101 WEST 116TH STREET
MANHATTAN · BIN 1057405
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R7-2Zoning
51,072 sfGross Floor Area
2Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 20,022 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMcDonald's USAUnder Construction26p · 1 filing · 19 docs
Floor 2McDonald's USA, Democracy Prep Harlem Middle SchoolUnder Construction31p · 4 filings · 20 docs
Floor 1McDonald's USA, Market SpaceUnder Construction55p · 3 filings · 20 docs
CellarWebster Associates1p · 2 filings · 6 docs
Sub-BasementMcDonald's USAUnder Construction17p · 1 filing · 19 docs
Site & exteriorMcDonald's USAUnder Construction11p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Webster4210/15/2026
Mitchell Enterprises3403/22/2026
101-115 West 116 St Realty1203/21/2026
Democracy Prep Harlem Middle School607/08/2026
Cemusa103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kindo108/28/2026
Bohler Engineering NY508/07/2026
Tatum Smith Welcher Engineers104/03/2026
Jarmel Kizel Architects & Engineers204/01/2026
Not Applicable103/31/2026
Andrew Fredman Architect403/06/2026
VAA312/16/2025
Urban Tectonics504/18/2023
W.d.ross, R.A412/02/2022
Tohfaz Uddin PE103/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting Company803/21/2026
JM Zoning1003/21/2026
Synergy Building Consultants103/21/2026
Vmarchdesign403/21/2026
VAA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A#1 Ace General ContractorsGeneral Contractor603/21/2026
Pasquale QuaratinoPlumbing307/08/2026
Tom Rectenwald ConstructionGeneral Contractor307/08/2026
Procida ConstructionGeneral Contractor204/09/2026
Joseph Weinstein ElectricElectrical203/22/2026
Allstate Construction & RGeneral Contractor207/08/2026
Signstar NYCSign hanger208/20/2026
L.P. Davis Electric CoElectrical103/21/2026
John H. MooreElectrical103/21/2026
Zerem ElectricElectrical103/21/2026
Jimenez LuisElectrical103/21/2026
Miller Plumbing & HeatingPlumbing107/08/2026
Dola Electrical CoElectrical103/21/2026
Admiral ElectricElectrical103/21/2026
Unity Construction ServicesGeneral Contractor107/08/2026
CS BridgeScaffold107/08/2026
Tom Rectenwald ConstructionScaffold106/28/2026
Astro Electrical ContngElectrical103/22/2026
Adriano Plumbing & HeatingPlumbing107/08/2026
Adriano Plumbing & HeatingFire Protection107/08/2026
FirequestFire Protection109/09/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
L J Electrical ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Whitestone Associates Engineering8144508/28/2026
Halo Architecture8021403/06/2026
C.M. Testing Laboratory1352312/16/2025
Benazzi Engineering5603307/01/2022
Building Lifecycle
All (186)Filed (27)Permit Issued (22)Signed Off (8)Violation (60)Inspection (12)Objection (27)Special Inspection (30)
09/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2026
Permit issued — Sprinklers
M01377356-S4-EW-SP
08/28/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S4
08/25/2026
Special inspection requirement — Sprinkler Systems
Mudar Khantamr
08/19/2026
Permit issued — Sign
M01431267-I1-SG
08/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2026
Permit issued — Sign
M01378980-I1-SG
08/07/2026
Filed — Alteration
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
M01378976-P1
07/31/2026
Special inspection requirement — Final
Mudar Khantamr
07/21/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01378980-P1
07/21/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01431267-I1
07/20/2026
Special inspection requirement — Final
Mudar Khantamr
07/08/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/06/2026
Permit issued — Plumbing
M01377356-S3-PL
06/26/2026
Permit issued — Construction Fence
M01378976-I1-FN
06/25/2026
Objection resolved — Addressed
06/24/2026
Objection raised — Other
06/24/2026
Objection resolved — Addressed
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
06/11/2026
Permit issued — Structural
M01377356-S1-ST
06/11/2026
Permit issued — General Construction
M01377356-I1-GC
06/11/2026
Permit issued — Mechanical Systems
M01377356-S2-MS
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2026
Filed — Alteration
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
M01378980-I1
05/14/2026
Objection raised — Other
05/13/2026
Filed — Alteration
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
M01378976-I1
04/22/2026
Signed off — Alteration
Propose to modify plumbing and sprinkler as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
M00447430-I1
04/16/2026
Objection raised — Plumbing
04/16/2026
Objection raised — Plumbing
04/16/2026
Objection raised — Inspections
04/09/2026
Objection raised — Other
04/08/2026
Objection raised — Scope
04/03/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S1
04/01/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S2
04/01/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-S3
03/31/2026
Filed — Alteration
Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy.
M01377356-I1
03/30/2026
Special inspection requirement — Post-installed Anchors
Mudar Khantamr
03/30/2026
Special inspection requirement — Masonry
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Mudar Khantamr
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Mudar Khantamr
03/30/2026
Special inspection requirement — Shutoff dampers
Mudar Khantamr
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
03/30/2026
Special inspection requirement — Maintenance information
Mudar Khantamr
03/30/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Mudar Khantamr
03/30/2026
Special inspection requirement — Subgrade Inspections
Mudar Khantamr
03/30/2026
Special inspection requirement — Structural Cold-Formed Steel
Mudar Khantamr
03/24/2026
Special inspection requirement — Final
Mudar Khantamr
03/24/2026
Special inspection requirement — Mechanical Systems
Mudar Khantamr
03/24/2026
Special inspection requirement — Structural Steel - Details
Mudar Khantamr
03/24/2026
Special inspection requirement — Final
Mudar Khantamr
03/13/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-S1
03/13/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-I1
03/09/2026
Permit issued — General Construction
M01321549-I1-GC
03/09/2026
Permit issued — General Construction
M01321545-I1-GC
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
03/09/2026
Special inspection requirement — Final
Hanli Liu
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
03/06/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01321545-P1
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedFirequest09/08/2026
DOB NOWSignPermit IssuedSignstar NYC08/19/2026
DOB NOWSignPermit IssuedSignstar NYC08/12/2026
DOB NOWPlumbingPermit IssuedJ. Caiazzo Plumbing & Heating07/06/2026
DOB NOWConstruction FencePermit IssuedTom Rectenwald Construction06/26/2026
DOB NOWStructuralPermit IssuedTom Rectenwald Construction06/11/2026
DOB NOWGeneral ConstructionPermit IssuedTom Rectenwald Construction06/11/2026
DOB NOWMechanical SystemsPermit IssuedTom Rectenwald Construction06/11/2026
DOB NOWGeneral ConstructionPermit IssuedProcida Construction03/09/2026
DOB NOWGeneral ConstructionSigned-offProcida Construction03/09/2026
DOB NOWPlumbingSigned-offMiller Plumbing & Heating12/15/2025
DOB NOWPlumbingSigned-offPasquale Quaratino11/28/2023
DOB NOWPlumbingSigned-offPasquale Quaratino04/25/2023
DOB NOWPlumbingSigned-offPasquale Quaratino08/16/2022
DOB NOWGeneral ConstructionSigned-offUnity Construction Services08/01/2022
DOB NOWGeneral ConstructionSigned-offAllstate Construction & R05/23/2022
DOB NOWGeneral ConstructionSigned-offAllstate Construction & R03/30/2022
DOB NOWGeneral ConstructionSigned-offA#1 Ace General Contractors03/25/2022
DOB NOWSupported ScaffoldSigned-offCS Bridge03/14/2022
DOB NOWGeneral ConstructionSigned-offA#1 Ace General Contractors10/08/2021
DOB NOWSprinklersSigned-offAdriano Plumbing & Heating03/03/2021
DOB NOWPlumbingSigned-offAdriano Plumbing & Heating02/08/2021
BIS—ISSUEDSardar Restoration10/15/2025
BISPLISSUEDPasquale Quaratino07/17/2025
BIS—ISSUEDSardar Restoration04/02/2025
BISPLISSUEDPasquale Quaratino01/07/2025
BISPLISSUEDPasquale Quaratino09/27/2023
BISPLISSUEDPasquale Quaratino09/27/2023
BISPLISSUEDPasquale Quaratino09/27/2023
BISPLISSUEDPasquale Quaratino09/27/2023
BISPLISSUEDPasquale Quaratino09/27/2023
BISPLISSUEDPasquale Quaratino03/07/2023
BIS—ISSUEDAllstate Construction & R07/19/2022
BIS—ISSUEDAllstate Construction & R06/14/2022
BIS—ISSUEDAllstate Construction & R06/14/2022
BISPLISSUEDPasquale Quaratino12/22/2021
BISPLISSUEDPasquale Quaratino12/22/2021
BISPLISSUEDPasquale Quaratino12/22/2021
BISPLISSUEDPasquale Quaratino12/22/2021
BISPLISSUEDPasquale Quaratino12/22/2021
+ 32 more permits on file
1 project · most recent 08/28/2026
Heating and Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2026Permit IssuedTom Rectenwald ConstructionHeating and Air Conditioning Systems, Others, Ventilation Systems
Heat / Cool
Mitsubishi Electric TPEFYP054MA144A 60,000 BTU · Vrf Indoor ×4
TPEFYP072MH140A 80,000 BTU · Fan Coil Indoor ×1
Accurex XID-7-VG 600 CFM · Exhaust Fan ×1
Captiveaire CAS-HVAC3-E.902-24-20T-DOAS 3,255 CFM · Doas ×1
Ventilation
Accurex XUEF-4 575 CFM · Exhaust Fan ×2
XID-7-VG 100 CFM · Exhaust Fan ×1
XUEF-13 1,350 CFM · Exhaust Fan ×1
Other
Mitsubishi Electric TURYE2883BN41AN 320,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/28/2026
Sprinkler System
FiledStatusContractorScope
08/28/2026Permit IssuedFirequestSprinkler System
1 project · most recent 08/28/2026
Water/Sanitary
FiledStatusContractorScope
08/28/2026Permit IssuedJ. Caiazzo Plumbing & HeatingWater/Sanitary
13 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedKamp ElectricGeneral Wiring
07/11/2026Permit IssuedLebo ElectricGeneral Wiring
05/19/2026Permit IssuedAmr Electrical ContractingGeneral Wiring
12/31/2025Permit IssuedJoseph Weinstein Electric1 meters
12/31/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
12/31/2025Permit IssuedJoseph Weinstein Electric2 meters
12/31/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
12/02/2025CompleteJoseph Weinstein ElectricGeneral Wiring
12/02/2025CompleteJoseph Weinstein ElectricGeneral Wiring
12/02/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
12/02/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
11/28/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
10/19/2022CompleteAstro Electrical Contng—
1 project · most recent 08/28/2026
Steel Concrete Wood
FiledStatusContractorScope
08/28/2026Permit IssuedFirequestSteel, Concrete, Wood
1 project · most recent 08/07/2026
Fence
FiledStatusContractorScope
08/07/2026Permit IssuedTom Rectenwald ConstructionFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2026Pass-Final PL - UndergroundPassView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/11/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/25/2026Sprinkler SystemsMudar Khantamrspecial
07/31/2026FinalMudar Khantamrprogress
07/20/2026FinalMudar Khantamrprogress
06/19/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
03/30/2026Post-installed AnchorsMudar Khantamrspecial
03/30/2026MasonryMudar Khantamrspecial
03/30/2026HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
03/30/2026HVAC-R and service water heating equipmentMudar Khantamrenergy_progress
03/30/2026Duct leakage testing, insulation and designMudar Khantamrenergy_progress
03/30/2026Shutoff dampersMudar Khantamrenergy_progress
03/30/2026HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
03/30/2026Maintenance informationMudar Khantamrenergy_progress
03/30/2026Subsurface Conditions – Fill Placement & In-Place DensityMudar Khantamrspecial
03/30/2026Subgrade InspectionsMudar Khantamrspecial
03/30/2026Structural Cold-Formed SteelMudar Khantamrspecial
03/24/2026FinalMudar Khantamrprogress
03/24/2026Mechanical SystemsMudar Khantamrspecial
03/24/2026Structural Steel - DetailsMudar Khantamrspecial
03/24/2026FinalMudar Khantamrprogress
03/09/2026Fire-Resistance Rated ConstructionHanli Liuprogress
03/09/2026FinalHanli Liuprogress
03/09/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
01/01/2026Sprinkler SystemsJOHN SEMIOLIspecial
11/19/2025Air barrier - visual inspectionHanli Liuenergy_progress
11/19/2025PreliminaryHanli Liuprogress
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
McDonald's USARestaurant / Food ServiceSub-basement, Floors 1, 2, Roof
Project M01378980 Alteration · Permit Entire · 05/19/2026
Project M01377356 Alteration · Permit Entire · 03/31/2026
Market SpaceRetailFloor 1
Project M01321545 Alteration · LOC Issued · 11/26/2025
Project M01321549 Alteration · Permit Entire · 11/26/2025
Democracy Prep Harlem Middle SchoolEducationFloor 2
Project M00757550 Alteration · LOC Issued · 07/07/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 847 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch21
09/03/2026M00573560-I1Request digital key ↗
09/02/2026M00691429-I1Request digital key ↗
09/02/2026M00766078-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/20/2026M00447430-P2Request digital key ↗
08/20/2026M00447430-I1Request digital key ↗
08/15/2026M00447430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/20/2026M00447430-P2Request digital key ↗
08/20/2026M00447430-I1Request digital key ↗
08/15/2026M00447430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/02/2026M00757549-I1Request digital key ↗
09/02/2026M00757549-P1Request digital key ↗
▸Applications & Permits248
▸BISPLAN / WORK APPROVAL APPLICATION163
10/15/2025102561577Open ↗
04/02/2025100436798Open ↗
02/07/2025100436798Open ↗
Showing 3 of 163 on file for this type
▸BISWORK PERMIT APPLICATION73
04/02/2025100436798Open ↗
03/26/2025100436798Open ↗
09/27/2023102561577Open ↗
Showing 3 of 73 on file for this type
▸BISPLACE OF ASSEMBLY11
01/21/2025123550629Open ↗
01/21/2025123550610Open ↗
Showing 2 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications106
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/03/2026M00573560-I1Open ↗
09/03/2026M00573560-P1Open ↗
09/02/2026M00691429-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00766078-I1Open ↗
09/01/2026M01377356-S2Open ↗
09/01/2026M01377356-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01377356-S4Open ↗
09/01/2026M00766078-I1Open ↗
09/01/2026M01377356-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment85
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE32
10/04/2022103093484Open ↗
10/04/2022101930644Open ↗
02/11/2022100436798Open ↗
Showing 3 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING25
10/15/2025102561577Open ↗
05/31/2024102561577Open ↗
05/07/2024101009249Open ↗
Showing 3 of 25 on file for this type
▸BISEQUIPMENT USE PERMITS22
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
05/10/2023101930644Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/20/2026M01321545-P1Open ↗
08/20/2026M01321545-S1Open ↗
08/20/2026M01321545-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/05/2022100436798Open ↗
08/05/2022100436798Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY LIGHTING - PA1
12/17/2024123550629Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY12
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
Showing 2 of 12 on file for this type
▸BISLetter to Change Work Order (Prior to Inspection)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-012
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BIS* SOIL BEARING PRESSURE (AI-1) 27-6781
02/01/2023101930644Open ↗
▸BIS* WELDING 27-6161
02/01/2023101930644Open ↗
▸Approvals, Objections & Sign-offs135
▸BISLETTERS - SUPPORTING DOCUMENTATION44
04/02/2025100436798Open ↗
09/27/2023102561577Open ↗
09/27/2023102561577Open ↗
Showing 3 of 44 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
10/08/2025101009249Open ↗
03/01/2024102096535Open ↗
11/02/2023104555312Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE26
10/11/2023100436798Open ↗
10/06/2023100436798Open ↗
09/29/2023100436798Open ↗
Showing 3 of 26 on file for this type
▸BISSUPERSEDING LETTER23
04/02/2025100436798Open ↗
06/15/2022103093484Open ↗
06/15/2022100436798Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISANSUL SYSTEM SIGNOFF1
12/17/2024123550629Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/01/2023101930644Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸Filing & Intake Forms150
▸BISBOROUGH INTAKE FORM85
03/07/2023100967116Open ↗
03/01/2023100967116Open ↗
Showing 2 of 85 on file for this type
▸BISADDITIONAL INFORMATION53
12/17/2024102561577Open ↗
12/17/2024102561577Open ↗
03/15/2024102561577Open ↗
Showing 3 of 53 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00757549-P1Open ↗
08/16/2026M00757550-P2Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BIS* FIRE STOPS 27-3452
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
02/01/2023101930644Open ↗
08/05/2022100436798Open ↗
▸BISTCO - Supporting Documents1
01/12/2023100436798Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
02/01/2023101930644Open ↗
▸BIS* HIGH STRENGTH BOLTS TABLE 10-21
02/01/2023101930644Open ↗