Elevator cooperative
Metropolitan Museum of Art
1001 5 AVENUE · BIN 1046686
💬 Discuss this project
1978Year Built
23Stories
D4Building Class
R10Zoning
109,076 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1001 FIFTH AVENUE OWN · 7,500 sf lot · 14.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 23Under Construction4p · 1 filing · 5 docs
Floor 22Under Construction4p · 1 filing · 5 docs
Floor 21Under Construction4p · 1 filing · 5 docs
Floor 20Under Construction4p · 1 filing · 5 docs
Floor 19Under Construction4p · 1 filing · 5 docs
Floor 18Under Construction4p · 1 filing · 5 docs
Floor 17Under Construction4p · 1 filing · 5 docs
Floor 16Under Construction4p · 1 filing · 5 docs
Floor 15Under Construction4p · 1 filing · 5 docs
Floor 14Under Construction4p · 1 filing · 5 docs
Floor 13Under Construction4p · 1 filing · 5 docs
Floor 12Under Construction4p · 1 filing · 5 docs
Floor 11Under Construction4p · 1 filing · 5 docs
Floor 10Under Construction4p · 1 filing · 5 docs
Floor 9Under Construction4p · 1 filing · 5 docs
Floor 8Under Construction5p · 2 filings · 16 docs
Floor 7Under Construction7p · 2 filings · 15 docs
Floor 6Under Construction4p · 1 filing · 5 docs
Floor 5Under Construction8p · 2 filings · 20 docs
Floor 4Under Construction5p · 2 filings · 20 docs
Floor 3Under Construction4p · 1 filing · 5 docs
Floor 2Under Construction7p · 3 filings · 20 docs
Floor 1Under Construction6p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 20 docs
Cellar1p · 1 filing · 7 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT2007/08/2026
PYRAMID RESTORATION NY707/08/2026
KINGS GROUP NY404/09/2026
1001 FIFTH AVE OWNERS10903/22/2026
1001 FIFTH AVENUE OWN DOU103/22/2026
RESIDENTIAL MANAGEMENT GR203/22/2026
BRENMAC CONSTRUCTION203/21/2026
1001 5TH AVE OWNERS903/21/2026
QUANTUM DESIGN103/21/2026
INSIGNIA RESIDENTIAL OWNER GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING203/21/2026
HLZAE203/21/2026
KD DESIGNS103/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
GREEN LIGHT EXPEDITING LLC603/21/2026
JAM CONSULTANTS, INC.603/21/2026
SKYLINE ACCESS103/21/2026
HIGHRISE GROUP1203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CC INTERIOR CORPORATIONGeneral Contractor807/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor507/08/2026
94TH STREET CONSTRUCTIONGeneral Contractor507/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor404/09/2026
TRIBUTE RESTORATION INCGeneral Contractor304/09/2026
LIEBHABER COMPANY INCGeneral Contractor203/21/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
ALBATECH I CORPGeneral Contractor203/21/2026
PHILCO PLUMBING CORPPlumbing207/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
BASS ELECTRICAL CORP.Electrical103/22/2026
ZATOS PLBG AND HTG INCPlumbing107/08/2026
GOHDE, AUGUSTElectrical103/21/2026
LUPO, CIROElectrical103/21/2026
ARDNORE CONSTRUCTION INCGeneral Contractor107/08/2026
INTEGRATE COMFORT SYSTEMGeneral Contractor107/08/2026
KINGS GROUP NY CORPGeneral Contractor104/09/2026
COMMERICAL PLBG SVCES LLCPlumbing107/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712308/26/2025
H. A. BADER CONSULTANTS2332109/19/2024
ERIC SHEFFIELD ARCHITECT2195107/28/2023
MANCINI DUFFY ARCHITECTUR2985208/01/2022
TAN ENGINEERING, P.C.1291107/29/2022
HRF SERVICES CORP5616210/29/2021
Building Lifecycle
All (226)Filed (31)Permit Issued (32)Signed Off (18)Facade (FISP) (15)Violation (60)Inspection (15)Objection (32)Special Inspection (23)
08/03/2026
Signed off — Alteration
M01327201-I1
05/20/2026
Signed off — Alteration
ROOF REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01222825-I1
02/23/2026
Permit issued — General Construction
M01276933-I1-GC
02/20/2026
Permit issued — Suspended Scaffold
M01357590-I1-SC
02/19/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01357590-I1
02/09/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
01/20/2026
Permit issued — Sidewalk Shed
M01168928-I1-SH
12/08/2025
Permit issued — Sidewalk Shed
M01327201-I1-SH
12/04/2025
Permit issued — Suspended Scaffold
M01133596-I1-SC
12/03/2025
Filed — Alteration
M01327201-I1
09/24/2025
Cycle 10 facade report signed — SWARMP
08/26/2025
Filed — Alteration
M01276933-I1
08/06/2025
Permit issued — General Construction
M01222825-I1-GC
06/04/2025
Filed — Alteration
ROOF REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01222825-I1
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Howard Zimmerman
05/08/2025
Special inspection requirement — Final
Howard Zimmerman
05/05/2025
Signed off — Alteration
Plumbing work filed in conjunction with apartment# 8AB renovation.
M01103360-S1
05/05/2025
Signed off — Alteration
Plumbing work filed in conjunction with apartment# 8AB renovation.
M01103360-I1
04/24/2025
Violation issued (ECB, open)
Local Law
03/19/2025
Cycle 10 facade report submitted
03/07/2025
Signed off — Alteration
Mechanical work as per plans filed herewith. No change in use, egress and occupancy.
M00870348-I1
02/27/2025
Cycle 10 facade inspection completed
01/22/2025
Permit issued — Sidewalk Shed
M01168928-I1-SH
01/21/2025
Filed — Alteration
M01168928-I1
01/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/06/2024
Permit issued — Suspended Scaffold
M01133596-I1-SC
12/02/2024
Signed off — Alteration
Plumbing modifications in apartment 4D associated with apartment renovation.
M00909506-I1
11/08/2024
Signed off — Alteration
Interior demolition and installation of partitions associated with renovation of apartment 4D. No change in use egress or occupancy.
M00909493-I1
10/29/2024
Filed — Alteration
M01133596-I1
10/23/2024
Permit issued — Plumbing
M01103360-S1-PL
10/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2024
Permit issued — General Construction
M01103360-I1-GC
10/04/2024
Filed — Alteration
Plumbing modifications in apartment 4D associated with apartment renovation.
M00909506-P1
09/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2024
Filed — Alteration
Plumbing work filed in conjunction with apartment# 8AB renovation.
M01103360-S1
09/19/2024
Filed — Alteration
Plumbing work filed in conjunction with apartment# 8AB renovation.
M01103360-I1
09/17/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/28/2024
Permit issued — Suspended Scaffold
M01101033-I1-SC
08/28/2024
Special inspection requirement — Post-installed Anchors
Howard Bader
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
08/28/2024
Special inspection requirement — Final
Christian Ricci
08/23/2024
Filed — Alteration
M01101033-I1
04/22/2024
Signed off — Alteration
M00721922-I1
04/16/2024
Signed off — Alteration
FILING FOR INTERIOR RENOVATION AND COMBINATION OF APTS 10A & 10B AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00720586-I1
04/15/2024
Signed off — Alteration
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION AND COMBO OF APTS 10A & 10B AS PER PLANS SUBMITTED HEREWITH.
M00721906-I1
04/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2024
Permit issued — Mechanical Systems
M00870348-I1-MS
03/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2023
Permit issued — Plumbing
M00909506-I1-PL
11/30/2023
Permit issued — General Construction
M00909493-I1-GC
11/15/2023
Permit issued — Plumbing
M00376909-I1-PL
10/23/2023
Objection raised — Scope
10/23/2023
Objection resolved — Addressed
10/23/2023
Objection raised — Scope
Latest 60 of 226 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC02/23/2026
DOB NOWSuspended ScaffoldPermit IssuedTRIBUTE RESTORATION INC02/20/2026
DOB NOWSidewalk ShedPermit IssuedPYRAMID RESTORATION NY LL01/20/2026
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/08/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC08/06/2025
DOB NOWSidewalk ShedPermit IssuedPYRAMID RESTORATION NY LL01/22/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/06/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/23/2024
DOB NOWGeneral ConstructionSigned-offALBATECH I10/22/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC08/28/2024
DOB NOWMechanical SystemsSigned-offINTEGRATE COMFORT SYSTEM03/21/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC12/08/2023
DOB NOWGeneral ConstructionSigned-offLIEBHABER COMPANY11/30/2023
DOB NOWPlumbingPermit IssuedCOMMERICAL PLBG SVCES LLC11/15/2023
DOB NOWGeneral ConstructionSigned-offCC INTERIOR CORPORATION08/15/2023
DOB NOWMechanical SystemsSigned-offCC INTERIOR CORPORATION08/15/2023
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC04/24/2023
DOB NOWGeneral ConstructionSigned-offCC INTERIOR CORPORATION04/20/2023
DOB NOWMechanical SystemsSigned-offCC INTERIOR CORPORATION04/20/2023
DOB NOWMechanical SystemsSigned-off94TH STREET CONSTRUCTION01/09/2022
DOB NOWMechanical SystemsSigned-off94TH STREET CONSTRUCTION01/07/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO01/07/2022
DOB NOWGeneral ConstructionSigned-off94TH STREET CONSTRUCTION01/07/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO01/04/2022
DOB NOWGeneral ConstructionSigned-offARDNORE CONSTRUCTION INC12/22/2021
DOB NOWPlumbingPermit IssuedALL ABOUT P & H OF NY INC03/05/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/08/2020
DOB NOWPlumbingPermit IssuedALL ABOUT P & H OF NY INC08/24/2020
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC11/06/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION10/01/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION01/18/2019
BISPLISSUEDHUDSON PLMBING & MCH, LLC09/29/2022
BISPLISSUEDNEW MILLENNIUM P & H CORP05/16/2022
BISOTISSUEDKAY WATERPROOFING CORP09/22/2021
BISOTISSUEDFRANCISCO SOSA, INC03/24/2021
BISOTISSUEDKAY WATERPROOFING CORP01/15/2021
BISOTISSUEDFRANCISCO SOSA, INC08/21/2020
BISPLISSUEDNEW MILLENNIUM P & H CORP07/08/2020
BISOTISSUEDKAY WATERPROOFING CORP01/28/2020
+ 42 more permits on file
1 project · most recent 08/17/2020
Water/Sanitary
FiledStatusContractorScope
08/17/2020Permit IssuedCOMMERICAL PLBG SVCES LLCWater/Sanitary
12 projects · most recent 02/14/2025
General Wiring
FiledStatusContractorScope
02/14/2025CompleteHIGH QUALITY ELECTRIC OF—
10/21/2024CompleteTITANIUM ELECTRICAL CORPGeneral Wiring
04/08/2024CompletePRECISION ELECL CONT CORPGeneral Wiring
01/17/2024CompleteBASS ELECTRICAL CORP.General Wiring
02/02/2023CompleteELECTRIC ESSENTIALS CORPGeneral Wiring
12/10/2021CompleteELECTRIC ESSENTIALS CORP—
07/16/2021CompletePRUDENT ELECTRIC INCGeneral Wiring
12/19/2019Permit IssuedZIP ELECTRIC INCGeneral Wiring
09/30/2019Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
01/15/2019CompleteSTEVEN FARKAS—
10/02/2018Permit IssuedK & G ELECTRIC CO., INC.General Wiring
05/23/2018Permit IssuedK & G ELECTRIC CO., INC.—
1 project · most recent 02/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/19/2026Permit IssuedTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/09/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
05/08/2025Tenant Protection Plan ComplianceHoward Zimmermanspecial
05/08/2025FinalHoward Zimmermanprogress
08/28/2024Post-installed AnchorsHoward Baderspecial
08/28/2024Fire-Resistant Penetrations and JointsHoward Baderspecial
08/28/2024FinalChristian Ricciprogress
10/18/2023HVAC-R and service water heating system controlsHoward Zimmermanenergy_progress
10/18/2023HVAC-R and service water piping design and insulationHoward Zimmermanenergy_progress
10/18/2023Maintenance informationHoward Zimmermanenergy_progress
10/18/2023HVAC-R and service water heating equipmentHoward Zimmermanenergy_progress
09/20/2023Tenant Protection Plan ComplianceHoward Zimmermanspecial
07/25/2023FinalEric Sheffieldprogress
07/25/2023Fire-Resistant Penetrations and JointsEric Sheffieldspecial
07/25/2023Fire-Resistance Rated ConstructionEric Sheffieldprogress
05/04/2023FinalDariusz Makaraprogress
05/04/2023Mechanical SystemsHoward Zimmermanspecial
12/26/2022FinalFAHAD FATEHprogress
04/22/2022Fire-Resistant Penetrations and JointsWilliam Mandaraspecial
10/22/2021Post-installed AnchorsFAHAD FATEHspecial
10/22/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/04/2021FinalFAHAD FATEHprogress
10/04/2021Mechanical SystemsFAHAD FATEHspecial
08/17/2020Fire-Resistance Rated ConstructionMISHA SARADOFFprogress
▾Documents — 764 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch26
09/03/2026M00605636-I1Request digital key ↗
09/03/2026M00605634-I1Request digital key ↗
09/02/2026M00721922-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00376909-I1Request digital key ↗
08/15/2026M00376909-P2Request digital key ↗
08/15/2026M00217218-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00120259-I1Request digital key ↗
▸Applications & Permits151
▸BISPLAN / WORK APPROVAL APPLICATION66
10/17/2025122550202Open ↗
02/02/2022122426776Open ↗
06/18/2021123671008Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION56
09/29/2022122426776Open ↗
08/21/2020140931295Open ↗
01/28/2020123764042Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWLPC Approval/Permit28
09/04/2026M00376909-I1Open ↗
09/03/2026M00605636-I1Open ↗
08/15/2026M00556901-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/17/2021123764042Open ↗
▸Seals & Professional Certifications160
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION75
03/05/2020123671008Open ↗
03/05/2020123671008Open ↗
03/05/2020123534247Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00120259-I1Open ↗
09/04/2026M00376909-I1Open ↗
09/03/2026M00556901-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
08/17/2020140931295Open ↗
06/18/2019140855304Open ↗
03/04/2019123671008Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00605636-I1Open ↗
09/01/2026M00909493-I1Open ↗
09/01/2026M00909493-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
03/04/2019123671008Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/24/2026M00721906-I1Open ↗
09/02/2026M00605636-I1Open ↗
09/01/2026M00909493-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/17/2020140931295Open ↗
06/18/2019140855304Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/17/2020140931295Open ↗
06/18/2019140855304Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/03/2020140890472Open ↗
04/27/2020140890472Open ↗
▸Trade Schedules & Equipment49
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
06/11/2019123671008Open ↗
06/11/2019123671008Open ↗
03/14/2019123704036Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING12
06/18/2021123671008Open ↗
Showing 1 of 12 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
09/16/2019123744797Open ↗
06/11/2019123764042Open ↗
03/14/2019123704036Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan3
09/04/2026M00376909-I1Open ↗
08/13/2026M00376909-P2Open ↗
08/13/2026M00217218-I1Open ↗
▸Environmental & Asbestos58
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
08/17/2020140931295Open ↗
09/16/2019123744797Open ↗
06/11/2019123764042Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00605636-I1Open ↗
09/03/2026M00605634-I1Open ↗
09/01/2026M00556966-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/02/2026M00721922-I1Open ↗
08/31/2026M00556976-I1Open ↗
08/26/2026M01103360-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
07/10/2020140890472Open ↗
06/03/2020140890472Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance59
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
09/16/2019123744797Open ↗
06/11/2019123764042Open ↗
03/14/2019123704036Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
11/02/2021123764042Open ↗
08/18/2020123744797Open ↗
07/02/2020123534247Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
02/14/2022122426776Open ↗
11/02/2021123764042Open ↗
06/08/2021140931295Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00605636-I1Open ↗
08/13/2026M00605634-I1Open ↗
08/13/2026M00720586-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/17/2020140931295Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
03/04/2019123671008Open ↗
03/04/2019123671008Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/08/2021140931295Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY18
02/14/2022122426776Open ↗
11/02/2021123764042Open ↗
11/02/2021123764042Open ↗
Showing 3 of 18 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISLANDMARKS APPROVAL34
07/26/2023100262868Open ↗
08/17/2020140931295Open ↗
04/27/2020140890472Open ↗
Showing 3 of 34 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
02/08/2023122426776Open ↗
11/03/2021123764042Open ↗
11/03/2021123764042Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/29/2022122426776Open ↗
11/20/2019123704036Open ↗
Showing 2 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
11/03/2021123764042Open ↗
06/08/2021140931295Open ↗
08/18/2020123744797Open ↗
▸BISSUPERSEDING LETTER3
09/29/2022122426776Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01375665-I1Open ↗
08/13/2026M01375755-I1Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership58
▸BISCOST AFFIDAVIT56
02/09/2022122426776Open ↗
11/02/2021123764042Open ↗
12/04/2020123764042Open ↗
Showing 3 of 56 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms75
▸BISEFILING COVER SHEET29
09/16/2019123744797Open ↗
06/11/2019123764042Open ↗
03/14/2019123704036Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION23
01/13/2021123671008Open ↗
12/04/2020123764042Open ↗
12/04/2020123764042Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM18
09/29/2022122426776Open ↗
02/27/2020123671008Open ↗
02/27/2020123534247Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/17/2020140931295Open ↗
04/27/2020140890472Open ↗
06/18/2019140855304Open ↗
Showing 3 of 5 on file for this type
▸Other Documents16
▸DOB NOWProof of Historic Building6
08/14/2026M00909506-I1Open ↗
08/13/2026M00909506-P1Open ↗
08/13/2026M00909493-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
08/13/2026M01101033-I1Open ↗
08/13/2026M01133596-I1Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
05/01/2023100262868Open ↗
▸BISDHCR DOCUMENT1
09/16/2019123744797Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlot Diagram1
08/13/2026M01375665-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01357590-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01357590-I1Open ↗