Elevator cooperative
10 MONTAGUE TERRACE
BROOKLYN · Brooklyn Heights · BIN 3001516
💬 Discuss this project
1879Year Built
4Stories
D4Building Class
R6Zoning
15,197 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸
Elevator cooperative · Owner of record: 10 MONTAGUE TERRACE OWNERS COR · 6,500 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Floor 39p · 2 filings · 8 docs
Floor 21p · 1 filing · 4 docs
Floor 1
Cellar16p · 1 filing · 16 docs
Basement9p · 3 filings · 20 docs
Sub-Basement31p · 3 filings · 20 docs
Site & exterior8p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10 MONTAGUE OWNERS1803/21/2026
RICHARD YOUNGER MANAGEMENT807/08/2026
PHOENIX SUTTON STR INC503/22/2026
10 MONTAGUE TERRACE OWNERS COR103/22/2026
10 MONTAQUE TERR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OVERHEAD ARCHITECTURE DPC211/24/2025
RAAD509/19/2025
JOSEPH K. BLUM CO. LLP107/22/2024
HAGE ENGINEERING PC108/20/2021
ANNE MARIE LUBRANO108/18/2021
ROYAL ENGINEERING, P.C106/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.403/21/2026
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HATCHET WORKS CORPGeneral Contractor807/08/2026
DEMAR MECHANICAL INCPlumbing307/08/2026
BURDA CONSTRUCTION CORPGeneral Contractor207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
MARIO CASTROElectrical103/21/2026
BENJAMIN DREBINElectrical103/21/2026
DEMAR MECHANICALGeneral Contractor103/22/2026
WALDEN, LEEElectrical103/21/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
GARDNER, HORACEElectrical103/21/2026
JAMES VEECHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEVIN MILLS ARCHITECT7906211/24/2025
RAAD7727509/19/2025
JOSEPH K. BLUM CO. LLP1741107/22/2024
DOMANI INSPECTION SERVICE843108/20/2021
Building Lifecycle
All (108)Filed (11)Permit Issued (10)Signed Off (6)Violation (37)Inspection (8)Objection (6)Special Inspection (30)
01/16/2026
Signed off — Alteration
Installation of mechanical systems
B00998856-I1
01/16/2026
Signed off — Alteration
Installation of plumbing fixtures
B00998872-I1
12/12/2025
Signed off — Alteration
Proposed combine existing two apartments into one apartment in the basement per TPPN#3/97 with general construction as shown on plan. No change in use, egress and occupancy
B00996173-I1
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Devin Mills
12/09/2025
Special inspection requirement — Lighting in dwelling units
Devin Mills
12/09/2025
Special inspection requirement — Interior lighting power
Devin Mills
12/09/2025
Special inspection requirement — Lighting controls
Devin Mills
12/09/2025
Special inspection requirement — Final
Devin Mills
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Devin Mills
11/24/2025
Filed — Alteration
Proposed combine existing two apartments into one apartment in the basement per TPPN#3/97 with general construction as shown on plan. No change in use, egress and occupancy
B00996173-P1
11/24/2025
Special inspection requirement — Lighting in dwelling units
Devin Mills
11/24/2025
Special inspection requirement — Interior lighting power
Devin Mills
11/24/2025
Special inspection requirement — Final
Devin Mills
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Devin Mills
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Devin Mills
11/24/2025
Special inspection requirement — Lighting controls
Devin Mills
11/18/2025
Violation issued (HPD, closed)
I
10/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
09/19/2025
Filed — Alteration
Installation of plumbing fixtures
B00998872-P1
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
07/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — Duct leakage testing, insulation and design
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — Shutoff dampers
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — Final
NICHOLAS AZADIAN
05/30/2025
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
05/29/2025
Filed — Alteration
Installation of mechanical systems
B00998856-P2
05/27/2025
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
04/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2025
Permit issued — Structural
B00996173-S1-ST
01/10/2025
Permit issued — General Construction
B00996173-I1-GC
01/10/2025
Permit issued — Mechanical Systems
B00998856-I1-MS
12/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
11/18/2024
Filed — Alteration
Installation of mechanical systems
B00998856-P1
11/08/2024
Permit issued — Structural
B00996173-S1-ST
10/28/2024
Permit issued — Mechanical Systems
B00998856-I1-MS
07/22/2024
Filed — Alteration
Proposed combine existing two apartments into one apartment in the basement per TPPN#3/97 with general construction as shown on plan. No change in use, egress and occupancy
B00996173-S1
05/13/2024
Permit issued — Plumbing
B00998872-I1-PL
04/11/2024
Violation issued (HPD, closed)
A
04/08/2024
Filed — Alteration
Installation of plumbing fixtures
B00998872-I1
04/03/2024
Permit issued — General Construction
B00996173-I1-GC
04/01/2024
Filed — Alteration
Installation of mechanical systems
B00998856-I1
03/07/2024
Objection raised — Other
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHATCHET WORKS CORP01/13/2025
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP01/10/2025
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP01/10/2025
DOB NOWStructuralPermit IssuedHATCHET WORKS CORP11/08/2024
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP10/28/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC05/13/2024
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP04/03/2024
DOB NOWGeneral ConstructionSigned-offBURDA CONSTRUCTION CORP03/23/2022
DOB NOWStructuralSigned-offBURDA CONSTRUCTION CORP03/23/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/26/2018
BISPLISSUEDABR PLBG&HTG CONTR INC06/06/2018
BISMHISSUEDPALONE BROTHERS AIR05/10/2018
BISOTISSUEDCS CLEARSTONE CONSTRUCTIO01/23/2018
BISOTISSUEDFERRUM INC10/16/2017
BISMHISSUEDAIR DEPOT COMM. REFR. COR12/13/2016
BISPLISSUEDEINSTEINS PLBG & HTG INC08/17/2016
BISOTISSUEDFERRUM INC07/19/2016
BISOTISSUEDRYJAK, LLC02/21/2014
BISPLISSUEDORBIT PLBG & HTG INC12/12/2013
BISOTRE-ISSUEDK & A CONSTRUCTION & RENO10/16/2013
BISPLISSUEDWEISS PLUMBING INC06/14/2011
BISOTISSUEDZZZ CARPENTRY, INC07/26/2005
BISOTISSUEDWEISS PLUM INC12/15/2004
BISMHISSUEDCOMFORT AIR CONDITIONING & HEAT08/25/2004
BISPLISSUEDWEISS PLUMBING INC05/24/2004
BISOTISSUEDZZZ CARPENTRY, INC04/06/2004
BISOTISSUEDELJIN CONSTRUC OF NEW YORK03/11/2004
BISOTISSUEDMETROBUILD03/03/2004
BISOTISSUEDMETROBUILD03/03/2004
BISPLISSUEDWEISS PLBG INC03/01/2001
BISBLISSUEDWEISS PLBG INC03/01/2001
BISPLISSUEDWEISS PLUMBING INC07/14/1997
BISOTISSUEDANCHOR PROPERTY SERVICES LLC.06/27/1997
BISPLISSUEDPETER MC CANN PLG & HTG06/13/1994
BISPLISSUEDBROWN PLG & HEATING10/14/1992
BIS—ISSUEDJOTA CONSTRUCTION CO.09/23/1992
7 projects · most recent 07/30/2025
General Wiring Lighting
FiledStatusContractorScope
07/30/2025CompleteGRAMERCY ELECTRIC INCGeneral Wiring
01/12/2022Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/29/2020Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
04/17/2019CompleteWMS ELECTRICAL CONTNG LTD—
07/09/2018CompleteNAS ELECTRIC CORPGeneral Wiring, Lighting
06/18/2018Permit IssuedELPO ELECTRICAL CONTG INC—
06/01/2018CompleteACS ELECTRICAL CORPGeneral Wiring
1 project · most recent 11/24/2025
Steel Masonry
FiledStatusContractorScope
11/24/2025Permit IssuedHATCHET WORKS CORPSteel, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
12/09/2025Fire-Resistant Penetrations and JointsDevin Millsspecial
12/09/2025Lighting in dwelling unitsDevin Millsenergy_progress
12/09/2025Interior lighting powerDevin Millsenergy_progress
12/09/2025Lighting controlsDevin Millsenergy_progress
12/09/2025FinalDevin Millsprogress
12/09/2025Energy Code Compliance InspectionsDevin Millsprogress
11/24/2025Lighting in dwelling unitsDevin Millsenergy_progress
11/24/2025Interior lighting powerDevin Millsenergy_progress
11/24/2025FinalDevin Millsprogress
11/24/2025Energy Code Compliance InspectionsDevin Millsprogress
11/24/2025Fire-Resistant Penetrations and JointsDevin Millsspecial
11/24/2025Lighting controlsDevin Millsenergy_progress
09/23/2025HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
09/23/2025Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
09/23/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
09/23/2025HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/06/2025HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/06/2025Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/06/2025HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
05/30/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
05/30/2025Mechanical SystemsNICHOLAS AZADIANspecial
05/30/2025HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
05/30/2025Duct leakage testing, insulation and designNICHOLAS AZADIANenergy_progress
05/30/2025Shutoff dampersNICHOLAS AZADIANenergy_progress
Latest 25 of 55.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026B00056610-I1Request digital key ↗
09/01/2026B00540246-I1Request digital key ↗
09/01/2026B00540416-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits35
▸BISWORK PERMIT APPLICATION12
06/07/2018321579305Open ↗
05/10/2018321732470Open ↗
05/10/2018321732470Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
03/21/2020321732470Open ↗
05/10/2018321732470Open ↗
08/08/2017321634816Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLPC Approval/Permit10
09/01/2026B00540416-I1Open ↗
08/13/2026B00998872-I1Open ↗
08/13/2026B00998872-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
03/17/2020321732470Open ↗
08/02/2017321379575Open ↗
08/25/2016321379575Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature20
09/02/2026B00998856-P2Open ↗
09/02/2026B00998856-P2Open ↗
09/02/2026B00998856-P2Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/05/2020321732470Open ↗
10/15/2018321579305Open ↗
10/15/2018321579305Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B00998856-P2Open ↗
09/02/2026B00998856-P2Open ↗
09/01/2026B00998872-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026B00056610-I1Open ↗
09/01/2026B00540246-I1Open ↗
09/01/2026B00540416-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/10/2018321732470Open ↗
12/13/2016321493433Open ↗
05/09/2016321379575Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/10/2018321732470Open ↗
08/08/2017321634816Open ↗
12/13/2016321493433Open ↗
Showing 3 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
08/08/2017321634816Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/09/2017321579305Open ↗
09/02/2016321379575Open ↗
09/02/2016321379575Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/11/2018321732470Open ↗
06/11/2018321732470Open ↗
08/25/2014320874372Open ↗
▸BISEQUIPMENT USE PERMITS2
03/12/2019321493433Open ↗
03/12/2019321493433Open ↗
▸BISSCHEDULE B - PLUMBING1
09/17/2013320874372Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/01/2014320874372Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
05/10/2018321732470Open ↗
08/08/2017321634816Open ↗
06/09/2017321579305Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
05/10/2018321732470Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00540246-I1Open ↗
09/01/2026B00540416-I1Open ↗
08/25/2026B00998856-P2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/10/2018321579305Open ↗
12/13/2016321493433Open ↗
05/09/2016321379575Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
03/05/2020321732470Open ↗
06/22/2018321732470Open ↗
05/10/2018321732470Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/12/2019321493433Open ↗
01/16/2019321493433Open ↗
06/22/2018321732470Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISLANDMARKS APPROVAL9
03/12/2019321493433Open ↗
10/15/2018321579305Open ↗
06/22/2018321732470Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/12/2019321493433Open ↗
11/02/2018321579305Open ↗
10/11/2018321579305Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/06/2017321579305Open ↗
08/25/2014320874372Open ↗
05/31/2014320787902Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/31/2014320787902Open ↗
09/17/2013320874372Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
03/12/2019321493433Open ↗
11/02/2018321579305Open ↗
10/11/2018321579305Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET7
05/10/2018321732470Open ↗
08/08/2017321634816Open ↗
06/09/2017321579305Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
03/28/2020321732470Open ↗
06/12/2018321732470Open ↗
06/06/2018321493433Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/21/2020321732470Open ↗
03/12/2019321493433Open ↗
11/02/2018321579305Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISECCCNYS Analysis2
09/27/2013320874372Open ↗
09/27/2013320874372Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00056610-I1Open ↗