LL97 CoveredRent Stabilized3 Active Violations 6 likely answered 4 old, status unconfirmed ▸FISP: SAFE
Condo, other/miscellaneous [derived] · Owner of record: The Park Belvedere Condominium · 12,031 sf lot · 14.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe Park Belvadere10p · 2 filings · 6 docs
PenthouseUnit PHB6p · 1 filing · 13 docs
Floor 31Unit 31A, Unit 31B15p · 1 filing · 20 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24Unit 24B11p · 2 filings · 13 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17Unit 17A8p · 1 filing · 20 docs
Floor 16Unit 16B, Unit 16C5p · 2 filings · 16 docs
Floor 15Unit 16C, Unit 16D6p · 1 filing · 14 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9B4p · 1 filing · 17 docs
Floor 8
Floor 7Unit 7D6p · 1 filing · 13 docs
Floor 6Unit 6D, Unit 6EUnder Construction9p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Sub-Basement2p · 1 filing · 10 docs
Site & exterior1 filing · 2 docs
Filed — no permit issued5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Belevedere Condominium12103/22/2026
Park Belvedere LLC C/O2103/21/2026
Ghibly Realty603/21/2026
Park 79 Preservation407/08/2026
Black Diamonds403/21/2026
ABC Realty403/21/2026
Gilbert Global Equity Capital203/21/2026
Hadar Apartments103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bricolage Designs403/21/2026
Kna Consulting603/21/2026
Lombardo Building Consultants103/21/2026
Gerald J Caliendo Architect P203/21/2026
Wla Engineering P C203/21/2026
Idm Associates403/21/2026
JRL Skyline403/21/2026
Zen Construction Consulting103/21/2026
Spring Scaffolding803/21/2026
JLS Designs103/21/2026
ADG Architecture Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1707/08/2026
Interior Masters Group ofGeneral Contractor1107/08/2026
NYC Design & RenoGeneral Contractor707/08/2026
Hyatt InteriorsGeneral Contractor403/21/2026
H.K. Mechanical ServicePlumbing407/08/2026
Dordevic AdcGeneral Contractor207/08/2026
Gregg NY PlumbingPlumbing207/08/2026
SuburbanaGeneral Contractor207/08/2026
John Fitzgerald Plumbing & HeatingPlumbing207/08/2026
L.A. New York Restorationspecialty_contractor207/08/2026
BK Plumbing & Heating CoPlumbing207/08/2026
Flow-Right Plumbing & HeatingPlumbing108/12/2026
Metrotech MechanicalPlumbing107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Glendale Electl ContngElectrical103/21/2026
Samuel & Sons P & HPlumbing107/08/2026
F & F ElectricalElectrical103/22/2026
Johnson RaymondElectrical103/21/2026
Elmac ElectricElectrical103/21/2026
USA Elect'l ServicesElectrical103/21/2026
HI-Rite ElectricElectrical103/21/2026
Acer ConstructionGeneral Contractor107/23/2026
Elan ContractsGeneral Contractor107/08/2026
KNG Construction CoGeneral Contractor107/08/2026
Monello EnterprisesGeneral Contractor108/16/2026
Quad ContractingGeneral Contractor107/08/2026
Arsenal ScaffoldScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Politi Architecture9633209/09/2026
Yang Engineering8376409/04/2026
Logan Lavail Architect3443301/28/2025
Michael Zenreich Architects1724201/02/2025
Socotec Engineering4983107/12/2024
Ryan Special Engineering2018102/13/2024
Doyun Kim; RA7415103/04/2022
Ayuso Architecture7720110/11/2021
Building Lifecycle
All (237)Filed (37)Permit Issued (45)Signed Off (13)Facade (FISP) (15)Violation (60)Inspection (17)Objection (20)Special Inspection (30)
10/08/2026
Signed off — Alteration
Combination of two class "A" apartments. No change of use, egress or occupancy under this application.
M01306953-I1
10/05/2026
Special inspection requirement — Final
Thomas Politi
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Politi
10/05/2026
Special inspection requirement — Lighting in dwelling units
Thomas Politi
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Thomas Politi
09/25/2026
Objection resolved — Resolved
09/18/2026
Objection raised — Other
09/09/2026
Filed — Alteration
Combination of two class "A" apartments. No change of use, egress or occupancy under this application.
M01306953-P1
09/04/2026
Filed — Alteration
COMBINATION AND RENOVATION OF TWO (2) EXISTING APARTMENTS, #6D & #6E, INTO ONE APARTMENT. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
M00499159-P2
08/14/2026
Permit issued — Structural
M01384814-I1-GC-CX
08/13/2026
Special inspection requirement — Lighting in dwelling units
Jian Yang
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/11/2026
Permit issued — Plumbing
M01384814-S1-PL
07/29/2026
Signed off — Alteration
Application being filed to show combination and renovation of existing apartments 17 A,B,C and D on 17th floor as per TPPN #3/97. Plumbing work includes removal, replacement and installation of fixtures. No change in use, egress, or occupancy.
M00653072-I1
07/29/2026
Signed off — Alteration
Application being filed to show combination and renovation of existing apartments 17 A,B,C and D on 17th floor as per TPPN #3/97. Plumbing work includes removal, replacement and installation of fixtures. No change in use, egress, or occupancy.
M00653072-S1
07/22/2026
Permit issued — General Construction
M00499159-I1-GC
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Politi
07/22/2026
Special inspection requirement — Final
Thomas Politi
07/22/2026
Special inspection requirement — Lighting in dwelling units
Thomas Politi
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Thomas Politi
06/20/2026
Objection resolved — Resolved
06/17/2026
Objection raised — Scope
05/22/2026
Filed — Alteration
Interior renovation of Unit B
M01384814-S1
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/20/2026
Special inspection requirement — Maintenance information
Jian Yang
05/01/2026
Filed — Alteration
M00537980-P1
05/01/2026
Permit issued — Plumbing
M00537980-I1-PL
04/21/2026
Permit issued — General Construction
M01306953-I1-GC
04/16/2026
Filed — Alteration
Interior renovation of Unit B
M01384814-I1
04/09/2026
Special inspection requirement — Final
anthony santoro
01/21/2026
Objection resolved — Addressed
12/10/2025
Objection raised — Zoning
11/21/2025
Filed — Alteration
Combination of two class "A" apartments. No change of use, egress or occupancy under this application.
M01306953-I1
10/21/2025
Signed off — Alteration
M01061881-I1
10/02/2025
Filed — Alteration
M01286641-I1
09/11/2025
Signed off — Alteration
SCOPE OF WORK WILL INCLUDE INTERIOR RENOVATIONS TO APT. #16C AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00606237-I1
08/20/2025
Filed — Alteration
SCOPE OF WORK WILL INCLUDE INTERIOR RENOVATIONS TO APT. #16C AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00606237-P1
08/04/2025
Filed — Alteration
Application being filed to show combination and renovation of existing apartments 17 A,B,C and D on 17th floor as per TPPN #3/97. Plumbing work includes removal, replacement and installation of fixtures. No change in use, egress, or occupancy.
M00653072-P2
04/23/2025
Permit issued — Plumbing
M00959162-S2-PL
03/13/2025
Permit issued — General Construction
M01061881-I1-GC
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Logan LaVail
02/18/2025
Special inspection requirement — Final
Logan LaVail
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Logan LaVail
02/10/2025
Violation issued (ECB, open)
Construction
01/28/2025
Filed — Alteration
RELOCATION AND INSTALLATION OF GAS AND PLUMBING FIXTURES TO APT 31 A/B
M00959162-P2
01/28/2025
Filed — Alteration
RELOCATION AND INSTALLATION OF GAS AND PLUMBING FIXTURES TO APT 31 A/B
M00959162-P1
01/16/2025
Special inspection requirement — Final
Logan LaVail
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Logan LaVail
01/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Logan LaVail
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
01/14/2025
Special inspection requirement — Final
Michael Zenreich
01/02/2025
Filed — Alteration
Application being filed to show combination and renovation of existing apartments 17 A,B,C and D on 17th floor as per TPPN #3/97. Plumbing work includes removal, replacement and installation of fixtures. No change in use, egress, or occupancy.
M00653072-P3
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/2024
Special inspection requirement — Final
Michael Zenreich
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
10/08/2024
Permit issued — Plumbing
M00653072-S1-PL
09/16/2024
Permit issued — General Construction
M00959162-I1-GC
Latest 60 of 237 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMonello Enterprises08/14/2026
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating08/11/2026
DOB NOWGeneral ConstructionPermit IssuedAcer Construction07/22/2026
DOB NOWPlumbingSigned-offGregg NY Plumbing05/01/2026
DOB NOWGeneral ConstructionSigned-offQuad Contracting04/21/2026
DOB NOWPlumbingPermit IssuedBK Plumbing & Heating Co04/23/2025
DOB NOWGeneral ConstructionSigned-offL.A. New York Restoration03/13/2025
DOB NOWPlumbingSigned-offH.K. Mechanical Service10/08/2024
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno09/16/2024
DOB NOWGeneral ConstructionSigned-offL.A. New York Restoration07/31/2024
DOB NOWGeneral ConstructionSigned-offInterior Masters Group of07/11/2024
DOB NOWGeneral ConstructionSigned-offInterior Masters Group of07/11/2024
DOB NOWMechanical SystemsPermit IssuedNYC Design & Reno05/03/2024
DOB NOWPlumbingPermit IssuedBK Plumbing & Heating Co04/24/2024
DOB NOWGeneral ConstructionSigned-offNYC Design & Reno04/24/2024
DOB NOWPlumbingSigned-offH.K. Mechanical Service03/13/2024
DOB NOWGeneral ConstructionSigned-offInterior Masters Group of12/19/2023
DOB NOWGeneral ConstructionSigned-offInterior Masters Group of12/05/2023
DOB NOWGeneral ConstructionSigned-offDordevic Adc04/05/2023
DOB NOWPlumbingSigned-offH.K. Mechanical Service03/29/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/22/2023
DOB NOWPlumbingSigned-offH.K. Mechanical Service11/21/2022
DOB NOWGeneral ConstructionSigned-offInterior Masters Group of11/19/2022
DOB NOWPlumbingSigned-offM&G Plumbing and Heating09/23/2022
DOB NOWGeneral ConstructionSigned-offKNG Construction Co08/03/2022
DOB NOWGeneral ConstructionSigned-offSuburbana06/23/2022
DOB NOWPlumbingSigned-offSamuel & Sons P & H05/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold05/19/2022
DOB NOWGeneral ConstructionSigned-offSuburbana05/13/2022
DOB NOWGeneral ConstructionSigned-offDordevic Adc04/05/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/24/2022
DOB NOWGeneral ConstructionSigned-offElan Contracts12/13/2021
DOB NOWPlumbingSigned-offMetrotech Mechanical11/23/2021
DOB NOWGeneral ConstructionSigned-offHyatt Interiors11/18/2021
DOB NOWMechanical SystemsSigned-offHyatt Interiors11/18/2021
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating11/13/2021
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating10/28/2021
DOB NOWPlumbingSigned-offGregg NY Plumbing06/30/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/02/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding01/06/2021
+ 55 more permits on file
4 projects · most recent 05/22/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/22/2026Signed-offFlow-Right Plumbing & HeatingWater/Sanitary
08/04/2025Signed-offH.K. Mechanical ServiceGas, Water/Sanitary
01/28/2025Permit IssuedBK Plumbing & Heating CoGas, Water/Sanitary
04/05/2023Signed-offSamuel & Sons P & HGas, Water/Sanitary
22 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedK-10 ElectricGeneral Wiring
09/26/2025CompleteT.M.T. Electric—
06/12/2025CompleteS.A.L. Electric Co—
05/21/2025CompleteApollo Electric USAGeneral Wiring
02/04/2025CompleteS.A.L. Electric Co—
01/02/2025CompleteFSM ElectricalGeneral Wiring
11/11/2024Permit IssuedNelson & Tom Maintenance Inc DBGeneral Wiring
10/18/2024Permit IssuedJoseph Weinstein ElectricGeneral Wiring
07/10/2024CompleteUnited Electrical Cont'gGeneral Wiring
07/03/2024CompleteCrosswire ElectricalGeneral Wiring
04/03/2024CompleteRobert ChimentiGeneral Wiring
04/13/2022CompleteNash Electric Services—
04/12/2022CompleteInfinity ElectricGeneral Wiring
11/01/2021Permit IssuedRobert Chimenti4 meters, 1 new_meters
07/02/2021CancelledLerco ElectricGeneral Wiring
1 project · most recent 05/22/2026
FiledStatusContractorScope
05/22/2026Signed-offMonello Enterprises1 scope_items
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/05/2026FinalThomas Politiprogress
10/05/2026Fire-Resistant Penetrations and JointsThomas Politispecial
10/05/2026Lighting in dwelling unitsThomas Politienergy_progress
10/05/2026Energy Code Compliance InspectionsThomas Politiprogress
08/13/2026Lighting in dwelling unitsJian Yangenergy_progress
08/13/2026Energy Code Compliance InspectionsJian Yangprogress
08/13/2026Fire-Resistant Penetrations and JointsJian Yangspecial
07/22/2026Fire-Resistant Penetrations and JointsThomas Politispecial
07/22/2026FinalThomas Politiprogress
07/22/2026Lighting in dwelling unitsThomas Politienergy_progress
07/22/2026Energy Code Compliance InspectionsThomas Politiprogress
05/20/2026Energy Code Compliance InspectionsJian Yangprogress
05/20/2026Fire-Resistant Penetrations and JointsJian Yangspecial
05/20/2026Maintenance informationJian Yangenergy_progress
04/09/2026Finalanthony santoroprogress
02/18/2025Fire-Resistance Rated ConstructionLogan LaVailprogress
02/18/2025FinalLogan LaVailprogress
02/18/2025Fire-Resistant Penetrations and JointsLogan LaVailspecial
01/16/2025FinalLogan LaVailprogress
01/16/2025Fire-Resistant Penetrations and JointsLogan LaVailspecial
01/16/2025Fire-Resistance Rated ConstructionLogan LaVailprogress
01/14/2025Fire-Resistant Penetrations and JointsMichael Zenreichspecial
01/14/2025FinalMichael Zenreichprogress
11/25/2024FinalMichael Zenreichprogress
11/25/2024Fire-Resistant Penetrations and JointsMichael Zenreichspecial
Latest 25 of 48.
▾Documents — 1,073 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch34
09/06/2026M00033857-I1Request digital key ↗
09/03/2026M00499159-I1Request digital key ↗
09/03/2026M00499159-P2Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/06/2026M00033857-P1Request digital key ↗
09/06/2026M00033857-P3Request digital key ↗
09/06/2026M00033857-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits259
▸BISWORK PERMIT APPLICATION127
07/14/2023123416847Open ↗
11/18/2022123348270Open ↗
09/06/2022140372763Open ↗
Showing 3 of 127 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION100
10/30/2021122869903Open ↗
04/07/2021122869903Open ↗
03/26/2021123416847Open ↗
Showing 3 of 100 on file for this type
▸DOB NOWLPC Approval/Permit31
09/03/2026M00499159-P2Open ↗
09/03/2026M00606237-I1Open ↗
09/03/2026M00606237-P1Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/01/2020140955107Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications203
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION86
03/30/2020123510922Open ↗
03/30/2020123510922Open ↗
03/24/2020123416847Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/06/2026M00033857-P1Open ↗
09/06/2026M00033857-I1Open ↗
09/06/2026M00033857-P3Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/06/2026M01306953-I1Open ↗
10/06/2026M01306953-P1Open ↗
10/06/2026M01306953-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/06/2026M01306953-I1Open ↗
10/06/2026M01306953-P1Open ↗
10/04/2026M00499159-P2Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/26/2020140944888Open ↗
04/25/2018140749091Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/01/2020140955107Open ↗
08/26/2020140944888Open ↗
04/25/2018140749091Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/26/2020140944888Open ↗
04/25/2018140749091Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
10/01/2020140955107Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment86
▸BISSELF-CERT PLUMBING NOTICE35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING31
10/30/2021122869903Open ↗
Showing 1 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
06/24/2019123783110Open ↗
05/24/2019123510922Open ↗
05/02/2019123510922Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes17
06/24/2019123783110Open ↗
05/30/2019123416847Open ↗
03/05/2019123755098Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan4
09/06/2026M00033857-P2Open ↗
09/06/2026M00033857-P1Open ↗
09/06/2026M00033857-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/16/2019123416847Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos69
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
09/03/2026M00499159-P2Open ↗
09/03/2026M00606237-I1Open ↗
09/03/2026M00606237-P1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
10/01/2020140955107Open ↗
06/24/2019123783110Open ↗
04/24/2019123510922Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00605538-I1Open ↗
08/13/2026M00605533-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/30/2020123510922Open ↗
03/30/2020123510922Open ↗
08/14/2019122254791Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
12/02/2021122869903Open ↗
03/30/2020123510922Open ↗
08/14/2019122254791Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/06/2023123112979Open ↗
12/02/2021122869903Open ↗
10/01/2020140955107Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/01/2020140955107Open ↗
04/25/2018140749091Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/14/2026M00685126-I1Open ↗
08/13/2026M00744493-I1Open ↗
08/13/2026M00605533-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/01/2023123112979Open ↗
09/29/2023123416847Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/29/2023123416847Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/29/2023123416847Open ↗
▸BISFENESTRATION AREAS1
09/29/2023123416847Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/29/2023123416847Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/29/2023123416847Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY13
11/06/2023123112979Open ↗
12/02/2021122869903Open ↗
12/02/2021122869903Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs113
▸BISLANDMARKS APPROVAL42
10/01/2020140955107Open ↗
08/26/2020140944888Open ↗
07/05/2019123783110Open ↗
Showing 3 of 42 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
10/02/2023123416847Open ↗
12/03/2021122869903Open ↗
02/24/2021123783110Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
11/18/2022123348270Open ↗
09/09/2020140372763Open ↗
09/23/2019140372763Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS SIGNOFF7
04/28/2025140944888Open ↗
10/02/2023123416847Open ↗
12/03/2021122869903Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL3
09/29/2023123416847Open ↗
01/11/2023123112979Open ↗
10/13/2020122792488Open ↗
▸BISSHED LETTER3
09/06/2022140372763Open ↗
09/03/2021140372763Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER2
08/19/2021123348270Open ↗
Showing 1 of 2 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M01384814-I1Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT70
12/02/2021122869903Open ↗
01/08/2021123348270Open ↗
10/13/2020122792488Open ↗
Showing 3 of 70 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/06/2023123112979Open ↗
09/29/2023123416847Open ↗
02/24/2021123783110Open ↗
▸BISHIC LICENSE OR AFFIDAVIT3
04/24/2019123510922Open ↗
Showing 1 of 3 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/11/2023123416847Open ↗
11/21/2019123416847Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms106
▸BISADDITIONAL INFORMATION41
01/11/2021123416847Open ↗
01/08/2021123348270Open ↗
08/26/2020122792488Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET35
06/24/2019123783110Open ↗
03/05/2019123755098Open ↗
12/14/2018123510922Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM23
07/14/2023123416847Open ↗
11/18/2022123348270Open ↗
09/06/2022140372763Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
10/01/2020140955107Open ↗
08/26/2020140944888Open ↗
Showing 2 of 7 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
02/25/2021123783110Open ↗
07/19/2018123348270Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00959162-I1Open ↗
08/13/2026M00959162-P1Open ↗
08/13/2026M00653072-P3Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.