| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01075912 ↗ | 2 WALL STREET MANHATTAN | Alteration CO | Permit Issued | 10/25/2024 | 09/18/2026 | Design GKV ARCHITECTS Owner NEWMARK Contractor VANGUARD CONSTRUCTION AND Filer GILLMAN CONSULTING INC | Structural modifications, to include, but not limited to, wall openings, slab infill, and slab openings for future stair. No change in use, … |
| M00231867 ↗ | 426 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 02/06/2020 | 07/09/2026 | Design ABS ENGINEERING, PLLC Owner MEADOW PARTNERS Contractor EBM PLUMBING CORP | plumbing work as shown on cellar and 1st floor |
| M00919982 ↗ | 1375 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/05/2023 | 06/24/2026 | Design MG ENGINEERING D.P.C. Owner CBRE Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Filing for Structural modifications to include stair removal and slab infill on the 8th and 9th floor as per plans filed herewith. No change… |
| M00982894 ↗ | 298 9 AVENUE MANHATTAN | Alteration CO | Permit Issued | 05/21/2024 | 06/03/2026 | Contractor TRITON CONSTRUCTION CO., | STRUCTURAL MODIFICATIONS: RELOCATION OF COLUMNS IN CELLAR TO ALLOW CLEARANCE FOR NEW EQUIPMENT, NEW FOUNDATIONS & FRAMING AT ALL FLOORS FOR … |
| X00980196 ↗ | 1387 UNIVERSITY AVENUE BRONX | New Building | Permit Issued | 12/26/2023 | 05/06/2026 | Contractor MEGA CONTRACTING GP LLC Filer CORE CONSULTANTS NYC | STRUCTURAL IN CONJUCTION WITH NEW BUILDING JOB NUMBER# X00980196-I1 |
| B00848869 ↗ | 158 CLINTON STREET BROOKLYN | Alteration CO | Permit Issued | 04/27/2023 | 04/22/2026 | Design MURRAY ENGINEERING PC Owner SELECT Contractor R. SUTTON & CO LLC Filer JAM CONSULTANTS, INC. | Structural framing and reinforcements related to enlargement Description: Structural framing and reinforcements related to enlargement |
| Name | Projects together | Most recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 184 | 06/10/2026 |
| AMA CONSULTING ENGINEERS, PC | 176 | 08/05/2025 |
| MG ENGINEERING D.P.C. | 113 | 07/20/2025 |
| GENSLER | 56 | 01/14/2026 |
| COSENTINI ASSOCIATES | 51 | 08/11/2025 |
| SYSKA HENNESSY GROUP | 30 | 07/10/2024 |
| WB ENGINEERS & CONSULTANTS PLLC | 28 | 05/03/2024 |
| JAROS BAUM & BOLLES | 24 | 02/18/2025 |
| AKF ENGINEERS, LLP | 23 | 10/09/2023 |
| SEVERUD ASSOCIATES | 23 | 07/18/2025 |
| THORNTON TOMASETTI | 23 | 02/03/2025 |
| ABS ENGINEERING, PLLC | 19 | 03/21/2024 |
| GKV ARCHITECTS | 18 | 08/04/2026 |
| TPG ARCHITECTURE, LLP | 17 | 12/11/2024 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 16 | 06/10/2025 |
| ACTIVE DESIGN GROUP ENGINEERING | 15 | 08/07/2024 |
| KEVIN L. WILSON, PE | 15 | 08/04/2022 |
| GILSANZ MURRAY STEFICEK LLP | 14 | 06/10/2026 |
| STANTEC | 12 | 03/20/2025 |
| STEVEN PAUL HAMMER | 12 | 12/27/2024 |
| WSP | 12 | 08/04/2026 |
| JACK GREEN ASSOCIATES | 11 | 03/31/2025 |
| DESIMONE CONSULTING ENGINEERS | 10 | 10/31/2024 |
| HNY CONSULTING ENGINEERS LLC | 10 | 12/12/2023 |
| LALIRE MARCH ARCHITECTS LLP | 10 | 06/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURE TONE, LLC | 73 | 08/05/2025 |
| ABCO-PEERLESS SPRKLR CORP | 71 | 06/10/2026 |
| SAVCON LLC | 56 | 05/29/2025 |
| SIRINA FIRE PROT CORP | 55 | 08/18/2025 |
| TURNER CONSTRUCTION COMPA | 54 | 02/18/2025 |
| JT MAGEN & COMPANY INC | 48 | 04/23/2025 |
| JRM CONSTRUCTION MGMT LLC | 45 | 09/10/2024 |
| BENCHMARK BUILDERS LLC | 39 | 03/20/2025 |
| ADVANCED PLUMBING MECH | 33 | 07/20/2025 |
| JOHN GALLIN & SON, INC | 32 | 06/10/2026 |
| LAB PLBG & HTG CO INC | 32 | 06/10/2026 |
| SJP PROPERTIES COMPANY | 29 | 02/21/2025 |
| SAVCON CONSTRUCTION LLC | 26 | 03/11/2025 |
| PAR FIRE PROTECTION LLC | 25 | 10/30/2024 |
| PAR PLUMBING CO., INC | 22 | 02/18/2025 |
| CROSS CONSULTING INC | 21 | 12/06/2024 |
| PREFERRED SPKLR AND MECH | 18 | 09/30/2024 |
| RAEL AUTOMATIC SPR.CO INC | 18 | 03/11/2025 |
| ASHLAR MECHANICAL CORP | 16 | 02/03/2025 |
| ACCURATE MECHANICAL INC | 15 | 06/03/2025 |
| CROSS MANAGEMENT CORP | 15 | 05/03/2024 |
| PACE PLUMBING CORP | 15 | 03/11/2025 |
| PSI PARTNERS, LLC | 13 | 10/29/2024 |
| NYC FIRE SPRINKLER CORP | 12 | 09/10/2024 |
| A&A PLUMBING CORP | 11 | 08/05/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| VORNADO REALTY TRUST | 70 | 03/07/2025 |
| CUSHMAN & WAKEFIELD | 65 | 07/20/2025 |
| TISHMAN SPEYER | 56 | 07/18/2025 |
| SUMMIT GLORY LLC | 50 | 06/10/2025 |
| BOP WEST 31ST STREET LLC | 37 | 06/25/2024 |
| HEARST | 29 | 12/06/2024 |
| MEADOW PARTNERS | 27 | 06/04/2024 |
| SJP PROPERTIES | 27 | 02/21/2025 |
| CBRE | 26 | 12/11/2024 |
| SL GREEN REALTY CORP | 23 | 08/18/2025 |
| NBCUNIVERSAL | 21 | 06/22/2023 |
| 110 WILLIAM PROPERTY INVESTORS III, | 19 | 03/11/2025 |
| 509 W 34, L.L.C. | 15 | 12/15/2022 |
| Rockefeller Group | 14 | 07/15/2024 |
| THE CHETRIT GROUP | 14 | 08/04/2022 |
| METROPOLITAN 885 THIRD AVE LEASEHOL | 12 | 01/23/2025 |
| RELATED HUDSON YARDS MANAGER | 12 | 08/05/2025 |
| 3100 47TH AVENUE PROPERTY INVESTORS | 11 | 02/17/2023 |
| BROOKFIELD PROPERTIES | 10 | 02/04/2025 |
| PARAMOUNT GROUP | 10 | 05/20/2024 |
| THE SHOPS AT COLUMBUS CIRCLE | 10 | 10/20/2023 |
| 50 HYMC OWNER LLC | 9 | 10/30/2024 |
| RFR REALTY LLC | 9 | 11/25/2024 |
| THE DURST ORGANIZATION | 9 | 07/17/2023 |
| 101 PARK AVENUE ASSOCIATES | 8 | 10/17/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 230 | 01/14/2026 |
| RIZZO GROUP | 97 | 05/26/2026 |
| GILLMAN CONSULTING INC | 78 | 08/04/2026 |
| METROPOLIS GROUP INC | 70 | 06/27/2025 |
| EMPIRE CITY CONSULTANTS, INC. | 56 | 03/31/2025 |
| WILLIAM VITACCO ASSOCIATES | 56 | 06/10/2026 |
| JAM CONSULTANTS, INC. | 33 | 03/03/2026 |
| MICHAEL ZENREICH ARCHITECT, PC | 16 | 10/16/2024 |
| LMS-ACE SERVICES | 13 | 05/03/2024 |
| OUTSOURCE CONSULTANTS, INC. | 11 | 11/26/2024 |
| JM ZONING, LLC. | 8 | 01/14/2026 |
| ANZALONE ARCHITECTURE, PLLC | 5 | 08/26/2024 |
| ARCHETYPE CONSULTANTS, INC. | 5 | 11/13/2023 |
| BUILDING VIOLATION SERVICES INC. | 5 | 08/05/2024 |
| RPO INC. | 4 | 09/19/2022 |
| ABCO-PEERLESS SPRINKLER CORP | 3 | 10/30/2023 |
| BROOKBRIDGE CONSULTING | 3 | 12/17/2021 |
| CONVERSANO ASSOCIATES, INC. | 3 | 05/13/2026 |
| EXPEDITER | 3 | 04/20/2022 |
| NEW YORK DESIGN ARCHITECT LLP | 3 | 05/10/2024 |
| BETRO DESIGN GROUP | 2 | 10/30/2024 |
| CAPITOL FIRE SPRINKLER CO., INC. | 2 | 04/14/2022 |
| GREEN LIGHT EXPEDITING LLC | 2 | 12/11/2024 |
| JMG CONSULTANTS,INC. | 2 | 04/04/2022 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 09/09/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01075912 ↗ | 2 WALL STREET MANHATTAN | Alteration CO | Permit Issued | 10/25/2024 | 09/18/2026 | Design GKV ARCHITECTS Owner NEWMARK Contractor VANGUARD CONSTRUCTION AND Filer GILLMAN CONSULTING INC | Structural modifications, to include, but not limited to, wall openings, slab infill, and slab openings for future stair. No change in use, … |
| M00231867 ↗ | 426 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 02/06/2020 | 07/09/2026 | Design ABS ENGINEERING, PLLC Owner MEADOW PARTNERS Contractor EBM PLUMBING CORP | plumbing work as shown on cellar and 1st floor |
| M00919982 ↗ | 1375 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/05/2023 | 06/24/2026 | Design MG ENGINEERING D.P.C. Owner CBRE Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Filing for Structural modifications to include stair removal and slab infill on the 8th and 9th floor as per plans filed herewith. No change… |
| M00982894 ↗ | 298 9 AVENUE MANHATTAN | Alteration CO | Permit Issued | 05/21/2024 | 06/03/2026 | Contractor TRITON CONSTRUCTION CO., | STRUCTURAL MODIFICATIONS: RELOCATION OF COLUMNS IN CELLAR TO ALLOW CLEARANCE FOR NEW EQUIPMENT, NEW FOUNDATIONS & FRAMING AT ALL FLOORS FOR … |
| X00980196 ↗ | 1387 UNIVERSITY AVENUE BRONX | New Building | Permit Issued | 12/26/2023 | 05/06/2026 | Contractor MEGA CONTRACTING GP LLC Filer CORE CONSULTANTS NYC | STRUCTURAL IN CONJUCTION WITH NEW BUILDING JOB NUMBER# X00980196-I1 |
| B00848869 ↗ | 158 CLINTON STREET BROOKLYN | Alteration CO | Permit Issued | 04/27/2023 | 04/22/2026 | Design MURRAY ENGINEERING PC Owner SELECT Contractor R. SUTTON & CO LLC Filer JAM CONSULTANTS, INC. | Structural framing and reinforcements related to enlargement Description: Structural framing and reinforcements related to enlargement |
| X00531687 ↗ | 1315 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 06/02/2021 | 04/22/2026 | Design OCV ARCHITECTS Contractor A & M WARSHAW PLBG & HTG Filer OCV ARCHITECTS | INSTALLATION OF NEW SPRINKLER SYSTEM AND ASSOCIATED PLUMBING WORK IN CONJUNCTION WITH ALT1 APPLICATION #210180944. |
| X08034412 ↗ | 1315 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 11/04/2022 | 04/21/2026 | Design OCV ARCHITECTS Contractor A & M WARSHAW PLBG & HTG | INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH APPLICATION #X00531687-I1. |
| Q00460763 ↗ | 36-45 31ST STREET QUEENS | Alteration | Signed-off | 02/03/2021 | 04/14/2026 | Design GEA CONSULTING ENGINEERS Owner 36-43 31ST STREET, LLC Contractor D.H. EAGLE PLUMBING, LLC Filer MISTER EXPEDITER | Sprinkler and standpipe work associated with New Building #421797611. |
| Q01073299 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 08/21/2024 | 03/12/2026 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy. |
| M00794230 ↗ | 31 WEST 27 STREET MANHATTAN | Alteration | Permit Issued | 12/02/2022 | 03/06/2026 | Contractor RALLY RESTORATION CORP Filer RIZZO GROUP | Filing for Facade repairs as per plans filed herewith. No change in use, egress, or occupancy. |
| Q01073311 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 08/21/2024 | 12/17/2025 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP Filer JM ZONING, LLC. | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair and roof repair. No change in use, egress and occupancy. |
| Q01073296 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 08/21/2024 | 12/17/2025 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy. |
| X08034286 ↗ | 911 SIMPSON STREET BRONX | Alteration | Permit Issued | 11/04/2022 | 11/18/2025 | Design OCV ARCHITECTS Contractor BMT PLUMBING&HEATING LLC | INSTALLATION OF (2) NEW BOILERS AT THE CELLAR FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION. |
| X08034304 ↗ | 911 SIMPSON STREET BRONX | Alteration | Permit Issued | 11/04/2022 | 11/05/2025 | Design OCV ARCHITECTS Contractor LIQUID TECH PLBG&HTG,INC | INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH APPLICATION #X08034232-I1. |
| M01085368 ↗ | 22 CORTLANDT STREET MANHATTAN | Alteration | Permit Issued | 10/09/2024 | 10/30/2025 | Design ROBERT DERECTOR ASSOCIATES Owner MAYORE ESTATES LLC Contractor JOHN GALLIN SON | Structural work of MCU Space for floors |
| S01081668 ↗ | 800 FOREST AVENUE STATEN ISLAND | Alteration | Signed-off | 09/08/2024 | 10/17/2025 | Design BKA ARCHITECTS Owner WHARTON PROPERTIES LLC Contractor L&T CONSULTANTS LLC | Structural work as shown on plans |
| M00979788 ↗ | 915 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/13/2024 | 10/07/2025 | Design TULLER/MCNEALUS/FELD Owner ABS PARTNERS REAL ESTATE Contractor JRR CONTRACTING INC | Filing subsequent structural work in conjunction with the installation of a new skylight, as per plans submitted. |
| M00834273 ↗ | 915 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/17/2023 | 09/11/2025 | Contractor JRR CONTRACTING INC | Filing application for structural work in association w/construction of a Lula elevator between 20th floor and roof - associated with DOB NO… |
| M00834054 ↗ | 915 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/10/2023 | 09/10/2025 | Contractor JRR CONTRACTING INC | Filing application for the construction of a Lula elevator between 20th floor and roof. Also includes construction of GWB enclosure at 20th … |
| M00263762 ↗ | 380 11 AVENUE MANHATTAN | Alteration | Signed-off | 01/08/2020 | 09/08/2025 | Contractor PATRIOT FIRE SUPPRESSION, Filer JAM CONSULTANTS, INC. | Point 72: Standpipe work in conjunction with Interior build out of office spaces |
| M01104149 ↗ | 298 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 11/06/2024 | 08/07/2025 | Design STUDIO 5 PARTNERSHIP Owner 111 Wall GC LLC Contractor PLAZA CONSTRUCTION LLC | Structural work related to new elevator and stair. |
| M00585439 ↗ | 15 PARK ROW MANHATTAN | Alteration | Signed-off | 12/21/2021 | 07/07/2025 | Owner ATLAS CAPITAL GROUP LLC Contractor BREND RESTORATION LLC Filer METROPOLIS GROUP INC | TEMPORARY SHORING OF A ROOF FRAMING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. TEMPORARY SHORING TO COMPLY … |
| M01067043 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 07/18/2024 | 07/01/2025 | Design CFS ENGINEERING, DPC Owner BXP Contractor JT MAGEN & COMPANY INC Filer GILLMAN CONSULTING INC | Removal and new installation of ductwork, new fan powered boxes and water cooled supplemental AC units as shown on drawings filed herewith. … |
| M01064851 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 07/17/2024 | 06/26/2025 | Design GENSLER Contractor JT MAGEN & COMPANY INC | Modification to interior partitions, ceilings, doors and finishes as shown on drawings filed herewith. No change in use, egress or occupan… |
| M00613185 ↗ | 86 TRINITY PLACE MANHATTAN | Alteration | Permit Issued | 11/29/2021 | 06/26/2025 | Owner GH123 GREENWICH, LLC Contractor ELYSIUM CONSTRUCTION INC Filer RIZZO GROUP | General construction in Cel, Bas, Floors 1-14, Mez 1, Roof as per plans filed herewith. no changes in use, egress or occupancy. |
| M01087279 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 12/11/2024 | 06/26/2025 | Owner SUMMIT GLORY LLC Contractor A.W. & S. CONSTRUCTION CO | FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. |
| M00991890 ↗ | 527 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 02/12/2024 | 06/17/2025 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to us… |
| M01064935 ↗ | 139 EAST 79 STREET MANHATTAN | Alteration | Permit Issued | 06/24/2024 | 05/23/2025 | Design BOHN ARCHITECTURE AND DESIGN Contractor A & E PLUMBING CORP | SUBSEQUENT APPLICATION FILED FOR MODIFICATION TO PLUMBING SYSTEM AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THI… |
| B08051313 ↗ | 703 CARROLL STREET BROOKLYN | Alteration CO | Permit Issued | 01/10/2023 | 05/01/2025 | Design 1100ARCHITECT PC Contractor ARCHSTONE BUILDERS LLC | Support of excavation in conjunction with Alt-CO B08051313-I1. |
| B01032699 ↗ | 701 CARROLL STREET BROOKLYN | Alteration | Signed-off | 04/26/2024 | 05/01/2025 | Design COSENTINI ASSOCIATES Contractor ARCHSTONE BUILDERS LLC | Filing for Sprinkler work at the cellar, 1 thru 3. No change to use, egress, or occupancy. |
| M01082141 ↗ | 427 10 AVENUE MANHATTAN | Alteration | Signed-off | 08/11/2024 | 04/15/2025 | Design WSP Owner 50 HYMC OWNER LLC Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Filing herewith Mechanical modifications to the existing systems. No change to use, egress or occupancy. |
| M00777930 ↗ | 26 EAST 63 STREET MANHATTAN | Alteration | Permit Issued | 05/03/2023 | 04/09/2025 | Design HIGHLAND ASSOCIATES Contractor A + SPRINKLER CORP | Modifications to existing sprinkler system for existing retail space. |
| M00847505 ↗ | 119 VARICK STREET MANHATTAN | Alteration | Permit Issued | 04/10/2023 | 04/04/2025 | Design MG ENGINEERING D.P.C. Owner 121 VARICK STREET CORP. Contractor NGV INDUSTRIES, INC | Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy. |
| M01116232 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 03/31/2025 | Design ROSINI ENGINEERING, PC Contractor I-RESOLVE CONSTRUCTION GR Filer GILLMAN CONSULTING INC | Modification to plumbing fixtures and related piping for RU 318B as shown on drawings. No change in use, egress or occupancy. |
| M00993022 ↗ | 527 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 03/21/2025 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to us… |
| M00945987 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2023 | 03/20/2025 | Design ROBERT DERECTOR ASSOCIATES Owner SL GREEN REALTY CORP Contractor SIRINA FIRE PROT CORP | Modification to existing Plumbing fixtures, sprinkler, and standpipe as per plans filed herewith. No change in use, egress or occupancy. |
| M00959198 ↗ | 3 EAST 28 STREET MANHATTAN | Alteration | Permit Issued | 01/16/2024 | 03/19/2025 | Design AMA CONSULTING ENGINEERS, PC Owner SEVEN VALLEYS LLC Contractor DNP BUILDERS LLC | Sprinkler work as shown on plans. |
| M01087984 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 09/19/2024 | 03/14/2025 | Design OFFICE OF JAMES RUDERMAN Owner SUMMIT GLORY LLC Contractor JOHN GALLIN SON | Interior Concrete stair and landing renovations to connect to existing stair between Cellar Level and Street Leve as plans filed herewith. N… |
| M01022084 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 03/13/2025 | Design JACK GREEN ASSOCIATES Owner SUMMIT GLORY LLC Contractor JOHN GALLIN SON | Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy, |
| M01022075 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 05/01/2024 | 03/13/2025 | Owner SUMMIT GLORY LLC Contractor JOHN GALLIN SON | Interior renovations of existing partitions, fixtures, and finishes. No change to use, egress, or occupancy. |
| M01129109 ↗ | 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/24/2024 | 03/11/2025 | Design AMA CONSULTING ENGINEERS, PC Owner VORNADO REALTY TRUST Contractor ANTHONY DISABATO | Filing herewith plumbing scope to remove & cap existing incoming gas connection. No change in use, egress or occupancy. |
| M00839394 ↗ | 103 LENOX AVENUE MANHATTAN | Alteration | Permit Issued | 05/22/2023 | 02/28/2025 | Design NY AC, LLC Contractor PEAQ RESTORATION LLC | Facade Restoration to include Brick Replacement, Masonry Crack Repair, Stone Patching and Lintel Resetting as per plans filed herewith. No c… |
| B00866514 ↗ | 158 CLINTON STREET BROOKLYN | Alteration | Signed-off | 05/18/2023 | 02/26/2025 | Design CES ENGINEERING LLC Owner SELECT Contractor H M SPRINKLER INC Filer JAM CONSULTANTS, INC. | Installation of New Sprinkler System including sprinkler heads and piping. |
| M00891283 ↗ | 462 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/27/2023 | 02/24/2025 | Design THORNTON TOMASETTI Contractor SJP PROPERTIES COMPANY | Architectural feature support, slab infill as per plans. No change in use, egress or occupancy. |
| M00778712 ↗ | 1 WATER STREET MANHATTAN | Alteration CO | Permit Issued | 07/27/2023 | 02/24/2025 | Design GENSLER Contractor BENCHMARK BUILDERS LLC | Updating of occupancy on 29th floor. Modification of core toilets. Revision to Schedule A to reflect updated occupant load on 29th floor. |
| M01046396 ↗ | 110 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 07/17/2024 | 02/20/2025 | Design MG ENGINEERING D.P.C. Contractor PACE PLUMBING CORP Filer METROPOLIS GROUP INC | Herewith filing for modifications to the existing plumbing fixtures and piping on the 14th, 17th, 21st, and 22nd floors as per plans. No cha… |
| M01005195 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/07/2024 | 02/18/2025 | Design ROBERT DERECTOR ASSOCIATES Owner SL GREEN REALTY CORP Contractor JT MAGEN & COMPANY INC | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. |
| M01029215 ↗ | 302 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 07/17/2024 | 02/18/2025 | Design LALIRE MARCH ARCHITECTS LLP Contractor HIRSCH CONSTRUCTION CORP Filer NYCCODE LLC | Minor plumbing scope associated with the renovation of the existing Bars at the Al Hirschfeld Theater to accommodate the ADA counter for the… |
| M00892009 ↗ | 2 CHARLTON STREET MANHATTAN | Alteration | Permit Issued | 08/09/2023 | 02/14/2025 | Contractor FLINT MECHANICAL CORP | PLUMBING MODIFICATIONS IN APARTMENT 12 C,D,E AS PER PLANS FOR UNIT COMBINATION.. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01025160 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 06/20/2024 | 02/10/2025 | Design JACK GREEN ASSOCIATES Owner SUMMIT GLORY LLC Contractor ADVANCED PLBG, MECH & SPR | Sprinkler modifications including temporary sprinkler loop as per plans filed herewith. No change to use, egress, or occupancy. |
| B00914588 ↗ | 598 MADISON STREET BROOKLYN | Alteration CO | Permit Issued | 08/25/2023 | 01/30/2025 | Design KYLE MAY, ARCHITECT Contractor ALMONTE HOME IMPROVEMENTS Filer A+ EXPEDITING INC. | Application filed to renovate the existing 4 family residence with modification to the non bearing partitions and new finishes, new rooftop … |
| M01114667 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 12/09/2024 | 01/30/2025 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Filing herewith Sprinkler modification to the existing system. Installation, modification and removal of sprinkler heads and associated pi… |
| M01020163 ↗ | 1109 5 AVENUE MANHATTAN | Alteration CO | Permit Issued | 04/08/2024 | 01/21/2025 | Design ALTIERISEBORWIEBER LLC Contractor CONSIGLI CONSTRUCTION CO Filer JM ZONING, LLC. | Structural application filed related to Alteration CO M01020163-S1 application filed for the increase floor occupancy at the fourth floor. |
| M00618180 ↗ | 86 TRINITY PLACE MANHATTAN | Alteration | Permit Issued | 12/10/2021 | 01/15/2025 | Design GACE DPC Owner GH123 GREENWICH, LLC Contractor ELYSIUM CONSTRUCTION INC Filer RIZZO GROUP | Structural modifications in Bas, Floors 1-14, Mez 1 associated with slab and framing removals as per plans filed herewith. no changes in use… |
| M00996528 ↗ | 501 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 03/21/2024 | 12/18/2024 | Design JAROS BAUM & BOLLES Contractor RICHTER & RATNER CONTRACTING Filer GILLMAN CONSULTING INC | Filing herewith Interior renovation, removal and installation of non load bearing partitions, ceilings, floors as per plans. No change to u… |
| B00819474 ↗ | 20 FURMAN STREET BROOKLYN | New Building | Permit Issued | 03/03/2023 | 12/10/2024 | Contractor L&K PARTNERS, INC Filer RIZZO GROUP | STRUCTURAL SCOPE FILED FOR 1-STORY NEW BUILDING APPLICATION |
| M01107464 ↗ | 462 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/01/2024 | 12/09/2024 | Design AMA CONSULTING ENGINEERS, PC Owner SJP PROPERTIES Contractor SJP PROPERTIES COMPANY Filer GILLMAN CONSULTING INC | Modify mechanical ductwork, related piping and equipment as per plans. No change in use, egress or occupancy. |
| M01107423 ↗ | 462 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/04/2024 | 12/09/2024 | Contractor SJP PROPERTIES COMPANY | Modification to interior non load bearing partitions, ceilings, doors and related finishes as per plans. No change in use, egress or occupa… |
| M01119503 ↗ | 640 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/25/2024 | 12/09/2024 | Design THORNTON TOMASETTI Owner SJP TS, LLC Contractor SJP PROPERTIES COMPANY Filer GILLMAN CONSULTING INC | Structural modifications as per plans. No change in use, egress or occupancy. |
| M01125385 ↗ | 1120 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/20/2024 | 11/25/2024 | Design CFS ENGINEERING, DPC Contractor PETRETTI & ASSOCIATES LLC | Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy. |
| M01112830 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 11/01/2024 | 11/14/2024 | Design JAROS BAUM & BOLLES Contractor STRUCTURE TONE, LLC Filer GILLMAN CONSULTING INC | Filing herewith the Plumbing work for the ADA Bathroom as per plans. No change to use, egress, or occupancy. |
| M01107528 ↗ | 462 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/01/2024 | 11/06/2024 | Design AMA CONSULTING ENGINEERS, PC Contractor SIRINA FIRE PROT CORP | Modification to sprinkler heads and related piping. No change in use, egress or occupancy. |
| M01129119 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 10/24/2024 | 10/29/2024 | Design AMA CONSULTING ENGINEERS, PC Owner VORNADO REALTY TRUST Contractor ANTHONY DISABATO | Filing herewith plumbing modifications to extend existing gas piping from cellar to 1st floor. No change in use, egress or occupancy. |
| M01083925 ↗ | 110 WILLIAM STREET MANHATTAN | Alteration | Permit Issued | 10/15/2024 | 10/18/2024 | Design MG ENGINEERING D.P.C. Contractor SAVCON CONSTRUCTION LLC Filer METROPOLIS GROUP INC | Herewith filing for modifications to existing mechanical systems on the 33rd floor and roof as indicated plans. No change in use, occupancy,… |
| M01112498 ↗ | 395 HUDSON STREET MANHATTAN | Alteration | Signed-off | 10/01/2024 | 10/17/2024 | Design STANTEC Owner CUSHMAN & WAKEFIELD Contractor LAB PLBG & HTG CO INC | Alterations/modifications to existing plumbing system. No change in egress, use, or occupancy. |
| M00925553 ↗ | 426 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 02/18/2024 | 10/15/2024 | Owner MEADOW PARTNERS Contractor MORA FIRE PROTECTION LLC | Sprinkler work as shown on the plans. |
| M01058101 ↗ | 110 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 09/24/2024 | 10/15/2024 | Contractor SAVCON CONSTRUCTION LLC | Herewith filing for structural work on the 6th, 7th, & 15th floors as indicated on plans. |
| B01078774 ↗ | 305 PARKSIDE AVENUE BROOKLYN | Alteration | Signed-off | 08/26/2024 | 10/11/2024 | Design DAVID YUM ARCHITECTS Contractor KELCO CONSTRUCTION INC | INSTALLATION OF NEW TEMPORARY AIR SUPPORTED STRUCTURES FOR TENNIS COURT ENCLOSURE, AT THE EXISTING PROSPECT PARK TENNIS CENTER. NO CHANGE TO… |
| M01108045 ↗ | 140 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/02/2024 | 10/08/2024 | Owner CBRE Contractor TURNER CONSTRUCTION COMPANY | REMOVAL AND INSTALLATION OF DAMAGED PORTIONS OF CONCRETE SLAB-ON-GRADE AT SUB-LEVEL B AND ASSOCIATED REMOVAL AND INSTALLATION OF NON LOAD BE… |
| M00922513 ↗ | 375 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/02/2023 | 10/08/2024 | Design ROBERT DERECTOR ASSOCIATES Owner RFR REALTY LLC Contractor CITY/SUBURBAN PLBG CORP Filer METROPOLIS GROUP INC | REMOVE AND INSTALL STORM PIPING. INSTALL NEW ROOF DRAINS ON 5TH FLOOR TERRACES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01110105 ↗ | 140 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/24/2024 | 10/04/2024 | Contractor TURNER CONSTRUCTION COMPANY | REPAIR AND REPLACEMENT OF DAMAGED SLAB AND OTHER STRUCTURAL ELEMENTS AT SUB CELLAR 1. |
| M01003087 ↗ | 585 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/12/2024 | 10/02/2024 | Design TSF ENGINEERING, PC Contractor TAVELLA PLBG & HTG CORP | filing for fire resistant penetrations and joints associated with the gas piping project as per plans filed herewith. no change to use, egre… |
| M01044020 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/05/2024 | 09/27/2024 | Design PERKINS&WILL ARCHITECTS, PC Owner SL GREEN REALTY CORP Contractor JT MAGEN & COMPANY INC | Installation of interior non bearing partitions as per plans filed herewith. No change in use, egress or occupancy. |
| M01062657 ↗ | 527 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 07/10/2024 | 09/27/2024 | Design SYSKA HENNESSY GROUP Owner TISHMAN SPEYER Contractor UNITED FIRE PROT CORP Filer GILLMAN CONSULTING INC | hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occ… |
| M01044032 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/17/2024 | 09/27/2024 | Design SEVERUD ASSOCIATES Owner SL GREEN REALTY CORP Contractor JT MAGEN & COMPANY INC | Structural modifications as per plans filed herewith. No change in use, egress or occupancy. |
| M01044023 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/13/2024 | 09/27/2024 | Design ROBERT DERECTOR ASSOCIATES Owner SL GREEN REALTY CORP Contractor JT MAGEN & COMPANY INC | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. |
| M01084122 ↗ | 866 UNITED NATIONS PLAZA MANHATTAN | Alteration | Signed-off | 07/25/2024 | 09/25/2024 | Design TSF ENGINEERING, PC Owner MANSFIELD Contractor JRM CONSTRUCTION MGMT LLC | Mechanical and associated ductwork associated with the tenant build-out for the office space on the 4th floor as per plans filed herewith. N… |
| M01111657 ↗ | 25 BROADWAY MANHATTAN | Alteration | Signed-off | 09/18/2024 | 09/25/2024 | Contractor APOLON CONSTRUCTION | FILING HEREWITH FOR THE REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS SHOWN ON PLANS. THERE WILL BE NO… |
| M00945932 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 09/24/2024 | Design PERKINS&WILL ARCHITECTS, PC Contractor JT MAGEN & COMPANY INC | Installation of interior non bearing partitions as per plans filed herewith. No change in use, egress or occupancy. |
| M00946046 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2023 | 09/24/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor JT MAGEN & COMPANY INC | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. |
| M00947255 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 09/24/2024 | Design SEVERUD ASSOCIATES Contractor JT MAGEN & COMPANY INC | Structural modifications as per plans filed herewith. No change in use, egress or occupancy. |
| M00946074 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 09/24/2024 | Design PERKINS&WILL ARCHITECTS, PC Contractor JT MAGEN & COMPANY INC | Installation of interior non bearing partitions as per plans filed herewith. No change in use, egress or occupancy. |
| M00945976 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2023 | 09/24/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor JT MAGEN & COMPANY INC | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. |
| M00947245 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 09/24/2024 | Design SEVERUD ASSOCIATES Contractor JT MAGEN & COMPANY INC | Structural modifications as per plans filed herewith. No change in use, egress or occupancy. |
| M00946084 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2023 | 09/24/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor JT MAGEN & COMPANY INC | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. |
| M00946017 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 09/24/2024 | Design PERKINS&WILL ARCHITECTS, PC Contractor JT MAGEN & COMPANY INC | Installation of interior non bearing partitions as per plans filed herewith. No change in use, egress or occupancy. |
| M00947182 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 09/24/2024 | Design SEVERUD ASSOCIATES Contractor JT MAGEN & COMPANY INC | Structural modifications as per plans filed herewith. No change in use, egress or occupancy. |
| M01089063 ↗ | 501 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 09/03/2024 | 09/18/2024 | Design HALSEY MCCORMACK HELMER INC Contractor SUPERIOR HVAC INC | Filing herewith drawings showing general construction work on the 21st floor. No change to occupancy, egress. |
| M01081493 ↗ | 140 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/14/2024 | 09/16/2024 | Design ROBERT DERECTOR ASSOCIATES Owner CBRE Contractor STRUCTURE TONE, LLC | Removal of ductwork and associated mechanical equipment on 42nd floor. |
| M01062750 ↗ | 1271 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/10/2024 | 09/13/2024 | Design AMA CONSULTING ENGINEERS, PC Contractor NYC FIRE SPRINKLER CORP | Filing herewith sprinkler work on existing 5th floor. No change in use, egress or occupancy. |
| M01062729 ↗ | 1271 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/10/2024 | 09/12/2024 | Design AMA CONSULTING ENGINEERS, PC Contractor JRM CONSTRUCTION MGMT LLC | FILING HEREWITH MECHANICL WORK, EXISTING AIR HANDLING UNIT AHU-5-1, TO BE ROTATED TO ALLOW ROOM FOR NEW AHU-5-3 ON EXISTING 5TH FLOOR SPACE.… |
| Q00787711 ↗ | 31-02 47 AVENUE QUEENS | Alteration | Permit Issued | 10/21/2022 | 09/09/2024 | Design AKF ENGINEERS, LLP Contractor ADVANCED PLUMBING MECH | Herewith filing for modifications to existing plumbing system as indicated on plans. No change in use, occupancy, or egress. |
| Q01073304 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 08/21/2024 | 09/06/2024 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy. |
| Q01073314 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 08/21/2024 | 09/06/2024 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP Filer JM ZONING, LLC. | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair. No change in use, egress and occupancy. |
| Q01073308 ↗ | 112-50 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 08/21/2024 | 09/06/2024 | Design HOFFMANN ARCHITECTS, INC. Contractor XINOS CONSTRUCTION CORP | Application filed for Facade Inspection Safety Program (FISP) Cycle 9B Repair and roof repair. No change in use, egress and occupancy. |
| M01080638 ↗ | 63 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/28/2024 | 08/30/2024 | Design LGA PARTNERS, LP Contractor BENCHMARK BUILDERS LLC | Commercial Office Interior Fit-Out; No change to use, occupancy or egress. |
| M01078628 ↗ | 63 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 08/29/2024 | Design GILSANZ MURRAY STEFICEK LLP Contractor BENCHMARK BUILDERS LLC | New steel framing for support of operable partitions and high-density shelving systems |
| M00664489 ↗ | 28 WEST 11 STREET MANHATTAN | Alteration | Permit Issued | 05/24/2022 | 08/28/2024 | Design RMBA LLC Contractor PRESERV BLD RESTOR MGT IN | THE SCOPE OF THIS PROJECT INCLUDES FRONT/REAR FACADE AND ROOF RESTORATION AT 28 WEST 11TH STREET. THE SCOPE FURTHER INCLUDES THE REPAIR & RE… |
| M01078631 ↗ | 63 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 08/28/2024 | Design GILSANZ MURRAY STEFICEK LLP Contractor BENCHMARK BUILDERS LLC | New steel framing for support of high-density shelving systems |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/09/2026 | Fire-Resistant Penetrations and Joints | 26 EAST 63 STREET | WILLIAM FITZJOHN | special |
| 07/09/2026 | Sprinkler Systems | 26 EAST 63 STREET | WILLIAM FITZJOHN | special |
| 07/09/2026 | Tenant Protection Plan Compliance | 26 EAST 63 STREET | — | special |
| 06/10/2026 | Post-installed Anchors | 22 CORTLANDT STREET | WILLIAM FITZJOHN | special |
| 06/10/2026 | Sprinkler Systems | 22 CORTLANDT STREET | WILLIAM FITZJOHN | special |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | 22 CORTLANDT STREET | WILLIAM FITZJOHN | special |
| 06/04/2026 | Fenestration and door U-factor and product ratings | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Lighting controls | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Exterior lighting power | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Interior lighting power | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Air barrier — testing | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Air barrier continuity plan testing | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Fenestration areas | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Fenestration air leakage | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Metering | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Protection of exposed foundation insulation | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Maintenance information | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Air barrier - visual inspection | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Insulation placement and R values | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 06/04/2026 | Lowest Floor Elevation | 20 FURMAN STREET | WILLIAM FITZJOHN | progress |
| 06/04/2026 | Fire-Resistance Rated Construction | 20 FURMAN STREET | WILLIAM FITZJOHN | progress |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | 20 FURMAN STREET | WILLIAM FITZJOHN | special |
| 06/04/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | 20 FURMAN STREET | WILLIAM FITZJOHN | special |
| 05/21/2026 | Air barrier — testing | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Fenestration and door U-factor and product ratings | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Exterior lighting power | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Fenestration air leakage | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Lighting controls | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Maintenance information | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Fenestration areas | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Metering | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Protection of exposed foundation insulation | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Fire-Resistance Rated Construction | 20 FURMAN STREET | WILLIAM FITZJOHN | progress |
| 05/21/2026 | Air barrier - visual inspection | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Interior lighting power | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Air barrier continuity plan testing | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Lowest Floor Elevation | 20 FURMAN STREET | WILLIAM FITZJOHN | progress |
| 05/21/2026 | Insulation placement and R values | 20 FURMAN STREET | WILLIAM FITZJOHN | energy_progress |
| 05/21/2026 | Fire-Resistant Penetrations and Joints | 20 FURMAN STREET | WILLIAM FITZJOHN | special |
| 05/21/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | 20 FURMAN STREET | WILLIAM FITZJOHN | special |
| 05/05/2026 | Insulation placement and R values | 298 9 AVENUE | WILLIAM FITZJOHN | energy_progress |
| 05/05/2026 | Fenestration air leakage | 298 9 AVENUE | WILLIAM FITZJOHN | energy_progress |
| 05/05/2026 | Fenestration and door U-factor and product ratings | 298 9 AVENUE | WILLIAM FITZJOHN | energy_progress |
| 05/05/2026 | Energy Code Compliance Inspections | 298 9 AVENUE | WILLIAM FITZJOHN | progress |
| 05/05/2026 | Structural Stability – Alterations of existing buildings | 298 9 AVENUE | WILLIAM FITZJOHN | special |
| 05/05/2026 | Fire-Resistant Penetrations and Joints | 298 9 AVENUE | WILLIAM FITZJOHN | special |
| 04/14/2026 | Interior lighting power | 322 WEST 57 STREET | WILLIAM FITZJOHN | energy_progress |
| 04/14/2026 | Final | 322 WEST 57 STREET | WILLIAM FITZJOHN | progress |
| 04/14/2026 | Fire-Resistant Penetrations and Joints | 322 WEST 57 STREET | WILLIAM FITZJOHN | special |
| 04/14/2026 | Post-installed Anchors | 22 CORTLANDT STREET | WILLIAM FITZJOHN | special |