 | 03/10/2026 | Owner Met Tower Owner Contractor TRITON CONSTRUCTION CO., Filer METROPOLIS GROUP INC | PARTIAL DEMOLITION OF FLOOR SLAB WITH BRACING FOR CONVENIENCE STAIR BUILD-OUT AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01354477 ↗ | 55 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 02/12/2026 | 02/18/2026 | Contractor EMPIRE PROP PARTNERS LLC* | THE SCOPE OF WORK SHOWN ON THESE DRAWINGS INCLUDE A NEW CONVENIENCE STAIR FROM 1ST FLOOR TO CELLAR. FILED TO SUPERSEDE ST WORKTYPE VIA 10490… |
| M01175827 ↗ | 800 3 AVENUE MANHATTAN | Alteration | Permit Issued | 05/29/2025 | 02/13/2026 | Owner JOSEPH P. DAY REALTY Contractor FINALY GENL CONTR Filer WALTER T. GORMAN, PE, PC | Structural work on 16th floor as per plans. No change to use, egress or occupancy. |
| X00883731 ↗ | 715 NOBLE AVENUE BRONX | Alteration | Permit Issued | 05/15/2024 | 01/27/2026 | Owner Douglaston Development Contractor J.E. LEVINE BUILDER INC Filer JM ZONING, LLC. | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01011527 ↗ | 24 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/15/2024 | 01/08/2026 | Owner Orsid New York Contractor SKYLINE RESTORATION INC Filer RIMKUS NEW YORK PLLC | Structural bracing and repairs of the existing unreinforced masonry parapet at 18th floor roof terrace. All work as per plans submitted. N… |
| M01106867 ↗ | 52 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/25/2024 | 01/08/2026 | Contractor CM TOWERS, INC | Dunnage for new Cooling tower Framing to support new roof opening (New Cooling Tower in MEP bulkhead). |
| M01324824 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Permit Issued | 12/23/2025 | 01/06/2026 | Owner CBRE Contractor DARBY CONSTRUCTION SVC LL Filer DVA Advisors | Structural work as shown on the plans. |
| M01316080 ↗ | 38 COMMERCE STREET MANHATTAN | Alteration | Signed-off | 12/08/2025 | 12/22/2025 | Contractor BLDG INCORPORATED | Structural work as shown on plans filed herewith |
| B01150423 ↗ | 111 NORTH 9 STREET BROOKLYN | Alteration | Permit Issued | 02/18/2025 | 12/04/2025 | Owner DAFNONAS ESTATES LTD Contractor EC FRAMING INC Filer DHD ARCHITECTURE, PC | Replace, relocate and install plumbing fixtures in existing apartment 1LR and 2L on floors 001 - 002 and is in compliance with TPPN 03 of 19… |
| B00903957 ↗ | 233 BANKER STREET BROOKLYN | Alteration CO | Permit Issued | 08/31/2023 | 11/12/2025 | Contractor CONSTRUCTION PARTNERS Filer RIZZO GROUP | STRUCTURAL MODIFICATIONS FOR INSTALLATION OF NEW MEZZANINE. |
| M01236713 ↗ | 797 BROADWAY MANHATTAN | Alteration | Signed-off | 06/10/2025 | 11/07/2025 | Owner SAVANNA Contractor SAVCON LLC Filer RIZZO GROUP | Structural modifications taking place on the Cellar & 1st floor as indicted on the drawings. |
| M01246743 ↗ | 247 EAST 28 STREET MANHATTAN | Alteration | Signed-off | 07/11/2025 | 10/24/2025 | Contractor COAST GROUP CORP | PROPOSE FACADE REPAIR WORKS AS PER PLAN. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. |
| M01127693 ↗ | 24 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/07/2024 | 09/30/2025 | Owner Orsid New York Contractor C C CONTROLLED COMBUSTION Filer NORTHEAST EXPEDITING LLC | SUBSEQUENT ST FILING IN CONJUNCTION WITH CHIMNEY WORK FOR EXT'G RESTAURANT. INCLDS NEW STEEL BEAM INSTALLATION FOR INTERIOR CHIMNEY REINFORC… |
| M01039165 ↗ | 50 PRINCE STREET MANHATTAN | Alteration | Signed-off | 06/06/2024 | 09/24/2025 | Owner ABINGTON PROPERTIES Contractor CJS INDUSTRIES INC | STORE RENOVATION (STUSSY) WORK TO INCLUDE PLUMBING MODIFICATIONS AS INDICATED ON PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY, |
| M01190659 ↗ | 38 COMMERCE STREET MANHATTAN | Alteration | Signed-off | 03/06/2025 | 09/22/2025 | Owner CV PARTNERS Contractor BLDG INCORPORATED | Structural work as shown on plans to include reconstruction of courtyard wall and connection of existing joists to brick masonry walls. |
| B01099625 ↗ | 5323 5 AVENUE BROOKLYN | Alteration | Signed-off | 11/20/2024 | 09/18/2025 | Owner COMJEM ASSOCIATES LTD Contractor SIGNATURE CONSTRUCTION GR Filer JM ZONING, LLC. | Structural work related to ALT-1 application 321591005 |
| M01096750 ↗ | 24 WEST 9 STREET MANHATTAN | Alteration | Signed-off | 01/15/2025 | 09/16/2025 | Owner 26 W. 9TH STREET LLC Contractor A.W. & S. CONSTRUCTION CO Filer JAM CONSULTANTS, INC. | Removal of a section of exterior bearing wall at Cellar, Framing for new penetrations through mechanical room roof (1st Floor), Addition of … |
| M01242662 ↗ | 63 WALL STREET MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 09/04/2025 | Contractor KAMA CONSTRUCTION CORP Filer CORE CONSULTANTS NYC | Temp standpipe application filed in conjunction with Alt-1 # 103493514 for Stair B Enlargement |
| M00827594 ↗ | 800 3 AVENUE MANHATTAN | Alteration | Permit Issued | 06/01/2023 | 08/20/2025 | Contractor CELTIC GENERAL CONTRACT | Structural work on 12th floors as per plans. No change to use, egress or occupancy. |
| M01260922 ↗ | 101 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/07/2025 | 08/14/2025 | Contractor UNITY CONSTRUCTION GROUP | Support for three new operable partitions to the existing concrete structure |
| B01225309 ↗ | 1104 FULTON STREET BROOKLYN | Alteration | Signed-off | 06/30/2025 | 07/07/2025 | Contractor AFFECT BUILD LLC Filer DBI PROJECTS | Herewith Filing Structural modifications to the facade, in conjunction with mechanical system upgrades. Work includes New Louver openings an… |
| M01187541 ↗ | 161 FRONT STREET MANHATTAN | Alteration | Signed-off | 03/03/2025 | 05/02/2025 | Contractor ESSENTIAL CONTRACTING | THE SCOPE OF WORK SHOWN ON THESE DRAWINGS INCLUDE THE INSTALLATION OF A NEW COOLING TOWER PLATFORM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00658172 ↗ | 169 EAST 74 STREET MANHATTAN | Alteration | Signed-off | 05/20/2022 | 04/14/2025 | Owner OGRIN ASSOCIATESLLC Contractor REGAL CONSTRUCTION GROUP Filer NORTHEAST EXPEDITING LLC | Renovation of the 2nd floor apartment's rear enclosed balcony only. Removal of the balcony glass enclosure. No interior apartment work. No c… |
| M01110026 ↗ | 252 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2024 | 04/11/2025 | Contractor TOWN & GARDENS LTD | RENOVATION/MISC UPGRADES OF EXISTING 17TH FL TENANT'S RECREATION AREA AND EX. ROF DECK STRUCTURE FOR RESIDENTIAL CONDOMINIUM IN OSP AS PER P… |
| M00922305 ↗ | 815 WEST 180 STREET MANHATTAN | Alteration | Signed-off | 11/21/2023 | 04/03/2025 | Owner PLAZA MANAGEMENT Contractor LIME STONE BUILDERS INC Filer JM ZONING, LLC. | Structural work filed to repair fire-damaged building |
| M01124342 ↗ | 60 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 10/16/2024 | 03/28/2025 | Owner THE MOINIAN GROUP Contractor SKYWAY REST. SERVICES Filer RIZZO GROUP | STRUCTURAL MODIFICATIONS ON THE PENTHOUSE CONSTRUCTION FLOOR (ROOF MARKETING) AND 12TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRE… |
| M01189814 ↗ | 83 HORATIO STREET MANHATTAN | Alteration CO | Filed — no permit on record | 03/27/2025 | — | Owner RT Horatio Property LLC | — |
| M01138516 ↗ | 55 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 11/13/2024 | 03/24/2025 | Contractor BELLET CONSTRUCTION CO.IN | REAR FACADE REPAIR OF LINTELS AND BRICK PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01008802 ↗ | 200 CENTRAL PARK SOUTH MANHATTAN | Alteration | Permit Issued | 03/18/2024 | 03/19/2025 | Owner PARK SOUTH TENANTS CORP. Contractor CERTIFIED OF N.Y. INC | Structural work for new marquee/portico within property line at residential lobby entrance. Work in conjunction with M01006382. |
| M08028630 ↗ | 14 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 11/01/2022 | 02/19/2025 | Owner DIAMOND LANE LLC Contractor LEGACY BUILDERS/DEVELOPER | Structural work in relation to residential building renovation. 1st floor extension proposed. Vault reinforcement at cellar. No change to us… |
| B01082573 ↗ | 47 NORTH 8 STREET BROOKLYN | Alteration | Permit Issued | 08/13/2024 | 02/18/2025 | Contractor WAXTEL LLC | PLUMBING WORK IN CONJUCTION WITH COMBINE AND RENOVATE APARTMENTS 3C & 3D ON THE THIRD FLOOR. INSTALL PLUMBING FIXTURES AND PIPING. CAP/REMOV… |
| M01105189 ↗ | 1241 BROADWAY MANHATTAN | Alteration | Signed-off | 11/22/2024 | 02/07/2025 | Owner Met Tower Owner Contractor VANGUARD CONSTRUCTION AND Filer METROPOLIS GROUP INC | Structural work on Cellar and 1st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00882914 ↗ | 38 COMMERCE STREET MANHATTAN | Alteration | Signed-off | 06/12/2023 | 12/11/2024 | Owner CV PARTNERS Contractor BLDG INCORPORATED | Structural work as shown on plans to include new openings in existing interior brick masonry walls. |
| M00665541 ↗ | 64 READE STREET MANHATTAN | Alteration CO | Permit Issued | 01/21/2022 | 10/28/2024 | Contractor TRITON CONSTRUCTION CO., Filer ADAM MAISER | Vertical Enlargement and Tax lot merger (Lots 4&5) of existing Multiple Dwelling buildings. New Certificate of Occupancy to be obtained. |
| M01036517 ↗ | 50 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 04/19/2024 | 09/03/2024 | Owner JACK SHAINMAN GALLERY Contractor LIEBHABER COMPANY Filer DOMANI CONSULTING | Herewith filed Structural work for Bank Hall |
| M01048813 ↗ | 322-326 7TH AVENUE MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/17/2024 | Owner Met Tower Owner Contractor SAGE BUILDERS CORP Filer METROPOLIS GROUP INC | Filed herewith New opening in 1st floor for Stairs. No change in Use , Egress, or Occupancy |
| M01034318 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Filed — no permit on record | 05/08/2024 | — | Filer WALTER T. GORMAN, PE, PC | — |
| M00995982 ↗ | 285 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/22/2024 | 04/22/2024 | Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Structural modifications to include removal of existing floor framing, new steel frame stair structure, and support of folding partition to … |
| M00816191 ↗ | 50 EAST 41 STREET MANHATTAN | Alteration | Signed-off | 02/16/2023 | 03/18/2024 | Contractor WESBUILT CONSTRUCTION MAN | THE DYLAN HOTEL - STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00975000 ↗ | 35 REMSEN STREET BROOKLYN | Alteration | Permit Issued | 12/12/2023 | 02/22/2024 | Owner 35 Remsen Owner LLC Contractor HLB CONSTRUCTION CORP | ALTERATIONS TO EXISTING TIMBER FRAMED STRUCTURE; NEW STAIR OPENINGS AND OPENING IN REAR WALL. APP FILED IN CONJUNCTION W/B00908351-I1 (ALT C… |
| B00993073 ↗ | 35 REMSEN STREET BROOKLYN | Alteration | Permit Issued | 01/19/2024 | 01/24/2024 | Owner 35 Remsen Owner LLC Contractor HLB CONSTRUCTION CORP | Structural work related to the alteration of building under job B00908351-I1 |
| M00824289 ↗ | 829 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/14/2023 | 01/03/2024 | Contractor RAINIER RESTORATION LLC Filer DOMANI CONSULTING | Interior removal and build out of existing commercial space at cellar,, 1st floor & 2nd floor. Facade replacement on 1st and 2nd floors. Roo… |
| Q00741431 ↗ | 10-15 43 AVENUE QUEENS | New Building | Permit Issued | 06/06/2022 | 10/25/2023 | Owner DOJO LIC HOLDINGS, LLC Contractor DITTA MALITO CONSTRUCTIO* Filer JM ZONING, LLC. | Structural work related to a new 2 story building as per plans. |
| X00798768 ↗ | 416 EAST 145TH STREET BRONX | Alteration | Signed-off | 09/08/2022 | 09/12/2023 | Owner SETON EDUCATION PARTNERS Contractor SIGNATURE CONSTRUCTION GR Filer JM ZONING, LLC. | scope of work to include new concrete pits, stair opening, masonry pier removal, installation of lintels and steel dunnage |
| M00877964 ↗ | 866 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/15/2023 | 08/14/2023 | Owner 866 THIRD AVENUE CONDO Contractor BLADE CONTRACTING INC | Facade work on the 14th and 15th floor for spandrel repair as indicated on drawings |
| M00912308 ↗ | 531 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/04/2023 | 08/10/2023 | Contractor PRECISION BUILDING & CONS | APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST AND MEZZANINE (CREATE SLAB OPENING FOR NEW STAIR) AS PER PLANS FILED HER… |
| X00799138 ↗ | 414 EAST 145 STREET BRONX | Alteration | Signed-off | 09/06/2022 | 07/05/2023 | Owner SETON EDUCATION PARTNERS Contractor SIGNATURE CONSTRUCTION GR Filer JM ZONING, LLC. | SOE scope of work for new ejector pit and lint interceptor pit |
| M00861566 ↗ | 224 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 04/24/2023 | 06/30/2023 | Contractor PROTON CCM LLC | PROPOSE FACADE REPAIR FOR EXISTING EXTERIOR WALLS, AND WATERPROOFING SECTIONS AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. |
| M00857816 ↗ | 25 BROADWAY MANHATTAN | Alteration | Signed-off | 05/16/2023 | 05/30/2023 | Owner ACTA REALTY CORP. Contractor NUCOR CONSTRUCTION CORP | Structural work as shown on plans to include steel framing (Tenant Fitout Phase). |
| M00449817 ↗ | 4568 BROADWAY MANHATTAN | Alteration | Signed-off | 02/17/2021 | 05/09/2023 | Owner LARGAVISTA COMPANIES Contractor PRESS BUILDERS INC Filer MBE CODE & ZONING LLC | Structural work for new 7-story residential building. |
| B08033528 ↗ | 599 THROOP AVENUE BROOKLYN | Alteration | Signed-off | 01/20/2023 | 03/15/2023 | Owner ROCKLYN ASSET CORP Contractor TALISEN CONSTRUCTION CORP Filer JM ZONING, LLC. | Renovation of an existing 3 story school with cellar that will require a new footing for the elevator pit. |
| M07995478 ↗ | 800 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2022 | 03/13/2023 | Contractor CELTIC GENERAL CONTRACT Filer WALTER T. GORMAN, PE, PC | Structural work on 29th floor as per plans. No change to use, egress or occupancy. |
| B08020206 ↗ | 599 THROOP AVENUE BROOKLYN | Alteration | Signed-off | 01/19/2023 | 03/08/2023 | Owner ROCKLYN ASSET CORP Contractor TALISEN CONSTRUCTION CORP Filer JM ZONING, LLC. | Renovation of an existing 3 story school with cellar including addition of structural steel for addition of elevator and rooftop bulkhead co… |
| M00812651 ↗ | 30 BROAD STREET MANHATTAN | Alteration | Permit Issued | 01/25/2023 | 03/03/2023 | Contractor IGON CONSTRUCTION MAINT | New floor penetration through second floor slab. No change in use, egress or occupancy. |
| M00724954 ↗ | 75 EAST 95 STREET MANHATTAN | Alteration | Signed-off | 05/04/2022 | 02/24/2023 | Owner CLINY Contractor SUPER POWER CONSTRUCTION | STRUCTURAL FRAMING FOR ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY… |
| M00801908 ↗ | 800 3 AVENUE MANHATTAN | Alteration | Permit Issued | 01/06/2023 | 01/19/2023 | Owner JOSEPH P. DAY REALTY Contractor CELTIC GENERAL CONTRACT Filer WALTER T. GORMAN, PE, PC | Structural work for stab infill on 28th floor as per plans. No change to use, egress or occupancy. |
| M00577256 ↗ | 1164 BROADWAY MANHATTAN | Alteration CO | Permit Issued | 10/14/2021 | 12/22/2022 | Owner SOHO HOUSE DESIGN LLC Contractor ELYSIUM CONSTRUCTION INC Filer JAM CONSULTANTS, INC. | Structural framing and reinforcements for new slab on metal deck per plans filed herewith. |
| M00763571 ↗ | 516 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 09/09/2022 | 12/14/2022 | Contractor SHAWMUT WOODWORKING & SUPPLY | Filing for structural work on floors 1, 2, and 3. Work includes new framing, removal and installation of new beams, new opening and convenie… |
| M00689594 ↗ | 450 WEST BROADWAY MANHATTAN | Alteration | Signed-off | 04/16/2022 | 09/16/2022 | Owner BLDG Contractor ELYSIUM CONSTRUCTION INC Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK IN SUPPORT OF PLANNED MECHANICAL WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00679993 ↗ | 1241 BROADWAY MANHATTAN | Alteration | Signed-off | 06/17/2022 | 09/15/2022 | Owner Met Tower Owner Contractor TRITON CONSTRUCTION CO., Filer METROPOLIS GROUP INC | Convivence stair build out for the signal use tenant office space 6- 10 FLRS (A24 Films LLC). No change in use, egress or occupancy. |
| M00706364 ↗ | 93 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 03/31/2022 | 06/28/2022 | Contractor MID-STATE CONSTRUCTION C | STRUCTURAL WORK TO ACCOMMODATE CHILLER AND ROOFTOP UNIT REPLACEMENT AS PER PLANS. MECHANICAL WORK IS FILED UNDER MECHANICAL APPLICATION #M00… |
| M00721664 ↗ | 790 8 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/02/2022 | — | — | |
| B00693462 ↗ | 143 ROEBLING STREET BROOKLYN | Alteration CO | Filed — no permit on record | 03/23/2022 | — | — | |
| M00561480 ↗ | 1241 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 12/20/2021 | — | — | — |
| M00599474 ↗ | 175 MORNINGSIDE AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/19/2021 | — | Filer HTX BUILDING CONSULTING | — |