← Back
BuildNYC
Elevator cooperative
10 MONTAGUE TERRACE
BROOKLYN · Brooklyn Heights · BIN 3001516
💬 Discuss this project
1879Year Built
4Stories
D4Building Class
R6Zoning
15,197 sfGross Floor Area
16Units
Rent Stabilized1 Active Violation 1 likely answered ▸
Elevator cooperative · Owner of record: 10 Montague Terrace Owners · 6,500 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Demolition and construction, 3rd floor apartment10p · 2 filings · 8 docs
Floor 2
Floor 1
CellarRichard Younger Management16p · 1 filing · 16 docs
BasementRichard Younger Management9p · 3 filings · 20 docs
Sub-BasementRichard Younger Management31p · 3 filings · 20 docs
Site & exterior8p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10 Montague Owners1803/21/2026
10 Montague Terrace Owners103/22/2026
10 Montaque Terr103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Overhead Architecture211/24/2025
Raad509/19/2025
Joseph K. Blum107/22/2024
Hage Engineering108/20/2021
Anne Marie Lubrano108/18/2021
Royal T&E106/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates403/21/2026
BMB Building Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hatchet WorksGeneral Contractor607/08/2026
Demar MechanicalPlumbing307/08/2026
MetrobuildGeneral Contractor203/21/2026
Weiss PlumbingPlumbing203/21/2026
Phoenix Sutton STRScaffold203/21/2026
Hatchet Worksspecialty_contractor207/08/2026
Burda ConstructionGeneral Contractor207/08/2026
RyjakGeneral Contractor103/21/2026
ZZZ CarpentryGeneral Contractor103/21/2026
Gramercy ElectricElectrical103/21/2026
CS Clearstone ConstructionGeneral Contractor103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Abr Plumbing & Heating ContractingPlumbing106/06/2018
Air Depot Commercial RefrigerationGeneral Contractor112/13/2016
Anchor Property ServicesGeneral Contractor106/27/1997
Brown PLG & HeatingPlumbing110/14/1992
Comfort Air Conditioning & HeatingGeneral Contractor108/25/2004
Einsteins Plumbing & HeatingPlumbing108/17/2016
Eljin ConstructionGeneral Contractor103/11/2004
FerrumGeneral Contractor210/16/2017
K & A ConstructionGeneral Contractor110/16/2013
Orbit Plumbing & HeatingPlumbing112/12/2013
Palone Brothers Air CondiGeneral Contractor105/10/2018
Peter MC Cann PLG & HeatingPlumbing106/13/1994
Weiss PlumbingPlumbing306/14/2011
Weiss PlumGeneral Contractor112/15/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Devin Mills Architect7906211/24/2025
Raad7727509/19/2025
Joseph K. Blum1741107/22/2024
Domani Inspection Service843108/20/2021
Building Lifecycle
06/24/2026
Elevator Category 1 inspection report filed
05/04/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/16/2026
Signed off — Alteration
Installation of mechanical systems
B00998856-I1
01/16/2026
Signed off — Alteration
Installation of plumbing fixtures
B00998872-I1
01/13/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
B00996173-S1-ST
134 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHatchet Works01/13/2025
DOB NOWMechanical SystemsSigned-offHatchet Works01/10/2025
DOB NOWGeneral ConstructionSigned-offHatchet Works01/10/2025
DOB NOWStructuralPermit IssuedHatchet Works11/08/2024
DOB NOWMechanical SystemsSigned-offHatchet Works10/28/2024
DOB NOWPlumbingSigned-offDemar Mechanical05/13/2024
DOB NOWGeneral ConstructionSigned-offHatchet Works04/03/2024
DOB NOWGeneral ConstructionSigned-offBurda Construction03/23/2022
DOB NOWStructuralSigned-offBurda Construction03/23/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR06/26/2018
BISPLISSUEDAbr Plumbing & Heating Contracting06/06/2018
BISMHISSUEDPalone Brothers Air05/10/2018
BISOTISSUEDCS Clearstone Construction01/23/2018
BISOTISSUEDFerrum10/16/2017
BISMHISSUEDAir Depot Commercial Refrigeration12/13/2016
BISPLISSUEDEinsteins Plumbing & Heating08/17/2016
BISOTISSUEDFerrum07/19/2016
BISOTISSUEDRyjak02/21/2014
BISPLISSUEDOrbit Plumbing & Heating12/12/2013
BISOTRE-ISSUEDK & A Construction10/16/2013
BISPLISSUEDWeiss Plumbing06/14/2011
BISOTISSUEDZZZ Carpentry07/26/2005
BISOTISSUEDWeiss Plum12/15/2004
BISMHISSUEDComfort Air Conditioning & Heating08/25/2004
BISPLISSUEDWeiss Plumbing05/24/2004
BISOTISSUEDZZZ Carpentry04/06/2004
BISOTISSUEDEljin Construc of New York03/11/2004
BISOTISSUEDMetrobuild03/03/2004
BISOTISSUEDMetrobuild03/03/2004
BISPLISSUEDWeiss Plumbing03/01/2001
BISBLISSUEDWeiss Plumbing03/01/2001
BISPLISSUEDWeiss Plumbing07/14/1997
BISOTISSUEDAnchor Property Services06/27/1997
BISPLISSUEDPeter MC Cann PLG & Heating06/13/1994
BISPLISSUEDBrown PLG & Heating10/14/1992
BIS—ISSUEDJota Construction09/23/1992
7 projects · most recent 07/30/2025
General Wiring Lighting
FiledStatusContractorScope
07/30/2025CompleteGramercy ElectricGeneral Wiring
01/12/2022Permit IssuedJoseph Weinstein ElectricGeneral Wiring
06/29/2020Permit IssuedElpo Electrical ContgGeneral Wiring
04/17/2019CompleteWMS Electrical Contng—
07/09/2018CompleteNas ElectricGeneral Wiring, Lighting
06/18/2018Permit IssuedElpo Electrical Contg—
06/01/2018CompleteACS ElectricalGeneral Wiring
1 project · most recent 11/24/2025
Steel Masonry
FiledStatusContractorScope
11/24/2025Permit IssuedHatchet WorksSteel, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
12/09/2025Fire-Resistant Penetrations and JointsDevin Millsspecial
12/09/2025Energy Code Compliance InspectionsDevin Millsprogress
12/09/2025FinalDevin Millsprogress
12/09/2025Lighting controlsDevin Millsenergy_progress
12/09/2025Interior lighting powerDevin Millsenergy_progress
12/09/2025Lighting in dwelling unitsDevin Millsenergy_progress
11/24/2025Fire-Resistant Penetrations and JointsDevin Millsspecial
11/24/2025Energy Code Compliance InspectionsDevin Millsprogress
11/24/2025FinalDevin Millsprogress
11/24/2025Interior lighting powerDevin Millsenergy_progress
11/24/2025Lighting in dwelling unitsDevin Millsenergy_progress
11/24/2025Lighting controlsDevin Millsenergy_progress
09/23/2025Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
09/23/2025HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
09/23/2025HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
09/23/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/06/2025HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/06/2025Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/06/2025HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
05/30/2025Mechanical SystemsNICHOLAS AZADIANspecial
05/30/2025Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
05/30/2025Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
05/30/2025FinalNICHOLAS AZADIANprogress
05/30/2025HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
Latest 25 of 55.
215 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account