| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00767292 ↗ | 389 EAST 194 STREET BRONX | Alteration | Permit Issued | 07/02/2022 | 09/28/2026 | Contractor ARAMCO CONTRACTING LLC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00263367 ↗ | 96-21 68 AVENUE QUEENS | Alteration | Permit Issued | 01/06/2020 | 09/25/2026 | Contractor ALL PRO PLBG & HTG INC | FILING TO LEGALIZE SHOWER, TOILET, LAVATORY, WASHER & DRYER AT CELLAR. |
| M01310272 ↗ | 312 EAST 106 STREET MANHATTAN | Alteration | Permit Issued | 11/03/2025 | 09/25/2026 | Owner REVAMP NYC Contractor NESS MECHANICAL P & H INC Filer EZFILINGNYCORP | PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB #M01310272 |
| B01378804 ↗ | 637 ROCKAWAY PKWY BROOKLYN | Alteration CO | Permit Issued | 03/29/2026 | 09/24/2026 | Owner RUBI MANAGEMENT LLC Contractor REVAMP NYC CORP Filer EXPRESS FILING INC | Filing for construction fence in conjunction with DOB NOW Job Number B01378804-I1 |
| B01377903 ↗ | 1601 ST JOHNS PLACE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/26/2026 | 09/24/2026 | Contractor REVAMP NYC CORP Filer EXPRESS FILING INC | MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01377903-I1 |
| B01193391 ↗ | 143 9 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/19/2025 | 09/23/2026 | Owner 7 residence llc Contractor ADOR BUILDERS LLC | Structural work type hereby filed subsequent to the Alt. CO / NB application: B01193391-I1 |
| Person | Filings | Most recent |
|---|---|---|
| MOHAMMAD AHEAD | 2,779 | 09/23/2026 |
| ABDUL MANNAN | 2 | 04/05/2021 |
| John Nucatola | 1 | 10/29/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| VASILIOS ARTEMIOU PE | 38 | 09/10/2026 |
| ASIF JAMIL, RA | 37 | 12/13/2022 |
| AG ENGINEERING PLLC | 15 | 07/15/2026 |
| CHOSEN MEP, CORP. | 13 | 06/04/2026 |
| KCE CONSULTING ENGINEERING PLLC | 13 | 08/17/2026 |
| 360 ENGINEERING P.C. | 12 | 05/12/2026 |
| SH ENGINEERING PLLC | 9 | 09/02/2026 |
| ASHRAF CORP | 8 | 04/03/2025 |
| PRAMODRAY SHAH, P.E. | 8 | 08/17/2026 |
| R & O ENGINEERING | 7 | 08/10/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 7 | 08/05/2026 |
| SYED ENGINEERING, P.C. | 7 | 09/09/2021 |
| BORIS BALKHIYEV, PE | 6 | 08/20/2026 |
| RIMKUS NEW YORK PLLC | 6 | 02/03/2026 |
| ADVANCED ENGINEERING & INSPECT. PLL | 5 | 08/05/2026 |
| BGM ENGINEERING | 5 | 07/16/2026 |
| ELEVATED ENGINEERING NYC | 5 | 08/11/2026 |
| LIGHT HOUSE | 3 | 02/27/2025 |
| SOLHJOU ENGINEERING | 3 | 08/19/2026 |
| A&D ENGINEERING, PLLC | 2 | 02/03/2025 |
| ALBERTO ROMAN | 2 | 05/07/2024 |
| AP PROFESSIONAL ENGINEERING PLLC | 2 | 09/14/2023 |
| ATLAS ATC ENGINEERING INC | 2 | 06/21/2026 |
| F.P.VILLANO CONSULTING ENGINEER LLC | 2 | 08/07/2023 |
| GERALD CALIENDO ARCHITECTS | 2 | 04/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| J & G CONSTRUCTION SVCS | 396 | 10/22/2024 |
| KINGS GROUP NY CORP | 329 | 02/03/2026 |
| DYNAMIX SCAFFOLD GROUP LL | 190 | 02/17/2026 |
| SIGNSTAR NYC | 160 | 09/09/2025 |
| ROCK GROUP NY CORP | 134 | 03/14/2023 |
| TOPLINE NYC CONTRACTING | 102 | 08/10/2022 |
| KAJ NY CONSTRUCTION INC | 68 | 07/15/2022 |
| L.S. SIGN CO., INC | 66 | 02/12/2026 |
| EDMUND S. JOSEPH | 59 | 09/02/2026 |
| ACTIVE SIGNS INC | 56 | 04/28/2023 |
| CITY SIGNS INC | 52 | 02/23/2026 |
| Z-CAR-D CORP | 46 | 03/13/2025 |
| GSA SIGNS INC | 41 | 01/21/2026 |
| ALL PRO PLBG & HTG INC | 34 | 07/30/2026 |
| GOING SIGN & SVCNG CO,INC | 33 | 01/11/2024 |
| JASCO, INC | 32 | 07/07/2022 |
| AMERICAN STANDARD P&H COR | 31 | 07/21/2026 |
| AMS CONTRACTOR INC | 28 | 06/22/2022 |
| YAFE MEOD CORP | 26 | 07/29/2026 |
| DHS FRACO LLC | 25 | 11/15/2022 |
| GSR CONTRACTOR INC | 23 | 07/26/2022 |
| FM95 NY LLC | 19 | 11/05/2024 |
| R.G.M. SIGNS INC | 18 | 08/06/2024 |
| CAPITOL DESIGN & MAINT IN | 17 | 03/05/2025 |
| KISHAN PLUMBING INC | 17 | 09/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| J & G CONSTRUCTION SRVCS | 255 | 10/22/2024 |
| KINGS GROUP NY CORP | 213 | 02/03/2026 |
| ROCK GROUP NY CORP | 79 | 12/13/2022 |
| TOPLINE NYC CONTRACTING | 65 | 08/10/2022 |
| KAJ NY CONSTRUCTION INC | 36 | 07/15/2022 |
| NETDT LLC | 26 | 09/13/2026 |
| PLATINUM SERVICES NY LLC | 21 | 03/14/2023 |
| AMS CONTRACTOR INC | 17 | 06/22/2022 |
| JASCO, INC | 17 | 07/07/2022 |
| SIGNEXPO | 12 | 10/27/2023 |
| BUILDING DESIGN &CONSULTANCY INC | 10 | 08/10/2026 |
| BLUE HILLS FUELS LLC | 9 | 06/16/2022 |
| INDER CONSTRUCTION INC | 9 | 07/25/2022 |
| AARCO CONTRACTING LLC | 8 | 11/14/2025 |
| EXTRA SPACE MGMT, INC | 8 | 01/18/2024 |
| ZKW ENTERPRISES INC. | 8 | 06/09/2022 |
| J&S WATERPROOFING LLC, SUITE 2 | 7 | 09/14/2023 |
| PHOENIX SUTTON STR INC | 7 | 12/13/2021 |
| RENAISSANCE EQUITY HOLDINGS LLC | 7 | 05/01/2026 |
| REVAMP NYC | 7 | 08/13/2026 |
| TOTAL NY CONSTRUCTION | 7 | 11/02/2022 |
| U S STAR CONSTRUCTION NY CORP | 7 | 04/22/2025 |
| VERIZON WIRELESS | 7 | 08/08/2022 |
| BREEZY POINT COOPERATIVE, INC. | 6 | 10/29/2024 |
| EZFILINGNYCORP | 6 | 07/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LOUIS STRIAR INC. | 442 | 06/09/2026 |
| ARSENAL BUILDING CONSULTANTS LLC | 295 | 03/13/2025 |
| EZFILINGNYCORP | 239 | 09/03/2026 |
| ADVANCED BUILDERS SERVICES | 195 | 08/27/2026 |
| THE GREEN STUDIO | 61 | 06/22/2022 |
| XPDITE GROUP LLC (104) | 31 | 08/26/2026 |
| ACE CONSULTANTS | 27 | 08/10/2026 |
| EXPERT BUILDING VIOLATION REMOVAL | 25 | 07/30/2026 |
| EXPRESS FILING INC | 19 | 08/19/2026 |
| M.W. EXPEDITING INC | 19 | 03/02/2026 |
| ARCHVISION DESIGN STUDIO | 17 | 08/20/2026 |
| KD DESIGNS | 16 | 11/14/2025 |
| DESIGN COMMUNICATION MK | 11 | 05/19/2026 |
| EXPEDITING 4 U | 11 | 09/03/2026 |
| NYC DESIGN FILE | 11 | 09/10/2026 |
| SOLARIZE PLUS | 11 | 07/17/2026 |
| KMA DESIGNS LLC | 10 | 02/03/2026 |
| ZV Drafting | 10 | 08/14/2026 |
| PLATINUM SERVICES NY LLC | 9 | 03/14/2023 |
| LIGHT HOUSE | 8 | 07/30/2026 |
| BAC Developers Group | 7 | 09/11/2026 |
| NORTHEAST EXPEDITING LLC | 7 | 01/01/2025 |
| SERVICE CORP | 6 | 02/16/2023 |
| BMG GROUP USA | 4 | 07/01/2026 |
| ABC PERMIT EXPEDITING INC | 3 | 12/20/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00767292 ↗ | 389 EAST 194 STREET BRONX | Alteration | Permit Issued | 07/02/2022 | 09/28/2026 | Contractor ARAMCO CONTRACTING LLC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00263367 ↗ | 96-21 68 AVENUE QUEENS | Alteration | Permit Issued | 01/06/2020 | 09/25/2026 | Contractor ALL PRO PLBG & HTG INC | FILING TO LEGALIZE SHOWER, TOILET, LAVATORY, WASHER & DRYER AT CELLAR. |
| M01310272 ↗ | 312 EAST 106 STREET MANHATTAN | Alteration | Permit Issued | 11/03/2025 | 09/25/2026 | Owner REVAMP NYC Contractor NESS MECHANICAL P & H INC Filer EZFILINGNYCORP | PL APPLICATION HEREBY FILED IN CONJUCTION TO JOB #M01310272 |
| B01378804 ↗ | 637 ROCKAWAY PKWY BROOKLYN | Alteration CO | Permit Issued | 03/29/2026 | 09/24/2026 | Owner RUBI MANAGEMENT LLC Contractor REVAMP NYC CORP Filer EXPRESS FILING INC | Filing for construction fence in conjunction with DOB NOW Job Number B01378804-I1 |
| B01377903 ↗ | 1601 ST JOHNS PLACE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/26/2026 | 09/24/2026 | Contractor REVAMP NYC CORP Filer EXPRESS FILING INC | MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01377903-I1 |
| B01193391 ↗ | 143 9 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/19/2025 | 09/23/2026 | Owner 7 residence llc Contractor ADOR BUILDERS LLC | Structural work type hereby filed subsequent to the Alt. CO / NB application: B01193391-I1 |
| M00874373 ↗ | 532 WEST 122 STREET MANHATTAN | Alteration | Permit Issued | 06/12/2023 | 09/23/2026 | Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. |
| B01089886 ↗ | 542 LAFAYETTE AVENUE BROOKLYN | Alteration | Permit Issued | 10/02/2024 | 09/23/2026 | Contractor YELLOW HAT CONSTRUCTION I Filer EZFILINGNYCORP | SOE subsequent filing in conjunction with GC - B01089886-I1 |
| Q01332878 ↗ | 107-11 126 STREET QUEENS | Alteration | Permit Issued | 12/21/2025 | 09/22/2026 | Contractor ALL PRO PLBG & HTG INC | FILING TO AMEND GC PLAN TO REFLECT ATTIC AND CELLAR LAYOUT AS PER PLAN. REMOVE PARTITION WALLS AT CELLAR. REMOVE AND REINSTALL SHEET ROCK PA… |
| B01447768 ↗ | 504 EAST 2 STREET BROOKLYN | Alteration | Permit Issued | 08/20/2026 | 09/22/2026 | Contractor EDMUND S. JOSEPH Filer EZFILINGNYCORP | HEREWITH FILING FOR A 6'-6 X 9'-0 STEEL OPEN BALCONY TO BE ERECTED AT THE SECOND FLOOR OF THE EXISTING BUILDING. NO CHANGE IN USE, OCCUPANCY… |
| B01110508 ↗ | 65 COOPER STREET BROOKLYN | Alteration | Permit Issued | 09/26/2024 | 09/22/2026 | Contractor ABOVE BUILDER GROUP LLC Filer XPDITE GROUP LLC (104) | RESTORATION OF FIRE DAMAGE AND INTERIOR RENOVATION FOR A THREE (3) STORY SIX (6) FAMILY RESIDENTIAL BUILDING |
| M01255283 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 09/04/2025 | 09/22/2026 | Owner MAXWELL KATES Contractor STREAMLINE USA LLC | SUBSEQUENT FILING HERWEITH PLANS FOR INSTALLATION OF TEMPORARY SCAFFOLDING IN ELEVATOR SHAFT FOR REMOVAL OF EXISTING DECOMMISSIONED ELEVATOR… |
| B01009058 ↗ | 619 GLENMORE AVENUE BROOKLYN | Alteration | Permit Issued | 02/23/2024 | 09/21/2026 | Contractor KINGS GROUP NY CORP | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. |
| S01420544 ↗ | 331 MOUNTAINVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 07/03/2026 | 09/21/2026 | Contractor SOLAR STRING INC Filer SOLARIZE PLUS | INSTALLATION OF SOLAR PANELS |
| M01245622 ↗ | 90 JOHN STREET MANHATTAN | Alteration | Permit Issued | 10/06/2025 | 09/17/2026 | Contractor BLUE JAY CONTRACTING INC | INSTALLATION OF 300 PSF SIDEWALK SHED AND SCAFFOLD AS PER PLANS. SIDEWALK SHED AND SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. … |
| B01424406 ↗ | 118 CONKLIN AVENUE BROOKLYN | Alteration | Permit Issued | 07/14/2026 | 09/17/2026 | Contractor CAPITOL CONTRACTING LLC | 1. REPLACE SHEET ROCK CEILING IN THE 1ST FLOOR.2. REPLACE SHEET ROCK IN THE ALL WALLS AND CEILING IN THE 2ND FLOOR.3. REPLACE FLOOR TILES IN… |
| B01272085 ↗ | 173 LEXINGTON AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/20/2025 | 09/17/2026 | Owner ADOR BUILDERS LLC Contractor ADOR BUILDERS LLC Filer EXPRESS FILING INC | Support of Excavation (SOE) for cellar excavation including rear wall sheeting and side wall per plans. |
| B01030108 ↗ | 457 WILLOUGHBY AVENUE BROOKLYN | Alteration | Permit Issued | 04/03/2024 | 09/17/2026 | Contractor EDMUND S. JOSEPH | FACADE REPAIR AT BUILDING EXPOSURE 1. FILING FOR REPAIR OF BROWNSTONE, FRONT STAIR REPAIRS, SCRAPE AND REPAINT CORNICE, SCRAPE AND PAINT EXI… |
| M01280450 ↗ | 303 PARK AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 09/26/2025 | 09/16/2026 | Owner ABC REALTY Contractor VILLAGE P & H NY INC Filer CARLOS ROBERTO GASTELUM | Interior sprinkler work for restaurant with commercial kitchen on Floor-1 and cellar |
| X00572547 ↗ | 2123 TIEBOUT AVENUE BRONX | Alteration | Permit Issued | 08/13/2021 | 09/16/2026 | Owner J & G CONSTRUCTION SRVCS Contractor J & G CONSTRUCTION SVCS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| M00946299 ↗ | 110 EAST 107 STREET MANHATTAN | Alteration | Permit Issued | 12/06/2023 | 09/16/2026 | Owner WMC ASSOCIATES LLC Contractor RODCON GROUP LLC | Parapet replacement as per plans filed herewith. No change to use, egress or occupancy |
| Q00899075 ↗ | 350 BEACH CHANNEL DRIVE QUEENS | Alteration | Permit Issued | 07/11/2023 | 09/15/2026 | Contractor J & G CONSTRUCTION SVCS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYC |
| B01441368 ↗ | 537 EAST 3 STREET BROOKLYN | Alteration | Permit Issued | 08/24/2026 | 09/15/2026 | Contractor ZONE PLUMBING & HEATING C Filer EZFILINGNYCORP | FILING WITH REMOVAL AND DIRECT REPLACEMENT OF PL FIXTURES AT FL 001-002. FILING PL APPLICATION TO ADDRESS PL VIOLATION: 39195057R FILING FOR… |
| B01358100 ↗ | 152 HEYWARD STREET BROOKLYN | Alteration | Permit Issued | 03/09/2026 | 09/15/2026 | Contractor L&J PLG & HTG CO OF NY IN Filer EZFILINGNYCORP | HEREWITH FILING A PLUMBING APPLICATION FOR THE REMOVAL AND DIRECT REPLACEMENT OF PLUMBING FIXTURES AT FLOORS CEL - 002. THERE IS NO GAS WORK… |
| B01428489 ↗ | 282 4 AVENUE BROOKLYN | Alteration | Signed-off | 07/13/2026 | 09/14/2026 | Owner BRUKLYN BUILDERS INC Contractor BRUKLYN BUILDERS INC Filer EXPEDITING 4 U | APPLICATION FILED HEREWITH FOR REMOVAL OF EXISTING NON-STRUCTURAL EXTERIOR WALL AS PER PLANS. |
| Q01459260 ↗ | 90-11 179 STREET QUEENS | Alteration | Filed — no permit on record | 09/13/2026 | — | Owner NETDT LLC | — |
| B01455822 ↗ | 184 NOSTRAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/11/2026 | — | Filer BAC Developers Group | — |
| M00827521 ↗ | 400 EAST 35TH STREET MANHATTAN | Alteration | Permit Issued | 02/17/2023 | 09/11/2026 | Contractor DYNAMIX SCAFFOLD GROUP LL | installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy |
| X00854925 ↗ | 1551 SHAKESPEARE AVENUE BRONX | Alteration | Permit Issued | 04/11/2023 | 09/10/2026 | Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| B01339950 ↗ | 345 ELDERT STREET BROOKLYN | Alteration CO | Permit Issued | 03/17/2026 | 09/09/2026 | Contractor EDMUND S. JOSEPH Filer EZFILINGNYCORP | PLUMBING WORK ONLY IN CONJUNCTION WITH APPLICATION #B01339950-I1 |
| B01147340 ↗ | 64 FRANKLIN AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/04/2024 | 09/09/2026 | Contractor PRIME PIPING & HEATING IN | Sprinkler work type hereby filed subsequent to the Alt. CO / NB application: B01147340-I1 |
| B01233197 ↗ | 2030 EAST 14 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 06/16/2025 | 09/09/2026 | Contractor ACER CONSTRUCTION INC | Support of excavation for related work to GC + Foundation work associated with job #B011233197I1. |
| B01372558 ↗ | 532 LAFAYETTE AVENUE BROOKLYN | Alteration | Permit Issued | 03/24/2026 | 09/09/2026 | Owner YNR Construction LLC Contractor YNR CONSTRUCTION LLC Filer REDCUT EXPEDITING | Partial demolition and reconstruction of the rear portion of the building, replacing in-kind within the existing footprint. No change in use… |
| M01015444 ↗ | 201 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 03/06/2024 | 09/09/2026 | Contractor KINGS GROUP NY CORP | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. |
| B01061790 ↗ | 466 LAFAYETTE AVENUE BROOKLYN | New Building | Permit Issued | 06/17/2024 | 09/09/2026 | Contractor EMERALD BUILDERS GROUPLLC | Structural work type hereby filed subsequent to the NB GC application: B01061790-I1 |
| B01192394 ↗ | 27 LEE AVENUE BROOKLYN | Alteration | Permit Issued | 03/12/2025 | 09/09/2026 | Contractor EDMUND S. JOSEPH | ALTERATION FILED FOR FRONT FACADE ANEXISTING 2 STORY BUILDING. NO BULK CHANGE,NO CHANGE IN USE EGRESS OR ANYOCCUPANCY. |
| M07996866 ↗ | 442 WEST 31 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2022 | 09/08/2026 | Owner KINGS GROUP NY CORP Contractor KINGS GROUP NY CORP | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. |
| M00827291 ↗ | 247 WEST 38 STREET MANHATTAN | Alteration | Permit Issued | 02/10/2023 | 09/08/2026 | Contractor DYNAMIX SCAFFOLD GROUP LL | Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy |
| B01304473 ↗ | 5516 16 AVENUE BROOKLYN | Alteration | Permit Issued | 10/20/2025 | 09/04/2026 | Contractor EDMUND S. JOSEPH Filer EZFILINGNYCORP | HEREWITH FILING FOR AN INTERIOR RENOVATION ON FLOORS CEL-002 FILING TO EXCAVATE EXISTING CELLAR AT2'-0. FILING TO REMOVE AND REPLACE EXISTIN… |
| B00672579 ↗ | 876 LINCOLN PLACE BROOKLYN | Alteration | Permit Issued | 02/02/2022 | 08/31/2026 | Owner J & G CONSTRUCTION SRVCS Contractor J & G CONSTRUCTION SVCS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| B01286361 ↗ | 232 SPENCER STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 10/06/2025 | 08/31/2026 | Contractor CASA AZOUTR INC Filer XPDITE GROUP LLC (104) | STRUCTURAL APPLICATION FILED IN CONJUNCTION TO APPLICATION #B01286361-I1 |
| M01152241 ↗ | 110 EAST 1 STREET MANHATTAN | Alteration | Permit Issued | 04/22/2025 | 08/31/2026 | Contractor U S STAR CONSTRUCTION NY | 1. REPAIR/REPLACE WINDOW LINTEL=1 PCS 2. BRICK REPLACEMENT=18SF 3. BRICK RE-POINTING=3000 SF. ADDRESS ECB#39128493N |
| B01369520 ↗ | 12 LEE AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/23/2026 | 08/31/2026 | Contractor HARTZION ENTERPRISES CORP Filer XPDITE GROUP LLC (104) | Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes… |
| Q01354851 ↗ | 87-72 124 STREET QUEENS | Alteration | Permit Issued | 02/07/2026 | 08/28/2026 | Contractor ALL PRO PLBG & HTG INC | 1. REMOVE PARTITION WALL IN CELLAR AS PER PLAN 2. LEGALIZE 3 PCS BATHROOM ENCLOSURE IN CELLAR.NO LIVING, DWELLING, SLEEPING OR COOKING IS … |
| B01191738 ↗ | 572 MYRTLE AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/12/2025 | 08/27/2026 | Contractor EMPIRE MANAGEMENT & CON* Filer XPDITE GROUP LLC (104) | SUBSEQUENT FILING FOR UNDERPINNING WORK IN CONJUNCTION TO NB FILING # B01191738-I1 |
| B00626865 ↗ | 51 CLARK STREET BROOKLYN | Alteration | Permit Issued | 11/15/2021 | 08/26/2026 | Contractor J & G CONSTRUCTION SVCS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| B01450537 ↗ | 325 NOSTRAND AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 08/26/2026 | — | Filer XPDITE GROUP LLC (104) | — |
| B01451116 ↗ | 1760 EAST 28 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/25/2026 | — | Filer EZFILINGNYCORP | — |
| B01434353 ↗ | 137 TAAFFE PLACE BROOKLYN | Alteration | Permit Issued | 07/22/2026 | 08/25/2026 | Contractor EDMUND S. JOSEPH Filer EZFILINGNYCORP | ALTERATION TYPE 2 HEREWITH FILING FOR A RENOVATION OF THE FRONT FACADE; REPATCH MASONRY. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| B01364162 ↗ | 1513 39 STREET BROOKLYN | Alteration | Permit Issued | 03/05/2026 | 08/25/2026 | Contractor KISHAN PLUMBING INC Filer EZFILINGNYCORP | HEREWITH FILING FOR AN INTERIOR RENOVATION FOR FLOORS CEL-002. FILING TO REMOVE AND REPLACE INTERIOR NON STRUCTURAL PARTITIONS. FILING TO RE… |
| B01403357 ↗ | 121 LEGION STREET BROOKLYN | Alteration | Permit Issued | 05/30/2026 | 08/25/2026 | Contractor SM ZAHID CONTRACTING CORP Filer ARCHVISION DESIGN STUDIO | SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK TYPE AS PER PLAN. |
| X00606687 ↗ | 1380 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 10/11/2021 | 08/24/2026 | Contractor J & G CONSTRUCTION SVCS | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVEL LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 … |
| B01448342 ↗ | 488 WILLOUGHBY AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/24/2026 | — | Owner ROYALE MANAGEMENT LLC Filer EZFILINGNYCORP | — |
| B01445667 ↗ | 4006 14 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/20/2026 | — | Filer AVALON DESIGNS INC | — |
| Q01448024 ↗ | 83-42 159 STREET QUEENS | Alteration | Filed — no permit on record | 08/20/2026 | — | Filer ARCHVISION DESIGN STUDIO | — |
| B01438694 ↗ | 1105 WINTHROP STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 08/20/2026 | — | Owner BEZZ ENTERPRISES INC Filer BAC Developers Group | — |
| B01447859 ↗ | 1337 STERLING PLACE BROOKLYN | Alteration | Filed — no permit on record | 08/19/2026 | — | Owner 1337 Sterling Place LLC Filer XPDITE GROUP LLC (104) | — |
| X01447557 ↗ | BIN 2805961 | New Building | Filed — no permit on record | 08/19/2026 | — | Owner MADISON TOWER LLC Filer EXPRESS FILING INC | — |
| M01010061 ↗ | 577 WEST 42 STREET MANHATTAN | Alteration | Permit Issued | 02/26/2024 | 08/18/2026 | Contractor DYNAMIX SCAFFOLD GROUP LL | INSTALLATION OF PIPE SCAFFOLD IN COMPLAINCE WITH CHAPTER 33 OF NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01444708 ↗ | 184 NOSTRAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/17/2026 | — | Filer BAC Developers Group | — |
| X01208562 ↗ | 2724 HERING AVENUE BRONX | New Building | Permit Issued | 04/10/2025 | 08/17/2026 | Contractor ELITE GC NY INC | HERE WITH FILING OF NEW PLYWOOD CONSTRUCTION FENCE TO SAFEGUARD PROPERTY FILED SUBSEQUENT TO ALT-1 FILING X01208562-I1. |
| B01446885 ↗ | 1337 STERLING PLACE BROOKLYN | Alteration | Filed — no permit on record | 08/17/2026 | — | Owner 1337 Sterling Place LLC Filer XPDITE GROUP LLC (104) | — |
| B01405733 ↗ | 585 MYRTLE AVENUE BROOKLYN | Alteration | Permit Issued | 05/21/2026 | 08/17/2026 | Contractor YNR CONSTRUCTION LLC Filer REDCUT EXPEDITING | STRUCTURAL SPECIFICATION FILED IN CONJUNCTION WITH ALT B01405733-I1 |
| X01208375 ↗ | 2722 HERING AVENUE BRONX | New Building | Permit Issued | 04/10/2025 | 08/17/2026 | Contractor ELITE GC NY INC | HERE WITH FILING OF NEW PLYWOOD CONSTRUCTION FENCE TO SAFEGUARD PROPERTY FILED SUBSEQUENT TO ALT-1 FILING X01208375-I1. |
| B01221552 ↗ | 1660 NOSTRAND AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/08/2025 | 08/14/2026 | Contractor AB CONTRACTING USA INC Filer NYC DESIGN FILE | Filing Foundation application superseding the foundation filed and permitted in BIS |
| B01293435 ↗ | 4921 14 AVENUE BROOKLYN | New Building | Permit Issued | 10/16/2025 | 08/14/2026 | Contractor BH GENERAL CONTRACTING IN Filer BAC Developers Group | STRUCTURE FILED IN CONJUNCTION WITH NB JOB NUMBER B01293435-I1. |
| B01368215 ↗ | 184 BUTLER STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/16/2026 | 08/13/2026 | Owner REVAMP NYC Contractor REVAMP NYC CORP Filer EXPRESS FILING INC | INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE |
| B01205418 ↗ | 233 VERNON AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 04/10/2025 | 08/13/2026 | Contractor CASA AZOUTR INC | Structural work type hereby filed subsequent to the Alt. CO / NB application: B01205418-I1 |
| B01371422 ↗ | 1240 43 STREET BROOKLYN | Alteration | Permit Issued | 03/16/2026 | 08/13/2026 | Contractor GS INTERIORS LLC Filer EZFILINGNYCORP | HEREWITH FILING FOR AN INTERIOR RENOVATION TO FLOOR 002. FILING TO REMOVE CEILING JOISTS AT TOP FLOOR AND USE EXISTING ROOF BEAMS TO CREATE … |
| B01394665 ↗ | 608 EAST 4 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/12/2026 | — | Filer EZFILINGNYCORP | — |
| B01205448 ↗ | 231 VERNON AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 04/10/2025 | 08/12/2026 | Contractor CASA AZOUTR INC | Structural work type hereby filed subsequent to the Alt. CO / NB application: B01205448-I1 |
| B01310586 ↗ | 287 NOSTRAND AVENUE BROOKLYN | New Building | Permit Issued | 11/10/2025 | 08/12/2026 | Contractor CASA AZOUTR INC | Structural worktype hereby filed subsequent to the NB application: B01310586-I1. |
| B01440254 ↗ | 1453 36TH STREET BROOKLYN | Alteration | Filed — no permit on record | 08/12/2026 | — | Filer EZFILINGNYCORP | — |
| M00888610 ↗ | 590 EAST 68 STREET MANHATTAN | Alteration | Permit Issued | 06/12/2023 | 08/11/2026 | Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| M00754107 ↗ | 143 EAST 21 STREET MANHATTAN | Alteration | Permit Issued | 06/08/2022 | 08/11/2026 | Contractor DYNAMIX SCAFFOLD GROUP LL | installation of pipe scaffold as per chapter 33 of building code. No change in use, egress, or occupancy |
| Q01443695 ↗ | 27-28 21 STREET QUEENS | Alteration | Filed — no permit on record | 08/11/2026 | — | Owner HW CONSTRUCTION LLC Filer ZV Drafting | — |
| Q01411151 ↗ | 25-01 STEINWAY STREET QUEENS | Alteration | Filed — no permit on record | 08/10/2026 | — | Filer ACE CONSULTANTS | — |
| B01437549 ↗ | 1455 36 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/10/2026 | — | Filer EZFILINGNYCORP | — |
| B01331724 ↗ | 735 DEKALB AVENUE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/15/2025 | 08/07/2026 | Contractor HIL GROUP LLC Filer BAC Developers Group | UNDERPINNING FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01331724-I1. |
| B01340496 ↗ | 381 MYRTLE AVENUE BROOKLYN | Alteration | Permit Issued | 12/31/2025 | 08/07/2026 | Owner 381 Brucha Partners LLC Contractor YAFE MEOD CORP Filer XPDITE GROUP LLC (104) | NEW BEARING PARTITIONS AND EXTERIOR WALL ON THE SECOND AND THIRD FLOOR ONLY |
| X00579031 ↗ | 1033 BOSTON ROAD BRONX | Alteration | Permit Issued | 08/20/2021 | 08/07/2026 | Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| B01327805 ↗ | 1 AVENUE J BROOKLYN | Alteration | Permit Issued | 01/05/2026 | 08/07/2026 | Contractor SOLAR STRING INC Filer SOLARIZE PLUS | INSTALLATION OF SOLAR PANELS. |
| B01309937 ↗ | 1552 39 STREET BROOKLYN | Alteration | Signed-off | 11/05/2025 | 08/06/2026 | Contractor SOHO CONSTRUCTION MANAGEMENT Filer EZFILINGNYCORP | TEMPORARY CONSTRUCTION FENCE |
| Q01389522 ↗ | 99-34 BELLAIRE PLACE QUEENS | Alteration | Permit Issued | 04/21/2026 | 08/06/2026 | Owner NETDT LLC Contractor MERCY CONSTRUCTION INC | INTERIOR RENOVATION AS PER PLAN. |
| X00840322 ↗ | 940 TIFFANY STREET BRONX | Alteration | Permit Issued | 03/21/2023 | 08/05/2026 | Contractor KINGS GROUP NY CORP | INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC. |
| B00900392 ↗ | 60 HART STREET BROOKLYN | Alteration | Permit Issued | 07/10/2023 | 08/05/2026 | Contractor YL CONSTRUCTION ADVISER Filer EZFILINGNYCORP | STRUCTURAL UPDATE - INSTALLATION OF STRUCTURAL JOISTS AND INTERIOR SLAB .REFURBISHING AS PER DRAWINGS HEREIN. NO CHANGE IN USE, EGRESS, OROC… |
| M01380716 ↗ | 517 WEST 29 STREET MANHATTAN | Alteration | Permit Issued | 04/14/2026 | 08/04/2026 | Contractor FIVE STAR AWNINGS INC | TWO NON-ILLUMINATED NON-ADVERTISING RETRACTABLE AWNINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| B01439401 ↗ | 871 LINDEN BOULEVARD BROOKLYN | Alteration | Filed — no permit on record | 08/04/2026 | — | Filer XPDITE GROUP LLC (104) | — |
| B08019131 ↗ | 444 HUMBOLDT STREET BROOKLYN | Alteration | Permit Issued | 10/13/2022 | 08/03/2026 | Owner J & G CONSTRUCTION SRVCS Contractor J & G CONSTRUCTION SVCS | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF N… |
| Q01104371 ↗ | 85-10 34 AVENUE QUEENS | Alteration | Permit Issued | 08/31/2024 | 08/03/2026 | Contractor TRISTATE BUILDINGS RENOVA | FACADE REPAIR AS PER PLAN. |
| B00127491 ↗ | 143 JOHNSON AVENUE BROOKLYN | Alteration | Permit Issued | 02/07/2019 | 07/31/2026 | Contractor ROCK GROUP NY CORP | INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE,… |
| X01424925 ↗ | 1925 GRAND CONCOURSE BRONX | Alteration CO | Filed — no permit on record | 07/31/2026 | — | Owner REVAMP NYC | — |
| B01438266 ↗ | 1295 CARROLL STREET BROOKLYN | Alteration | Filed — no permit on record | 07/29/2026 | — | Filer EZFILINGNYCORP | — |
| X01436722 ↗ | 3230 FAIRFIELD AVENUE BRONX | Alteration | Filed — no permit on record | 07/28/2026 | — | Owner REVAMP NYC Filer XPDITE GROUP LLC (104) | — |
| Q01382402 ↗ | 142-32 119 ROAD QUEENS | Alteration | Permit Issued | 04/06/2026 | 07/28/2026 | Contractor R & SS GENERAL CONSTRUCTI Filer ARCHVISION DESIGN STUDIO | APPLICATION FILED FOR ADDRESS ECB VIOLATION # 39161494J, TO DEMO. REAR EXTENSION FOR PRIOR TO LEGAL CONDITION AS PER PLAN. NO CHANGE IN USE,… |
| B01376722 ↗ | 740 DEKALB AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/27/2026 | — | Owner EZFILINGNYCORP Filer EZFILINGNYCORP | — |
| Q01365705 ↗ | 84-20 PENELOPE AVENUE QUEENS | Alteration | Signed-off | 03/26/2026 | 07/24/2026 | Contractor ALL PRO PLBG & HTG INC | 1.REMOVE PARTITION IN THE CELLAR AS PER PLAN. 2. LEGALIZE 3 PCS BATH ENCLOSURE IN THE CELLAR. 3. ADDRESS ECB# 35720557K. NO LIVING, DWELLING… |
| B01244268 ↗ | 172 VERNON AVENUE BROOKLYN | Alteration | Permit Issued | 06/24/2025 | 07/23/2026 | Owner VERNON AV. HOLDINGS LLC Contractor PYRAMID FRAMERS USA INC Filer EZFILINGNYCORP | SUBSEQUENCE FILED FOR STRUCTURAL DRAWING AS PER PLAN. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY |
| B01434946 ↗ | 740 DEKALB AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 07/22/2026 | — | Owner EZFILINGNYCORP Filer EZFILINGNYCORP | — |
| B01424564 ↗ | 1865 63 STREET BROOKLYN | Alteration | Filed — no permit on record | 07/20/2026 | — | Filer EZFILINGNYCORP | — |