| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01394890 ↗ | 67 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 09/29/2026 | Owner Halstead Management Contractor COOLING CONTROLS CORP | INSTALLATION OF NEW MULTIZONE AC SYSTEM WITH OUTDOOR AIR COOLED CONDENSING UNIT AND ASSOCIATED AC UNITS IN APT 6B AS PER PLANS FILED HEREWIT… |
| M00227649 ↗ | 800 2 AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2022 | 09/24/2026 | Contractor ADVANCED AUTO SPR.CO.,INC | INSTALLATION OF A NEW SPRINKLER SYSTEM ON THE 11-12 FLOOR. ALL AS PER PLANS. |
| M01355507 ↗ | 8 WARREN STREET MANHATTAN | Alteration | Permit Issued | 02/24/2026 | 09/21/2026 | Contractor MARQUIS P & H CO., INC | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01042352 ↗ | 56-61 59 STREET QUEENS | New Building | Permit Issued | 09/17/2024 | 09/15/2026 | Owner KORBUILD INC Contractor KORBUILD INC Filer MARIA | PROPOSED ONE STORY USE FOR COMMERCIAL GARAGE BUILDING. FILED TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| M01124594 ↗ | 4 EAST 77 STREET MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 09/10/2026 | Owner LANTERN ORGANIZATION Contractor PROCORE MECHANICAL CORP | Gas piping modification as per plan in cellar & 1.2.3,4,5 floor. Replacement of existing fire places on 3,4,5 floor |
| M01332506 ↗ | 112 EAST 4 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 09/10/2026 | Contractor SLC RESTORATION CORP Filer ADAL ENGINEERING PLLC | REPLACEMENT OF EXISTING SPRINKLER SYSTEM WITH NEW AS PER PLAN IN CELLAR AND 1ST FLOOR. |
| Person | Filings | Most recent |
|---|---|---|
| Dariusz Makara | 423 | 08/05/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURAL ENGINEERING INTEGRATED | 6 | 08/19/2026 |
| A2 ARCHITECT, PC | 2 | 02/12/2026 |
| CO.DE CONSULTING AND DESIGN, INC. | 2 | 08/19/2026 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 08/21/2026 |
| MARCELO BARUJEL ARCHITECT, PC | 2 | 12/17/2025 |
| AA BLDG & INSP SVC LLC | 1 | 03/28/2026 |
| ALLEGRA KOCHMAN ARCHITECTURE | 1 | 10/18/2023 |
| AM ARCHITECTURE PLLC | 1 | 06/11/2026 |
| ARCHITECT ASSOCIATES LLP | 1 | 06/17/2026 |
| CX CONSULTING CORP | 1 | 04/27/2026 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 07/07/2026 |
| HAMANN ENGINEERING, PLLC | 1 | 05/11/2026 |
| HNY CONSULTING ENGINEERS LLC | 1 | 07/07/2026 |
| HUAN DESIGN INC. | 1 | 04/27/2026 |
| ISSAC & STERN ARCHITECTS, P.C | 1 | 04/27/2026 |
| JAKLITSCH GARDNER ARCHITECTS | 1 | 02/06/2024 |
| JAMES HARB ARCHITECTS | 1 | 07/07/2026 |
| KBN SERVICES LLC | 1 | 10/11/2025 |
| LEAGUE STUDIO ARCHITECTS, PLLC | 1 | 08/21/2026 |
| LORENZ OF VIENNA ENTERPRISE | 1 | 09/12/2025 |
| MCNAMARA SALVIA | 1 | 08/19/2026 |
| MILLWARD ARCHITECTURE DESIGN | 1 | 05/15/2024 |
| MKO ARCHITECTURE | 1 | 05/01/2026 |
| NEVILLE ENGINEERING GROUP | 1 | 08/19/2026 |
| NV/DESIGN.ARCHITECTURE PLLC | 1 | 05/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ORBIT PLBG & HTG INC | 13 | 08/21/2026 |
| Z.W. PLBG & HTG CORP | 10 | 06/17/2026 |
| ORBIT SPRINKLER CORP | 9 | 08/21/2026 |
| E.L.T. CONSTRUCTION SVCS | 8 | 03/09/2022 |
| INTEGRATE COMFORT SYSTEM | 8 | 11/16/2024 |
| A.M.N. CORPORATION | 7 | 09/08/2025 |
| ADVANCED P,MECH & SPRK CO | 7 | 07/07/2026 |
| COOLING CONTROLS CORP | 6 | 06/04/2026 |
| NEW YORK PARK PLBG&HTG CO | 6 | 03/16/2026 |
| CROSSFIELD PLBG.&HTG | 5 | 05/27/2026 |
| SUPERB PLUMBING & HEATING | 5 | 02/12/2026 |
| COOLQUEST MECHANICAL INC | 4 | 08/05/2025 |
| DEMAR MECHANICAL INC | 4 | 03/20/2025 |
| GW MECHANICAL CORP | 4 | 11/18/2024 |
| NY CONSTRUCTION&STONE INC | 4 | 02/27/2024 |
| ROYAL HVAC SYSTEMS INC | 4 | 08/06/2025 |
| AMN PLUMBING CORP | 3 | 09/13/2024 |
| AMN SPRINKLER INC | 3 | 09/12/2025 |
| BRIDGE ZALE CONSTRUCT COR | 3 | 03/16/2026 |
| COBALT MECHANICAL INC | 3 | 08/19/2026 |
| D.D. INTERIORS INC | 3 | 07/12/2026 |
| DEMAR PLUMBING CORP | 3 | 05/14/2024 |
| JP HVAC CORP | 3 | 01/17/2023 |
| LIQUID TECH PLBG&HTG,INC | 3 | 05/13/2021 |
| Not Applicable | 3 | 05/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ALVAREZ ASSOCIATES, L.P. | 8 | 08/22/2021 |
| HOLDINGS LLC | 8 | 04/26/2024 |
| BRIDGE ZALE CONSTRUCTION CORP. | 7 | 04/27/2026 |
| MATRIS HOLDING, LLC | 5 | 07/12/2026 |
| ABC REALTY | 4 | 10/10/2025 |
| LANTERN ORGANIZATION | 4 | 02/12/2026 |
| AKAM ASSOCIATES, INC. | 3 | 08/22/2024 |
| First & 73 LLC | 3 | 05/18/2026 |
| HELM MANAGEMENT INC | 3 | 03/20/2025 |
| R&T CONSTRUCTION NY INC | 3 | 10/08/2024 |
| RED OAK RENOVATIONS CORP. | 3 | 12/23/2022 |
| 521 BROADWAY GROUP LLC | 2 | 05/06/2026 |
| 632 MANHATTAN AVE LLC. | 2 | 07/26/2022 |
| DOM CORP | 2 | 12/10/2020 |
| EMS CAPITAL LP | 2 | 11/05/2024 |
| EURO ELITE CONSTRUCTION | 2 | 08/29/2025 |
| GIAKOUMIS MGT, LLC | 2 | 01/19/2021 |
| M&A PROJECTS RESTORATION INC. | 2 | 03/27/2026 |
| THE UNION BAPTIST CHURCH | 2 | 10/20/2022 |
| The Gora Group | 2 | 01/30/2024 |
| VYNAR REALTY LLC | 2 | 05/06/2024 |
| 111 JAVA STREET LLC | 1 | 08/28/2025 |
| 120 EAST END AVENUE CORP | 1 | 03/14/2025 |
| 120 WOOSTER LLC | 1 | 08/14/2025 |
| 140 PERRY ST. CONDOMINIUM | 1 | 03/08/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG ORANGE EXPEDITING, INC | 101 | 08/20/2026 |
| SYNCHRON EXPEDITING, LLC | 33 | 07/12/2026 |
| QUICK FILING OF NY INC | 17 | 10/11/2025 |
| ADVANCED BUILDERS SERVICES | 5 | 05/01/2026 |
| WILLIAM VITACCO ASSOCIATES | 4 | 03/12/2024 |
| NEXUS CONSULTING NYC, INC | 3 | 04/13/2026 |
| ADAM MAISER | 2 | 05/27/2026 |
| ADVANCED PLUMBING MECH & SP CORP | 2 | 06/11/2024 |
| BMB BUILDING CONSULTING INC. | 2 | 12/12/2024 |
| CO.DE CONSULTING AND DESIGN, INC. | 2 | 08/19/2026 |
| EAST COAST EXPEDITING | 2 | 01/30/2024 |
| LLOYD NOEL BUILDING CONSULTANT | 2 | 09/16/2024 |
| ACA ASSOCIATES | 1 | 07/01/2021 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 10/18/2023 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 08/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 09/24/2021 |
| J.A. EXPEDITING, LLC | 1 | 12/10/2025 |
| JM ZONING, LLC. | 1 | 04/27/2026 |
| MARIA | 1 | 03/28/2026 |
| MEP DESIGNS, INC | 1 | 08/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 09/12/2025 |
| Manetta architecture design pllc | 1 | 10/11/2025 |
| NEW YORK DESIGN ARCHITECT LLP | 1 | 06/11/2024 |
| RIZZO GROUP | 1 | 07/07/2026 |
| SBLM | 1 | 05/15/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01394890 ↗ | 67 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 09/29/2026 | Owner Halstead Management Contractor COOLING CONTROLS CORP | INSTALLATION OF NEW MULTIZONE AC SYSTEM WITH OUTDOOR AIR COOLED CONDENSING UNIT AND ASSOCIATED AC UNITS IN APT 6B AS PER PLANS FILED HEREWIT… |
| M00227649 ↗ | 800 2 AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2022 | 09/24/2026 | Contractor ADVANCED AUTO SPR.CO.,INC | INSTALLATION OF A NEW SPRINKLER SYSTEM ON THE 11-12 FLOOR. ALL AS PER PLANS. |
| M01355507 ↗ | 8 WARREN STREET MANHATTAN | Alteration | Permit Issued | 02/24/2026 | 09/21/2026 | Contractor MARQUIS P & H CO., INC | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01042352 ↗ | 56-61 59 STREET QUEENS | New Building | Permit Issued | 09/17/2024 | 09/15/2026 | Owner KORBUILD INC Contractor KORBUILD INC Filer MARIA | PROPOSED ONE STORY USE FOR COMMERCIAL GARAGE BUILDING. FILED TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| M01124594 ↗ | 4 EAST 77 STREET MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 09/10/2026 | Owner LANTERN ORGANIZATION Contractor PROCORE MECHANICAL CORP | Gas piping modification as per plan in cellar & 1.2.3,4,5 floor. Replacement of existing fire places on 3,4,5 floor |
| M01332506 ↗ | 112 EAST 4 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 09/10/2026 | Contractor SLC RESTORATION CORP Filer ADAL ENGINEERING PLLC | REPLACEMENT OF EXISTING SPRINKLER SYSTEM WITH NEW AS PER PLAN IN CELLAR AND 1ST FLOOR. |
| M01300538 ↗ | 261 11 AVENUE MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 09/02/2026 | Owner TERMINAL FEE OWNER LP Contractor DESIMONE BUILDERS Filer RIZZO GROUP | Structural modifications on floors 1-4 and 8th floor roof framing as per plans filed herewith. No changes in use, egress or occupancy. |
| M01103284 ↗ | 14 EAST 69 STREET MANHATTAN | Alteration | Permit Issued | 05/23/2025 | 08/31/2026 | Contractor NEW YORK PARK PLBG&HTG CO | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANHE IN USE, EGRESS AND OCCUPANCY. |
| M01309529 ↗ | 320 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 08/25/2026 | Owner 320 OWNERS CORP Contractor RD-WRIGHT INC | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01391164 ↗ | 130-16 91 AVENUE QUEENS | Alteration | Permit Issued | 08/20/2026 | 08/25/2026 | Owner DSA FINISHING INC. Contractor ORBIT SPRINKLER CORP | INSTALLATION OF NEW SPRINGLER SYSTEM INCLUDING NEW FIRE WATER SERVICE AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01103288 ↗ | 14 EAST 69 STREET MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 08/24/2026 | Contractor R'POL CONSTRUCTION INC | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01257712 ↗ | 204 LINCOLN ROAD BROOKLYN | Alteration | Permit Issued | 07/18/2025 | 07/23/2026 | Owner Stay Project Solutions Contractor ART + 1, INC | INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01018918 ↗ | 40 BEDFORD STREET MANHATTAN | Alteration | Permit Issued | 07/01/2024 | 07/17/2026 | Contractor Z.W. PLBG & HTG CORP | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00924536 ↗ | 317 WYTHE AVENUE BROOKLYN | Alteration | Permit Issued | 10/27/2023 | 07/16/2026 | Contractor ORBIT SPRINKLER CORP | JOB FILED TO SHOW INSTALLATION OF NEW SPRONKLER SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01426341 ↗ | 147 WEST 78 STREET MANHATTAN | Alteration | Signed-off | 07/12/2026 | 07/15/2026 | Owner MATRIS HOLDING LLC Contractor D.D. INTERIORS INC Filer SYNCHRON EXPEDITING, LLC | Replacement of interior partitions as part of a lead paint remediation. All existing flooring, wood and tile, and plumbing fixtures are to r… |
| M01397339 ↗ | 9 AVENUE B MANHATTAN | Alteration | Permit Issued | 06/16/2026 | 07/13/2026 | Owner Fluff Club NYC LLC Contractor ARK DESIGN & BUILD INC | Ground level retail space in a mixed use building at 9 Avenue B in the East Village, NYC.Renovation work includes interior partitions and ME… |
| B01064419 ↗ | 97 DUPONT STREET BROOKLYN | Alteration | Permit Issued | 06/14/2024 | 06/23/2026 | Owner DOMHAUS PROPERTIES Contractor LPA DEVELOPMENT | Support of excavation for foundation work |
| M01354767 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 06/17/2026 | Contractor ACCURATE MECHANICAL INC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 7Q ON THE 7TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00789002 ↗ | 33 NORTH HENRY STREET BROOKLYN | Alteration | Permit Issued | 10/05/2022 | 06/12/2026 | Owner WILLIAMSBURG A31, LLC Contractor ELITE PROFESSIONAL CONST* Filer ADAM MAISER | REINFORCEMENT OF THE EXISTING ROOF STRUCTURE FOR NEW BULKHEAD AND NEW ROOF DECK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| X01228080 ↗ | 5237 NETHERLAND AVENUE BRONX | Alteration | Signed-off | 07/16/2025 | 06/10/2026 | Contractor ACHIEVE L.Y. CONSTRUCTION | Installation of AC system as per plan filed herewith. No change in use, egress and occupancy. |
| Q00539481 ↗ | 86-56 SANCHO STREET QUEENS | Alteration | Permit Issued | 03/27/2026 | 06/08/2026 | Contractor M&A PROJECTS RESTORATION* | MECH. WORK FILED HEREWITH FOR INSTALLATION OF 21 TONS MULTI ZONE HVAC SYSTEMS WITH 3 CONDENSING UNITS ON OSP AND ASSOCIATED AC UNITS IN THE … |
| Q01384391 ↗ | 90-60 UNION TURNPIKE QUEENS | Alteration | Permit Issued | 05/29/2026 | 06/08/2026 | — | Removal of none load bearing partition wall and other minor work in kitchen area in apt 17K as per plans filed herewith. No change in use, e… |
| B00876739 ↗ | 166 ECKFORD STREET BROOKLYN | Alteration | Permit Issued | 06/02/2023 | 05/20/2026 | Owner 166 ECKFORD LLC Contractor PROFESSIONAL CONSTRUCTION | Sprinkler work type hereby filed subsequent to the Alt GC application: B00876739-I1 |
| M01379566 ↗ | 78 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 05/18/2026 | — | Owner First & 73 LLC | — |
| M01393499 ↗ | 338 WEST 23 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/18/2026 | — | Owner First & 73 LLC | — |
| M01367091 ↗ | 235 EAST 58 STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 05/14/2026 | Contractor COSME PLBG & HTG CORP | Removal of exist and installation of new HVAC system as per plan filed herewith. No change in use, egress and occupancy. |
| M01352732 ↗ | 255 WEST 113 STREET MANHATTAN | Alteration | Permit Issued | 01/30/2026 | 05/11/2026 | Contractor BLUSTONE CONTRACTING LLC | General construction is proposed within the existing property. We are also addressing Stop Work Order violation 039175089N under this applic… |
| Q01396729 ↗ | 53-70 62 STREET QUEENS | Alteration | Filed — no permit on record | 05/05/2026 | — | — | — |
| M01338544 ↗ | 315 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 12/29/2025 | 04/27/2026 | Contractor RENOVYT, INC | Modification to interior partitions related to the minor renovation of apartment 2A on the 2nd floor. |
| M01391440 ↗ | 27 EAST 22 STREET MANHATTAN | Alteration | Filed — no permit on record | 04/27/2026 | — | — | — |
| B00536409 ↗ | 160 12 STREET BROOKLYN | Alteration | Permit Issued | 11/03/2025 | 04/24/2026 | Contractor MILL BROOK FIRE PROTECTION | SPRINKLER WORK ON THE CELLAR, 1ST THRU 4TH AND ROOF FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01346153 ↗ | 160 WEST 120 STREET MANHATTAN | Alteration | Permit Issued | 01/29/2026 | 04/17/2026 | Contractor ALL PRO PLBG & HTG INC | Plumbing wok type hereby filed in subsequent to the ALT GC application: M01346153-I1 |
| B01347488 ↗ | 570 WASHINGTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 02/03/2026 | 04/03/2026 | Contractor ROCK FACE CONSTR INC | APPLICATION FILED TO SHOW CONVERSION OF 5 FAMILYHOUSE TO 3 FAMILY HOUSE AS PER PLANS FILED HEREWITH. CHANGE TO CERTIFICATE OF OCCUPANCY REQU… |
| Q01194789 ↗ | 355 KNOLLWOOD AVENUE QUEENS | Alteration | Permit Issued | 03/17/2025 | 04/01/2026 | Contractor PHOENIX SUTTON STR INC Filer SYNCHRON EXPEDITING, LLC | Plumbing work related to the renovation of an existing (1) family residence. No change to use, egress, or occupancy. |
| B01121483 ↗ | 220 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 10/22/2024 | 03/20/2026 | Contractor DATO A/C INC | INSTALLATION OF MULTIZONE HEAT PUMP SYSTEM WITH CONDENSING UNITS ON THE ROOF AND ASSOCIATED AIR HANDLERS, DUCTWORKS AND GRILLES AS PER PLANS… |
| B00495644 ↗ | 160 12 STREET BROOKLYN | Alteration | Permit Issued | 04/01/2021 | 03/19/2026 | Contractor NEW YORK PARK PLBG&HTG CO | PLUMBING WORK FILED HEREWITH AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00733955 ↗ | 1540 PUTNAM AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/12/2022 | 03/16/2026 | Contractor RED OAK RENOVATIONS CORP Filer MEP DESIGNS, INC | Subsequent filing for plumbing and sprinkler work. |
| B00867858 ↗ | 103 MILTON STREET BROOKLYN | Alteration | Permit Issued | 10/30/2023 | 03/16/2026 | Contractor SIMPLY ELEGANT GENERAL CO | REPLACEMENT OF EXISTING WINDOWS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY |
| B01360531 ↗ | 246 NORTH 5 STREET BROOKLYN | Alteration | Permit Issued | 02/25/2026 | 03/13/2026 | Contractor MB CNSTRT & DSGN SVCES LL | MODIFICATION OF EXISTING COMMERCIAL SPACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01329814 ↗ | 152 DRIGGS AVENUE BROOKLYN | Alteration | Permit Issued | 01/20/2026 | 03/09/2026 | Owner Rasa thai group Contractor RK NYC REMODELING INC | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01333037 ↗ | 92-15 ASTORIA BOULEVARD QUEENS | Alteration | Permit Issued | 12/31/2025 | 03/02/2026 | Contractor MAT ROM LLC | CONSTRUCTION OF FENCE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY, |
| M01324480 ↗ | 8 EAST 83 STREET MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 02/11/2026 | Contractor GRREENWICH RESTORATION Filer J.A. EXPEDITING, LLC | Removal of existing PTAC units and installation of new HVAC system with condenser on yhe roof and indoor AC units as per plans filed herewit… |
| M01251047 ↗ | 955 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2025 | 02/09/2026 | Owner BROWN HARRIS STEVENS Contractor ROYAL HVAC SYSTEMS INC | IREMOVAL OF EXISTING (10 TON) 4 AC SYSTEMS AND INSTALLATION OF NEW 2 MULTI ZONE AC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, … |
| M01346144 ↗ | 21 EAST 126 STREET MANHATTAN | Alteration | Filed — no permit on record | 01/30/2026 | — | — | |
| Q00435875 ↗ | 85-65 111 STREET QUEENS | Alteration | Signed-off | 12/10/2020 | 01/22/2026 | Contractor JAM P&H LLC Filer SYNCHRON EXPEDITING, LLC | Plumbing work related to the conversion of a single-family residence into a two-family residence. |
| B00410709 ↗ | 444 GRAHAM AVENUE BROOKLYN | Alteration | Permit Issued | 02/04/2021 | 01/12/2026 | Contractor CITYWIDE PLBG, HTG &SPRKL | INSTALLATION OF COMBINED SPRINKLER/STANDPIPE SYSTEM, THREE (3) NEW 6 FIRE SERVICES FROM FROST STREET, GRAHAM AVENUE, AND RICHARDSON STREET A… |
| M01082491 ↗ | 359 SECOND AVENUE MANHATTAN | Alteration | Permit Issued | 10/03/2024 | 01/06/2026 | Contractor ROSS & ASSOCIATES LLC Filer SCARANO ARCHITECT PLLC | Proposed new structural opening at 1st floor for convenience stair to the cellar. No change to use, occupancy or egress under this applicat… |
| B01069051 ↗ | 258 ECKFORD STREET BROOKLYN | Alteration | Signed-off | 09/04/2024 | 12/18/2025 | Owner EURO ELITE CONSTRUCTION Contractor ABSOLUTE SPECIAL INSPTN | Job filed to show installation of new sprinkler system and new water service and new BFP as per plansd attached herewith. No change in use, … |
| B01242339 ↗ | 129 EAGLE STREET BROOKLYN | Alteration | Filed — no permit on record | 11/26/2025 | — | — | — |
| M01243591 ↗ | 1192 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2025 | 11/17/2025 | Contractor MAGIC RENOVATIONS CORP | REPLACEMENT, RELOCATION AND CAPPING OF PLUMBING FIXTURES. CAP AND REMOVE GAS SERVICE TO THE APT INCLUDING GAS METER. NO CHANGE TO USE, EGRES… |
| B01288778 ↗ | 150 MONROE STREET BROOKLYN | Alteration CO | Filed — no permit on record | 10/31/2025 | — | Owner 521 BROADWAY GROUP LLC Filer ADAL ENGINEERING PLLC | — |
| M00909402 ↗ | 282 CONVENT AVENUE MANHATTAN | Alteration | Signed-off | 12/22/2023 | 10/30/2025 | Contractor T.N.T. PLBG & HTG, INC | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01180922 ↗ | 415 WEST 127 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2025 | 10/23/2025 | Owner Park It Management Contractor A.M.N. CORPORATION | Installation of 2 gas fired Unit Heaters and associated gas piping. |
| B01293782 ↗ | 632 HUMBOLDT STREET BROOKLYN | New Building | Filed — no permit on record | 10/16/2025 | — | Filer JM ZONING, LLC. | — |
| B01205472 ↗ | 354 78 STREET BROOKLYN | Alteration | Signed-off | 05/30/2025 | 10/09/2025 | Contractor ORBIT PLBG & HTG INC Filer QUICK FILING OF NY INC | LEGALIZATION WORK FILED AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01277480 ↗ | 61-65 70 STREET QUEENS | Alteration | Permit Issued | 09/12/2025 | 10/01/2025 | Contractor SUPERB PLUMBING & HEATING | Modification of gas piping in the basement and installation on new boiler and HWH as per plans filed herewith. NO CHANGE IN USE, EGRESS AND … |
| B01162146 ↗ | 11 BLEECKER STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 01/27/2025 | 09/05/2025 | Contractor CODE MECHANICAL INC | REMOVE EXISTING PLUMBING FIXTURES, REMOVE EXISTING GAS RANGE/OVENS, REMOVE EXISTING GAS METER, GAS BOILER AND HWHs. |
| M01123713 ↗ | 40 EAST 61 STREET MANHATTAN | Alteration | Permit Issued | 10/10/2024 | 08/26/2025 | Owner EMS CAPITAL LP Contractor OAK & STONE DEMOLITION Filer SYNCHRON EXPEDITING, LLC | Interior demolition of existing medical offices, UG 6, in the cellar and floors one through four. Creating white box to market space to pote… |
| M01033411 ↗ | 155 PERRY STREET MANHATTAN | Alteration | Signed-off | 08/05/2025 | 08/22/2025 | Owner ABC REALTY Contractor COOLQUEST MECHANICAL INC | INSTALLATION OF MECHANICAL HEAT AND COOLING SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01215465 ↗ | 333 EAST 68 STREET MANHATTAN | Alteration | Permit Issued | 06/30/2025 | 08/20/2025 | Contractor COOLING CONTROLS CORP Filer STECC CORP | INTERIOR RENOVATION IN APT 13A&14A |
| M01234136 ↗ | 8 WARREN STREET MANHATTAN | Alteration | Permit Issued | 08/07/2025 | 08/20/2025 | Contractor SUPREME CONSTRUCTION AND | Ventilation for the gas meter room as per plans filed herewith. No change in use, egress and occupancy. |
| M01240621 ↗ | 120 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 08/14/2025 | 08/15/2025 | Owner 120 WOOSTER LLC Contractor NYC RENOVATION INC | Replace existing 15 Ton AC system as per plans attached herewith. No change in use, egress and occupancy. |
| B01162783 ↗ | 293 HENRY STREET BROOKLYN | Alteration | Permit Issued | 02/26/2025 | 08/14/2025 | Owner 293 HENRY LLC Contractor ROCK FACE CONSTR INC | WORK FILED TO REMOVE THE VIOLATION# VIO-25-0404 AND INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01219349 ↗ | 2612 BROADWAY MANHATTAN | Alteration | Signed-off | 05/28/2025 | 07/31/2025 | Owner LANTERN ORGANIZATION Contractor AMN FIRE CORP | Job filed to show removal of the Abandoned gravity tank on the roof to address violation# 35690012X as per plans attached herewith. No chang… |
| B01188575 ↗ | 150 MONROE STREET BROOKLYN | Alteration | Permit Issued | 03/28/2025 | 07/14/2025 | Owner 521 BROADWAY GROUP LLC Contractor MK MANAGMENT AND MAINTENA | Renovation to 2nd and 3rd floors ans per plans attached herewith. No change in use, egress and occupancy. |
| M01245585 ↗ | 432 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 06/24/2025 | 07/10/2025 | Contractor ALPINE REFRIGERATION CO | REPLACE, RELOCATE PLUMBING FIXTURES AT 1ST FLOOR REAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01114407 ↗ | 172 EAST 7 STREET MANHATTAN | Alteration | Signed-off | 03/20/2025 | 06/10/2025 | Owner HELM MANAGEMENT INC Contractor DEMAR MECHANICAL INC Filer SUSKA INC | Cap & Remove existing legalized gas dryers filed under job# M00719091 and job# M00719121 replaced with new electrical type. No change in use… |
| M01181648 ↗ | 2 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 04/21/2025 | 06/09/2025 | Owner HOFFMAN MANAGEMENT Contractor HVAC EXPERTS, INC | PARTIAL APARTMENT RENOVATION ON THE 8TH FLOOR INCLUDING KITCHEN, LAUNDRY ROOM RENOVATIONS, INSTALLATION OF INTERIOR FINISHES AND LENGHTENING… |
| Q08021047 ↗ | 25-54 12 STREET QUEENS | Alteration | Signed-off | 11/04/2022 | 05/22/2025 | Contractor CROSSFIELD PLBG.&HTG | replacement of existing gas boiler with a new one |
| Q01173594 ↗ | 56-02 31ST AVENUE QUEENS | Alteration | Permit Issued | 05/02/2025 | 05/21/2025 | Contractor GO PRO FIRE PROTECTION C | Modification of exist sprinkler system on 2nf floor as per plans attached herewith. No change in use, egress and occupancy. |
| S01097087 ↗ | 45 WINDY HOLLOW WAY STATEN ISLAND | Alteration | Permit Issued | 01/23/2025 | 05/20/2025 | Contractor BOGUMIL KUREK | INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01158938 ↗ | 404 EAST 76 STREET MANHATTAN | Alteration | Permit Issued | 05/08/2025 | 05/19/2025 | Contractor COOLING CONTROLS CORP | INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY, |
| M00935433 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 11/02/2023 | 04/18/2025 | Contractor CROSSFIELD PLBG.&HTG | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY |
| Q08021050 ↗ | 25-54 12 STREET QUEENS | Alteration | Signed-off | 11/02/2022 | 04/01/2025 | Contractor CROSSFIELD PLBG.&HTG | modification of the gas piping in the cellar to accommodate gas boiler replacement |
| B00671559 ↗ | 122 HURON STREET BROOKLYN | Alteration | Signed-off | 05/19/2023 | 03/14/2025 | Contractor HIGHLAND PLUMBING LLC | INSTALLATION OF NEW WATER SERVICE AND SPRINKLER SYSTEM IN ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00959048 ↗ | 333 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 02/01/2024 | 02/24/2025 | Contractor NEW YORK PARK PLBG&HTG CO | Plumbing work related to the combination of apartments 16A and 16D on the 15th floor. |
| Q01148539 ↗ | 90-60 UNION TURNPIKE QUEENS | Alteration | Signed-off | 01/16/2025 | 02/07/2025 | — | JOB FILED TO SHOW REMOWAL OF NON LOAD BEARING PARTITION WALL AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01167266 ↗ | 345 WEST 123 STREET MANHATTAN | Alteration | Signed-off | 01/16/2025 | 02/05/2025 | Contractor ZORIA HOUSING, LLC | Architectural work is proposed to restore and maintain SRO units. All per submitted plans. No changes to use, egress, or occupancy under thi… |
| M01041747 ↗ | 521 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 10/01/2024 | 01/29/2025 | Owner ABC REALTY Contractor SUPERB PLUMBING & HEATING | Modification of exist gas piping, replacement of exist gas riser cellar - 3rd floor, Cap & remove 8 gas meters on 4,5,6,7,8,8,9,10, Installa… |
| Q00803026 ↗ | 61-20 55 DRIVE QUEENS | Alteration | Signed-off | 02/13/2023 | 01/29/2025 | Contractor SIGNORE & SONS PLBG CORP | FILING HEREWITH TO RELOCATE BOILER ROOM & INSTALL NEW EQUIPMENT; RELOCATE BATHROOM & LAUNDRY AREA & FIXTURES IN EXISTING BASEMENT DUE TO HUR… |
| M01169197 ↗ | 147 WEST 78 STREET MANHATTAN | Alteration | Permit Issued | 01/22/2025 | 01/27/2025 | Contractor SHIN DEVELOPMENT CORP | General construction related to the minor renovation of apartment 1B in the basement. Work to include the replacement of wood flooring, plyw… |
| Q01147175 ↗ | 90-60 UNION TURNPIKE QUEENS | Alteration | Signed-off | 12/30/2024 | 01/27/2025 | — | JOB FILED TO SHOW REMOWAL OF NON LOAD BEARING PARTITION WALL AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01085314 ↗ | 265A NASSAU AVENUE BROOKLYN | Alteration | Filed — no permit on record | 01/14/2025 | — | — | — |
| M01069482 ↗ | 105 EAST 38 STREET MANHATTAN | Alteration | Filed — no permit on record | 12/12/2024 | — | — | — |
| M01069487 ↗ | 105 EAST 38 STREET MANHATTAN | Alteration | Filed — no permit on record | 12/12/2024 | — | — | — |
| Q01082110 ↗ | 37-04 233RD PLACE QUEENS | Alteration | Filed — no permit on record | 12/12/2024 | — | Owner Parsons Beach LLC | — |
| M01087166 ↗ | 410 EAST 57 STREET MANHATTAN | Alteration | Permit Issued | 09/06/2024 | 12/09/2024 | Contractor COOLING CONTROLS CORP | INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS ABD OCCUPANCY. |
| B08038877 ↗ | 14 OLIVE STREET BROOKLYN | Alteration | Signed-off | 07/18/2023 | 12/02/2024 | Contractor DMT PLUMBING&HEATING CORP | Installation of fuel oil storage tank on the 5th floor as per plans. No change in use, egress and occupancy. |
| Q01129259 ↗ | 37-04 233RD PLACE QUEENS | Alteration | Filed — no permit on record | 11/27/2024 | — | — | — |
| Q01125819 ↗ | 59-58 69 LANE QUEENS | Alteration | Signed-off | 11/18/2024 | 11/20/2024 | Contractor GW MECHANICAL CORP | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01027617 ↗ | 78 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/16/2024 | 11/18/2024 | Owner First & 73 LLC Contractor INTEGRATE COMFORT SYSTEM | Installation of 8 Ton multizone HVAC system on 5th floor as per plans attached herewith. No change in use, egress and occupancy. |
| B00884134 ↗ | 225 CALYER STREET BROOKLYN | Alteration CO | Permit Issued | 06/02/2023 | 11/08/2024 | Contractor HOMELINE CONSTRUCTION INC | INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS. |
| X01080923 ↗ | 1856 HUNT AVENUE BRONX | Alteration | Permit Issued | 10/30/2024 | 11/08/2024 | Contractor INTEGRATE COMFORT SYSTEM | INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| Q01124673 ↗ | 1826 WOODBINE STREET QUEENS | Alteration | Signed-off | 10/28/2024 | 11/06/2024 | Owner FSM ELECTRICAL CORP Contractor ORBIT PLBG & HTG INC | PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00700608 ↗ | 241 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/08/2024 | 10/18/2024 | Owner R&T CONSTRUCTION NY INC Contractor DENI INTERNATIONAL INC | Installation of new HVAC systems, kitchen exhaust and makeup system in proposed restaurant as per plan on 1st floor and cellar. No change in… |
| M00935421 ↗ | 2101 BROADWAY ATRIUM MANHATTAN | Alteration | Signed-off | 11/02/2023 | 10/18/2024 | Contractor COOLING CONTROLS CORP | INSTALLATION OF NEW AC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00887984 ↗ | 910 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 10/11/2024 | — | — | |
| B01078133 ↗ | 14 OLIVE STREET BROOKLYN | Alteration | Signed-off | 09/12/2024 | 10/01/2024 | Contractor AMN PLUMBING CORP | Installation of Hot Water Boiler as per plans attached herewith. No change in use, egress and occupancy. |
| B01048061 ↗ | CARROLL STREET BROOKLYN | Alteration | Signed-off | 09/05/2024 | 09/17/2024 | Contractor KNOCKOUT CONSTRUCTION INC. | Installation of new ERV and modification of exist duct work as per plans filed herewith. No change in use, egress and occupancy. |
| Q00539468 ↗ | 86-56 SANCHO STREET QUEENS | Alteration | Signed-off | 08/02/2021 | 08/06/2024 | Contractor AMERICAN STANDARD P&H CORORP. | PLUMBING WORK FILED HEREWITH FOR INSTALLATION OF PLUMBING SYSTEM AS PER PLANS ON CELL. 1ST AND 2ND FLOORS IN CONJUNCTION WITH JOB # 42153796… |