| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01368742 ↗ | 101 LUQUER STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/11/2026 | 09/24/2026 | Design YANG ENGINEERING LLC Owner HABITAT ON DEGRAW LLC Contractor GREAT STONE GEN'L CONST* Filer SD DESIGN STUDIO LLC | PROPOSE MECHANICAL WORKS AS PER PLAN IN CONJUNCTION WITH ALT-CO JOB#B01368742-I1. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY FILED UNDER… |
| B01177740 ↗ | 152 31 STREET BROOKLYN | Alteration CO | Permit Issued | 02/19/2025 | 09/21/2026 | Owner HARROW NY INC Contractor REDIRECTING LIC INC | PROPOSE TO CONVERT EXISTING THREE-FAMILY TO TWO FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLAN. OBTAIN NEW CO. OTHER WORK TYPES WI… |
| B01223388 ↗ | 877 58 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/12/2025 | 09/21/2026 | Design YANG ENGINEERING LLC Owner JRL BLDNG CONSULTING INC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 2-STORY TWO-FAMILY BUILDING TO 6-STORY 17-FAMILY MIXED-USE BUILDING AS PER PLAN.… |
| B01398732 ↗ | 410 AVENUE N BROOKLYN | Alteration | Permit Issued | 05/07/2026 | 09/16/2026 | Design YANG ENGINEERING LLC Owner LATI PROPERTIES LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR & 1ST THUR 2TH FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01242675 ↗ | 3914 8 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2025 | 09/08/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PARTIAL INTERIOR RENOVATION LIMITED TO CELLAR, 1ST & 2ND FLOORS TO RESTORE PREVIOUSLY APPROVED CONDITIONS IN RESPONSE TO DOB VIOLATION#05032… |
| Q01381207 ↗ | 45-20 83 STREET QUEENS | Alteration CO | Permit Issued | 04/01/2026 | 09/03/2026 | Design YANG ENGINEERING LLC Owner BARONE CONSTRUCTION LLC Contractor SAFEPIPE PLUMBING INC Filer SD DESIGN STUDIO LLC | THE FOUNDATION DRAWINGS HEREIN ARE RELATED TO A NEW ONE-STORY ADDITION TO THE EXISTING BUILDING. |
| Name | Projects together | Most recent |
|---|---|---|
| JIMENEZ BUILDING CONSULTING LLC | 98 | 07/30/2026 |
| JIAN ENGINEERING PLLC | 13 | 09/04/2026 |
| BASIC GROUPS CORP | 9 | 07/13/2026 |
| ALL CITY ENGINEERING, P.C. | 5 | 07/16/2026 |
| BAYSIDE ENGINEERING PC | 4 | 02/14/2026 |
| DEFONSECA ARCHITECTS | 4 | 05/28/2026 |
| HPL ENGINEERING P.C. | 4 | 06/05/2026 |
| NIC 88 CORP | 4 | 05/07/2026 |
| MSM ENGINEERING SERVICES, PLLC | 3 | 05/21/2025 |
| FRANK DENNER ARCHITECT | 2 | 03/11/2025 |
| HTX BUILDING CONSULTING INC | 2 | 07/30/2026 |
| IMC ARCHITECTURE DPC | 2 | 07/16/2026 |
| JAE CHANG DESIGN | 2 | 04/13/2026 |
| PAUL CHRISTAKOS ARCHITECTURE | 2 | 06/18/2026 |
| S M TAM ARCHITECT, PLLC | 2 | 12/22/2025 |
| ATOZ CONSULTING ENGINEERS, PC | 1 | 08/05/2026 |
| BITOPI CONSULTANTS LLC | 1 | 04/01/2026 |
| FABIAN CRUZ PE PLLC | 1 | 05/07/2026 |
| Goodland Build & Design | 1 | 10/15/2025 |
| HRM ENGINEERING SERVICES, PC | 1 | 06/05/2026 |
| HWL ENGINEERING PC | 1 | 03/17/2026 |
| JOHN D NAKROSIS JR BLDG DESIGN | 1 | 09/18/2024 |
| LU ENGINEERING SERVICE PC | 1 | 06/05/2026 |
| MORTAR ARCHITECTURE PLLC | 1 | 10/17/2025 |
| Matthew Cortez | 1 | 07/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| WINWAY DEVELOPMENT LLC | 77 | 07/09/2026 |
| ACER CONSTRUCTION INC | 60 | 08/20/2026 |
| DYNAMIC PLBG & SPRKLR COR | 43 | 07/30/2026 |
| AMERICAN STANDARD P&H COR | 32 | 08/05/2026 |
| WATSON'S PLBG, HTG, & BDG | 10 | 07/21/2026 |
| HCMC GROUP INC | 9 | 02/11/2026 |
| T & T PLUMBING INC | 9 | 02/11/2026 |
| SAFEPIPE PLUMBING INC | 7 | 08/07/2026 |
| WING JAY CONSTRUCTION INC | 7 | 07/30/2026 |
| AIR DEPOT COMM. REFR. COR | 6 | 11/18/2025 |
| CATMAN PLUMBING INC | 6 | 08/13/2026 |
| REGAL CONSTRUCTION GROUP | 6 | 07/20/2026 |
| STEEL TONE CONSTRUCTION | 6 | 05/07/2026 |
| JOHN FITZGERALD PLBG &HTG | 5 | 07/10/2026 |
| JRL SKYLINE INC | 4 | 06/05/2026 |
| TRI STATE PLBG & HTG INC | 4 | 03/17/2026 |
| AMC PLBG, HTG & CLNG, INC | 3 | 10/17/2025 |
| BARONE MANAGEMENT LLC | 3 | 07/16/2026 |
| CROSSFIELD PLBG.&HTG | 3 | 08/26/2026 |
| DYNAMIC PLBNG & SPRKR COR | 3 | 07/30/2026 |
| JABBIE INDUSTRIES INCORP* | 3 | 08/05/2026 |
| JOHN EVAN CONTRACTING COR | 3 | 08/04/2026 |
| REDIRECTING LIC INC | 3 | 08/05/2026 |
| RRP PLUMBING CORP | 3 | 11/19/2024 |
| S & L PLUMBING INC | 3 | 08/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| SD DESIGN STUDIO LLC | 52 | 07/30/2026 |
| HABITAT ON DEGRAW LLC | 5 | 09/04/2026 |
| BARONE CONSTRUCTION LLC | 4 | 07/24/2026 |
| LATI PROPERTIES LLC | 4 | 06/19/2026 |
| SUNLIGHT DEVELOPMENT GROUP | 4 | 05/28/2026 |
| NUSUN TOWERS | 3 | 02/07/2025 |
| TF CORNERSTONE INC. | 3 | 08/07/2026 |
| 491 COURT LLC | 2 | 05/07/2026 |
| Atelier LIC Holdings 42-20 LLC | 2 | 07/09/2025 |
| FM CONSOLIDATED HOLDING | 2 | 10/03/2022 |
| GORDON PROPERTY | 2 | 05/07/2024 |
| RockSolid PM | 2 | 03/11/2025 |
| WERWAISS & COMPANY, INC. | 2 | 05/21/2025 |
| 1129 59TH STREET LLC | 1 | 10/31/2024 |
| 116 Madison Street LLC | 1 | 07/21/2026 |
| 155 PERRY ST CONDOMINIUM | 1 | 09/30/2024 |
| 610 SMITH ST LLC | 1 | 10/28/2025 |
| 90 LUDLOW REAL ESTATE LLC | 1 | 12/22/2025 |
| ARYEH REALTY CORP. | 1 | 02/05/2026 |
| BENJAMIN PARTNERS | 1 | 11/19/2024 |
| CP GROUP CAPITAL | 1 | 12/16/2022 |
| CROPSEY PARTNERS LLC | 1 | 08/03/2026 |
| DROX LLC | 1 | 05/07/2026 |
| EAGLE STREET DEVELOPMENT | 1 | 08/30/2023 |
| EAGLE STREET DEVELOPMENT 3, LLC | 1 | 09/06/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SD DESIGN STUDIO LLC | 223 | 09/04/2026 |
| Bealin Groups Corp | 8 | 07/13/2026 |
| BASIC GROUPS CORP | 3 | 05/07/2026 |
| ACCRETE CONSTRUCTION INC | 2 | 06/18/2026 |
| BMB BUILDING CONSULTING INC. | 2 | 08/05/2026 |
| I & L CONSULTING, INC. | 2 | 03/11/2025 |
| JD DESIGN ASSOCIATES INC | 2 | 02/14/2026 |
| METROPOLIS GROUP INC | 2 | 05/21/2025 |
| REDCUT EXPEDITING | 2 | 05/14/2025 |
| CAVALRY LLC | 1 | 10/17/2025 |
| H&Z BUILDING NY CORP. | 1 | 06/05/2026 |
| HWL ENGINEERING PC | 1 | 03/17/2026 |
| Hierarch-E LLC | 1 | 07/13/2026 |
| JAM CONSULTANTS, INC. | 1 | 03/17/2026 |
| K & A INTERIOR DESIGN INC | 1 | 10/15/2025 |
| MICHAEL ZENREICH ARCHITECT, PC | 1 | 03/17/2025 |
| Rigid Structural Design, LLC | 1 | 08/05/2026 |
| S M TAM ARCHITECT, PLLC | 1 | 10/09/2024 |
| S.G. DRAFTING SERVICE | 1 | 06/18/2026 |
| SAFECO GROUP CORP | 1 | 04/01/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01368742 ↗ | 101 LUQUER STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/11/2026 | 09/24/2026 | Design YANG ENGINEERING LLC Owner HABITAT ON DEGRAW LLC Contractor GREAT STONE GEN'L CONST* Filer SD DESIGN STUDIO LLC | PROPOSE MECHANICAL WORKS AS PER PLAN IN CONJUNCTION WITH ALT-CO JOB#B01368742-I1. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY FILED UNDER… |
| B01177740 ↗ | 152 31 STREET BROOKLYN | Alteration CO | Permit Issued | 02/19/2025 | 09/21/2026 | Owner HARROW NY INC Contractor REDIRECTING LIC INC | PROPOSE TO CONVERT EXISTING THREE-FAMILY TO TWO FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS PER PLAN. OBTAIN NEW CO. OTHER WORK TYPES WI… |
| B01223388 ↗ | 877 58 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/12/2025 | 09/21/2026 | Design YANG ENGINEERING LLC Owner JRL BLDNG CONSULTING INC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF AN EXISTING 2-STORY TWO-FAMILY BUILDING TO 6-STORY 17-FAMILY MIXED-USE BUILDING AS PER PLAN.… |
| B01398732 ↗ | 410 AVENUE N BROOKLYN | Alteration | Permit Issued | 05/07/2026 | 09/16/2026 | Design YANG ENGINEERING LLC Owner LATI PROPERTIES LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR & 1ST THUR 2TH FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01242675 ↗ | 3914 8 AVENUE BROOKLYN | Alteration | Permit Issued | 06/17/2025 | 09/08/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PARTIAL INTERIOR RENOVATION LIMITED TO CELLAR, 1ST & 2ND FLOORS TO RESTORE PREVIOUSLY APPROVED CONDITIONS IN RESPONSE TO DOB VIOLATION#05032… |
| Q01381207 ↗ | 45-20 83 STREET QUEENS | Alteration CO | Permit Issued | 04/01/2026 | 09/03/2026 | Design YANG ENGINEERING LLC Owner BARONE CONSTRUCTION LLC Contractor SAFEPIPE PLUMBING INC Filer SD DESIGN STUDIO LLC | THE FOUNDATION DRAWINGS HEREIN ARE RELATED TO A NEW ONE-STORY ADDITION TO THE EXISTING BUILDING. |
| Q01225394 ↗ | 30-76 STEINWAY STREET QUEENS | Alteration CO | Permit Issued | 05/16/2025 | 08/26/2026 | Design YANG ENGINEERING LLC Owner prince 88 realty llc Contractor ACER CONSTRUCTION INC Filer H&Z BUILDING NY CORP. | PROPOSED PLUMBING WORK IN CONJUNCTION WITH DOB NOW GC JOB NO:Q01225394-I1. RELOCATED DRINKING FOUNTAIN AND SERVICE SINK ON 1ST FLOOR, INSTAL… |
| B01384688 ↗ | 614 50 STREET BROOKLYN | Alteration | Permit Issued | 08/18/2026 | 08/25/2026 | Design YANG ENGINEERING LLC Owner ST TONE MANAGEMENT INC Contractor ST TONE MANAGEMENT INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS O… |
| B01447157 ↗ | 854 BAY RIDGE AVENUE BROOKLYN | Alteration | Permit Issued | 08/17/2026 | 08/20/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON BASEMENT AND 1ST FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OC… |
| Q01362385 ↗ | 82-19 QUEENS BOULEVARD QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 02/25/2026 | 08/19/2026 | Design YANG ENGINEERING LLC Contractor WING JAY CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | FILE PLUMBING WORK IN CONJUNCTION WITH JOB #: Q01362385-I1. |
| B01425306 ↗ | 303 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 07/01/2026 | 08/17/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR AND 1ST FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS, BULK OR OCC… |
| B01320919 ↗ | 421 GRAND AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/26/2025 | 08/13/2026 | Design YANG ENGINEERING LLC Owner HABITAT ON DEGRAW LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | THE DRAWINGS HEREIN ARE RELATED TO AN ALTERATION TO THE EXISTING 5-STORY BRICK BUILDING. THE EXISTING BEARING WALL AND WOOD JOIST FLOOR TO R… |
| B01346749 ↗ | 1146 BUSHWICK AVENUE BROOKLYN | Alteration | Permit Issued | 01/14/2026 | 08/10/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | FILE APPLICATION TO REMOVE THE FENCE IN FRONT YARD, TO RESOLVE THE ECB VIOLATION#34296779J;34221912N;110399C04HS01;052901C04MC11, NO INTERIO… |
| B01228082 ↗ | 663 53 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/19/2025 | 08/06/2026 | Design YANG ENGINEERING LLC Contractor JOHN EVAN CONTRACTING COR Filer SD DESIGN STUDIO LLC | FILE STRUCTURAL IN CONJUNCTION WITH ALT-CO JOB #: B01228082-I1. |
| B01397722 ↗ | 447 PROSPECT PLACE BROOKLYN | Alteration | Permit Issued | 05/06/2026 | 08/06/2026 | Design YANG ENGINEERING LLC Owner HABITAT ON DEGRAW LLC Contractor ESSENTIAL RESTORATION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 4TH FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS… |
| B01424106 ↗ | 54 BAY 22 STREET BROOKLYN | Alteration | Permit Issued | 06/30/2026 | 08/06/2026 | Design YANG ENGINEERING LLC Contractor CROSSFIELD PLBG.&HTG Filer SD DESIGN STUDIO LLC | RELOCATE (1) HWH, AND INSTALL NEW (2) HWH AND NEW (2) BOILERS AT CELLAR FL. AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY. |
| Q01425280 ↗ | 575 WOODWARD AVENUE QUEENS | Alteration | Permit Issued | 08/04/2026 | 08/06/2026 | Design YANG ENGINEERING LLC Contractor CATMAN PLUMBING INC Filer SD DESIGN STUDIO LLC | INSTALL NEW (1) GAS COMBI BOILER AT 2ND FLOOR, NEW (1) COMBI BOILER AT 3RD FLOOR. BOILER WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR… |
| M01376874 ↗ | 65 BAYARD STREET MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 08/05/2026 | Design YANG ENGINEERING LLC Owner 116 Madison Street LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON PARTIAL 3RD FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #: M01376874-I1. |
| B01313929 ↗ | 82 BATTERY AVENUE BROOKLYN | Alteration | Permit Issued | 11/13/2025 | 08/03/2026 | Design YANG ENGINEERING LLC Contractor CATMAN PLUMBING INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING & GAS WORK ON CELLAR, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #: B01313929-I1. |
| Q00951994 ↗ | 133-45 39 AVENUE QUEENS | New Building | Permit Issued | 10/24/2023 | 07/28/2026 | Design HPL ENGINEERING P.C. Contractor JRL SKYLINE Filer H&Z BUILDING NY CORP. | Proposed support of excavation work in conjunction with NB #Q00951994-I1. |
| M01341508 ↗ | 14 WEST 29 STREET MANHATTAN | Alteration | Permit Issued | 03/17/2026 | 07/23/2026 | Design HWL ENGINEERING PC Contractor HECAN CONSTRUCTION CORP Filer HWL ENGINEERING PC | Interior renovation to convert existing barber shop to be a Sushi Bar. No change to occupancy, use or egress |
| M00499159 ↗ | 402 COLUMBUS AVENUE MANHATTAN | Alteration | Permit Issued | 04/14/2021 | 07/22/2026 | Design YANG ENGINEERING LLC Owner HALSTEAD MGMT CO. Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | COMBINATION AND RENOVATION OF TWO (2) EXISTING APARTMENTS, #6D & #6E, INTO ONE APARTMENT. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY. |
| Q01383607 ↗ | 160-16 RIVERSIDE DRIVE QUEENS | Alteration | Permit Issued | 04/09/2026 | 07/22/2026 | Design YANG ENGINEERING LLC Contractor JOHN FITZGERALD PLBG &HTG Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR, ATTIC & 1ST THUR 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCU… |
| B01403682 ↗ | 2286 CROPSEY AVENUE BROOKLYN | Alteration | Permit Issued | 05/22/2026 | 07/20/2026 | Design YANG ENGINEERING LLC Owner CROPSEY PARTNERS LLC Contractor GLORY R CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPAN… |
| B01421374 ↗ | 816 58 STREET BROOKLYN | Alteration | Permit Issued | 06/26/2026 | 07/17/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION AND INSTALL NEW HVAC UNITS AT 2ND FLOOR ONLY. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01214219 ↗ | 830 3 AVENUE MANHATTAN | Alteration | Permit Issued | 04/24/2025 | 07/14/2026 | Design BASIC GROUPS CORP Owner UPHOLD CONSTRUCTION CORP Contractor E & O BROTHER INC Filer Hierarch-E LLC | Temporary removal of existing glass facade and install metal roll down gate for debris removal operation. Facade to be restore back to origi… |
| Q01361543 ↗ | 52-37 2 STREET QUEENS | Alteration CO | Permit Issued | 03/17/2026 | 07/14/2026 | Design YANG ENGINEERING LLC Owner TF CORNERSTONE INC. Contractor SAFEPIPE PLUMBING INC Filer SD DESIGN STUDIO LLC | PROPOSE PLUMBING WORKS ON 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01428476 ↗ | 854 BAY RIDGE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/10/2026 | — | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | — |
| X01382136 ↗ | 1623 EDISON AVENUE BRONX | Alteration | Permit Issued | 04/03/2026 | 07/09/2026 | Design YANG ENGINEERING LLC Contractor AMERICAN STANDARD P&H CORORP. Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR & 1ST THUR 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| Q01361470 ↗ | 52-37 2 STREET QUEENS | Alteration CO | Permit Issued | 03/17/2026 | 07/08/2026 | Design YANG ENGINEERING LLC Owner TF CORNERSTONE INC. Contractor SAFEPIPE PLUMBING INC Filer SD DESIGN STUDIO LLC | PROPOSE PLUMBING WORKS ON 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| X01306268 ↗ | 1000 WALTON AVENUE BRONX | Alteration CO | Permit Issued | 11/11/2025 | 07/07/2026 | Design IMC ARCHITECTURE DPC Owner BARONE CONSTRUCTION LLC Contractor SAFEPIPE PLUMBING INC Filer SD DESIGN STUDIO LLC | INSTALL NEW PLUMBING FIXTURES AS PER PLAN. |
| B01195637 ↗ | 227 WARREN STREET BROOKLYN | Alteration CO | Permit Issued | 03/20/2025 | 06/25/2026 | Design PAUL CHRISTAKOS ARCHITECTURE Contractor SUNSHINE BUILDERS INC Filer ACCRETE CONSTRUCTION INC | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALTERATION CO. |
| M01391914 ↗ | 210 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 05/14/2026 | 06/10/2026 | Design YANG ENGINEERING LLC Contractor CLEARCUT GROUP CORP Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION OF APARTMENT 9C ON THE 009 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| Q01392777 ↗ | 575 WOODWARD AVENUE QUEENS | Alteration | Permit Issued | 04/27/2026 | 06/08/2026 | Design YANG ENGINEERING LLC Contractor KALE CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR, 2ND FLOOR & 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. EXISTING BOILER ID #: 40000059379N0001 TO BE… |
| Q01317364 ↗ | 159-11 46 AVENUE QUEENS | Alteration | Permit Issued | 11/11/2025 | 06/05/2026 | Design YANG ENGINEERING LLC Contractor WING JAY CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | REMOVE ILLEGAL ROOF OF DECK AT REAR. REMEDY TO CURE DOB VIOLATIONS #: 39161194H. NO INTERIOR WORK. NO CHANGE IN USE, BULK, EGRESS OR OCCUPA… |
| B01300083 ↗ | 8 KOSSUTH PLACE BROOKLYN | Alteration | Permit Issued | 10/09/2025 | 06/04/2026 | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | FILE APPLICATION TO REPAIR AND REPLACE PART OF EXTERIOR BRICK FACE AT KOSSUTH PLACE AS PER PLAN. REMEDY TO CURE DOB VIOLATION #:39109711Z. N… |
| Q01257156 ↗ | 37-11 73 STREET QUEENS | Alteration | Permit Issued | 07/18/2025 | 05/26/2026 | Design YANG ENGINEERING LLC Contractor JABBIE INDUSTRIES INCORP* Filer SD DESIGN STUDIO LLC | PROPOSED RENOVATION ON CELLAR, 1ST & MEZZ. FLOOR & MEZ ROOF. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS… |
| B01357954 ↗ | 902 45 STREET BROOKLYN | Alteration | Permit Issued | 02/11/2026 | 05/19/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR, 001 THRU 002 FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01357954-I1. |
| B01362302 ↗ | 559 50 STREET BROOKLYN | Alteration | Permit Issued | 03/03/2026 | 05/11/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR (APT 1A). CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS O… |
| M01379105 ↗ | 344 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 04/03/2026 | 05/08/2026 | Design JAE CHANG DESIGN Contractor A & E PLUMBING CORP | Interior renovation on basement level - partition work as per plan. Not change in use, bulk, egress or occupancy. |
| B01346856 ↗ | 352 MENAHAN STREET BROOKLYN | Alteration | Signed-off | 01/26/2026 | 05/01/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR, 1ST THUR 3RD FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| M00537980 ↗ | 402 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 06/11/2021 | 05/01/2026 | Contractor GREGG NY PLUMBING, INC | COMBINATION AND RENOVATION OF TWO (2) EXISTING APARTMENT: #6D & #6E. PLUMBING WORKS AS PER PLANS. OT WORK WILL BE FILED UNDER JOB #: M004991… |
| B01300735 ↗ | 1463 FULTON STREET BROOKLYN | Alteration | Permit Issued | 10/09/2025 | 04/27/2026 | Design YANG ENGINEERING LLC Contractor DESIGN R US Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON 1ST FLOOR IN CONJUNCTION WITH APPLICATION B01300735-I1, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01303775 ↗ | 206 EAST 34 STREET MANHATTAN | Alteration | Signed-off | 10/16/2025 | 04/14/2026 | Design DEFONSECA ARCHITECTS Contractor ACER CONSTRUCTION INC Filer H&Z BUILDING NY CORP. | MINOR INTERIOR RENOVATION, PAINTING AND REPAIR EXISTING GYPSUM BOARD, PARTITIONS, CEILING AND FLOORING AT 1ST FLOOR. NO CHANGE IN USE, EGRE… |
| S00999557 ↗ | 154 ARMSTRONG AVENUE STATEN ISLAND | Alteration CO | Permit Issued | 02/13/2024 | 04/13/2026 | Design YANG ENGINEERING LLC Contractor REGAL CONSTRUCTION GROUP Filer SD DESIGN STUDIO LLC | SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00999557-I1. NO CHANGE IN USE, EGRESS OR OCCUPA… |
| Q01357985 ↗ | 103-06 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 02/11/2026 | 04/03/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC | PROPOSE INTERIOR RENOVATION ON CELLAR, ROOF. 1ST THUR 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPA… |
| Q01326006 ↗ | 58-17 138 STREET QUEENS | Alteration | Permit Issued | 11/28/2025 | 04/02/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | FILE APPLICATION TO REPLACE AND REPAIR TERRACE AT EXP. #2 WITH STAIR TO REAR YARD. REMEDY CURE ECB VIOLATION #: 39162366J. NO CHANGE IN USE,… |
| M01353641 ↗ | 32 EAST 68 STREET MANHATTAN | Alteration | Permit Issued | 02/05/2026 | 03/31/2026 | Design YANG ENGINEERING LLC Owner ARYEH REALTY CORP. Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR(APT. #2). CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUP… |
| B01193867 ↗ | 35 PARK PLACE BROOKLYN | Alteration | Permit Issued | 04/03/2025 | 03/27/2026 | Design BASIC GROUPS CORP Owner DROX LLC Contractor ST TONE MANAGEMENT INC Filer Bealin Groups Corp | Plumbing work in conjunction to GC JOB#B01193867-l1. No change in use, egress, or occupancy. |
| B01338003 ↗ | 421 GRAND AVENUE BROOKLYN | Alteration | Permit Issued | 12/23/2025 | 03/27/2026 | Design YANG ENGINEERING LLC Owner HABITAT ON DEGRAW LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION WORK AT CEL., BAS., 1ST THRU 4TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01191665 ↗ | 5 SPRING STREET MANHATTAN | Alteration | Permit Issued | 04/01/2025 | 03/26/2026 | Design BASIC GROUPS CORP Owner TARGO MANAGEMENT Contractor T & T PLUMBING INC Filer Bealin Groups Corp | SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB#M01191665-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01371442 ↗ | 36-21 PRINCE STREET QUEENS | Alteration | Permit Issued | 03/19/2026 | 03/25/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR & 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRES… |
| B01367352 ↗ | 774 51 STREET BROOKLYN | Alteration | Permit Issued | 03/09/2026 | 03/16/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR AND 1ST FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCU… |
| X01287524 ↗ | 1000 WALTON AVENUE BRONX | Alteration | Signed-off | 09/26/2025 | 03/13/2026 | Design IMC ARCHITECTURE DPC Owner BARONE CONSTRUCTION LLC Contractor BARONE MANAGEMENT LLC Filer SD DESIGN STUDIO LLC | MINOR RENOVATION OF AN EXISTING SCHOOL. NO CHANGE TO USE, EGRESS, OR OCCUPANCYPROPOSED UNDER THIS APPLICATION |
| Q01328421 ↗ | 9-21 44 ROAD QUEENS | Alteration | Signed-off | 12/05/2025 | 03/12/2026 | Design Matthew Cortez Owner BARONE CONSTRUCTION LLC Contractor BARONE MANAGEMENT LLC Filer SD DESIGN STUDIO LLC | REMODEL OF 1ST FLOOR WAREHOUSE TO PARTITION OFF STORAGE ROOMS. . NO CHANGE IN USE, OCCUPANCY, BULK OR EGRESS. |
| B01337560 ↗ | 1715 WEST 5 STREET BROOKLYN | Alteration | Permit Issued | 12/19/2025 | 03/11/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01337560-I1. |
| B01317245 ↗ | 869 57TH STREET BROOKLYN | Alteration CO | Permit Issued | 11/24/2025 | 03/03/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED CONVERT EXISTING ADULT DAY CARE USE ON PARTIAL FIRST FLOOR TO COMMUNITY CENTER, OBTAIN NEW C/O. NO CHANGE IN EGRESS, NO WORK ON OTH… |
| B00955580 ↗ | 18 1 PLACE BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 10/31/2023 | 03/02/2026 | Design PAUL CHRISTAKOS ARCHITECTURE Owner 491 COURT LLC Contractor ACER CONSTRUCTION INC Filer ACCRETE CONSTRUCTION INC | STRUCTURAL WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| S01322156 ↗ | 186 BURGHER AVENUE STATEN ISLAND | Alteration | Permit Issued | 11/20/2025 | 02/27/2026 | Design YANG ENGINEERING LLC Contractor TOWER GENERAL CONSTRUCTIO Filer SD DESIGN STUDIO LLC | Filing plumbing work type for an existing 2-story building. Remove piping for cast iron baseboard @ extension, replace existing 4 house trap… |
| B01320107 ↗ | 654 53 STREET BROOKLYN | Alteration | Permit Issued | 11/17/2025 | 02/24/2026 | Design YANG ENGINEERING LLC Contractor JABBIE INDUSTRIES INCORP* Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR IN CONJUNCTION WITH APPLICATION B01320107-I1 TO ADDRESS VIOLATION39165961H, 39165960X. NO CHANGE IN USE, EG… |
| Q01341723 ↗ | 71-04 GRAND AVENUE QUEENS | Alteration | Signed-off | 01/02/2026 | 02/24/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC | PROPOSED INTERIOR RENOVATION ON 3RD FLOOR(APT.#3F,3R). CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OC… |
| B01321095 ↗ | 816 58 STREET BROOKLYN | Alteration | Permit Issued | 11/20/2025 | 02/09/2026 | Design DEFONSECA ARCHITECTS Contractor CITYWIDE PLBG HTG & SPKLS Filer H&Z BUILDING NY CORP. | PROPOSED PLUMBING WORK ON 3RD FLOOR. IN CONJUNCTION WITH DOB NOW GC JOB NO: B01321095-I1. |
| Q01327497 ↗ | 43-51 BYRD STREET QUEENS | Alteration | Signed-off | 12/02/2025 | 02/02/2026 | Contractor ACER CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. SUPERSEDE BIS JOB #: 420039283. CEILING, FLOORING, PARTITION WORK AS PER PLAN. NO CHANGE IN USE, … |
| S01099681 ↗ | 127 LINDENWOOD ROAD STATEN ISLAND | Alteration | Signed-off | 09/03/2024 | 01/30/2026 | Design YANG ENGINEERING LLC Owner SD DESIGN STUDIO LLC Contractor AMERICAN STANDARD P&H CORORP. Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CELLAR FLOOR. LEGALIZE WATER & GAS FIXTURE. REMEDY TO CURE DOB COMPLAINT #: 5184297. NO CHANGE IN USE, EGRES… |
| M01317645 ↗ | 31 MARKET STREET MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 01/28/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED RELOCATED PLUMBING FIXTURES ON 1ST FLOOR(APT. #1). NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01320137 ↗ | 1741 EAST 32 STREET BROOKLYN | Alteration | Permit Issued | 11/17/2025 | 01/27/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION ON CELLAR & EXTERIOR RENOVATION TO CHANGE SIDING TO STUCCO, REPAIR FLOORING, PAINTING AS PER PLAN. NO CHANGE I… |
| M01217335 ↗ | 4 EAST 43 STREET MANHATTAN | Alteration | Signed-off | 04/28/2025 | 01/27/2026 | Design YANG ENGINEERING LLC Contractor HCMC GROUP INC | PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01346002 ↗ | 429 53 STREET BROOKLYN | Alteration | Signed-off | 01/13/2026 | 01/22/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED MECHANICAL WORK IN CONJUNCTION WITH ALT-CO NB JOB # B01169931-I1. |
| M01306053 ↗ | 437 EAST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/22/2025 | 01/21/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR, BASEMENT, 1ST, 2ND AND 3RD FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #: M01306053-I1. CAP & REMOVE OIL … |
| Q01204821 ↗ | 43-44 161 STREET QUEENS | Alteration | Permit Issued | 04/04/2025 | 01/21/2026 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED RENOVATION AT CELLAR, 1ST, 2ND, & 3RD FLOOR. PLUMBING WORKS AS PER PLAN. UTILITY REQUIRED FOR GAS TEST. NO CHANGE IN USE, BULK, EGR… |
| B01343583 ↗ | 1146 BUSHWICK AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 01/09/2026 | — | Design YANG ENGINEERING LLC Filer SD DESIGN STUDIO LLC | — |
| B01297005 ↗ | 124 BAY RIDGE AVENUE BROOKLYN | Alteration CO | Permit Issued | 10/02/2025 | 01/06/2026 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED CHANGE OF USE FROM DOCTORS OFFICE TO DAYCARE ON CELLAR AND FIRST FLOOR. |
| Q01317995 ↗ | 135-38 39 AVENUE QUEENS | Alteration | Permit Issued | 11/12/2025 | 01/06/2026 | Design YANG ENGINEERING LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON CEL. & 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| Q01132417 ↗ | 90-18 PARK LANE SOUTH QUEENS | Alteration | Signed-off | 10/25/2024 | 12/30/2025 | Design YANG ENGINEERING LLC Owner SD DESIGN STUDIO LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR. 1ST THUR 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| Q01297753 ↗ | 134-16 35 AVENUE QUEENS | Alteration | Signed-off | 10/06/2025 | 12/26/2025 | Design DEFONSECA ARCHITECTS Contractor THOMAS F. CASH & SONS INC Filer H&Z BUILDING NY CORP. | PROPOSED PLUMBING WORK ON 1ST FLOOR. IN CONJUNCTION WITH DOB NOW GC JOB NO: Q01297753-I1. |
| Q01311833 ↗ | 53-55 69 STREET QUEENS | Alteration | Signed-off | 10/31/2025 | 12/26/2025 | Design YANG ENGINEERING LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PROPOSE INTERIOR RENOVATION ON CELLAR. 1ST THUR 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01267546 ↗ | 3861 NOSTRAND AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/08/2025 | 12/22/2025 | Design YANG ENGINEERING LLC Contractor AMERICAN STANDARD P&H CORORP. Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATIONS AT STORE H - CELLAR & 1ST FLOOR ONLY. NO CHANGES TO THE MEANS OF EGRESS. PLUMBING WORK LIMITED TO CELLAR; 1ST … |
| B00960234 ↗ | 269 BAINBRIDGE STREET BROOKLYN | New Building | Permit Issued | 05/16/2024 | 12/19/2025 | Design YANG ENGINEERING LLC Owner SD DESIGN STUDIO LLC Contractor WING JAY CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | THE DRAWINGS HEREIN ARE RELATED TO A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF ORDINARY RE… |
| B01320506 ↗ | 932 52 STREET BROOKLYN | Alteration | Signed-off | 12/02/2025 | 12/08/2025 | Design YANG ENGINEERING LLC Contractor WATSON'S PLBG, HTG, & BDG Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING & GAS WORK ON CELLAR, 1ST TO 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #: B01320506-I1. |
| B00948930 ↗ | BAINBRIDGE STREET BROOKLYN | New Building | Permit Issued | 03/18/2024 | 12/04/2025 | Design YANG ENGINEERING LLC Owner SD DESIGN STUDIO LLC Contractor WING JAY CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | THE DRAWINGS HEREIN ARE RELATED TO A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF ORDINARY RE… |
| M01301375 ↗ | 206 EAST 34 STREET MANHATTAN | Alteration | Signed-off | 10/15/2025 | 12/01/2025 | Design DEFONSECA ARCHITECTS Contractor ACER CONSTRUCTION INC Filer H&Z BUILDING NY CORP. | ADDED STUCCO AND WOOD PANEL DECORATION AT LEFT SIDE(#208) STORE FRONT, LEGALIZATION RIGHT SIDE(#206) STORE FRONT AT 1ST FLOOR. NO CHANGE IN … |
| Q01307803 ↗ | 71-02 GRAND AVENUE QUEENS | Alteration | Signed-off | 10/23/2025 | 11/26/2025 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON 3RD FLOOR(APT. #3F) & ROOF. INSTALL NEW HVAC SPLIT UNITS. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. N… |
| B01316698 ↗ | 4721 8 AVENUE BROOKLYN | Alteration | Signed-off | 11/11/2025 | 11/25/2025 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION AT 1ST FLOORS ONLY. NO CHANGE IN USE, EGRESS, OCCUPANCY & BULK. |
| Q01268240 ↗ | 120-24 INWOOD STREET QUEENS | Alteration | Permit Issued | 08/07/2025 | 11/19/2025 | Design YANG ENGINEERING LLC Contractor JENOCA CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING APPLICATION TO LEGALIZE 3-PC BATHROOM ON CELLAR. REMOVE REF, SINK & ELEC.STOVE. REMEDY TO CURE ECB VIOLATIONS #: 39153658R… |
| S01168244 ↗ | 62 WIMAN AVENUE STATEN ISLAND | Alteration CO | Permit Issued | 01/20/2025 | 11/13/2025 | Design Goodland Build & Design Owner GOODLAND DESIGN & BUILD Contractor DW PLUMBING INC | Replace existing exterior siding with stucco finish, repair the existing concrete walk way, remove a broken concrete patio in the side yard … |
| B01308015 ↗ | 628 SMITH STREET BROOKLYN | Alteration | Signed-off | 10/28/2025 | 11/10/2025 | Design YANG ENGINEERING LLC Owner 610 SMITH ST LLC Contractor AIR DEPOT COMM REFR COR Filer SD DESIGN STUDIO LLC | PROPOSE FILE APPLICATION TO INSTALL NEW AC SPLIT OUTDOOR & INDOOR UNIT, NEW VENTILATOR ON 2ND FLOOR. NO CHANGE IN USE, BULK, EGRESS OR OCCUP… |
| Q01284616 ↗ | 134-54 MAPLE AVENUE QUEENS | Alteration | Signed-off | 09/09/2025 | 11/03/2025 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC | PROPOSED INTERIOR RENOVATION & REPAIR STORE FRONT ON 1ST FLOOR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGR… |
| M01258837 ↗ | 135 EAST 54 STREET MANHATTAN | Alteration | Permit Issued | 07/21/2025 | 10/30/2025 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSE FILE APPLICATION TO OBTAIN EQUIPMENT USE PERMIT FOR HVAC UNIT ON 1ST FLOOR & OSP. ALL MECHANICAL DUCTWORK WERE DONE UNDER DOB JOB#: … |
| Q01280763 ↗ | 35-04 28 STREET QUEENS | Alteration | Permit Issued | 09/06/2025 | 10/27/2025 | Design YANG ENGINEERING LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING WORK ON CELLAR, 1ST AND 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #: Q01280763-I1. NO CHANGE IN USE, BULK, EGRESS O… |
| B01221102 ↗ | 981 57 STREET BROOKLYN | Alteration | Permit Issued | 05/06/2025 | 10/20/2025 | Design YANG ENGINEERING LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PROPOSE PLUMBING & GAS WORKS ON CELLAR, 1ST & 2ND AS PER PLAN TO RESOLVE ECB VIOLATIONS #: 39145543R;39145545K. NO CHANGE IN USE, BULK, EGRE… |
| S01245416 ↗ | 93 GANSEVOORT BOULEVARD STATEN ISLAND | Alteration | Permit Issued | 06/23/2025 | 10/15/2025 | Design YANG ENGINEERING LLC Contractor RISE CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | FILE APPLICATION TO REMOVE THE ONE STORY STRUCTURE IN REAR YARD, TO RESOLVE THE ECB VIOLATION#39144083K , NO INTERIOR WORK. NO CHANGE IN USE… |
| B01211019 ↗ | 6403 14 AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/23/2025 | 10/14/2025 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON 1ST FLOOR ONLY, REPAIRING FLOORING, PARTITION. OTHER FLOORS REMAIN AS EXISTING. OBTAIN NEW CO FOR 1ST FLOOR … |
| Q01270895 ↗ | 1454 159 STREET QUEENS | Alteration | Permit Issued | 08/13/2025 | 10/14/2025 | Contractor ACER CONSTRUCTION INC | ALTERATION WORK - THE ADDITION OF AN OPEN WOOD PORCH AT 1ST FLOOR FRONT ENTRANCE OF AN EXISTING ONE-FAMILY HOUSE, 2-STORY WITH CELLAR. NO NE… |
| B01286593 ↗ | 89 ROCKAWAY AVENUE BROOKLYN | Alteration | Permit Issued | 09/16/2025 | 10/10/2025 | Design YANG ENGINEERING LLC Contractor ACER CONSTRUCTION INC | TO REPAIR BRICK FACADE TO CURE ECB VIOLATIONS #: 39157699L;39138494Y. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY. |
| B01294090 ↗ | 143 JOHNSON AVENUE BROOKLYN | Alteration | Permit Issued | 09/29/2025 | 10/03/2025 | Design YANG ENGINEERING LLC Contractor NY STATE BUILDERS INC Filer SD DESIGN STUDIO LLC | FILE APPLICATION TO REPAIR PARAPET ON FRONT ELEVATION AT JOHNSON AVENUE AS PER PLAN. REMEDY TO CURE DOB VIOLATION #:39145018Z. NO CHANGE IN … |
| M01224165 ↗ | 172 1/2 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/22/2025 | 10/03/2025 | Design YANG ENGINEERING LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | INSTALL NEW SITE CONNECTION IN CONJUNCTION WITH SD 12. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. |
| B01263731 ↗ | 1084 38 STREET BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 09/22/2025 | Design YANG ENGINEERING LLC Contractor AMERICAN STANDARD P&H CORORP. Filer SD DESIGN STUDIO LLC | PROPOSED PLUMBING APPLICATION TO REMOVE 3-PC BATHROOM ON CELLAR FLOOR. REMEDY TO CURE DOB VIOLATIONS #: 39150653Y, 39150652M, 39150641R. NO … |
| M01244666 ↗ | 121 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 07/01/2025 | 09/12/2025 | Contractor CHEF CREATIVE OFFICE INC | PROPOSED STRUCTURAL WORK ON CELLAR AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B01074720 ↗ | 722 68 STREET BROOKLYN | Alteration | Permit Issued | 07/01/2024 | 09/03/2025 | Design YANG ENGINEERING LLC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSE RENOVATION ON CELLAR, FIRST, AND SECOND FLOOR. CEILING, FLOORING AND PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPA… |
| B01205623 ↗ | 6211 8 AVENUE BROOKLYN | Alteration | Signed-off | 04/03/2025 | 08/07/2025 | Design BAYSIDE ENGINEERING PC Contractor WINWAY DEVELOPMENT LLC Filer SD DESIGN STUDIO LLC | PROPOSED INTERIOR RENOVATION ON PARTIAL 1ST FLOOR FOR EXISTING EATING & DRINKING ESTABLISHMENT. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/28/2026 | Tenant Protection Plan Compliance | 54 BAY 22 STREET | Jian Yang | special |
| 08/28/2026 | Fire-Resistant Penetrations and Joints | 54 BAY 22 STREET | Jian Yang | special |
| 08/28/2026 | Energy Code Compliance Inspections | 54 BAY 22 STREET | Jian Yang | progress |
| 08/28/2026 | HVAC-R and service water piping design and insulation | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/28/2026 | HVAC-R and service water heating equipment | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/28/2026 | HVAC-R and service water heating system controls | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/28/2026 | Maintenance information | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Concrete - Cast-In-Place | 52-37 2 STREET | Jian Yang | special |
| 08/27/2026 | Fire-Resistant Penetrations and Joints | 52-37 2 STREET | Jian Yang | special |
| 08/27/2026 | Energy Code Compliance Inspections | 52-37 2 STREET | Jian Yang | progress |
| 08/27/2026 | Fire-Resistance Rated Construction | 52-37 2 STREET | Jian Yang | progress |
| 08/27/2026 | Lighting controls | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Fenestration air leakage | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Metering | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Maintenance information | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Fenestration areas | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Fenestration and door U-factor and product ratings | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/27/2026 | Interior lighting power | 52-37 2 STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water heating system controls | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water piping design and insulation | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water heating equipment | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/25/2026 | Maintenance information | 54 BAY 22 STREET | Jian Yang | energy_progress |
| 08/25/2026 | Fire-Resistant Penetrations and Joints | 54 BAY 22 STREET | Jian Yang | special |
| 08/25/2026 | Tenant Protection Plan Compliance | 54 BAY 22 STREET | Jian Yang | special |
| 08/25/2026 | Energy Code Compliance Inspections | 54 BAY 22 STREET | Jian Yang | progress |
| 08/25/2026 | Maintenance information | 101 LUQUER STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water heating system controls | 101 LUQUER STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water piping design and insulation | 101 LUQUER STREET | Jian Yang | energy_progress |
| 08/25/2026 | HVAC-R and service water heating equipment | 101 LUQUER STREET | Jian Yang | energy_progress |
| 08/24/2026 | Fire-Resistant Penetrations and Joints | 1146 BUSHWICK AVENUE | Jian Yang | special |
| 08/24/2026 | Sprinkler Systems | 1146 BUSHWICK AVENUE | Jian Yang | special |
| 08/24/2026 | Tenant Protection Plan Compliance | 1146 BUSHWICK AVENUE | Jian Yang | special |
| 08/24/2026 | Energy Code Compliance Inspections | 1146 BUSHWICK AVENUE | Jian Yang | progress |
| 08/24/2026 | Maintenance information | 1146 BUSHWICK AVENUE | Jian Yang | energy_progress |
| 08/24/2026 | HVAC-R and service water heating system controls | 1146 BUSHWICK AVENUE | Jian Yang | energy_progress |
| 08/24/2026 | HVAC-R and service water piping design and insulation | 1146 BUSHWICK AVENUE | Jian Yang | energy_progress |
| 08/24/2026 | HVAC-R and service water heating equipment | 1146 BUSHWICK AVENUE | Jian Yang | energy_progress |
| 08/21/2026 | Fire-Resistant Penetrations and Joints | 101 LUQUER STREET | Jian Yang | special |
| 08/21/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 101 LUQUER STREET | Jian Yang | special |
| 08/21/2026 | Energy Code Compliance Inspections | 101 LUQUER STREET | Jian Yang | progress |
| 08/17/2026 | Fire-Resistance Rated Construction | 854 BAY RIDGE AVENUE | Jian Yang | progress |
| 08/17/2026 | Fire-Resistant Penetrations and Joints | 854 BAY RIDGE AVENUE | Jian Yang | special |
| 08/14/2026 | HVAC-R and service water piping design and insulation | 82 BATTERY AVENUE | Jian Yang | energy_progress |
| 08/14/2026 | HVAC-R and service water heating system controls | 82 BATTERY AVENUE | Jian Yang | energy_progress |
| 08/14/2026 | HVAC-R and service water heating equipment | 82 BATTERY AVENUE | Jian Yang | energy_progress |
| 08/14/2026 | Maintenance information | 82 BATTERY AVENUE | Jian Yang | energy_progress |
| 08/14/2026 | Energy Code Compliance Inspections | 82 BATTERY AVENUE | Jian Yang | progress |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | 82 BATTERY AVENUE | Jian Yang | special |
| 08/13/2026 | HVAC-R and service water heating equipment | 82 BATTERY AVENUE | Jian Yang | energy_progress |
| 08/13/2026 | HVAC-R and service water heating system controls | 82 BATTERY AVENUE | Jian Yang | energy_progress |