← Back
BuildNYC
Miscellaneous and old-style bank buildings
10 ROCKEFELLER PLAZA
MANHATTAN · BIN 1077284
💬 Discuss this project
1939Year Built
22Stories
O9Building Class
C5-2.5Zoning
1,898,155 sfGross Floor Area
230Units
LL97 Covered2 Active Violations ▸FISP: SWARMP
Miscellaneous and old-style bank buildings · Owner of record: Rcpi Holdco LCC Attn: Kelley Marbury · 142,087 sf lot · 13.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsChristie's, Little Nell Big AppleUnder Construction14 filings
RoofChristie's, NBC UniversalUnder Construction20p · 11 filings · 2 docs
BulkheadRcpi Landmark Properties, LLCUnder Construction1p · 1 filing · 8 docs
Floor 19Temporary fence enclosureUnder Construction1 filing · 2 docs
Floor 18K&LGroup3 filings
Floor 17K&LGroupUnder Construction4 filings
Floor 16Markle Foundation1p · 3 filings
Floor 15Tishman Speyer Properties2 filings
Floor 14
Floor 13Rcpi Landmark Properties, LLC1p · 1 filing
Floor 12Rcpi Landmark Properties, LLC1p · 3 filings
Floor 11Rcpi Landmark Properties, LLC2p · 2 filings
Floor 10
Floor 9Rcpi Landmark Properties, LLC1p · 1 filing
Floor 8
Floor 7
Floor 6Christie'sUnder Construction14p · 6 filings
Floor 5Christie'sUnder Construction15p · 4 filings
Floor 4JPMorgan Chase, First Republic Bank17p · 15 filings
Floor 3JPMorgan Chase, Nintendo of America +212p · 17 filings
Floor 2Christie'sUnder Construction19p · 5 filings
Floor 1Christie's, NBC Universal +1Under Construction29p · 16 filings
MezzanineChristie's, NBC Universal +1Under Construction13p · 7 filings
CellarChristie's, NBC UniversalUnder Construction14p · 13 filings
Sub-CellarChristie'sUnder Construction30p · 11 filings · 9 docs
Site & exteriorNBC Today Show, American Ballet TheatreUnder Construction6 filings · 20 docs
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rcpi Landmark Propoerties93609/13/2026
Tishman Speyer Properties19010/04/2026
Rcpi Trust6903/21/2026
Rockefeller Center Properties5003/21/2026
Pcpi Landmark Properties2803/21/2026
Nbcuniversal1707/08/2026
Properties by Rockefeller Group403/21/2026
Rcpi Trust 45 Rockfeller Plaza203/21/2026
RCP Associates203/21/2026
Rcpi203/21/2026
Rock Plaza CTR203/21/2026
Rcpi Holdco LCC Attn: Kelley Marbury103/22/2026
NBC103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structure ToneGeneral Contractor8709/13/2026
Tristate Plumbing ServicesPlumbing1707/08/2026
Abco-Peerless SprinklerFire Protection1607/08/2026
JT Magen & CompanyGeneral Contractor1407/08/2026
Safway AtlanticScaffold1110/09/2026
Robert HindmanGeneral Contractor1107/08/2026
Par Fire ProtectionFire Protection1007/08/2026
The McKissach GroupGeneral Contractor707/08/2026
Coyle ContractingGeneral Contractor707/08/2026
OsmanGeneral Contractor403/21/2026
KNS Building RestorationGeneral Contractor403/21/2026
Tower Fire ProtectionFire Protection407/08/2026
Jam ElectricalElectrical403/21/2026
Citiline Restorationspecialty_contractor308/26/2026
Ashland PlumbingPlumbing307/08/2026
A&A PlumbingPlumbing207/08/2026
Par Plumbing Co., Inc.oFire Protection203/21/2026
BP Mechanicalspecialty_contractor203/21/2026
Jads ProductionsGeneral Contractor203/21/2026
JKT ConstructionGeneral Contractor203/21/2026
Master Fire SystemsGeneral Contractor203/21/2026
Nbcuniversal MediaGeneral Contractor207/08/2026
Turner Construction CompanyGeneral Contractor203/21/2026
Winick ProductionsGeneral Contractor203/21/2026
Ashlar MechanicalFire Protection207/08/2026
A + SprinklerFire Protection207/08/2026
Preferred Sprinkler and MechanicalFire Protection207/08/2026
Reem Plumbing & HeatingFire Protection207/08/2026
Reem Plumbing & HeatingPlumbing207/08/2026
York Scaffold EquipmentScaffold107/08/2026
K & M Electrical Contng IElectrical103/21/2026
Frank J Quatela ArchitectsElectrical103/21/2026
Lorson Electric ContractorsElectrical103/21/2026
Bass ElectricalElectrical103/22/2026
Denko MechanicalFire Protection107/08/2026
Dependable MechanicalFire Protection107/08/2026
EH Plumbing & HeatingPlumbing107/08/2026
Enobrac PlumbingFire Protection107/08/2026
Pace PlumbingPlumbing106/28/2026
Difalzo Electric NYElectrical103/22/2026
Rinnovo ConstructionGeneral Contractor107/08/2026
Skyline Windowsspecialty_contractor107/08/2026
Pullman SSTGeneral Contractor107/08/2026
G.F. SheridanFire Protection103/21/2026
Par Plumbing CoPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Abco-Peerless SprinklerFire Protection103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4232510/15/2026
Shahrish Shuvo Engineering85241009/15/2026
Socotec Engineering49832506/09/2026
Sag Engineering & Consulting608104/20/2026
Walter T. Gorman, P.E., P2681501/21/2026
PSI Agency2542512/05/2025
Milrose Consultants2003509/18/2025
PCS Engineering3745206/09/2024
Hawa Engineering7982308/18/2023
NYC Facade Architecture9035107/03/2023
WB Engineering5331204/27/2023
Outsource Special Inspection2827104/18/2023
Custodio Consulting1835608/01/2022
Atlantic Engineeringlabor1381106/28/2022
Future Tech Consultants O589306/14/2022
Quality Testing7344209/08/2021
DNA Controlled Inspection554509/30/2020
Stracar Special Inspectio229309/16/2020
Skyline Engineering267109/25/2019
Building Lifecycle
All (300)Filed (65)Permit Issued (80)Signed Off (21)Facade (FISP) (3)Violation (3)Inspection (38)Objection (60)Special Inspection (30)
10/15/2026
Filed — Alteration
Disconnecting dry sprinkler and provide wet sprinkler in area of work as shown on plans filed herewith. No change in use, egress or occupancy.
M08038548-P1
10/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2026
Permit issued — Supported Scaffold
M01454230-S2-SF
10/07/2026
Permit issued — Protection and Mechanical Methods
M01454230-S3-PMM
10/06/2026
Filed — Alteration
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01454230-S3
10/06/2026
Filed — Alteration
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01454230-S2
10/06/2026
Objection resolved — Resolved
09/30/2026
Objection raised — Other
09/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2026
Special inspection requirement — Sprinkler Systems
Young Suh
09/24/2026
Special inspection requirement — Post-installed Anchors
Young Suh
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/22/2026
Signed off — Alteration
Hereby filing remove, relocate and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
M01216275-S2
09/17/2026
Permit issued — Construction Fence
M01273570-I1-FN
09/15/2026
Filed — Alteration CO
Filing herewith Sprinkler modifications as per plans. Installation of sprinkler heads and associated piping.
M01103346-P6
09/11/2026
Permit issued — Sidewalk Shed
M01454230-S1-SH
09/11/2026
Permit issued — Mechanical Systems
M01103346-S2-MS
09/11/2026
Permit issued — Construction Fence
M01454230-I1-FN
09/11/2026
Permit issued — General Construction
M01103346-I1-GC
09/10/2026
Filed — Alteration
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01454230-S1
09/10/2026
Filed — Alteration
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01454230-I1
09/09/2026
Signed off — Alteration
Modifications and upgrades to elevators 1-7 in existing shafts. Extension of elevators 2, 4, 5 to 17 and extension of elevator 3 down to SC2 and up to floor 17 as shown on plans filed herewith. No change in use, egress or occupancy.
M08038030-I1
09/09/2026
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
09/09/2026
Special inspection requirement — Luminous Exit Path Markings
Shahrish Shuvo
09/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
09/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
09/08/2026
Signed off — Alteration
Elevator smoke vent installation as shown on plans filed herewith. No change in use, egress or occupancy.
M08038499-I1
08/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2026
Permit issued — Mechanical Systems
M01044177-S1-MS
08/24/2026
Permit issued — General Construction
M01044177-I1-GC
08/24/2026
Permit issued — Structural
M01044177-S4-ST
08/11/2026
Permit issued — Structural
M01230311-S1-ST
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2026
Signed off — Alteration
Alterations to mechanical system as per plans. No change to use, egress or occupancy.
M00852409-I1
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2026
Permit issued — Mechanical Systems
M01389356-S2-MS
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Special inspection requirement — Luminous Exit Path Markings
Shahrish Shuvo
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/14/2026
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
07/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/09/2026
Permit issued — General Construction
M01224970-I1-GC
07/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Water Test
Certified
View inspection ↗
07/02/2026
Permit issued — Plumbing
M01216275-S3-PL
07/01/2026
Filed — Alteration CO
Filing herewith Sprinkler modifications as per plans. Installation of sprinkler heads and associated piping.
M01103346-P5
06/29/2026
Permit issued — General Construction
M01216275-I1-GC
06/26/2026
Permit issued — Plumbing
M01230311-S3-PL
06/25/2026
Permit issued — Mechanical Systems
M01230311-S2-MS
06/24/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/22/2026
Signed off — Alteration
Filing herewith for Standpipe modification as per plans.
M00909915-I1
06/22/2026
Filed — Alteration CO
Filing herewith Sprinkler modifications as per plans. Installation of sprinkler heads and associated piping.
M01103346-P4
06/22/2026
Signed off — Alteration
Filing herewith for Standpipe modification as per plans.
M00909915-S1
06/16/2026
Permit issued — Sprinklers
M01389356-S4-EW-SP
06/10/2026
Permit issued — Plumbing
M01389356-S3-PL
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/10/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic10/07/2026
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic10/07/2026
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/17/2026
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/11/2026
DOB NOWMechanical SystemsPermit IssuedStructure Tone09/11/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone09/11/2026
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/11/2026
DOB NOWMechanical SystemsPermit IssuedStructure Tone08/26/2026
DOB NOWStructuralPermit IssuedStructure Tone08/24/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone08/24/2026
DOB NOWStructuralPermit IssuedStructure Tone08/11/2026
DOB NOWMechanical SystemsPermit IssuedStructure Tone07/22/2026
DOB NOWGeneral ConstructionPermit IssuedCitiline Restoration07/09/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services07/02/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone06/29/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services06/26/2026
DOB NOWMechanical SystemsSigned-offStructure Tone06/25/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler06/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co06/10/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone06/01/2026
DOB NOWSprinklersPermit IssuedPar Fire Protection06/01/2026
DOB NOWStructuralPermit IssuedStructure Tone06/01/2026
DOB NOWSprinklersPermit IssuedPar Fire Protection05/28/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone05/20/2026
DOB NOWGeneral ConstructionPermit IssuedJacobs Development05/18/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone05/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic05/05/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler04/29/2026
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler04/02/2026
DOB NOWStandpipeSigned-offAbco-Peerless Sprinkler04/02/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler03/24/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services03/16/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services01/29/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services12/22/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection12/16/2025
DOB NOWStructuralPermit IssuedStructure Tone12/12/2025
DOB NOWGeneral ConstructionPermit IssuedStructure Tone12/12/2025
DOB NOWMechanical SystemsPermit IssuedStructure Tone12/12/2025
DOB NOWSprinklersSigned-offAshlar Mechanical11/05/2025
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/29/2025
+ 60 more permits on file
9 projects · most recent 09/15/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems Cooling Towers Refrigeration Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Permit IssuedStructure ToneHeating Systems
Heating
Aaon RN-016 307,170 BTU · Rooftop Unit ×1
06/09/2026Permit IssuedStructure ToneHeating and Air Conditioning Systems—
12/11/2025Permit IssuedStructure ToneHeating and Air Conditioning Systems—
12/05/2025Permit IssuedStructure ToneHeating Systems, Ventilation Systems
Heating
Aaon V3-ERB-8-0-28FA-7MS 28,700 BTU · Ahu ×2
RN-016 307,421 BTU · Makeup Air ×4
V3-DRB-8-0-28FA-7HS 143,300 BTU · Ahu ×2
Indeeco QUA 85,300 BTU · Electric Heater ×8
Iec CPY03 5,118 BTU · Fan Coil Indoor ×2
Nortek CSU-18K EH/CHW 247,300 BTU · Ahu ×2
Qmark MUH0581 17,070 BTU · Electric Heater ×2
__Junk__ CWH35083 16,375 BTU · Electric Heater ×2
Ventilation
Aaon V3-ERB-8-0-28FA-7MS 8,000 CFM · Ahu ×2
09/18/2025Permit IssuedStructure ToneCooling Towers, Refrigeration Systems—
06/13/2025Signed-offStructure ToneHeating and Air Conditioning Systems—
09/11/2024Signed-offStructure ToneAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Lg ARNU483B8A4 4 tons · Vrf Indoor ×12
ARNU363M2A4 3 tons · Vrf Indoor ×8
ARUM144BTE5 144 CFM · Vrf Outdoor ×4
ARUN060GSS4 60 CFM · Vrf Outdoor ×4
Cooling
Lg ARUM144BTE5 144,000 BTU · Vrf Outdoor ×1
ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
Heating
Lg ARUM144BTE5 162,000 BTU · Vrf Outdoor ×1
ARUN060GSS4 64,000 BTU · Vrf Outdoor ×1
05/25/2023——Heating and Air Conditioning Systems
Heat / Cool
Lg ARNU483B8A4 4 tons · Vrf Indoor ×3
ARNU303NJA4 3 tons · Vrf Indoor ×2
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×1
ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
04/21/2022Permit IssuedRobert HindmanAssociated Ducts and Piping—
11 projects · most recent 10/15/2026
Sprinkler System
FiledStatusContractorScope
10/15/2026Permit IssuedPar Fire Protection—
09/15/2026Permit IssuedAbco-Peerless SprinklerSprinkler System
06/09/2026Permit IssuedAbco-Peerless SprinklerSprinkler System
06/01/2026Permit IssuedPar Fire Protection271 heads
12/11/2025Permit IssuedSirina Fire ProtectionSprinkler System
09/18/2025Permit IssuedPar Fire ProtectionSprinkler System
03/28/2024Signed-offAbco-Peerless Sprinkler1 outlets
08/18/2023Permit IssuedAbco-Peerless Sprinkler45 heads
07/18/2022———
09/08/2021Permit IssuedA&H Express Plumbing & Heating8 heads
09/16/2020Permit IssuedReem Plumbing & Heating75 heads
12 projects · most recent 09/15/2026
Water/Sanitary Storm
FiledStatusContractorScope
09/15/2026Permit IssuedTristate Plumbing ServicesWater/Sanitary
06/09/2026Permit IssuedPar Plumbing CoWater/Sanitary
06/01/2026Permit IssuedTristate Plumbing ServicesWater/Sanitary
12/11/2025Permit IssuedTristate Plumbing ServicesWater/Sanitary
12/05/2025Permit IssuedTristate Plumbing ServicesStorm, Water/Sanitary
09/18/2025Permit IssuedTristate Plumbing ServicesWater/Sanitary
03/28/2024Signed-offTristate Plumbing ServicesWater/Sanitary
05/23/2023Signed-offTristate Plumbing ServicesWater/Sanitary
09/08/2021Signed-offEH Plumbing & HeatingWater/Sanitary
09/16/2020———
09/25/2019——Water/Sanitary
———Water/Sanitary
25 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedCorporate Electric Group—
08/07/2026Permit IssuedStriano Electric CoGeneral Wiring
06/08/2026Permit IssuedNead ElectricGeneral Wiring
06/08/2026Permit IssuedNead ElectricGeneral Wiring
06/08/2026Permit IssuedNead ElectricGeneral Wiring
05/28/2026CompleteUnity Electric Co—
05/28/2026Permit IssuedUnity Electric Co—
05/18/2026CompleteUnity Electric Co—
04/02/2026Permit IssuedJam Electrical—
03/24/2026Permit IssuedUnity Electric Co—
03/10/2026Permit IssuedJam Electrical—
02/27/2026Permit IssuedH. & L. ElectricGeneral Wiring
02/15/2026Permit IssuedJam Electrical—
02/15/2026Permit IssuedJam Electrical—
10/21/2025CompleteKleinknecht Electric Co1 meters
9 projects · most recent 09/15/2026
Steel Concrete
FiledStatusContractorScope
09/15/2026Permit IssuedStructure ToneSteel
06/09/2026Permit IssuedStructure ToneSteel, Concrete
12/11/2025Permit IssuedTristate Plumbing ServicesSteel, Concrete
12/05/2025Permit IssuedStructure ToneSteel, Concrete
09/18/2025Permit IssuedStructure ToneSteel, Concrete
06/13/2025Signed-offStructure ToneSteel
05/12/2023Permit IssuedStructure ToneSteel
03/17/2023Permit IssuedStructure ToneSteel
———Steel
1 project · most recent 06/09/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/09/2024Permit IssuedPullman SSTSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 62
DateTypeResultReport
10/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2026Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 62.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/24/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/24/2026Sprinkler SystemsYoung Suhspecial
09/24/2026Post-installed AnchorsYoung Suhspecial
09/09/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
09/09/2026Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
09/09/2026Luminous Exit Path MarkingsShahrish Shuvospecial
09/09/2026Sprayed fire-resistant materialsShahrish Shuvospecial
09/09/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/14/2026Sprayed fire-resistant materialsShahrish Shuvospecial
07/14/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/14/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/14/2026Luminous Exit Path MarkingsShahrish Shuvospecial
07/14/2026Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
06/24/2026Post-installed AnchorsShahrish Shuvospecial
06/24/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/10/2026Post-installed AnchorsShahrish Shuvospecial
06/10/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/02/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
06/02/2026Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
06/02/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/02/2026FinalStephanie Lanprogress
04/17/2026Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
04/17/2026FinalALEXIS SCHLESSINGERMANprogress
04/17/2026Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
04/17/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Christie'sArts / Culture / EntertainmentSub-cellar, Cellar, Floors 1–7, 9–18, Mezzanine, Roof
Project M01389356 Alteration · Permit Entire · 05/22/2026
Project M01315273 Alteration · Permit Entire · 12/10/2025
Project M01273570 Alteration · Permit Entire · 08/19/2025
Project M01216275 Alteration · Permit Entire · 06/25/2025
Project M01217225 Alteration · Permit Entire · 06/12/2025
Project M01230311 Alteration · Permit Entire · 06/12/2025
Project M01224970 Alteration · Permit Entire · 06/10/2025
Project M01181269 Alteration CO · Permit Entire · 04/11/2025
Project M00909915 Alteration · LOC Issued · 11/29/2023
Project M00779486 Alteration · Permit Entire · 08/01/2022
Project M00775941 Alteration · Permit Entire · 07/22/2022
Project M00708593 Alteration · Permit Entire · 04/21/2022
JPMorgan ChaseOfficeFloors 3, 4
Project M01054802 Alteration · LOC Issued · 07/18/2024
Project M01054821 Alteration · LOC Issued · 07/18/2024
Project M01054847 Alteration · LOC Issued · 07/18/2024
NBC UniversalOfficeCellar, Floor 1, Mezzanine, Roof
Project M00960409 Alteration · LOC Issued · 12/08/2023
Project M00960413 Alteration · LOC Issued · 12/08/2023
Project M08052311 Alteration · LOC Issued · 05/24/2023
Project M08052355 Alteration · LOC Issued · 05/24/2023
Project M08028041 Alteration · LOC Issued · 03/30/2023
Project M08034558 Alteration · LOC Issued · 03/15/2023
Project M08028062 Alteration · Filing Withdrawn · 11/30/2022
Project M08028088 Alteration · LOC Issued · 11/16/2022
Project M08052335 Alteration · Filing Withdrawn
K&LGroupOfficeFloors 17, 18
Project M00880026 Alteration · LOC Issued · 05/25/2023
Project M00880036 Alteration · Filing Withdrawn · 05/25/2023
Project M00852424 Alteration · Filing Withdrawn · 05/12/2023
Project M00852427 Alteration · Filing Withdrawn · 05/12/2023
Nintendo of AmericaOfficeFloor 3
Project M00855204 Alteration · LOC Issued · 04/18/2023
Little Nell Big AppleHotel / Lodging—
Project M08038030 Alteration · LOC Issued · 01/20/2023
First Republic BankBank / Financial branchFloors 3, 4
Project M00715656 Alteration · LOC Issued · 07/08/2022
Project M00693228 Alteration · LOC Issued · 06/29/2022
Project M00715795 Alteration · LOC Issued · 06/29/2022
Project M00720966 Alteration · LOC Issued · 06/28/2022
Project M00543261 Alteration · LOC Issued · 07/09/2021
Project M00543278 Alteration · LOC Issued · 07/09/2021
Project M00543977 Alteration · LOC Issued · 07/09/2021
Project M00542893 Alteration · LOC Issued · 07/07/2021
NBC Today ShowArts / Culture / Entertainment—
Project M00659143 Alteration · LOC Issued · 01/18/2022
Project M00558252 Alteration · LOC Issued · 07/15/2021
Dough DoughnutsRestaurant / Food ServiceFloor 1, Mezzanine
Project M00525990 Alteration · Permit Entire · 07/22/2021
Project M00523361 Alteration · Permit Entire · 05/19/2021
American Ballet TheatreArts / Culture / Entertainment—
Project M00557305 Alteration · LOC Issued · 07/14/2021
Markle FoundationOfficeFloor 16
Project M00463868 Alteration · Permit Entire · 04/13/2021
Project M00473443 Alteration · Permit Entire · 04/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,704 on file (BIS + DOB NOW)
▸Plans & Drawings181
▸DOB NOWPlans/Sketch161
09/15/2026M01454230-I1Request digital key ↗
09/15/2026M01454230-S1Request digital key ↗
09/03/2026M00523361-I1Request digital key ↗
Showing 3 of 161 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/05/2026M00257133-S1Request digital key ↗
09/04/2026M00297020-I1Request digital key ↗
09/04/2026M00376859-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00218903-I1Request digital key ↗
09/05/2026M00222016-I1Request digital key ↗
09/05/2026M00257133-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00222036-I1Request digital key ↗
09/05/2026M00248979-I1Request digital key ↗
09/04/2026M00376845-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/05/2026M00207972-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00355713-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00463868-I1Request digital key ↗
▸Applications & Permits689
▸BISPLAN / WORK APPROVAL APPLICATION315
07/28/2025101551125Open ↗
07/16/2025101551125Open ↗
07/15/2025101551125Open ↗
Showing 3 of 315 on file for this type
▸BISWORK PERMIT APPLICATION237
06/25/2021123676209Open ↗
10/14/2020140941989Open ↗
10/02/2020140951209Open ↗
Showing 3 of 237 on file for this type
▸DOB NOWLPC Approval/Permit132
10/05/2026M01103346-P6Open ↗
09/06/2026M00873087-I1Open ↗
09/05/2026M00222016-I1Open ↗
Showing 3 of 132 on file for this type
▸DOB NOWCPC Hotel Special Permit4
10/05/2026M01103346-P6Open ↗
Showing 1 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications1,138
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION485
03/25/2020123773773Open ↗
11/12/2019123743164Open ↗
10/09/2019123426355Open ↗
Showing 3 of 485 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature183
10/05/2026M01103346-P6Open ↗
09/14/2026M01454230-I1Open ↗
09/14/2026M01454230-S1Open ↗
Showing 3 of 183 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature149
10/17/2026M08038548-P1Open ↗
10/17/2026M08038548-P1Open ↗
10/17/2026M08038548-P1Open ↗
Showing 3 of 149 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST91
11/12/2019123743164Open ↗
Showing 1 of 91 on file for this type
▸DOB NOWProgress Inspector Seal & Signature89
10/05/2026M01103346-P6Open ↗
10/03/2026M00720966-I1Open ↗
09/25/2026M00558252-P1Open ↗
Showing 3 of 89 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT62
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
Showing 3 of 62 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISPC FULL REPORT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
▸Trade Schedules & Equipment272
▸BISSELF-CERT PLUMBING NOTICE97
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 97 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISSCHEDULE B - PLUMBING53
12/09/2020123552958Open ↗
12/03/2020123552958Open ↗
11/04/2020123552958Open ↗
Showing 3 of 53 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA43
10/29/2020123455108Open ↗
Showing 1 of 43 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8517
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
10/05/2026M01103346-P6Open ↗
Showing 1 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos340
▸DOB NOWDEP ACP-5: Asbestos Assessment Report125
09/05/2026M00222016-I1Open ↗
09/04/2026M00297020-P1Open ↗
09/04/2026M00297020-I1Open ↗
Showing 3 of 125 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)109
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
Showing 3 of 109 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'83
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 83 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form18
09/06/2026M00873087-I1Open ↗
Showing 1 of 18 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
10/01/2019123748864Open ↗
Showing 1 of 3 on file for this type
▸BISNYCECC EXEMPTION3
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY32
03/18/2022123426355Open ↗
03/18/2022123426355Open ↗
11/23/2021140951209Open ↗
Showing 3 of 32 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/24/2021140951209Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/24/2021140951209Open ↗
▸Approvals, Objections & Sign-offs338
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST132
04/22/2022123748864Open ↗
03/21/2022123426355Open ↗
03/21/2022123426355Open ↗
Showing 3 of 132 on file for this type
▸BISADMINISTRATIVE OBJECTIONS80
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 80 on file for this type
▸BISLANDMARKS APPROVAL80
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
Showing 3 of 80 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
07/28/2025101551125Open ↗
07/16/2025101551125Open ↗
07/15/2025101551125Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLANDMARKS SIGNOFF7
04/15/2022123748864Open ↗
11/23/2021140951209Open ↗
09/01/2021140926808Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLandmark Approval3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
06/25/2021123676209Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
04/14/2022123748864Open ↗
11/24/2021140951209Open ↗
▸Cost, Insurance & Ownership308
▸BISCOST AFFIDAVIT302
03/18/2022123426355Open ↗
11/23/2021140951209Open ↗
09/01/2021140926808Open ↗
Showing 3 of 302 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
04/14/2022123748864Open ↗
11/24/2021140951209Open ↗
07/27/2021123676192Open ↗
Showing 3 of 5 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms291
▸BISEFILING COVER SHEET179
11/12/2019123743164Open ↗
Showing 1 of 179 on file for this type
▸BISADDITIONAL INFORMATION60
08/12/2025101551125Open ↗
03/06/2025101551125Open ↗
03/06/2025101551125Open ↗
Showing 3 of 60 on file for this type
▸BISBOROUGH INTAKE FORM43
03/25/2020123773773Open ↗
03/06/2020101551125Open ↗
02/14/2020123455082Open ↗
Showing 3 of 43 on file for this type
▸BISeFiling Job Application Cover Sheet8
09/28/2020140941989Open ↗
09/16/2020140951209Open ↗
07/17/2020140926808Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents70
▸DOB NOWProof of Historic Building47
10/05/2026M01103346-P6Open ↗
09/06/2026M00873087-I1Open ↗
09/02/2026M00687916-I1Open ↗
Showing 3 of 47 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
08/12/2025101551125Open ↗
08/12/2025101551125Open ↗
08/12/2025101551125Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProperty Ownership Certification5
10/05/2026M01103346-P6Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type