← Back
BuildNYC
Elevator cooperative
Cadman Tower
101 CLARK STREET · Brooklyn Heights · BIN 3001727
💬 Discuss this project
1971Year Built
31Stories
D4Building Class
R8Zoning
450,503 sfGross Floor Area
306Units
LL97 CoveredRent Stabilized2 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: UNSAFE
Elevator cooperative · Owner of record: Cadman Towers Housing Development Fund C Orporation · 80,605 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCadman Towers, INC.3p · 3 filings · 16 docs
Floor 2Cadman Towers, INC.17p · 3 filings · 20 docs
Floor 1Cadman Towers, INC.12p · 2 filings · 18 docs
CellarCadman Towers, INC.20p · 4 filings · 20 docs
Site & exteriorCadman Towers, INC.24p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cadman Towers12307/08/2026
Whitman Owners1003/21/2026
Gristedes103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants703/21/2026
Rand Engineering & Arch403/21/2026
NYPL103/21/2026
Hlzae503/21/2026
CH Building Consultants403/21/2026
AE Design Solution203/21/2026
Riggining Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1407/08/2026
Precision Hoist & Scaffo*Scaffold1307/08/2026
Dual Fuel CompanyGeneral Contractor303/21/2026
The Metro GroupGeneral Contractor303/21/2026
Central Construction ManagementScaffold307/08/2026
Abr Plumbing & Heating ContractingFire Protection207/08/2026
Matros Automated ElectricalElectrical103/21/2026
Central Construction ManagementGeneral Contractor107/08/2026
Abr Plumbing & Heating ContractingPlumbing107/08/2026
Dual Fuel Plumbing & HeatingPlumbing107/08/2026
GW MechanicalPlumbing103/22/2026
A Electrical Main ServiceElectrical103/21/2026
Rael Automatic Sprinkler CoFire Protection107/08/2026
All Ways Electric Corp.wElectrical103/22/2026
Emco Electric ServicesElectrical103/21/2026
Moskowitz StuartElectrical103/21/2026
Nash Electric ServicesElectrical103/22/2026
All Ways Electric Corp.wElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842411/30/2022
Howard L Zimmerman Architects1712108/16/2022
Rand Engineering & Architects266201/03/2022
Building Lifecycle
All (171)Filed (19)Permit Issued (27)Signed Off (11)Facade (FISP) (15)Violation (60)Inspection (6)Objection (18)Special Inspection (15)
10/06/2025
Signed off — Alteration
Installation of temporary chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00594294-I1
09/30/2025
Signed off — Alteration
Installation of temporary sidewalk shed on roadway per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00574771-I1
09/21/2025
Violation issued (HPD, closed)
A
09/21/2025
Violation issued (HPD, closed)
A
09/21/2025
Violation issued (HPD, closed)
A
09/21/2025
Violation issued (HPD, closed)
A
09/21/2025
Violation issued (HPD, closed)
B
09/21/2025
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2024
Violation issued (ECB, closed)
Construction
09/06/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
B00969323-I1
07/30/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00790782-I1
07/24/2024
Permit issued — Sidewalk Shed
B00574771-I1-SH
02/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2024
Cycle 9 facade report signed — UNSAFE
02/05/2024
Signed off — Alteration
Plumbing work being filed in conjunction with renovation project for plaza and garage. No change to use, egress, or occupancy.
B00791708-I1
02/01/2024
Cycle 9 facade inspection completed
01/02/2024
Permit issued — Suspended Scaffold
B00969323-I1-SC
01/02/2024
Objection resolved — Addressed
12/28/2023
Objection raised — Other
12/21/2023
Violation issued (HPD, closed)
C
12/21/2023
Violation issued (HPD, closed)
A
12/11/2023
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
B00969323-I1
11/15/2023
Signed off — Alteration
Sprinkler work being filed in conjunction with renovation project for the garage. No change to use, egress, or occupancy.
B00785604-I1
11/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2023
Permit issued — Sprinklers
B00785604-I1-EW-SP
10/20/2023
Signed off — Alteration
Mechanical work associated with plaza, garage, and roof renovation.
B00321743-I1
10/02/2023
Permit issued — Protection and Mechanical Methods
B00594294-I1-PM
08/01/2023
Permit issued — Sidewalk Shed
B00574771-I1-SH
08/01/2023
Permit issued — Supported Scaffold
B00790782-I1-SF
04/19/2023
Filed — Alteration
Installation of temporary sidewalk shed on roadway per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00574771-P4
03/03/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/04/2023
Permit issued — Mechanical Systems
B00321743-I1-MS
12/13/2022
Special inspection requirement — Duct leakage testing
CONNIE PISANI
12/13/2022
Special inspection requirement — HVAC insulation and sealing
CONNIE PISANI
12/13/2022
Special inspection requirement — Mechanical Systems
CONNIE PISANI
12/13/2022
Special inspection requirement — Final
Jon Colatrella
12/12/2022
Permit issued — Sprinklers
B00785604-I1-EW-SP
11/30/2022
Filed — Alteration
Mechanical work associated with plaza, garage, and roof renovation.
B00321743-P1
11/17/2022
Special inspection requirement — Mechanical Systems
CONNIE PISANI
11/17/2022
Special inspection requirement — Duct leakage testing
CONNIE PISANI
11/17/2022
Special inspection requirement — HVAC insulation and sealing
CONNIE PISANI
11/17/2022
Special inspection requirement — Final
Jon Colatrella
10/28/2022
Permit issued — Plumbing
B00791708-I1-PL
10/11/2022
Signed off — Alteration
PAA TO REVISE: EQ-100.01 EXTEND SIDEWALK SHED 20' SOUTH OF 10 CLINTON ORIGINAL APPROVED LOCATION EXTEND SIDEWALK SHED 20' NORTH OF 101 Cl.ARK ORIGINAL APPROVED LOCATION SEE REVISION CLOUDS ON EQ-100.01
B00396632-I1
09/06/2022
Permit issued — Protection and Mechanical Methods
B00594294-I1-PM
09/02/2022
Filed — Alteration
Plumbing work being filed in conjunction with renovation project for plaza and garage. No change to use, egress, or occupancy.
B00791708-I1
08/31/2022
Permit issued — Sprinklers
B00785604-I1-EW-SP
08/22/2022
Signed off — Alteration
B00551576-I1
08/22/2022
Signed off — Alteration
B00558802-I1
08/18/2022
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00790782-I1
08/18/2022
Permit issued — Supported Scaffold
B00790782-I1-SF
08/17/2022
Filed — Alteration
Installation of temporary sidewalk shed on roadway per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00574771-P3
08/16/2022
Filed — Alteration
Sprinkler work being filed in conjunction with renovation project for the garage. No change to use, egress, or occupancy.
B00785604-I1
08/08/2022
Permit issued — Sidewalk Shed
B00574771-I1-SH
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*07/24/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System01/02/2024
DOB NOWSprinklersSigned-offAbr Plumbing & Heating Contracting11/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*10/02/2023
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*08/01/2023
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*08/01/2023
DOB NOWMechanical SystemsSigned-offThe Metro Group01/04/2023
DOB NOWSprinklersSigned-offAbr Plumbing & Heating Contracting12/12/2022
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting10/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*09/06/2022
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co08/31/2022
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*08/18/2022
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*08/08/2022
DOB NOWSidewalk ShedSigned-offCentral Construction Management03/04/2022
DOB NOWMechanical SystemsSigned-offDual Fuel Company01/14/2022
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating01/14/2022
DOB NOWGeneral ConstructionPermit IssuedCentral Construction Management12/20/2021
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*09/17/2021
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*08/19/2021
DOB NOWSidewalk ShedSigned-offCentral Construction Management04/06/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/18/2020
DOB NOWSidewalk ShedSigned-offCentral Construction Management09/10/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/28/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/19/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/26/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/01/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/05/2018
BISOTISSUEDStructural Preserv System08/04/2025
BISOTISSUEDStructural Preserv System08/04/2025
BISOTISSUEDStructural Preserv System08/04/2025
BISOTISSUEDStructural Preserv System07/01/2024
BISOTISSUEDStructural Preserv System07/01/2024
BISOTISSUEDStructural Preserv System07/01/2024
BISOTISSUEDStructural Preserv System06/27/2023
BISOTISSUEDStructural Preserv System06/27/2023
BISOTISSUEDStructural Preserv System06/27/2023
BISOTISSUEDStructural Preserv System06/27/2022
BISOTISSUEDStructural Preserv System06/27/2022
BISOTISSUEDStructural Preserv System06/27/2022
BISOTISSUEDStructural Preserv System01/13/2022
+ 37 more permits on file
15 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026CompleteKings Electric Co—
07/20/2026CompleteKings Electric Co—
05/14/2025Permit IssuedEmco Electric ServicesGeneral Wiring
04/11/2025Permit IssuedAll Ways Electric Corp.w—
09/05/2024Permit IssuedA Electrical Main ServiceGeneral Wiring
08/08/2023CompletePeter J. CatanzaroGeneral Wiring
02/03/2023Permit IssuedLSM Electrical ContngGeneral Wiring
10/05/2022CompleteLeader Electric CoGeneral Wiring
08/11/2021CompleteNash Electric Services—
01/25/2021CompleteMac Elect'l ContractingGeneral Wiring
12/08/2020Permit IssuedHylan Datacom & Electrical2 meters, 1 new_meters
11/10/2020Permit IssuedTesta Electric CoGeneral Wiring
09/09/2020Permit IssuedTop Shelf Electric—
04/19/2018Permit IssuedJte Electrical Services—
01/18/2018CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/13/2022Duct leakage testing CONNIE PISANIenergy_progress
12/13/2022HVAC insulation and sealing CONNIE PISANIenergy_progress
12/13/2022Mechanical SystemsCONNIE PISANIspecial
12/13/2022FinalJon Colatrellaprogress
11/17/2022Mechanical SystemsCONNIE PISANIspecial
11/17/2022Duct leakage testing CONNIE PISANIenergy_progress
11/17/2022HVAC insulation and sealing CONNIE PISANIenergy_progress
11/17/2022FinalJon Colatrellaprogress
12/09/2021Energy Code Compliance InspectionsCONNIE PISANIprogress
05/14/2021Fenestration air leakageCONNIE PISANIenergy_progress
05/14/2021Insulation placement and R valuesCONNIE PISANIenergy_progress
05/14/2021Air barrier - visual inspectionCONNIE PISANIenergy_progress
05/14/2021Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
01/28/2021FinalJon Colatrellaprogress
10/20/2020FinalNicholas DeFeliceprogress
▾Documents — 362 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch13
09/03/2026B00012930-I1Request digital key ↗
09/01/2026B00594294-I1Request digital key ↗
08/31/2026B00551576-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00396632-I1Request digital key ↗
08/15/2026B00396632-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026B00321743-I1Request digital key ↗
08/15/2026B00321743-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00321748-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026B00462190-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00321748-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION38
05/20/2025322017722Open ↗
07/25/2023321443513Open ↗
02/02/2023322017722Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION38
08/04/2025322017722Open ↗
08/04/2025322017722Open ↗
08/04/2025322017722Open ↗
Showing 3 of 38 on file for this type
▸BISPLACE OF ASSEMBLY2
03/07/2014320581875Open ↗
09/14/2012320581875Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/18/2016320930720Open ↗
03/18/2016320930720Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/27/2016340268971Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/05/2021322017722Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/05/2021322017722Open ↗
▸Seals & Professional Certifications73
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
01/29/2020322017722Open ↗
04/05/2018321682862Open ↗
11/03/2017321682862Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026B00012930-I1Open ↗
09/01/2026B00462190-I1Open ↗
08/31/2026B00551576-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00321743-I1Open ↗
09/02/2026B00321743-I1Open ↗
09/01/2026B00396632-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/06/2013320695226Open ↗
09/21/2012320586022Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/15/2021340809851Open ↗
03/22/2021340808219Open ↗
06/10/2015340268999Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/15/2021340809851Open ↗
03/22/2021340808219Open ↗
06/10/2015340268999Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/15/2021340809851Open ↗
03/22/2021340808219Open ↗
06/10/2015340268999Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/21/2012320586022Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00321743-I1Open ↗
08/25/2026B00321743-P1Open ↗
▸BISProfessional and Owner Certification (POC3)1
02/06/2013320695226Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING8
09/21/2012320586022Open ↗
08/30/2012320489967Open ↗
Showing 2 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
11/02/2013320586022Open ↗
11/02/2013320586022Open ↗
10/01/2012320489967Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/21/2012320586022Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/02/2014320695226Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan6
08/13/2026B00321743-P1Open ↗
08/13/2026B00321748-I1Open ↗
08/13/2026B00462190-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
09/24/2021322017722Open ↗
01/29/2020322017722Open ↗
▸BISTenant Protection Plan and Notes2
01/29/2020322017722Open ↗
11/03/2017321682862Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan Attachments/Drawings1
08/13/2026B00462190-I1—
▸Environmental & Asbestos21
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00551576-I1Open ↗
08/31/2026B00558802-I1Open ↗
08/13/2026B00321743-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/03/2017321682862Open ↗
06/10/2015340268999Open ↗
09/02/2014320930720Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
08/05/2021322017722Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
09/24/2012320581875Open ↗
▸BISASBESTOS INSPECTION REPORT1
09/20/2012320586022Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026B00791708-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
01/29/2020322017722Open ↗
11/03/2017321682862Open ↗
04/25/2017321443513Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/19/2022322017722Open ↗
08/05/2021322017722Open ↗
11/13/2020321682862Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/13/2020321682862Open ↗
07/07/2016320930720Open ↗
06/07/2016320930720Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00551576-I1Open ↗
08/13/2026B00558802-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/10/2015340268971Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/01/2025322017722Open ↗
09/24/2021322017722Open ↗
09/24/2021322017722Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
12/20/2021322017722Open ↗
10/13/2021322017722Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/13/2021322017722Open ↗
▸Approvals, Objections & Sign-offs41
▸BISADMINISTRATIVE OBJECTIONS13
04/07/2020322017722Open ↗
09/02/2014320930720Open ↗
02/06/2013320695226Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
03/13/2020322017722Open ↗
10/17/2017321443513Open ↗
09/18/2014320581875Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
11/13/2020321682862Open ↗
07/07/2016320930720Open ↗
07/07/2016320930720Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER3
08/04/2025322017722Open ↗
01/13/2022322017722Open ↗
12/16/2021322017722Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/09/2015320930720Open ↗
▸BISFLAME SPREAD/FIRE LETTER1
09/18/2014320581875Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00791708-I1Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT27
05/19/2025322017722Open ↗
04/15/2021340809851Open ↗
03/22/2021340808219Open ↗
Showing 3 of 27 on file for this type
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET14
01/29/2020322017722Open ↗
01/29/2020322017722Open ↗
01/29/2020322017722Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION13
06/05/2025322017722Open ↗
02/08/2023322017722Open ↗
12/20/2021322017722Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/15/2021340809851Open ↗
03/22/2021340808219Open ↗
06/10/2015340268999Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
08/04/2025322017722Open ↗
01/13/2022322017722Open ↗
12/16/2021322017722Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/18/2016320930720Open ↗
05/18/2016320930720Open ↗
▸DOB NOWIRA Certification1
08/13/2026B00969323-I1Open ↗