| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01359351 ↗ | 20 EAST 20 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 09/18/2026 | Design KIT MIDDLETON ARCHITECT P.C. Owner GRAMERCY HOUSE, INC. | Sprinkler work in conjunction with the build-out of a retail store. |
| M01380858 ↗ | 266 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 05/19/2026 | 09/10/2026 | Design TSF ENGINEERING, PC Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change in use, egress or occupancy. |
| B01222981 ↗ | 283 CARROLL STREET BROOKLYN | Alteration | Permit Issued | 05/31/2025 | 08/13/2026 | Design KIM HOYT ARCHITECT Filer B&A INSPECTIONS INC. . | STRUCTURAL WORK IN CONJUNCTION WITH GC JOB # B01222981-I1 |
| B01418768 ↗ | 425 HANCOCK ST BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 07/24/2026 | Design GANNETT FLEMING | Replcace gas furnace at cellar, No change to use egress or occupancy. |
| M01060653 ↗ | 158 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 06/20/2024 | 07/20/2026 | Design JP ENGINEERING | plumbing work filed in conjunction with interior renovation and horizontal enlargement at the rear on the basement level. |
| M01341749 ↗ | 85 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/14/2026 | 06/12/2026 | Design MARINASASSUARCHITECTS | Mechanical work filed in conjunction with an alteration renovation at an existing second-floor residential space. No change to use, egress … |
| Name | Jobs together | Most recent |
|---|---|---|
| PIRO STUDIO LLC | 27 | 05/29/2026 |
| KEMS ENGINEERING AND CONSTRUCTION | 21 | 04/01/2026 |
| TSF ENGINEERING, PC | 21 | 06/26/2026 |
| CHARLES G. MICHEL ENGINEERING, PC. | 6 | 07/14/2026 |
| KIT MIDDLETON ARCHITECT P.C. | 5 | 06/23/2026 |
| TULLER/MCNEALUS/FELD | 3 | 05/29/2026 |
| WALTER T. GORMAN, P.E., P.C. | 3 | 03/27/2026 |
| ALL CITY ENGINEERING, P.C. | 2 | 01/07/2025 |
| ASE PLLC | 2 | 12/12/2019 |
| BECHT ENGINEERING BT, INC. | 2 | 02/13/2026 |
| JACK GREEN ASSOCIATES | 2 | 02/08/2022 |
| MICHAEL ZENREICH ARCHITECT PC | 2 | 04/13/2022 |
| MYLES ARCHITECTURE, P.C. | 2 | 01/12/2024 |
| PIER FINE ASSOCIATES | 2 | 07/14/2026 |
| WILLIAM F. RYAN, JR. P.E. PC | 2 | 01/12/2023 |
| ABS ENGINEERING, PLLC | 1 | 01/21/2022 |
| AMA CONSULTING ENGINEERS, PC | 1 | 03/19/2024 |
| BAALBAKI&ASSOCIATES ENGINEERING, PC | 1 | 08/06/2026 |
| BAZINI ENGINEERING, P.C. | 1 | 05/06/2022 |
| BENJAMIN ELLIS ARCHITECT | 1 | 10/11/2022 |
| CES ENGINEERING LLC | 1 | 09/25/2020 |
| DAGHER ENGINEERING PLLC | 1 | 12/01/2023 |
| DD DESIGN GROUP INC. | 1 | 11/14/2024 |
| DE LA GARZA ARCHITECTURE LLC | 1 | 08/04/2025 |
| E.G. ARCHITECTURE PLLC | 1 | 07/26/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| STRUCTURE VENTURES LLC | 8 | 07/14/2026 |
| VILLAGE P & H NY INC | 4 | 06/23/2026 |
| ASPECT PLBNG&HTNG CO LLC | 3 | 08/06/2026 |
| DESIGN TECH CONSTRUCT COR | 3 | 07/26/2024 |
| SARK FLOORING LLC | 3 | 04/30/2026 |
| ANESIS MECHANICAL CORP | 2 | 04/30/2026 |
| ANESIS SERVICES CORP | 2 | 04/30/2026 |
| GOLDS PLUMBING CORP | 2 | 07/14/2026 |
| IMPACT PLUMBING INC | 2 | 06/23/2026 |
| A&P REMODELING CO INC | 1 | 06/23/2026 |
| ARCO PLBG AND HTG INC | 1 | 05/16/2026 |
| BLUE WATER BUILDERS LLC | 1 | 11/28/2022 |
| BREFFNI MECHANICAL INC | 1 | 04/30/2026 |
| BUILDWISE PLUMBING HEATIN | 1 | 07/09/2026 |
| COBOT PLUMBING AND HEATIN | 1 | 01/12/2024 |
| DEANGELIS PLBG & HTG.INC | 1 | 03/19/2024 |
| DFE CONTRACTOR LLC | 1 | 04/14/2026 |
| DIESEL CONTRACTING OF N.Y | 1 | 04/14/2026 |
| DIPIERRO ACTION CONSTR CO | 1 | 01/12/2024 |
| DONATO PLUMBING, INC | 1 | 11/20/2024 |
| E AND G MODICA CONTRACTIN | 1 | 11/03/2021 |
| FLINT MECHANICAL CORP | 1 | 04/14/2026 |
| FRANCO BLDNG. MAINT, INC | 1 | 05/29/2026 |
| G. C. PLBG & HTG INC | 1 | 03/17/2026 |
| GRANT DAVIS THOMPSON INC | 1 | 08/06/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| 184 ASSOCIATES LLC C/O ABS P | 6 | 10/29/2020 |
| GFP REAL ESTATE LLC | 6 | 03/27/2026 |
| A. RUTH & SONS | 4 | 09/30/2025 |
| W.&M. OPERATING, LLC | 4 | 05/29/2026 |
| EMPIRE MANAGEMENT | 2 | 05/01/2023 |
| FRANCOBUILDING MAINTENANCE INC. | 2 | 05/11/2020 |
| HH REALTY EQUITIES LLC | 2 | 06/26/2023 |
| 16 VERANDAH PLACE LLC | 1 | 12/06/2021 |
| 180 Madison Prisa II LLC | 1 | 03/30/2026 |
| 34 EAST 30TH STREET CORP. | 1 | 01/21/2022 |
| 45 CANAL LLC | 1 | 11/20/2024 |
| 47 VESTRY STREET CORPORATION | 1 | 12/15/2021 |
| 69-61 180TH STREET | 1 | 04/14/2026 |
| 78-02 NORTHERN BOULEVARD LLC | 1 | 11/30/2022 |
| AJK Squared Properties LLC | 1 | 06/26/2026 |
| AVERY HALL INVESTMENTS | 1 | 02/28/2023 |
| BERRIMANSTREET ASSOCIATES LLC | 1 | 03/10/2021 |
| BROWN HARRIS STEVENS | 1 | 09/16/2024 |
| BUCHBINDER & WARREN LLC | 1 | 05/16/2022 |
| G.A.M. REAL ESTATE LLC | 1 | 08/31/2023 |
| GOWANUS87 LLC | 1 | 04/01/2026 |
| GRAMERCY HOUSE, INC. | 1 | 06/23/2026 |
| GUMLEY HAFT | 1 | 02/13/2026 |
| LEVY PROPERTIES | 1 | 08/18/2021 |
| MEMO NY | 1 | 01/03/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| LEWSAN CONSULTANTS | 14 | 04/01/2026 |
| HUNT ARCHITECTS | 12 | 09/30/2025 |
| WALTER T. GORMAN, PE, PC | 6 | 05/19/2026 |
| KIT MIDDLETON ARCHITECT P.C. | 5 | 06/23/2026 |
| MICHAEL ZENREICH ARCHITECT, PC | 4 | 08/04/2025 |
| SOL BUILDING CONSULTING SERVICES | 4 | 04/30/2026 |
| ADAM MAISER | 3 | 01/07/2025 |
| CLARKE CONSTRUCTION CONSULTANTS | 3 | 07/14/2026 |
| J. CALLAHAN CONSULTING, INC. | 3 | 06/26/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 01/24/2024 |
| CONVERSANO ASSOCIATES, INC. | 2 | 05/29/2024 |
| JOSEPH FELLNER | 2 | 07/26/2024 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 02/28/2023 |
| B&A INSPECTIONS INC. . | 1 | 08/06/2026 |
| DD DESIGN GROUP INC. | 1 | 11/14/2024 |
| DESARNO ASSOCIATES, INC. | 1 | 03/19/2024 |
| DOMINICK R. PILLA ASSOCIATES, PC | 1 | 09/21/2023 |
| EC BUILDING CONSULTANTS, INC. | 1 | 12/06/2021 |
| EXPEDIA BUILDING SOLUTION | 1 | 11/20/2024 |
| JAM CONSULTANTS, INC. | 1 | 05/16/2022 |
| JLS DESIGNS | 1 | 04/14/2026 |
| KUSHNER STUDIOS | 1 | 11/28/2022 |
| LS EXPEDITOR | 1 | 04/14/2026 |
| METROPOLIS GROUP INC | 1 | 02/08/2022 |
| MICHAEL DE LUNA AIA, ARCHITECT | 1 | 07/09/2026 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01359351 ↗ | 20 EAST 20 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 09/18/2026 | Design KIT MIDDLETON ARCHITECT P.C. Owner GRAMERCY HOUSE, INC. | Sprinkler work in conjunction with the build-out of a retail store. |
| M01380858 ↗ | 266 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 05/19/2026 | 09/10/2026 | Design TSF ENGINEERING, PC Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change in use, egress or occupancy. |
| B01222981 ↗ | 283 CARROLL STREET BROOKLYN | Alteration | Permit Issued | 05/31/2025 | 08/13/2026 | Design KIM HOYT ARCHITECT Filer B&A INSPECTIONS INC. . | STRUCTURAL WORK IN CONJUNCTION WITH GC JOB # B01222981-I1 |
| B01418768 ↗ | 425 HANCOCK ST BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 07/24/2026 | Design GANNETT FLEMING | Replcace gas furnace at cellar, No change to use egress or occupancy. |
| M01060653 ↗ | 158 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 06/20/2024 | 07/20/2026 | Design JP ENGINEERING | plumbing work filed in conjunction with interior renovation and horizontal enlargement at the rear on the basement level. |
| M01341749 ↗ | 85 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/14/2026 | 06/12/2026 | Design MARINASASSUARCHITECTS | Mechanical work filed in conjunction with an alteration renovation at an existing second-floor residential space. No change to use, egress … |
| M01363821 ↗ | 178 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 03/23/2026 | 06/09/2026 | Owner 180 Madison Prisa II LLC | Plumbing work for the installation of a coffee bar in an existing ground floor retail space. |
| B01349615 ↗ | 360 FURMAN STREET BROOKLYN | Alteration | Signed-off | 01/26/2026 | 06/01/2026 | RECONFIGURING OF EXISTING WET-TYPE SPRINKLER SYSTEM DISTRIBUTIONS THROUGHOUT SINGLE FAMILY, SIMPLEX RESIDENTIAL APARTMENT NO. 824 TO ACCOMMO… | |
| M01367166 ↗ | 200 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 04/30/2026 | 05/13/2026 | Design TSF ENGINEERING, PC | RENOVATION OF EXISTING COMMERCIAL UNIT ON THE 5TH FLOOR SUITE #501 AND 5TH FLOOR BATHROOM TO INCLUDE INSTALLATION OF NEW SPRINKLER HEADS AND… |
| M01367208 ↗ | 1001 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 03/17/2026 | 04/17/2026 | Design TSF ENGINEERING, PC | INTERIOR SPRINKLER RENOVATION OF EXISTING COMMERCIAL UNIT ON THE 14TH FLOOR, REMOVAL OF (72) SPRINKLER HEADS, INSTALL (100) SPRINKLER HEADS,… |
| M01364116 ↗ | 520 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/27/2026 | 04/07/2026 | Design WALTER T. GORMAN, P.E., P.C. Owner GFP REAL ESTATE LLC Filer WALTER T. GORMAN, PE, PC | Propose to install new condenser and air handlers. No change to use, egress or occupancy. |
| B01379235 ↗ | 87 LUQUER STREET BROOKLYN | Alteration | Signed-off | 04/01/2026 | 04/02/2026 | Owner GOWANUS87 LLC Filer LEWSAN CONSULTANTS | REGISTER SPLIT HEAT PUMP SYSTEM. |
| M01081093 ↗ | 88 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 09/16/2024 | 03/26/2026 | Design BECHT ENGINEERING BT, INC. Owner BROWN HARRIS STEVENS | Installation of new water cooled VRF system, kitchen, dryer, and toilet exhaust system in Apartment #3/4 N on the 3rd and 4th floor. No chan… |
| M01312058 ↗ | 150 VARICK STREET MANHATTAN | Alteration | Signed-off | 12/16/2025 | 01/20/2026 | Design TULLER/MCNEALUS/FELD Owner W.&M. OPERATING, LLC Filer SWA ARCHITECTURE PLLC | FILING FOR NEW MECHANICAL DUCT LAYOUT FOR A NEW OFFICE FITOUT ON THE 10TH FLOOR. REUSE EXISTING MECHANICAL UNITS. NO CHANGE TO USE, EGRESS,… |
| M01308939 ↗ | 102 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2025 | 12/11/2025 | — | Installation of (2) 15 ton air cooled systems located on the 11th floor mechanical room. |
| M01174081 ↗ | 374 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2025 | 12/02/2025 | Design TSF ENGINEERING, PC | subsequent application filed for exterior ramp replacement and limited, related exterior work, as per plans plans. |
| M01309163 ↗ | 1001 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/12/2025 | 11/28/2025 | Design TSF ENGINEERING, PC Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change in use, egress or occupancy. |
| Q08016329 ↗ | 69-61 180 STREET QUEENS | Alteration | Signed-off | 10/10/2022 | 11/06/2025 | Design JLS DESIGNS Owner 69-61 180TH STREET Filer LS EXPEDITOR | Proposed interior renovation on cellar and first floor with 1st floor horizontal addition to an existing one family two story dwelling |
| M01264546 ↗ | 1001 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/20/2025 | 09/29/2025 | Design TSF ENGINEERING, PC Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change in use, egress or occupancy. |
| M01284927 ↗ | 102 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/15/2025 | 09/19/2025 | Design PIRO STUDIO LLC Owner A. RUTH & SONS Filer HUNT ARCHITECTS | Installation of (2) 15ton air cooled systems located on the 11th floor mechanical room. |
| M01221286 ↗ | 630 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/02/2025 | 08/19/2025 | Owner GFP REAL ESTATE LLC Filer WALTER T. GORMAN, PE, PC | Propose installation of split system HVAC unit. No change in use, egress or occupancy. |
| M01218294 ↗ | 266 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/06/2025 | 06/25/2025 | Design TSF ENGINEERING, PC | INTERIOR MECHANICAL RENOVATION FOR INSTALLATION OF AIR COOLED CONDITIONING UNITS AND EXHAUST FANS AS PER PLANS. NO EXTERIOR WORK. NO CHANGE … |
| M01214274 ↗ | 119 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 05/20/2025 | 06/04/2025 | Design PIRO STUDIO LLC Filer HUNT ARCHITECTS | Mechanical work for renovations of family dwelling with an installation of (6) new air cooled split systems as per plans herewith., |
| M01040665 ↗ | 324 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 10/23/2024 | 05/23/2025 | Design TRAVIS ENGINEERING, PLLC Owner SYDA FOUNDATION Filer NYCCODE LLC | Installation of a wall mounted air conditioning split system unit on the basement level and the first floor along with the installation of a… |
| M01203956 ↗ | 102 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/22/2025 | 05/14/2025 | Design PIRO STUDIO LLC Owner A. RUTH & SONS Filer HUNT ARCHITECTS | Installation of (2) 15ton air cooled systems located on the 4th floor mechanical room. |
| M01203969 ↗ | 102 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/22/2025 | 05/14/2025 | Design PIRO STUDIO LLC | Installation of (2) 15ton air cooled systems located on the 10th floor mechanical room. |
| B00514316 ↗ | 225 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 10/05/2021 | 04/30/2025 | Design FLORINELA MURESAN | Renovation of existing Apartment 2/3D. Replace HVAC system, minor changes to existing windows to accommodate HVAC changes. No change of us… |
| Q00505359 ↗ | 31-75 STEINWAY STREET QUEENS | Alteration | Permit Issued | 10/05/2021 | 04/28/2025 | Filing subsequent plumbing application to show new 1 gas line connection to rooftop AC units. No change to use, egress or occupancy. | |
| M01198069 ↗ | 17 UNION SQUARE MANHATTAN | Alteration | Signed-off | 03/31/2025 | 04/08/2025 | Design TSF ENGINEERING, PC | MECHANICAL WORK ASSOCIATED WITH THE RENOVATION OF THE 3RD FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY, PER PLANS HERIN. |
| M01114115 ↗ | 45 CANAL STREET MANHATTAN | Alteration | Permit Issued | 11/08/2024 | 03/27/2025 | Design TRIMBLE ARCHITECTURE PC Owner 45 CANAL LLC | select upgrades to existing HVAC system |
| M01110911 ↗ | 291 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2024 | 03/20/2025 | Design PIRO STUDIO LLC | Installation of (2) 4 ton air cooled unit split systems installation on the 3rd floor / 10th floor roof. |
| M01028040 ↗ | 115 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 06/07/2024 | 03/19/2025 | Design PIER FINE ASSOCIATES | PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00896529 ↗ | 826 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 02/20/2025 | Design KIT MIDDLETON ARCHITECT P.C. | PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF AN EXISTING APARTMENT 7E. |
| 320407788BIS | 465 CLINTON AVENUE BROOKLYN | — | ISSUED | 08/01/2012 | 02/18/2025 | — | MH, PL |
| B01119347 ↗ | 25 8 AVENUE BROOKLYN | Alteration | Signed-off | 10/24/2024 | 12/09/2024 | Filer LEWSAN CONSULTANTS | PROPOSED TO INSTALL TWO (2) SPLIT AC SYSTEMS |
| M00992281 ↗ | 26 WEST 17 STREET MANHATTAN | Alteration | Permit Issued | 03/19/2024 | 12/05/2024 | Design AMA CONSULTING ENGINEERS, PC Owner WINTER MANAGEMENT CORP Filer DESARNO ASSOCIATES, INC. | Sprinkler Head changes as indicated on plans. |
| M01119321 ↗ | 125 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 10/24/2024 | 10/30/2024 | REPLACE SPLIT AC SYSTEM FOR LOBBY | |
| Q00881456 ↗ | 10-95 IRVING AVENUE QUEENS | Alteration | Permit Issued | 06/07/2023 | 09/23/2024 | Design TSF ENGINEERING, PC | AC SYSTEM INSTALLATION FOR SUITE 202A AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00957666 ↗ | 10-95 IRVING AVENUE QUEENS | Alteration | Permit Issued | 01/24/2024 | 09/23/2024 | Design TSF ENGINEERING, PC | HVAC SPLIT SYSTEM INSTALLATION FOR SUITES 202-208 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00723247 ↗ | 61 WEST 90 STREET MANHATTAN | Alteration | Signed-off | 07/05/2022 | 07/12/2024 | Design ALL CITY ENGINEERING, P.C. Filer ADAM MAISER | Renovation of existing single family residence on floors CEL, BAS, 001-003, and ROF. Mechanical work. There is to be no change of use, occup… |
| M00822594 ↗ | 59 WEST 90 STREET MANHATTAN | Alteration | Signed-off | 03/28/2023 | 07/09/2024 | Design ALL CITY ENGINEERING, P.C. | Renovation of existing dwelling unit on floors CEL and BAS. Mechanical work. There is to be no change of use, occupancy, or egress. |
| B08037721 ↗ | 196 LINCOLN PLACE BROOKLYN | Alteration | Signed-off | 05/17/2023 | 06/07/2024 | Install two (2) AC Condensers and one package unit on the roof; and one (1) Air Handler on each and the basement and 2nd floor levels. | |
| B00712482 ↗ | 383 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 05/03/2022 | 06/04/2024 | Design MYLES ARCHITECTURE, P.C. Filer MYLES ARCHITECTURE, P.C. | TEMPORARY CONSTRUCTION FENCE OUTSIDE OF PROPERTY LINE BUT WITHIN 3 FEET OF PROPERTY LINE. |
| M00971439 ↗ | 960 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/18/2024 | 04/29/2024 | Design KIT MIDDLETON ARCHITECT P.C. | Replacement of two existing split system AC units presently serving the apartment. |
| M00925713 ↗ | 162 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/08/2024 | 04/19/2024 | Design TSF ENGINEERING, PC | Filing application for the removal of mechanical equipment, and installation of new split system AC units as per plans submitted. |
| B00796605 ↗ | 214 MARLBOROUGH ROAD BROOKLYN | Alteration | Permit Issued | 09/14/2022 | 03/28/2024 | Design P.A. COLLINS PE | Filing herewith for the installation of new mechanical systems |
| B00986871 ↗ | 184 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 02/28/2024 | 03/07/2024 | Design PIRO STUDIO LLC Filer HUNT ARCHITECTS | Installation of new 4 ton VRF type split system, |
| B00722002 ↗ | 819 LINCOLN PLACE BROOKLYN | Alteration CO | Permit Issued | 06/13/2022 | 01/04/2024 | Design E.G. ARCHITECTURE PLLC Filer JOSEPH FELLNER | Two new small footings at cellar and two new small footings at backyard for the deck |
| M00898332 ↗ | 850 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/20/2023 | 01/04/2024 | Design BECHT ENGINEERING BT, INC. Owner GUMLEY HAFT | Installation of 7.5 tons HVAC system in Apt. #7B on the 7th floor. No change to use, egress, or occupancy. |
| B00808208 ↗ | 1 BOERUM PLACE BROOKLYN | Alteration | Signed-off | 01/12/2023 | 01/03/2024 | Design EMTG CONSULTANTS INC Owner AVERY HALL INVESTMENTS Filer JM ZONING, LLC. | FILING HEREWITH SPRINKLER WORK FOR INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00913634 ↗ | 9 EAST 19 STREET MANHATTAN | Alteration | Signed-off | 08/31/2023 | 11/30/2023 | Design PIRO STUDIO LLC Owner G.A.M. REAL ESTATE LLC Filer HUNT ARCHITECTS | Installation of (1) 10 ton air cooled unit split system, installed on the 5th floor and roof spaces. |
| M00727494 ↗ | 164 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 05/27/2022 | 09/29/2023 | Design DAGHER ENGINEERING PLLC | PLUMBING FIXTURES IN EXISTING DUPLEX. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B00770738 ↗ | 449 14 STREET BROOKLYN | Alteration | Signed-off | 02/02/2023 | 09/07/2023 | Design ETELAMAKI ARCHITECTURE | MECHANICAL WORK AS PER PLANS FILED HEREWITH. |
| B00802333 ↗ | 126 HAWTHORNE STREET BROOKLYN | Alteration | Signed-off | 01/12/2023 | 08/23/2023 | Design WILLIAM F. RYAN, JR. P.E. PC | MECHANICAL SYSTEMS MODIFICATIONS FILED HEREWITH AS PER PLANS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. |
| M00884432 ↗ | 15 EAST 30TH STREET MANHATTAN | Alteration | Signed-off | 06/09/2023 | 08/07/2023 | Filer RMBA LLC | Relocating a branch exhaust duct; duct shall tap back into same riser at higher elevation |
| B00892401 ↗ | 80 RICHARDS STREET BROOKLYN | Alteration | Permit Issued | 06/26/2023 | 07/18/2023 | Owner HH REALTY EQUITIES LLC | MECHANICAL WORK ASSOCIATED WITH THE INSTALLATION OF A/C EQUIPMENT ; NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B08030947 ↗ | 1236 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 11/28/2022 | 07/13/2023 | Design HANSEN ENGINEERING, PC Filer KUSHNER STUDIOS | INSTALLATION OF NEW PACAKAGED HVAC UNIT AT THE 1ST FLOOR AND THE RELATED STRUCTURAL WORK AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHAN… |
| M00853585 ↗ | 7 WEST 36 STREET MANHATTAN | Alteration | Signed-off | 05/01/2023 | 06/02/2023 | Owner EMPIRE MANAGEMENT | INSTALLATION OF AC EQUIPMENT ON ROOF, 15TH, 13TH AND 11TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00804912 ↗ | 360 FURMAN STREET BROOKLYN | Alteration | Signed-off | 04/19/2023 | 05/02/2023 | Filer LEWSAN CONSULTANTS | Replace one (1) HVAC Unit on Mezz-1 and install new ceiling mounted HVAC Unit with ducts and Remove PTAC on the 2nd floor of apartment 205 |
| B08051212 ↗ | 391 8 STREET BROOKLYN | Alteration | Signed-off | 01/02/2023 | 05/02/2023 | Design DD DESIGN GROUP INC. Filer DD DESIGN GROUP INC. | INSTALLATIATION OF 2 TONS SPLIT UNIT AIR CONDITION SERVING FIRST FLOOR. (2) 3.5 TONS AIR CONDITION SERVING 2ND AND 3RD FLOOR ROOF CONDENSOR … |
| B08053619 ↗ | 527 1 STREET BROOKLYN | Alteration | Permit Issued | 02/28/2023 | 04/10/2023 | Design EMTEC CONSULTANTS | INSTALL SPLIT HVAC SYSTEM FOR EXISTING 1-FAMILY RESIDENCE. WORK AT 3rd & 4th FLOOR, AND ROOF. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B00775565 ↗ | 1406 ALBEMARLE ROAD BROOKLYN | Alteration | Signed-off | 03/15/2023 | 04/03/2023 | Filer LEWSAN CONSULTANTS | Install five (5) Split Air Conditioning Systems throughout the house. |
| B00834188 ↗ | 160 IMLAY STREET BROOKLYN | Alteration | Signed-off | 03/02/2023 | 03/24/2023 | Design JON POWELL ARCHITECTURE PLLC | INSTALLATION OF HVAC UNITS ON APT 5E4 AS PER PLANS FILED HEREWITH. RELATED GC WORK FILED UNDER APPLICATION B00800723 |
| M08000676 ↗ | 80 GROVE STREET MANHATTAN | Alteration | Signed-off | 10/03/2022 | 03/23/2023 | Design JOSELOW & ASSOCIATES, LLC Owner SDG MANAGEMENT CORP | Mechanical work in conjunction with GC/ST M00788522. Installing new heating and cooling units on bulkhead roof. |
| 123783003BIS | 524 EAST 89 STREET MANHATTAN | — | ISSUED | 01/24/2020 | 03/15/2023 | — | MH, SP |
| M08035844 ↗ | 560 BROADWAY MANHATTAN | Alteration | Signed-off | 02/28/2023 | 03/01/2023 | Design PIRO STUDIO LLC Owner GFP REAL ESTATE LLC Filer HUNT ARCHITECTS | Installation of (1) 3 Ton Split System, ACCU-4-1 on Roof and AHU-4-1 on 4th Floor Offices. |
| M08038182 ↗ | 184 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/19/2023 | 01/31/2023 | Design TSF ENGINEERING, PC Filer WALTER T. GORMAN, PE, PC | Propose to perform mechanical work. No change to use, egress or occupancy. |
| Q08045458 ↗ | 131-10 MAPLE AVENUE QUEENS | Alteration | Signed-off | 01/11/2023 | 01/13/2023 | Filer LEWSAN CONSULTANTS | Register Split Heat Pump system |
| B00649060 ↗ | 117 2 STREET BROOKLYN | Alteration | Signed-off | 12/27/2021 | 12/23/2022 | Design RAAD | INSTALLATION OF NEW HVAC SYSTEM |
| B00627847 ↗ | 20 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 01/26/2022 | 12/13/2022 | Design SARAH JACOBY ARCHITECT, DPC Filer JOSEPH FELLNER | RENOVATION AT APARTMENT 5D. PARTITION AND MECHANICAL WORK. RENOVATION OF KITCHEN AND BATHROOM. ADDING ADDITIONAL BATHROOM. |
| Q08024486 ↗ | 78-02 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 11/30/2022 | 12/01/2022 | Filer LEWSAN CONSULTANTS | Direct Replacement of two (2) Roof Top Units all as per plans filed herewith. |
| M00702425 ↗ | 150 VARICK STREET MANHATTAN | Alteration | Permit Issued | 06/14/2022 | 11/09/2022 | Design PIRO STUDIO LLC Owner W.&M. OPERATING, LLC Filer HUNT ARCHITECTS | Proposed installation of (4) four new 15 ton indoor air cooled package AC units |
| M00702434 ↗ | 150 VARICK STREET MANHATTAN | Alteration | Permit Issued | 06/14/2022 | 11/09/2022 | Design PIRO STUDIO LLC | Proposed installation of (4) four new 15 ton indoor air cooled package AC units on 7th floor. |
| B00799216 ↗ | 423 CLINTON STREET BROOKLYN | Alteration | Signed-off | 10/11/2022 | 10/20/2022 | Design BENJAMIN ELLIS ARCHITECT Filer LEWSAN CONSULTANTS | Church Parish Hall: Installation of HVAC ducted split heat pump Mechanical system. No change to existing use, occupancy, or egress. |
| B07995873 ↗ | 318 WARREN STREET BROOKLYN | Alteration | Signed-off | 10/03/2022 | 10/07/2022 | Filer LEWSAN CONSULTANTS | Direct replacement of three (3) split HVAC systems. |
| B00683283 ↗ | 161 HENRY STREET BROOKLYN | Alteration | Signed-off | 08/10/2022 | 09/20/2022 | Filer LEWSAN CONSULTANTS | Install two (2) split cooling systems in Apartment 5C. |
| B00741129 ↗ | 652 KENT AVENUE BROOKLYN | Alteration | Signed-off | 06/23/2022 | 07/01/2022 | Filer LEWSAN CONSULTANTS | Replacement of one (1) split air conditioning system at Building 280, Suite 513. |
| M00702438 ↗ | 150 VARICK STREET MANHATTAN | Alteration | Signed-off | 05/09/2022 | 06/16/2022 | Design PIRO STUDIO LLC Owner W.&M. OPERATING, LLC Filer HUNT ARCHITECTS | PROPOSED INSTALLATION OF(4) FOUR NEW 15 ton INDOOR AIR COOLED PACKAGE AC UNITS |
| B00699001 ↗ | 477 MARLBOROUGH ROAD BROOKLYN | Alteration | Permit Issued | 05/19/2022 | 05/27/2022 | Filer LEWSAN CONSULTANTS | Direct replacement of existing HVAC unit with new split system. |
| B00727859 ↗ | 137 VAN BUREN STREET BROOKLYN | Alteration | Signed-off | 05/06/2022 | 05/12/2022 | Design BAZINI ENGINEERING, P.C. | LEGALIZE TWO (2) GAS-FURNACES, TWO (2) SPLIT AC UNITS AND ONE (1) GAS DRYER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00526207 ↗ | 30 WEST 9 STREET MANHATTAN | Alteration | Signed-off | 06/30/2021 | 05/06/2022 | Design TAN ENGINEERING PC Owner BUCHBINDER & WARREN LLC Filer JAM CONSULTANTS, INC. | Mechanical work to accommodate the condominium renovation as per plans submitted herewith. No change in use, egress of occupancy. |
| M00636667 ↗ | 915 BROADWAY MANHATTAN | Alteration | Signed-off | 01/11/2022 | 04/27/2022 | Design PIRO STUDIO LLC | Installation of (1) 2 ton air cooled split system (ACCU-1 & AHU-1) on the 10th Floor. |
| B00431433 ↗ | 2015 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2021 | 04/25/2022 | Design MYLES ARCHITECTURE, P.C. Filer MYLES ARCHITECTURE, P.C. | Mechanical work in conjunction with alt-1 application. No change in use, egress or certificate of occupancy. |
| M00578973 ↗ | 407 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 04/19/2022 | Installation of AC units and associated duct work for 3rd floor medical office. No change to use, egress or occupancy | |
| M00646848 ↗ | 34 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 01/21/2022 | 04/19/2022 | Design ABS ENGINEERING, PLLC Filer ADAM MAISER | Renovation of existing apartment 4A on floor 004. Mechanical work. There is to be no change of use, occupancy, or egress. |
| M00661172 ↗ | 150 VARICK STREET MANHATTAN | Alteration | Signed-off | 02/15/2022 | 03/19/2022 | Design PIRO STUDIO LLC Owner W.&M. OPERATING, LLC Filer HUNT ARCHITECTS | Proposed installation of(2) two new 15 ton indoor air cooled package AC units |
| M00689415 ↗ | 19 WEST 36 STREET MANHATTAN | Alteration | Signed-off | 03/10/2022 | 03/19/2022 | Design PIRO STUDIO LLC Filer HUNT ARCHITECTS | Installation of (1) 2 ton Air Cooled Split System (ACCU-1 & AHU-1) on the 1st Floor. |
| B00657371 ↗ | 9 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 03/11/2022 | 03/18/2022 | Filing to replace split AC system with two (2) Split HVAC Systems for Duplex apartment at 3rd & 4th floor. | |
| B00624900 ↗ | 18 VERANDAH PLACE BROOKLYN | Alteration | Signed-off | 12/06/2021 | 02/16/2022 | Design SHAWDESIGNWORKS Owner 16 VERANDAH PLACE LLC | ADDITION OF A MINI SPLIT AIR CONDITIONING SYSTEM TO AN EXISTING, 3 FLOOR, SINGLE FAMILY, GROUP R-3 BUILDING. NO CHANGE IN USE, EGRESS OR OCC… |
| M00647405 ↗ | 118 EAST 60 STREET MANHATTAN | Alteration | Permit Issued | 02/08/2022 | 02/16/2022 | Design JACK GREEN ASSOCIATES Filer METROPOLIS GROUP INC | Installation of new mechanical equipment, duct and piping, as per plans herein. There is no change to occupancy, use or egress. |
| B00585781 ↗ | 151 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 09/14/2021 | 02/04/2022 | Design VASILIOS ARTEMIOU PE | HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M00642343 ↗ | 437 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 12/15/2021 | 01/31/2022 | Design PIRO STUDIO LLC Filer HUNT ARCHITECTS | Installation of (2) roof top units (RTUs). Replacement on exact same steel dunnage at some location on 5th floor roof. |
| B00631410 ↗ | 139 ST FELIX STREET BROOKLYN | Alteration | Signed-off | 01/03/2022 | 01/11/2022 | Design PIRO STUDIO LLC Owner MEMO NY Filer HUNT ARCHITECTS | Installation of (1) 3 ton roof top unit and (1) 1 1/2 ton split-system unit replacement on exact same steel dunnage. |
| B00615819 ↗ | 241 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 11/03/2021 | 11/10/2021 | Install one (1) AC package unit on roof. | |
| B00562221 ↗ | 406 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 09/08/2021 | 09/23/2021 | Direct replacement of one (1) split air conditioning system. | |
| B00316442 ↗ | 10 CLINTON STREET BROOKLYN | Alteration | Signed-off | 04/23/2020 | 09/15/2021 | Design SPENCER ENGINEERING, PC | ALTERATION TYPE 2 IN CONJUNCTION WITH NO WORK ALTERATION 1 APPLICATION #321970444. FILED TO SUPERSEDE APPLICATION BN 1672/83 FOR THE PURPOSE… |
| Q00566492 ↗ | 56-14 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 08/18/2021 | 08/25/2021 | Owner LEVY PROPERTIES Filer LEWSAN CONSULTANTS | Direct replacement of one (1) packaged HVAC unit on roof. |
| B00330008 ↗ | 26 8 AVENUE BROOKLYN | Alteration | Signed-off | 05/05/2020 | 08/24/2021 | Design STRUCTURAL ENGINEERING BURO | REINFORCEMENT OF THE EXISTING STEEL LINTEL ABOVE THE GARAGE DOOR AND REPLACE DETERIORATED MASONRY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 123859903BIS | 266 MADISON AVENUE MANHATTAN | — | ISSUED | 07/19/2019 | 08/19/2021 | — | MH, PL |
| B00558783 ↗ | 1319 PROSPECT AVENUE BROOKLYN | Alteration | Signed-off | 08/05/2021 | 08/17/2021 | Install two (2) HVAC split systems in one family dwelling. |