10 EAST 30 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1016944
💬 Discuss this project
1958Year Built
8Stories
G1Building Class
C5-2Zoning
48,500 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 4 unresolved · 4 paperwork only ▸FISP: SAFE
All parking garages · Owner of record: AERO PARKING CORP · 7,159 sf lot · 6.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 31 filing
Floor 21 filing
Floor 11 filing
Site & exteriorUnder Construction6 filings · 2 docs
Filed — no permit issued1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RAPID PARK1507/08/2026
APEX GROUP NY907/08/2026
AERO PARKING CORP503/22/2026
RAPID PARK INDUSTRIES403/21/2026
B 33RD203/21/2026
EAST 29TH ST PAC O THE CLARETT203/21/2026
RAPID PARK HOLDINGS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPRING SCAFFOLDING LLC803/21/2026
ANGELA RIVERA303/21/2026
LMS-ACE SERVICES203/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS MAINTENANCE INCGeneral Contractor2107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor603/21/2026
APEX GROUP NY CORPGeneral Contractor407/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
NEW EMPIRE BUILDER CORPGeneral Contractor108/13/2026
RICHARD NEUElectrical103/21/2026
HEMANCHAL DEONARINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578505/05/2026
AP PROFESSIONAL ENGINEERI5974110/13/2025
RICHMOND TESTING LAB263310/20/2022
Building Lifecycle
All (140)Filed (16)Permit Issued (15)Signed Off (7)Facade (FISP) (21)Violation (60)Objection (2)Special Inspection (19)
08/26/2026
Objection resolved — Resolved
08/12/2026
Permit issued — Construction Fence
M01440859-I1-FN
08/05/2026
Filed — Alteration
ERECTING 8 FT PLYWOOD CONSTRUCTION GREEN FENCE FOR DEMOLITION OF GARAGE. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
M01440859-I1
08/03/2026
Objection raised — Admin
07/24/2026
Violation issued (ECB, open)
Construction
07/10/2026
Filed — Full Demolition
Full demolition of existing steel frame garage.
M01422087-I1
05/05/2026
Filed — Alteration
Structural Garage Repairs and temporary shoring installation as per plans filed herewith. No Change in use, egress, or occupancy
M00815258-P4
03/19/2026
Permit issued — General Construction
M00815258-I1-GC-CX
02/12/2026
Cycle 10 facade report submitted
02/12/2026
Cycle 10 facade report signed — UNSAFE
02/11/2026
Cycle 10 facade inspection completed
01/28/2026
Permit issued — Sidewalk Shed
M01184156-I1-SH
01/26/2026
Signed off — Alteration
M01297456-I1
10/27/2025
Filed — Alteration
Structural Garage Repairs and temporary shoring installation as per plans filed herewith. No Change in use, egress, or occupancy
M00815258-P3
10/14/2025
Permit issued — Supported Scaffold
M01297456-I1-SF
10/13/2025
Filed — Alteration
M01297456-I1
05/22/2025
Violation issued (ECB, closed)
Construction
04/10/2025
Cycle 10 facade report submitted
04/10/2025
Cycle 10 facade report signed — UNSAFE
04/07/2025
Special inspection requirement — Final
Anthony Stasio
04/07/2025
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
04/07/2025
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
03/25/2025
Permit issued — Structural
M00815258-I1-GC-CX
03/04/2025
Cycle 10 facade inspection completed
02/21/2025
Filed — Alteration
M01184156-I1
02/21/2025
Permit issued — Sidewalk Shed
M01184156-I1-SH
11/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2024
Violation issued (ECB, closed)
Construction
07/12/2024
Filed — Alteration
Structural Garage Repairs and temporary shoring installation as per plans filed herewith. No Change in use, egress, or occupancy
M00815258-P2
05/28/2024
Special inspection requirement — Final
Anthony Stasio
05/28/2024
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
05/28/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
04/25/2024
Violation issued (ECB, closed)
Construction
04/25/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/28/2024
Permit issued — General Construction
M00815258-I1-GC-CX
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2023
Violation issued (ECB, open)
Construction
12/27/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2023
Filed — Alteration
Structural Garage Repairs and temporary shoring installation as per plans filed herewith. No Change in use, egress, or occupancy
M00815258-P1
12/15/2023
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
12/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
12/15/2023
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
12/15/2023
Special inspection requirement — Final
Anthony Stasio
04/14/2023
Signed off — Alteration
FIRST FLOOR COLUMN REPAIRS
M00671500-I1
02/16/2023
Filed — Alteration
Structural Garage Repairs and temporary shoring installation as per plans filed herewith. No Change in use, egress, or occupancy
M00815258-I1
11/27/2022
Cycle 9 facade report signed — SAFE
11/26/2022
Cycle 9 facade report submitted
11/02/2022
Permit issued — Structural
M00671500-I1-ST
10/27/2022
Signed off — Alteration
Roof guardrail improvements
M08018156-I1
10/24/2022
Permit issued — Structural
M08018156-I1-ST
10/20/2022
Filed — Alteration
Roof guardrail improvements
M08018156-I1
10/18/2022
Cycle 9 facade inspection completed
10/10/2022
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
10/10/2022
Special inspection requirement — Final
WITOLD SZCZEPANIK
08/02/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00681212-I1
07/18/2022
Permit issued — Structural
M00671500-I1-ST
07/12/2022
Cycle 8 facade report signed — SWARMP
06/13/2022
Cycle 8 facade report submitted
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedNEW EMPIRE BUILDER CORP08/12/2026
DOB NOWGeneral ConstructionPermit IssuedTHOMAS MAINTENANCE INC03/19/2026
DOB NOWSidewalk ShedPermit IssuedAPEX GROUP NY CORP01/28/2026
DOB NOWSupported ScaffoldSigned-offAPEX GROUP NY CORP10/14/2025
DOB NOWStructuralPermit IssuedTHOMAS MAINTENANCE INC03/25/2025
DOB NOWSidewalk ShedPermit IssuedAPEX GROUP NY CORP02/21/2025
DOB NOWGeneral ConstructionPermit IssuedTHOMAS MAINTENANCE INC03/28/2024
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC11/02/2022
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC10/24/2022
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC07/18/2022
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC03/08/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/15/2022
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/02/2021
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC06/25/2021
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC04/30/2021
BISEQISSUEDSPRING SCAFFOLDING LLC03/01/2021
BISEQISSUEDSPRING SCAFFOLDING LLC02/27/2020
BIS—ISSUEDPROPARK AMERICA02/10/2020
BISEQISSUEDSPRING SCAFFOLDING LLC02/27/2019
BISEQISSUEDTRI BOROUGH SCAFFOLDING08/24/2018
BISEQISSUEDSPRING SCAFFOLDING LLC03/02/2018
BISOTISSUEDGLENWOOD CONSTRUCTION COR02/02/2018
BISEQISSUEDTRI BOROUGH SCAFFOLDING07/25/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/23/2017
BISEQISSUEDSPRING SCAFFOLDING LLC03/22/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM03/03/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM01/08/2016
BISOTISSUEDSATO CONSTRUCTION CO.INC10/19/2015
BISOTISSUEDEUROPEAN IRON WORKS INC08/15/2012
BISEQISSUEDEUROPEAN IRON WORKS INC08/14/2012
BISOTISSUEDTMI CONSTRUCTION CORP03/31/2011
BISOTISSUEDTMI CONSTRUCTION CORP03/30/2011
BISEQISSUEDUNIVERSAL BUILD SUPP LLC10/05/2007
BISEQISSUEDUNIVERSAL BUILD SUPP LLC10/02/2006
BISEQISSUEDUNIVERSAL BUILD SUPP LLC10/03/2005
BISEQRE-ISSUEDUNIVERSAL BUILD SUPP LLC07/25/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/30/1999
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/30/1999
3 projects · most recent 02/21/2025
General Wiring
FiledStatusContractorScope
02/21/2025Permit IssuedRICHARD NEU—
10/31/2022Permit IssuedWARREN ELEVATOR SVC COGeneral Wiring
09/16/2022CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
1 project · most recent 05/05/2026
Concrete
FiledStatusContractorScope
05/05/2026Permit IssuedTHOMAS MAINTENANCE INCConcrete
1 project · most recent 08/05/2026
Fence
FiledStatusContractorScope
08/05/2026Permit IssuedNEW EMPIRE BUILDER CORPFence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/07/2025FinalAnthony Stasioprogress
04/07/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
04/07/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/07/2025Structural Steel - WeldingAnthony Stasiospecial
05/28/2024FinalAnthony Stasioprogress
05/28/2024Structural Steel - WeldingAnthony Stasiospecial
05/28/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
05/28/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
12/15/2023Concrete - Cast-In-PlaceAnthony Stasiospecial
12/15/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
12/15/2023Structural Steel - WeldingAnthony Stasiospecial
12/15/2023FinalAnthony Stasioprogress
10/10/2022Structural Steel - WeldingRICHARD LEMANSKYspecial
10/10/2022FinalWITOLD SZCZEPANIKprogress
03/04/2022FinalMD TOHFAZ UDDINprogress
12/02/2021FinalMD TOHFAZ UDDINprogress
04/22/2021Energy Code Compliance InspectionsWITOLD SZCZEPANIKprogress
04/22/2021FinalWITOLD SZCZEPANIKprogress
04/22/2021Concrete - Cast-In-PlaceRICHARD LEMANSKYspecial
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/03/2026M00508917-I1Request digital key ↗
09/03/2026M00640030-I1Request digital key ↗
09/03/2026M00640609-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION27
11/13/2025140618632Open ↗
11/10/2025140618632Open ↗
12/19/2022123699499Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION19
03/01/2021140618632Open ↗
02/28/2020140618632Open ↗
02/11/2020123699499Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/04/2020123699499Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/01/2011120574814Open ↗
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
01/22/2020123699499Open ↗
06/07/2018140733464Open ↗
01/16/2018123022157Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00508917-I1Open ↗
09/03/2026M00640609-I1Open ↗
09/02/2026M00681212-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/24/2026M08018156-I1Open ↗
09/01/2026M00681212-I1Open ↗
08/30/2026M00815258-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/22/2020123699499Open ↗
03/08/2017123022157Open ↗
09/17/2015122514485Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/24/2026M08018156-I1Open ↗
08/30/2026M00815258-P2Open ↗
08/28/2026M00508917-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/24/2017140672074Open ↗
03/21/2017140618632Open ↗
03/08/2017123022157Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/24/2017140672074Open ↗
03/21/2017140618632Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/24/2017140672074Open ↗
03/21/2017140618632Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/15/2012121174870Open ↗
11/23/2010120536401Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/31/2018140733464Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/22/2020123699499Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08018156-I1Open ↗
08/17/2026M00815258-P4Open ↗
08/17/2026M00815258-P3Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/13/2017123022157Open ↗
03/08/2017123022157Open ↗
09/17/2015122514485Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/15/2012121174870Open ↗
11/23/2010120536401Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/27/2012121052298Open ↗
01/12/2011120574814Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00508917-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/22/2020123699499Open ↗
03/08/2017123022157Open ↗
09/17/2015122514485Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/07/2018140733464Open ↗
01/16/2018123022157Open ↗
05/22/2017122514485Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
07/24/2017140672074Open ↗
03/21/2017140618632Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/27/2012121052298Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/31/2018140733464Open ↗
07/24/2017140672074Open ↗
▸Approvals, Objections & Sign-offs40
▸BISSCHEDULE A - OCCUPANCY / USE11
12/19/2022123699499Open ↗
12/16/2022123699499Open ↗
09/07/2022123699499Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/28/2020140618632Open ↗
02/28/2020140618632Open ↗
02/28/2020140618632Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/13/2025140618632Open ↗
08/10/2022140672074Open ↗
06/07/2018140733464Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER5
03/01/2021140618632Open ↗
03/01/2021140618632Open ↗
02/27/2019140618632Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/15/2012121174870Open ↗
04/27/2012121052298Open ↗
01/12/2011120574814Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
06/22/2022140672074Open ↗
▸BISLANDMARKS APPROVAL1
02/01/2011120574814Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
02/28/2020140618632Open ↗
▸BISSUPERSEDING LETTER1
01/21/2016122514485Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
01/22/2020123699499Open ↗
06/07/2018140733464Open ↗
01/31/2018140733464Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
01/22/2020123699499Open ↗
03/08/2017123022157Open ↗
09/17/2015122514485Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/31/2018140733464Open ↗
07/24/2017140672074Open ↗
03/21/2017140618632Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/01/2021140618632Open ↗
06/07/2018140733464Open ↗
01/16/2018123022157Open ↗
▸BISADDITIONAL INFORMATION2
01/11/2018123022157Open ↗
01/17/2017122514485Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
10/03/2022140618632Open ↗
10/03/2022140618632Open ↗
10/03/2022140618632Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM1
01/22/2020123699499Open ↗
▸DOB NOWStructure Photographs1
08/14/2026M01422087-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026M01422087-I1Open ↗