| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN REALTY | 884 | 07/08/2026 |
| 10E53 OWNER LLC | 2 | 03/22/2026 |
| MCGOVERN COMPANY | 5 | 03/22/2026 |
| MCGOVERM & COMPANY LLC | 1 | 03/22/2026 |
| NEW MILLENNIUM ESTATES | 89 | 03/22/2026 |
| NEW MILLENNION ESTATES LT | 1 | 03/22/2026 |
| 4-10 E 53 ST HARPER & ROW | 1 | 03/22/2026 |
| SL GREEN | 2 | 03/22/2026 |
| SYNERGY CONSTRUCTION | 1 | 03/21/2026 |
| ALUMALINE | 5 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SOCOTEC, INC. | 3 | 05/13/2026 |
| MG ENGINEERING D.P.C. | 56 | 04/23/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 03/16/2026 |
| TED MOUDIS ASSOCIATES | 4 | 03/13/2026 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 01/21/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 17 | 09/24/2025 |
| DESIGN REPUBLIC | 1 | 12/12/2024 |
| SCHNACKEL ENGINEERS | 4 | 04/08/2024 |
| VALERIO ARCHITECTS | 1 | 03/18/2024 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 02/16/2024 |
| PIRO STUDIO LLC | 1 | 11/29/2023 |
| CANY ARCHITECTURE & ENGINEERING DPC | 2 | 03/31/2023 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 02/07/2023 |
| BRAND ACCESS SOLUTIONS | 1 | 12/12/2022 |
| TRICARICO ARCHITECTURE AND DESIGN | 2 | 09/03/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 94 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| VINCENT J. LIOTTA P.E. | 1 | 03/21/2026 |
| DI DIO ARCHITECTURE, PC | 2 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 03/21/2026 |
| VINCENT J. LIOTTA P. E. | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SYNERGY CONSTRUCTION INC | General Contractor | 26 | 07/08/2026 |
| EAST COAST OFFICE SOLUT | General Contractor | 10 | 07/08/2026 |
| CONCEPT CONSTRUCTION SERV | General Contractor | 7 | 07/08/2026 |
| DESIMONE BUILDERS LLC | General Contractor | 6 | 07/08/2026 |
| FERRAN CONTRACTING CORP | General Contractor | 6 | 03/21/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 6 | 09/17/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 4 | 07/08/2026 |
| TITAN INDUSTRIAL SVC CORP | General Contractor | 4 | 07/08/2026 |
| CROSSLAND MECHANICAL INC | General Contractor | 4 | 07/08/2026 |
| O'CONNOR, MOXIE | Electrical | 3 | 03/21/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 3 | 07/08/2026 |
| RYLEE MECHANICAL SOLUTION | General Contractor | 3 | 03/21/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 3 | 07/08/2026 |
| DEGENNARO III, CHARLES | Electrical | 3 | 03/21/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 3 | 07/08/2026 |
| POWER-TECH INSTALL. ELEC' | Electrical | 2 | 03/22/2026 |
| CONNELLY & SONS PLUMBING | Plumbing | 2 | 07/08/2026 |
| MILLER PLUMBING & HTG INC | Fire Protection | 2 | 07/08/2026 |
| OMARA ORGANIZATION INC | General Contractor | 2 | 03/21/2026 |
| MILLER PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| SOLUTION MECH CONTNG LLC | Plumbing | 2 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| SKH MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| BLADE CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| POWERS BRIDGING & SCAFFOLDING | General Contractor | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC, INC. | 301 | 3 | 05/13/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 37 | 04/23/2026 |
| CODEGREEN | 510 | 16 | 03/13/2026 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 01/21/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 01/06/2026 |
| SCHNACKEL ENGINEERS | 1821 | 2 | 03/19/2024 |
| PIRO STUDIO LLC | 7503 | 1 | 11/29/2023 |
| ANCORA ENGINEERING, PLLC | 6818 | 2 | 02/07/2023 |
| GREGORY V. PEROTTO, P.E. | 947 | 1 | 09/03/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/16/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | POWERS BRIDGING & SCAFFOLDING | 06/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SYNERGY CONSTRUCTION INC | 04/13/2026 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 04/10/2026 |
| DOB NOW | Plumbing | Permit Issued | SOLUTION MECH CONTNG LLC | 04/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DESIMONE BUILDERS | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS | 03/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BORO ASSOCIATES INC | 03/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | POWERS BRIDGING & SCAFFOL | 03/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 02/27/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS | 02/09/2026 |
| DOB NOW | Mechanical Systems | Signed-off | RYLEE MECHANICAL SOLUTION | 01/23/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 01/15/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS | 12/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BORO ASSOCIATES INC | 11/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | DESIMONE BUILDERS | 11/18/2025 |
| DOB NOW | Plumbing | Signed-off | SOLUTION MECH CONTNG LLC | 11/17/2025 |
| DOB NOW | Plumbing | Signed-off | MILLER PLBG & HTG INC | 11/05/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 10/02/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 10/01/2025 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS | 10/01/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 09/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SYNERGY CONSTRUCTION INC | 09/26/2025 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 09/26/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 05/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 05/16/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SYNERGY CONSTRUCTION INC | 03/14/2025 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 03/07/2025 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 01/13/2025 |
| DOB NOW | General Construction | Signed-off | CONCEPT CONSTRUCTION SERV | 01/13/2025 |
| DOB NOW | General Construction | Signed-off | OMARA ORGANIZATION INC | 12/16/2024 |
| DOB NOW | Sprinklers | Signed-off | SKH MECHANICAL CORP | 10/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/25/2024 |
| DOB NOW | Sprinklers | Signed-off | SKH MECHANICAL CORP | 06/20/2024 |
| DOB NOW | General Construction | Signed-off | EAST COAST OFFICE SOLUT | 04/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SYNERGY CONSTRUCTION INC | 04/18/2024 |
| DOB NOW | General Construction | Signed-off | SYNERGY CONSTRUCTION INC | 04/08/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 02/27/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/21/2026 | Signed-off | RYLEE MECHANICAL SOLUTION | Air Conditioning Systems | Cooling Trane HDWA500FAAFL0CEXMDEXCDCBG04000100AB 500 tons · Chiller ×1 |
| 01/16/2026 | Permit Issued | DESIMONE BUILDERS LLC | Air Conditioning Systems, Heating Systems | Cooling Above Air FCW-007S1-4-0000H-EC-00-UFF-FA 24,000 BTU · Crac Unit ×2 Climatemaster SC-048 42,500 BTU · Wshp ×2 Heating Climatemaster SC-048 59,200 BTU · Wshp ×2 |
| 09/24/2025 | Permit Issued | SYNERGY CONSTRUCTION INC | Air Conditioning Systems | Cooling Florida Heat Pump CL024 22,200 BTU · Wshp ×2 |
| 11/14/2019 | Signed-off | CROSSLAND MECHANICAL INC | Cooling Towers | Cooling Tower Marley NC8407ULN4 3,000 tons · Cooling Tower ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/23/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | — |
| 02/19/2026 | Permit Issued | FIVE BORO ASSOCIATES INC | 167 heads |
| 01/16/2026 | Permit Issued | FIVE BORO ASSOCIATES INC | 279 heads |
| 09/24/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 25 heads |
| 01/09/2025 | Permit Issued | BEDROCK MECHANICAL INC | 10 heads |
| 10/19/2021 | Signed-off | A + SPRINKLER CORP | 3 heads |
| 06/07/2021 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/13/2026 | Permit Issued | SOLUTION MECH CONTNG LLC | Water/Sanitary |
| 01/16/2026 | Signed-off | SOLUTION MECH CONTNG LLC | Water/Sanitary |
| 09/24/2025 | — | — | — |
| 09/24/2025 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| 06/07/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2026 | Complete | LEADER ELECTRIC CO., INC | General Wiring |
| 04/08/2026 | Permit Issued | LEADER ELECTRIC CO., INC | General Wiring |
| 02/23/2026 | Permit Issued | OPTIMAL ELECTRIC, INC | — |
| 02/18/2026 | Permit Issued | OPTIMAL ELECTRIC, INC | — |
| 01/29/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 09/03/2024 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 01/17/2024 | Complete | TOP SHELF ELECTRIC CORP | — |
| 02/17/2023 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 02/03/2022 | Complete | POWER-TECH INSTALL. ELEC' | General Wiring |
| 01/08/2020 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 11/13/2019 | Permit Issued | GALLANT FOX ELECTRIC CORP | General Wiring |
| 06/19/2019 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 02/27/2019 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 10/05/2018 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 07/12/2018 | Permit Issued | PREMIER ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/13/2026 | Permit Issued | DESIMONE BUILDERS LLC | 1 scope_items |
| 11/14/2019 | Signed-off | CROSSLAND MECHANICAL INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/16/2026 | Permit Issued | POWERS BRIDGING & SCAFFOL | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/09/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/07/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Underground | Certified | View ↗ |
| 06/24/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/01/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/07/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 03/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/18/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/18/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/28/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/28/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/13/2026 | Masonry | Jennifer Sze | special |
| 04/30/2026 | Final | Jennifer Sze | progress |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 04/28/2026 | Post-installed Anchors | Young Suh | special |
| 04/28/2026 | Sprinkler Systems | Young Suh | special |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 02/02/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 02/02/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 02/02/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 02/02/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 01/28/2026 | Final | HATIM ELSAID | progress |
| 01/28/2026 | Mechanical Systems | HATIM ELSAID | special |
| 01/28/2026 | Energy Code Compliance Inspections | HATIM ELSAID | progress |
| 01/28/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 01/28/2026 | Electrical motors and elevators | HATIM ELSAID | energy_progress |
| 01/28/2026 | HVAC-R and service water piping design and insulation | HATIM ELSAID | energy_progress |
| 01/28/2026 | HVAC-R and service water heating system controls | HATIM ELSAID | energy_progress |
| 01/28/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 01/28/2026 | Final | Ted Moudis | progress |
| 01/28/2026 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 01/28/2026 | HVAC-R and service water heating equipment | HATIM ELSAID | energy_progress |
| 01/28/2026 | Metering | HATIM ELSAID | energy_progress |
| 01/20/2026 | Lighting controls | HATIM ELSAID | energy_progress |
| 01/20/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 01/20/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Electra USA | Office | Floor 31 | Project M01352439 |
| Investec | Office | Floor 22 | Project M01150459 |
| Zegna | Office | Floor 7 | Project M01016299 Project M01016318 Project M01015963 |
| Altaris Capital Partners | Office | Floor 30 | Project M00625450 |
| Ermenegildo Zegna | Retail | Floor 6 | Project M00392814 Project M00392828 |