Elevator cooperative
One Hundred Hudson
100 HUDSON STREET · BIN 1002012
💬 Discuss this project
1910Year Built
10Stories
D4Building Class
C6-2AZoning
73,954 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: ONE HUNDRED HUDSON TENANTS CORP · 6,797 sf lot · 10.88 FAR built · Flood zone X500
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
Penthouse3p · 1 filing · 7 docs
Floor 91p · 1 filing · 5 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Under Construction1 filing
Floor 3
Floor 2
Floor 1
Cellar2p · 1 filing · 13 docs
Sub-Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TUDOR REALTY SERVICES1407/08/2026
ONE HUNDRED HUDSON TENANTS CORP103/22/2026
100 HUDSON TENANTS13703/22/2026
100 HUDSON TENMANTE CORP103/22/2026
100 HUDSON STREET203/22/2026
ANDREW BLD CORP103/22/2026
ANDREWS BUILDING103/22/2026
100 HUDSON ST TENANTS903/21/2026
REX203/21/2026
100 HUDSON TENANTS C O ANDREWS603/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A K EXPEDITING1203/21/2026
AE DESIGN SOLUTION403/21/2026
Rigid Structural Design, LLC403/21/2026
BOYD CONSULTING403/21/2026
DOMANI CONSULTING403/21/2026
BURNHAM NATIONWIDE INC1403/21/2026
ANZALONE ARCHITECTURE603/21/2026
BASIC GROUPS403/21/2026
JAM CONSULTANTS, INC.403/21/2026
NEW YORK ENGINEERING ASSOCIATES P1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor1407/08/2026
DUALCORE CONSTRUCTION MGTGeneral Contractor407/08/2026
BRIGHTON CONTRACTORS INCGeneral Contractor407/08/2026
FINE CONSTRUCTION SERVICEGeneral Contractor407/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor303/21/2026
T. NOBLE & CO., LLCGeneral Contractor303/21/2026
A & C HEATING SERVICES INGeneral Contractor303/21/2026
A & C HTG SERVICES, INCPlumbing207/08/2026
QUALITY RENOVATION TEAM IGeneral Contractor207/08/2026
QUADRANT DEVELOPMENTGeneral Contractor203/21/2026
FRANCO REMODELING CORPGeneral Contractor207/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
MACREDDIN PLBG HTGGeneral Contractor103/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
STX ELECTRICAL CORPElectrical103/22/2026
ARK DESIGN & BUILD INCGeneral Contractor107/08/2026
BULSON MANAGEMENT LLCGeneral Contractor107/08/2026
EINSTEIN ELEC'L CORPElectrical103/22/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
FIVE STAR P AND H CO, INCPlumbing107/08/2026
IMPACT PLUMBING INCPlumbing107/08/2026
MACREDDIN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851812/16/2024
WALTER B. MELVIN ARCHITEC6652210/21/2024
SITE SAFETY LLC8555210/21/2024
ATLAS ATC ENGINEERING INC8011307/05/2024
YORKOS ENGINEERING, DESIG6991207/06/2023
CROSSCHECK INSPECTION SER544107/05/2023
STRATFORD ENGINEERING997503/07/2023
ANDREW GOODRICH, P.E., PL965202/10/2023
CUSTODIO CONSULTING, LLC1835101/14/2022
AK ENGINEERING PC678201/15/2021
Building Lifecycle
All (261)Filed (38)Permit Issued (39)Signed Off (21)Facade (FISP) (12)Violation (54)Inspection (19)Objection (48)Special Inspection (30)
09/30/2026
Permit issued — General Construction
M01449892-I1-GC
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/03/2025
Signed off — Alteration
Masonry and waterproofing repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M00892128-I1
07/31/2025
Signed off — Alteration
MECHANICAL MODIFICATION RELATED TO RESIDENTIAL RENOVATIONS INCLUDING NEW INTERIOR FAN UNITS AND CONNECTION OF REQUIRED BATHROOM VENTING TO EXISTING RISER
M00328236-I1
06/26/2025
Signed off — Alteration
PLUMBING MODIFICATION RELATED TO APARTMENT RENOVATION REMOVING OF GAS RANGE
M00328194-I1
06/25/2025
Signed off — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-I1
06/25/2025
Signed off — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-S1
06/25/2025
Signed off — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-S2
04/22/2025
Signed off — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01129386-I1
03/20/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01126155-I1
03/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2025
Permit issued — Plumbing
M01067084-S1-PL
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/02/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
01/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
01/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
12/16/2024
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-P4
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
12/16/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01126155-P1
11/25/2024
Permit issued — General Construction
M00892128-I1-GC
11/12/2024
Signed off — Alteration
INSTALL NEW HVAC SYSTEM AND BATHROOM EXHAUSTS IN EXISTING APARTMENT #6B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00797980-I1
11/12/2024
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF APT. 6B. REMOVE EXISTING FIXTURES AND INSTALL 1 DISHWASHER, 1 KITCHEN SINK, 1 TUB, 2 LAVATORIES, 2 TOILETS AND 1 RANGE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00798038-I1
11/07/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/01/2024
Permit issued — Suspended Scaffold
M01129386-I1-SC
11/01/2024
Objection raised — Other
11/01/2024
Objection resolved — Addressed
10/31/2024
Signed off — Alteration
INTERIOR RENOVATION OF APT. 6B. GENERAL CONSTRUCTION WORK INCLUDING NON-STRUCTURAL DEMO AND CONSTRUCTION OF INTERIOR PARTITIONS, DOORS, MILLWORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00797902-I1
10/28/2024
Special inspection requirement — Final
Sergio De Orbeta
10/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Martin Griggs
10/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
10/21/2024
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01129386-I1
10/21/2024
Filed — Alteration
Masonry and waterproofing repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M00892128-P1
10/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01126155-I1
10/15/2024
Permit issued — Sidewalk Shed
M01126155-I1-SH
10/15/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
10/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
10/15/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
10/15/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
10/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/11/2024
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-P2
10/11/2024
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-P3
10/11/2024
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE GRADE OF OIL FROM #4 TO #2.
M01067084-P1
10/11/2024
Special inspection requirement — Final
LOUIS ARENA
10/11/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
Latest 60 of 261 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAPTEL CONSTRUCTION LLC09/30/2026
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP02/28/2025
DOB NOWGeneral ConstructionSigned-offFRANCO REMODELING CORP11/25/2024
DOB NOWSuspended ScaffoldSigned-offFRAN-CO REMODELING CORP11/01/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC10/15/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/16/2024
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP07/11/2024
DOB NOWGeneral ConstructionSigned-offA & C HEATING SERVICES IN07/10/2024
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC07/10/2024
DOB NOWMechanical SystemsSigned-offDUALCORE CONSTRUCTION MGT07/08/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/27/2024
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS12/19/2023
DOB NOWMechanical SystemsSigned-offDUALCORE CONSTRUCTION MGT12/14/2023
DOB NOWGeneral ConstructionSigned-offFRANCO REMODELING CORP12/14/2023
DOB NOWGeneral ConstructionSigned-offQUALITY RENOVATION TEAM I08/25/2023
DOB NOWMechanical SystemsSigned-offQUALITY RENOVATION TEAM I08/17/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/16/2023
DOB NOWPlumbingSigned-offFIVE STAR P AND H CO, INC08/09/2023
DOB NOWGeneral ConstructionSigned-offBRIGHTON CONTRACTORS INC03/24/2023
DOB NOWGeneral ConstructionSigned-offQUADRANT DEVELOPMENT01/18/2023
DOB NOWGeneral ConstructionSigned-offFINE CONSTRUCTION SERVICE09/27/2022
DOB NOWGeneral ConstructionSigned-offARK DESIGN & BUILD INC07/15/2022
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC06/01/2022
DOB NOWGeneral ConstructionSigned-offFINE CONSTRUCTION SERVICE04/02/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/25/2022
DOB NOWGeneral ConstructionSigned-offBRIGHTON CONTRACTORS INC03/08/2022
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC10/19/2021
DOB NOWGeneral ConstructionSigned-offT. NOBLE & CO., LLC07/27/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN04/07/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/18/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC03/18/2021
DOB NOWProtection and Mechanical MethodsSigned-offEVEREST SCAFFOLDING INC03/15/2021
DOB NOWMechanical SystemsSigned-offQUALITY ASSURED LLC10/20/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/30/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC03/27/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC01/22/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/10/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC01/22/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/17/2019
BISPLISSUEDAP PLUMBING & HVAC LLC02/11/2026
+ 49 more permits on file
1 project · most recent 01/30/2020
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/30/2020——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PEAD-A09AA7 7,500 BTU · Vrf Indoor ×1
PEAD-A15AA7 12,500 BTU · Vrf Indoor ×1
Heating
Mitsubishi Electric PEAD-A09AA7 8,300 CFM · Vrf Indoor ×1
PEAD-A15AA7 13,700 BTU · Vrf Indoor ×1
Ventilation
Mitsubishi Electric PEAD-A15AA7 PEAD-A09AA7 953 CFM · Fan Coil Indoor ×2
2 projects · most recent 02/10/2023
Water/Sanitary Gas
FiledStatusContractorScope
02/10/2023——Water/Sanitary
01/30/2020——Gas, Water/Sanitary
11 projects · most recent 12/02/2025
General Wiring Boiler Controls
FiledStatusContractorScope
12/02/2025CompleteEINSTEIN ELEC'L CORP—
10/17/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
09/10/2024CompleteSTX ELECTRICAL CORPBoiler Controls
08/29/2024CompleteWIRETECH ELECTRIC CORPGeneral Wiring
06/24/2024CompleteSTX ELECTRICAL CORP—
03/13/2024CompleteTWINTECH ELECTRIC INCGeneral Wiring
07/11/2022CompleteM&T ELECTRICAL LLC—
04/06/2022CompleteM&T ELECTRICAL LLC—
02/26/2020CompleteMLS ELECTRIC LLCGeneral Wiring
07/17/2019CompleteSTAR ELEC'L CONTRACTORS C—
01/15/2019CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
01/02/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/02/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/02/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/02/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
01/02/2025Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
01/02/2025Tenant Protection Plan ComplianceRONALD GRAPINspecial
01/02/2025Maintenance informationLOUIS ARENAenergy_progress
12/16/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
12/16/2024Tenant Protection Plan Compliance—special
12/16/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
12/16/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/16/2024Maintenance informationLOUIS ARENAenergy_progress
12/16/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/16/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/28/2024Fire-Resistant Penetrations and JointsMartin Griggsspecial
10/28/2024Tenant Protection Plan ComplianceKHALID ALGENDEspecial
10/28/2024FinalSergio De Orbetaprogress
10/15/2024Heating SystemsLOUIS ARENAspecial
10/15/2024Tenant Protection Plan ComplianceRONALD GRAPINspecial
10/15/2024Maintenance informationLOUIS ARENAenergy_progress
10/15/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/15/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/15/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/15/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
10/11/2024FinalLOUIS ARENAprogress
Latest 25 of 80.
▾Documents — 838 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch28
09/04/2026M00484387-I1Request digital key ↗
09/03/2026M00537924-I1Request digital key ↗
09/02/2026M00635267-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00302394-I1Request digital key ↗
09/03/2026M00328194-P2Request digital key ↗
09/03/2026M00328194-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00302473-I1Request digital key ↗
09/05/2026M00328236-P1Request digital key ↗
08/15/2026M00328236-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00119566-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00120717-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/03/2026M00432063-I1Request digital key ↗
▸Applications & Permits184
▸BISWORK PERMIT APPLICATION85
02/11/2026120188126Open ↗
02/06/2026120188126Open ↗
07/09/2024123843109Open ↗
Showing 3 of 85 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION67
01/15/2026120188126Open ↗
12/29/2025120188126Open ↗
03/23/2023100299892Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWLPC Approval/Permit30
09/05/2026M00302394-I1Open ↗
09/05/2026M00328236-P1Open ↗
09/03/2026M00328194-P2Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/17/2018122956319Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/25/2018122956319Open ↗
▸Seals & Professional Certifications191
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
11/20/2019120535215Open ↗
11/20/2019120535215Open ↗
03/27/2019123417212Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature44
09/29/2026M00328236-P1Open ↗
09/29/2026M00328236-P1Open ↗
09/29/2026M00328236-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/05/2026M00302394-I1Open ↗
09/05/2026M00328236-P1Open ↗
09/05/2026M00328236-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/29/2026M00328236-P1Open ↗
09/25/2026M00635267-I1Open ↗
09/25/2026M00635267-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment35
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING9
01/15/2026120188126Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
05/29/2018122666392Open ↗
12/15/2017123080735Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/11/2018123080735Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/10/2019122275028Open ↗
▸Safety & Tenant Protection20
▸BISTenant Protection Plan and Notes10
07/18/2020123843109Open ↗
01/17/2019123417212Open ↗
10/03/2018122666392Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan8
09/05/2026M00302394-I1Open ↗
09/05/2026M00328236-P1Open ↗
09/03/2026M00328194-P2Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/26/2017123080735Open ↗
▸Environmental & Asbestos56
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/02/2026M00635267-I1Open ↗
09/02/2026M00635267-P1Open ↗
09/02/2026M00635416-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
11/19/2020123417212Open ↗
01/17/2019123417212Open ↗
05/29/2018122666392Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/05/2026M00302394-I1Open ↗
08/15/2026M00328194-I1Open ↗
08/15/2026M00328236-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/18/2020123843109Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/19/2020123843109Open ↗
▸Energy Compliance52
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
05/11/2018123102944Open ↗
05/02/2018122956319Open ↗
05/02/2018122956319Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
05/11/2018123102944Open ↗
05/02/2018122956319Open ↗
02/07/2018123080735Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/30/2025123843109Open ↗
07/18/2020123843109Open ↗
▸BISLIGHTING CONTROLS1
07/30/2025123843109Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/30/2025123843109Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
01/17/2019123417212Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/30/2025123843109Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/15/2026120188126Open ↗
01/15/2026120188126Open ↗
07/30/2025123843109Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
05/02/2018122956319Open ↗
▸Approvals, Objections & Sign-offs102
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST42
07/31/2025123843109Open ↗
11/03/2021123417212Open ↗
03/02/2021122956319Open ↗
Showing 3 of 42 on file for this type
▸BISLANDMARKS APPROVAL30
07/18/2020123843109Open ↗
11/20/2019120535215Open ↗
08/28/2018122666392Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLANDMARKS SIGNOFF6
07/31/2025123843109Open ↗
11/03/2021123417212Open ↗
08/04/2020103034814Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER6
02/11/2026120188126Open ↗
12/05/2023123843109Open ↗
07/12/2018120535215Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/21/2017123102944Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
08/23/2018122956319Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
07/30/2025123843109Open ↗
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT48
10/28/2021123417212Open ↗
10/28/2021123417212Open ↗
11/19/2020123417212Open ↗
Showing 3 of 48 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/30/2025123843109Open ↗
10/28/2021123417212Open ↗
▸Filing & Intake Forms68
▸BISEFILING COVER SHEET29
03/30/2020123843109Open ↗
01/17/2019123417212Open ↗
05/29/2018122666392Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM20
03/27/2020123417212Open ↗
01/17/2020122956319Open ↗
12/20/2019122956319Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION19
03/21/2023100299892Open ↗
08/03/2020123417212Open ↗
08/03/2020123417212Open ↗
Showing 3 of 19 on file for this type
▸Other Documents23
▸DOB NOWProof of Historic Building11
09/02/2026M00635416-P1Open ↗
09/02/2026M00635416-P2Open ↗
09/02/2026M00635416-I1Open ↗
Showing 3 of 11 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/12/2020123843109Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01129386-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01129386-I1Open ↗