Condo, residential tower (mixed-use, multi-family elevator) [derived]
Be@schermerhorn Condominium
100 WEST 93RD STREET · BIN 1032526
💬 Discuss this project
1973Year Built
29Stories
RMBuilding Class
C1-9Zoning
301,776 sfGross Floor Area
282Units
LL97 CoveredRent Stabilized13 Active Violations 4 likely answered 3 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The 100 West 93 Condominium · 40,284 sf lot · 7.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsDecommission Sprint telecom site, remove equipment1 filing
RoofBe@schermerhorn Condominium10p · 4 filings · 15 docs
BulkheadBe@schermerhorn Condominium1p · 1 filing · 3 docs
Floor 29Unit 29F1 filing · 9 docs
Floor 28
Floor 27
Floor 26Unit 26K2 filings · 13 docs
Floor 25Unit 25F1 filing · 9 docs
Floor 24Unit 24K2 filings · 13 docs
Floor 23Unit 23J2 filings · 13 docs
Floor 22
Floor 21Unit 21B4 filings · 20 docs
Floor 20
Floor 19
Floor 18Unit 18F2 filings · 17 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Unit 12B, Unit 12D4 filings · 17 docs
Floor 11Unit 11K2 filings · 12 docs
Floor 10Unit 10C2 filings · 12 docs
Floor 9Unit 9C, Unit 9F5 filings · 20 docs
Floor 8Unit 8D, Unit 8EUnder Construction2p · 3 filings · 20 docs
Floor 7
Floor 6
Floor 5Unit 5J2 filings · 16 docs
Floor 4Unit 4K2 filings · 12 docs
Floor 3Just Salad1 filing · 3 docs
Floor 2Just Salad1 filing · 3 docs
Floor 1Just SaladUnder Construction7p · 9 filings · 20 docs
Cellar950 Second Ave LLCUnder Construction3p · 3 filings · 20 docs
Sub-Cellar950 Second Ave LLCUnder Construction11p · 3 filings · 20 docs
Site & exteriorBe@schermerhorn Condominium4 filings · 11 docs
Filed — no permit issued950 Second Ave LLC2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
950 Second Ave3510/04/2026
Aulder Capital3507/08/2026
Leader House Associates3103/21/2026
100 West 93 Street Operating2803/21/2026
660 Columbus Retail Owner2703/21/2026
Clinton Street2703/21/2026
100 West 93 Condominium2303/21/2026
1935 Bedford Apts2204/21/2026
LH Commercial Holdings1903/21/2026
LH Commercial Owner1603/21/2026
BE@SCHERMERHORN Condominium1303/22/2026
100 West Associates1103/21/2026
Grenadier Realty903/21/2026
New Amsterdam Associates803/21/2026
New York City Housing Authority303/22/2026
Klein Group203/21/2026
Manhattan Parkway Coops203/21/2026
Axton Owner203/21/2026
Manhasset103/22/2026
100 West 93rd Owner103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mbe Code Zoning803/21/2026
J.A.M. Associates5203/21/2026
Right Way Services NYC603/21/2026
Stone603/21/2026
Kma Designs203/21/2026
PS Engineers403/21/2026
Louis Striar203/21/2026
Kit Middleton Architect P403/21/2026
Clarke Construction Consultants203/21/2026
Construction Permit Services103/21/2026
AE Design Solution203/21/2026
Miriam Ortiz - Filing Rep203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arteco and Design Restorationspecialty_contractor1107/08/2026
Tribute Restorationspecialty_contractor807/08/2026
Orbit Plumbing & HeatingPlumbing807/08/2026
Spring ScaffoldingScaffold507/08/2026
Kings Group NYScaffold507/08/2026
Ridge ConstructionGeneral Contractor507/08/2026
AncorGeneral Contractor409/25/2026
Rita de Cassia SouzaGeneral Contractor303/21/2026
Reliable EnterprisesScaffold303/21/2026
Squan Construction ServicesGeneral Contractor203/21/2026
Capitol Fire Sprinkler CoFire Protection207/14/2026
Tribute RestorationScaffold203/21/2026
Nice PlumbingPlumbing109/01/2026
Procore MechanicalPlumbing107/02/2026
Rite-Flo P.H. & CoolingPlumbing107/08/2026
Akay ElectricElectrical103/22/2026
RRP PlumbingPlumbing107/08/2026
BNH ElectricalElectrical103/22/2026
High Quality Electric ofElectrical103/22/2026
Kopp ElectricElectrical103/22/2026
Martinez Electrical ContElectrical103/22/2026
R.j.electrical ContractorElectrical103/22/2026
Art Deco EnterprisesGeneral Contractor108/25/2026
Rodon Home ImprovementGeneral Contractor107/08/2026
Z-Car-DSign hanger107/08/2026
Alma Plumbing SprinklerPlumbing107/08/2026
Aranda Plumbing & HeatingPlumbing107/08/2026
Express PL SWR & WTR APlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Spivak Architects69572005/27/2026
Codegreen510505/26/2026
Ryan Special Engineering2018102/13/2026
Metric Consulting and Ins1803206/17/2025
KMB Design Group513111/03/2023
Special Testing & Consulting1688412/26/2022
AR Consulting Engineer P4054110/05/2021
Stone Engineering & Architects1362108/10/2021
Frederick Taylor Associates1076112/17/2020
Building Lifecycle
All (294)Filed (61)Permit Issued (54)Signed Off (30)Facade (FISP) (18)Violation (60)Inspection (35)Objection (6)Special Inspection (30)
10/06/2026
Filed — No Work
M01464251-I1
09/24/2026
Permit issued — Mechanical Systems
M01375870-S1-MS
09/24/2026
Permit issued — General Construction
M01375870-I1-GC
09/23/2026
Special inspection requirement — Public Assembly Emergency Lighting
08/31/2026
Permit issued — Plumbing
M01313355-S1-PL
08/24/2026
Permit issued — General Construction
M01313355-I1-GC
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/13/2026
Permit issued — Sprinklers
M01375870-S3-EW-SP
07/08/2026
Signed off — Alteration
M01263719-I1
07/07/2026
Signed off — Alteration
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
M01192776-I1
07/07/2026
Signed off — Alteration
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
M01330718-I1
07/07/2026
Signed off — Alteration
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01288398-I1
07/07/2026
Signed off — Alteration
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
M01263723-I1
06/30/2026
Permit issued — Plumbing
M01375870-S2-PL
06/25/2026
Permit issued — Mechanical Systems
M01375870-S1-MS
06/25/2026
Permit issued — General Construction
M01375870-I1-GC
05/27/2026
Filed — Alteration
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
M01263723-P2
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Spivak
05/26/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-S3
05/26/2026
Signed off — Alteration
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01229357-I1
05/26/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-P2
05/26/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-S2
05/26/2026
Special inspection requirement — Final
James Sullivan Jr
05/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
James Sullivan Jr
05/21/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-P1
05/21/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-S4
05/18/2026
Special inspection requirement — Concrete - Cast-In-Place
James Sullivan Jr
05/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
James Sullivan Jr
05/18/2026
Special inspection requirement — Structural Steel - Welding
James Sullivan Jr
05/18/2026
Special inspection requirement — Structural Steel - Details
James Sullivan Jr
05/18/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
05/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
James Sullivan Jr
05/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2026
Signed off — Alteration
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330715-I1
05/04/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (PUREGYM)
M01381774-I1
05/04/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (PUREGYM)
M01381765-I1
05/04/2026
Special inspection requirement — Interior lighting power
05/04/2026
Special inspection requirement — Shutoff dampers
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/04/2026
Special inspection requirement — Maintenance information
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Final
05/04/2026
Special inspection requirement — Final
05/04/2026
Special inspection requirement — Lighting controls
05/04/2026
Special inspection requirement — Mechanical Systems
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/16/2026
Filed — Alteration
MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
M01330718-P1
04/06/2026
Violation issued (HPD, closed)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, closed)
B
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, closed)
B
04/01/2026
Special inspection requirement — Final
LEON SKVIRSKY
03/27/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-S1
03/27/2026
Filed — Alteration
Structural modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy
M01375870-I1
03/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
James Sullivan Jr
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Special inspection requirement — Final
James Sullivan Jr
03/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 294 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAncor09/24/2026
DOB NOWGeneral ConstructionPermit IssuedAncor09/24/2026
DOB NOWPlumbingPermit IssuedNice Plumbing08/31/2026
DOB NOWGeneral ConstructionPermit IssuedArt Deco Enterprises08/24/2026
DOB NOWSprinklersPermit IssuedCapitol Fire Sprinkler Co07/13/2026
DOB NOWPlumbingPermit IssuedProcore Mechanical06/30/2026
DOB NOWMechanical SystemsPermit IssuedAncor06/25/2026
DOB NOWGeneral ConstructionPermit IssuedAncor06/25/2026
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration02/04/2026
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/02/2026
DOB NOWStructuralPermit IssuedTribute Restoration12/03/2025
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration10/16/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/02/2025
DOB NOWPlumbingSigned-offDJ Plumbing & Heating09/17/2025
DOB NOWPlumbingSigned-offExpress Plumbing SWR & WTR Ma09/03/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating08/19/2025
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration08/15/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating07/17/2025
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration07/11/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating01/15/2025
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration01/13/2025
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration11/20/2024
DOB NOWSidewalk ShedSigned-offKings Group NY11/14/2024
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration07/05/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating04/10/2024
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration03/22/2024
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co01/19/2024
DOB NOWAntennaSigned-offSquan Construction Services11/17/2023
DOB NOWGeneral ConstructionSigned-offRidge Construction03/22/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating03/21/2023
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration03/15/2023
DOB NOWSignSigned-offZ-Car-D02/27/2023
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration02/01/2023
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co01/26/2023
DOB NOWPlumbingSigned-offRRP Plumbing01/13/2023
DOB NOWMechanical SystemsSigned-offRidge Construction01/05/2023
DOB NOWGeneral ConstructionSigned-offRidge Construction01/05/2023
DOB NOWGeneral ConstructionSigned-offArteco and Design Restoration11/28/2022
DOB NOWSidewalk ShedSigned-offKings Group NY10/26/2022
DOB NOWGeneral ConstructionSigned-offTribute Restoration09/26/2022
+ 60 more permits on file
1 project · most recent 05/26/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Permit IssuedAncorVentilation Systems
Ventilation
N/A NA 1 BTU ×2
1 project · most recent 05/26/2026
Sprinkler System
FiledStatusContractorScope
05/26/2026Permit IssuedCapitol Fire Sprinkler CoSprinkler System
5 projects · most recent 05/27/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/27/2026Signed-offOrbit Plumbing & HeatingGas, Water/Sanitary
05/26/2026Permit IssuedRGL Pro ContractingWater/Sanitary
04/16/2026Signed-offOrbit Plumbing & HeatingGas, Water/Sanitary
02/13/2026Permit IssuedNice PlumbingGas, Water/Sanitary
10/08/2025Signed-offOrbit Plumbing & HeatingGas, Water/Sanitary
25 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026Permit IssuedKings Electric CoGeneral Wiring
07/14/2026Permit IssuedJohn Michael and Sons ElectricGeneral Wiring
05/27/2026CompleteKopp ElectricGeneral Wiring
05/27/2026CompleteKopp ElectricGeneral Wiring
07/31/2025CompleteKopp ElectricGeneral Wiring
07/15/2025Permit IssuedKopp ElectricGeneral Wiring
12/05/2024CompleteLens ElectricGeneral Wiring
11/14/2024CompleteHigh Quality Electric of—
09/13/2024CompleteBelmont ElectricalGeneral Wiring
08/06/2024CompleteTerranova Electric—
06/17/2024CompleteAccurate Electrical ContractorsGeneral Wiring
06/15/2023CompleteBelmont ElectricalGeneral Wiring
04/24/2023Permit IssuedIsland Electric—
01/26/2023CompleteL&B Electrical InternationalGeneral Wiring
09/07/2022CompleteBorowide Elect'l ContractorsGeneral Wiring
2 projects · most recent 05/26/2026
Concrete Steel
FiledStatusContractorScope
05/26/2026Permit IssuedAncorSteel, Concrete
06/17/2025Permit IssuedTribute RestorationConcrete
3 projects · most recent 04/16/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/16/2026Signed-offOrbit Plumbing & HeatingTenant Protection Plan 72 Hour
01/22/2026Signed-offArteco and Design RestorationTenant Protection Plan 72 Hour
09/29/2025Signed-offArteco and Design RestorationTenant Protection Plan 72 Hour
1 project · most recent 06/24/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/24/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
09/23/2026Public Assembly Emergency Lighting—progress
05/27/2026Fire-Resistant Penetrations and JointsHoward Spivakspecial
05/26/2026Tenant Protection Plan ComplianceJames Sullivan Jrspecial
05/26/2026FinalJames Sullivan Jrprogress
05/18/2026Tenant Protection Plan Compliance—special
05/18/2026Structural Steel - WeldingJames Sullivan Jrspecial
05/18/2026Structural Steel - High Strength BoltingJames Sullivan Jrspecial
05/18/2026Post-installed AnchorsJames Sullivan Jrspecial
05/18/2026Concrete - Cast-In-PlaceJames Sullivan Jrspecial
05/18/2026Structural Steel - DetailsJames Sullivan Jrspecial
05/18/2026Tenant Protection Plan ComplianceJames Sullivan Jrspecial
05/04/2026Lighting controls—energy_progress
05/04/2026Final—progress
05/04/2026Maintenance information—energy_progress
05/04/2026HVAC-R and service water heating system controls—energy_progress
05/04/2026Shutoff dampers—energy_progress
05/04/2026Mechanical Systems—special
05/04/2026Tenant Protection Plan Compliance—special
05/04/2026Energy Code Compliance Inspections—progress
05/04/2026Final—progress
05/04/2026HVAC-R and service water piping design and insulation—energy_progress
05/04/2026Interior lighting power—energy_progress
04/01/2026FinalLEON SKVIRSKYprogress
03/27/2026Tenant Protection Plan ComplianceJames Sullivan Jrspecial
03/25/2026FinalJames Sullivan Jrprogress
Latest 25 of 86.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Just SaladRestaurant / Food ServiceFloors 1–3
Project M00821133 Alteration · LOC Issued · 02/23/2023
Project M08046307 Alteration · LOC Issued · 12/26/2022
Project M08046316 Alteration · LOC Issued · 12/23/2022
Project M08046320 Alteration · LOC Issued · 12/23/2022
Project M08046325 Alteration · LOC Issued · 12/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,694 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch56
09/06/2026M01192771-I1Request digital key ↗
09/03/2026M00536320-I1Request digital key ↗
09/03/2026M00585119-I1Request digital key ↗
Showing 3 of 56 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026M00383626-P1Request digital key ↗
08/25/2026M00383626-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00316404-I1Request digital key ↗
09/05/2026M00317641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00417069-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
10/07/2026M01464251-I1Request digital key ↗
▸Applications & Permits355
▸BISPLAN / WORK APPROVAL APPLICATION206
02/19/2026120085433Open ↗
11/03/2025123195274Open ↗
10/02/2025123195274Open ↗
Showing 3 of 206 on file for this type
▸BISWORK PERMIT APPLICATION149
02/02/2021140995662Open ↗
12/03/2020140985343Open ↗
10/01/2020123529645Open ↗
Showing 3 of 149 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications412
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION174
12/26/2018123083457Open ↗
12/26/2018123083457Open ↗
12/26/2018123083457Open ↗
Showing 3 of 174 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
10/07/2026M01464251-I1Open ↗
09/05/2026M00317641-I1Open ↗
09/03/2026M00536320-I1Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST48
08/01/2018123529645Open ↗
Showing 1 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
10/08/2026M01009637-I1Open ↗
09/22/2026M01059019-I1Open ↗
09/22/2026M01059019-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT36
11/27/2020140968479Open ↗
05/01/2020140898517Open ↗
08/01/2018123529645Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
10/08/2026M01009637-I1Open ↗
10/03/2026M01192776-P1Open ↗
09/22/2026M01059019-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/27/2020140968479Open ↗
05/01/2020140898517Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/27/2020140968479Open ↗
05/01/2020140898517Open ↗
Showing 2 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/13/2021140995662Open ↗
12/03/2020140985343Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment115
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE45
01/22/2020123529645Open ↗
03/04/2019123360816Open ↗
02/25/2019123083457Open ↗
Showing 3 of 45 on file for this type
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING25
08/14/2020123529645Open ↗
Showing 1 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
10/26/2018122561325Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/08/2019123083457Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection27
▸BISTenant Protection Plan and Notes11
08/01/2018123529645Open ↗
04/12/2022120085433Open ↗
11/27/2020140968479Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan5
08/13/2026M00316404-I1Open ↗
08/13/2026M00317641-I1Open ↗
08/13/2026M00383626-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISST-1 Street Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
02/02/2021140995662Open ↗
12/03/2020140985343Open ↗
▸Environmental & Asbestos106
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
09/06/2026M01192771-I1Open ↗
09/03/2026M00536320-I1Open ↗
09/02/2026M00721423-I1Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)34
01/13/2021140995662Open ↗
12/03/2020140985343Open ↗
05/01/2020140898517Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/31/2026M00812408-I1Open ↗
08/25/2026M01059019-I1Open ↗
08/22/2026M01263719-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
12/26/2018123083457Open ↗
12/26/2018123083457Open ↗
11/29/2018123360816Open ↗
Showing 3 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
12/31/2020140985343Open ↗
12/26/2018123083457Open ↗
11/29/2018123360816Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
12/04/2025123195274Open ↗
11/14/2024140995662Open ↗
01/13/2021140995662Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
11/27/2020140968479Open ↗
05/01/2020140898517Open ↗
Showing 2 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
11/24/2025123195274Open ↗
11/14/2024140995662Open ↗
12/04/2020123529645Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00721423-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY13
12/04/2025123195274Open ↗
11/14/2024140995662Open ↗
01/13/2021140995662Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs160
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST79
11/27/2024140995662Open ↗
02/10/2021123360816Open ↗
12/31/2020140985343Open ↗
Showing 3 of 79 on file for this type
▸BISADMINISTRATIVE OBJECTIONS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE20
02/19/2026120085433Open ↗
11/21/2021120085433Open ↗
11/16/2021120085433Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
11/03/2025123195274Open ↗
Showing 1 of 19 on file for this type
▸BISSUPERSEDING LETTER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership135
▸BISCOST AFFIDAVIT123
01/13/2021140995662Open ↗
12/31/2020140985343Open ↗
12/03/2020140985343Open ↗
Showing 3 of 123 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/01/2025123195274Open ↗
11/22/2024140995662Open ↗
12/04/2020123529645Open ↗
▸Filing & Intake Forms183
▸BISEFILING COVER SHEET67
08/01/2018123529645Open ↗
Showing 1 of 67 on file for this type
▸BISADDITIONAL INFORMATION62
12/01/2021120085433Open ↗
08/21/2020123529645Open ↗
01/22/2020123529645Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM41
01/21/2020120085433Open ↗
01/15/2020123529645Open ↗
01/14/2020120085433Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET13
01/13/2021140995662Open ↗
12/03/2020140985343Open ↗
11/27/2020140968479Open ↗
Showing 3 of 13 on file for this type
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
12/02/2025123195274Open ↗
03/13/2025120085433Open ↗
Showing 2 of 7 on file for this type
▸BISDHCR DOCUMENT2
11/27/2020140968479Open ↗
03/11/2019120085433Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDHCR Document1
08/13/2026M00417069-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01069983-I1Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type