| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00610911 ↗ | 303 EAST 111 STREET MANHATTAN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 11/22/2021 | 09/03/2026 | Owner 111TH STREET NY LLC Filer MARTIN REBHOLZ ARCHITECT | ENLARGEMENT OF EXISTING 1 STORY COMMERCIAL BUILDING WITH 4 STORIES OF RESIDENTIAL (1 DU EACH ON FLOORS 2 AND 3. 2 UNITS EACH ON FLOORS 4… |
| M00732581 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 05/17/2022 | 08/28/2026 | Design CES ENGINEERING LLC | MECHANICAL APPLICATION IN CONJUNCTION WITH ALT-CO #M00610911. |
| M00739214 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 05/20/2022 | 08/26/2026 | Design KPFF CONSULTING ENGINEERS | STRUCTURAL WORK IN CONJUCTION WITH ALT-CO #M00610911. |
| M01418720 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Permit Issued | 06/23/2026 | 07/23/2026 | Design THE VILNITS GROUP | RENOVATE APT 19. MINOR PARTITION WORK, BATH AND KITCHEN REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01115327 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 07/08/2026 | Design ADB ASSOCIATES Filer HIGHRISE GROUP | PLUMBING WORK TO APT 1, 2, 3, 5, 7, 11, 15 17, 19, AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW, RE… |
| M01386833 ↗ | 157 2 AVENUE MANHATTAN | Alteration | Permit Issued | 04/22/2026 | 04/28/2026 | Design PVE ENGINEERING Owner RYCO CAPITAL | EXTERIOR FACADE REPAIR AT THE FRONT AND REAR FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| PVE ENGINEERING | 6 | 04/22/2026 |
| SA-DA ARCHITECTURE | 5 | 08/25/2026 |
| THE VILNITS GROUP | 5 | 06/23/2026 |
| GREEN SOLUTIONS ENGINEERING & ENERG | 4 | 08/25/2026 |
| KPFF CONSULTING ENGINEERS | 2 | 02/20/2024 |
| URBAN ENGINEERING, PC | 2 | 05/11/2026 |
| ADB ASSOCIATES | 1 | 08/25/2026 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 08/04/2025 |
| CES ENGINEERING LLC | 1 | 12/11/2025 |
| GUSTAVSON DUNDES | 1 | 09/14/2023 |
| LEE N KANTOR, PE | 1 | 12/24/2025 |
| MARCELO BARUJEL ARCHITECT, PC | 1 | 12/01/2025 |
| OPENSHOP ARCHITECTURE | 1 | 01/15/2021 |
| SANDEEP GUNNALA ENGINEERING PLLC | 1 | 07/25/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| DIMENSIONAL INC | 5 | 12/11/2025 |
| DONATO PLUMBING, INC | 4 | 08/25/2026 |
| AMERICAN STANDARD P&H COR | 1 | 08/25/2026 |
| BULSON MANAGEMENT LLC | 1 | 01/15/2021 |
| HARROW NY INC | 1 | 08/25/2026 |
| P.H. WORKS INC | 1 | 11/18/2025 |
| REDIRECTING LIC INC | 1 | 08/25/2026 |
| SENTINEL BUILDERS, LLC | 1 | 05/11/2026 |
| T & T PLUMBING INC | 1 | 08/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RYCO CAPITAL | 11 | 08/25/2026 |
| 111TH STREET NY LLC | 2 | 12/01/2025 |
| Broadway Continental Corp. | 1 | 08/25/2026 |
| CATALYST CHILMARK LLC | 1 | 09/14/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG ORANGE EXPEDITING, INC | 10 | 08/25/2026 |
| GRS CONSULTING SERVICES, LLC. | 3 | 12/11/2025 |
| A.E.C. PERMITS, INC | 1 | 12/24/2025 |
| HIGHRISE GROUP | 1 | 08/25/2026 |
| MARTIN REBHOLZ ARCHITECT | 1 | 12/01/2025 |
| PHILLIPS CONSULTING | 1 | 09/14/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00610911 ↗ | 303 EAST 111 STREET MANHATTAN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 11/22/2021 | 09/03/2026 | Owner 111TH STREET NY LLC Filer MARTIN REBHOLZ ARCHITECT | ENLARGEMENT OF EXISTING 1 STORY COMMERCIAL BUILDING WITH 4 STORIES OF RESIDENTIAL (1 DU EACH ON FLOORS 2 AND 3. 2 UNITS EACH ON FLOORS 4… |
| M00732581 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 05/17/2022 | 08/28/2026 | Design CES ENGINEERING LLC | MECHANICAL APPLICATION IN CONJUNCTION WITH ALT-CO #M00610911. |
| M00739214 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 05/20/2022 | 08/26/2026 | Design KPFF CONSULTING ENGINEERS | STRUCTURAL WORK IN CONJUCTION WITH ALT-CO #M00610911. |
| M01418720 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Permit Issued | 06/23/2026 | 07/23/2026 | Design THE VILNITS GROUP | RENOVATE APT 19. MINOR PARTITION WORK, BATH AND KITCHEN REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01115327 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 07/08/2026 | Design ADB ASSOCIATES Filer HIGHRISE GROUP | PLUMBING WORK TO APT 1, 2, 3, 5, 7, 11, 15 17, 19, AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW, RE… |
| M01386833 ↗ | 157 2 AVENUE MANHATTAN | Alteration | Permit Issued | 04/22/2026 | 04/28/2026 | Design PVE ENGINEERING Owner RYCO CAPITAL | EXTERIOR FACADE REPAIR AT THE FRONT AND REAR FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01280011 ↗ | 149 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/17/2025 | 12/16/2025 | Design THE VILNITS GROUP Owner RYCO CAPITAL | STRUCTURAL WORK FOR NEW MASONRY OPENING IN CONJUNCTION WITH APARTMENTS RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00778357 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 07/25/2022 | 12/04/2025 | INSTALLATION OF 8' HIGH TEMPORARY CONSTRUCTION FENCE | |
| M01091294 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 08/07/2024 | 11/13/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL | WORK TO APTS 2A,2B,2D,2E,2F,3A,3B,3C,3D,3E,3F,4B,4C,4E,4F,5A,5B,5C,5D,5E,5F,6B,6D,6E&6F IN A 6-STORY BUILDING. ALTERATIONS TO INCLUDE NEW, R… |
| M01292843 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/06/2025 | 11/12/2025 | Design PVE ENGINEERING Owner RYCO CAPITAL | MASONRY FACADE REPAIR INCLUDING CRACK REPAIR, REPOINTING, LINTEL REPLACEMENT AND BRICK REPLACEMENT . NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01192153 ↗ | 127 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/28/2025 | 10/01/2025 | Design THE VILNITS GROUP Owner RYCO CAPITAL | REMOVE ILLEGAL SIGNAGE NOTED IN VIOLATION 39101214L. REMOVE EXISTING DECORATIVE WALL & CEILING FINISHES & RETURN RETAIL TO WHITE BOX CONDITI… |
| M01223631 ↗ | 127 2 AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 09/04/2025 | Design SA-DA ARCHITECTURE | CONSTRUCT NEW ELECTRICAL METER ROOM AT THE FRONT OF THE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01183451 ↗ | 225 5 AVENUE BROOKLYN | Alteration | Signed-off | 02/26/2025 | 07/30/2025 | Design PVE ENGINEERING Owner RYCO CAPITAL | FAUX BRICK PANEL REMOVAL AND REPLACEMENT ON 5TH AVE FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01202758 ↗ | 131 2 AVENUE MANHATTAN | Alteration | Signed-off | 04/10/2025 | 07/16/2025 | Design PVE ENGINEERING Owner RYCO CAPITAL | Sidewalk vault replacement at corner property. No change to use, egress or occupancy. |
| M01202744 ↗ | 131 2 AVENUE MANHATTAN | Alteration | Signed-off | 04/24/2025 | 06/25/2025 | Design THE VILNITS GROUP Owner RYCO CAPITAL | Removal of existing one story structure in front yard. No change to use, egress or occupancy. |
| M01198339 ↗ | 127 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/26/2025 | 04/18/2025 | Design THE VILNITS GROUP | REMOVE EXISTING FULL HEIGHT PARTITIONS NOTED IN VIOLATION 39112187Z AND RESTORE CELLAR TO PREVIOUS LEGAL CONDITION. NO CHANGE IS PROPOSED T… |
| M01084060 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/30/2024 | 03/12/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL | WORK TO APT 5, 11, 15 AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO … |
| M01115330 ↗ | 131 2 AVENUE MANHATTAN | Alteration | Signed-off | 09/30/2024 | 03/07/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL | WORK TO APT.10 AT THE 4TH FLOOR OF AN EXISTING 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE T… |
| M01176560 ↗ | 74 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/15/2025 | 02/27/2025 | Design LEE N KANTOR, PE Filer A.E.C. PERMITS, INC | Installation of Electric Air Conditioning and Heating System and Associated Ductwork For Apartment # 5B |
| M01156494 ↗ | 74 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/18/2024 | 02/06/2025 | INTERIOR RENOVATION IN FIFTH FLOOR APARTMENT UNIT 5B AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | |
| M01129267 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/22/2024 | 11/22/2024 | Design URBAN ENGINEERING, PC | New Cellar concrete slab on grade. No change to use, egress or occupancy. |
| 123843109BIS | 100 HUDSON STREET MANHATTAN | — | ISSUED | 10/22/2020 | 07/09/2024 | — | OT |
| M00328236 ↗ | 100 HUDSON STREET MANHATTAN | Alteration | Signed-off | 05/08/2020 | 07/08/2024 | Design OPENSHOP ARCHITECTURE Filer BURNHAM NATIONWIDE INC | MECHANICAL MODIFICATION RELATED TO RESIDENTIAL RENOVATIONS INCLUDING NEW INTERIOR FAN UNITS AND CONNECTION OF REQUIRED BATHROOM VENTING TO E… |
| M00739233 ↗ | 303 EAST 111 STREET MANHATTAN | Alteration | Permit Issued | 05/22/2023 | 02/15/2024 | Design KPFF CONSULTING ENGINEERS Owner 111TH STREET NY LLC | FOUNDATION WORK IN CONJUCTION WITH ALT-CO #M00610911. |
| M00920128 ↗ | 153 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/14/2023 | 10/24/2023 | Design GUSTAVSON DUNDES Owner CATALYST CHILMARK LLC Filer PHILLIPS CONSULTING | new doors and millwork throughout apartment.. all plumbing work filed under separate application number M00941216-I1-LA |
| 120636295BIS | 314 WEST 58 STREET MANHATTAN | — | ISSUED | 07/10/2014 | 10/11/2023 | — | — |
| Building | Filings | Most Recent |
|---|---|---|
| 303 EAST 111 STREET ↗ | 23 | 09/07/2026 |
| 129 2 AVENUE ↗ | 3 | 07/25/2026 |
| 225 5 AVENUE ↗ | 1 | 07/08/2026 |
| 74 5 AVENUE ↗ | 2 | 07/08/2026 |
| 100 HUDSON STREET ↗ | 4 | 07/08/2026 |
| 156 2 AVENUE ↗ | 11 | 07/08/2026 |
| 153 MADISON AVENUE ↗ | 1 | 07/08/2026 |
| 131 2 AVENUE ↗ | 11 | 07/08/2026 |
| 127 2 AVENUE ↗ | 6 | 07/08/2026 |
| 141 2 AVENUE ↗ | 2 | 07/08/2026 |
| 157 2 AVENUE ↗ | 1 | 06/28/2026 |
| 149 2 AVENUE ↗ | 5 | 04/09/2026 |