← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Savoy
1011 3RD AVENUE · BIN 1043547
💬 Discuss this project
1986Year Built
43Stories
RMBuilding Class
C1-9Zoning
251,954 sfGross Floor Area
230Units
LL97 CoveredRent Stabilized14 Active Violations 12 unresolved · 2 paperwork only 2 likely answered 9 old, status unconfirmed ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 3rd and 60th Asociates · 19,983 sf lot · 12.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBalcony slab and railing repairsUnder Construction1 filing
Floor 36Unit 36E1 filing · 7 docs
Floor 35Unit 35E2 filings · 7 docs
Floor 34
Floor 33
Floor 3215th Drive, LLC1 filing · 7 docs
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22Unit 22ABD2 filings · 7 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9E1p · 2 filings · 7 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Blinds to Go23p · 7 filings · 20 docs
Floor 1Blinds to GoUnder Construction32p · 9 filings · 20 docs
MezzanineMaxwell-kates, INC.1p · 1 filing · 7 docs
CellarBlinds to GoUnder Construction19p · 9 filings · 20 docs
Sub-CellarOlshan PropertiesUnder Construction4p · 7 filings · 20 docs
Site & exteriorVaura Pilates, Blinds to GoUnder Construction10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3rd & 60th Associates7003/21/2026
Olshan Properties6407/17/2026
3rd & 6th Associates2803/21/2026
Mall Properties2303/21/2026
15th Drive2207/08/2026
Janoff & Olshan1703/21/2026
Third Sixty Associates1003/21/2026
MPI503/21/2026
Daisy404/09/2026
200 East 61 Street303/21/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Consulting Management1403/21/2026
J.A.M. Associates1203/21/2026
Grand Expediters NYC603/21/2026
New York Sign Consultants603/21/2026
AE Design Solution803/21/2026
KC Expediting603/21/2026
Building Brothers403/21/2026
Project Tactical Solutions1103/21/2026
Municipal Building Consultants303/21/2026
PHS Consulting Service203/21/2026
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1803/21/2026
Dolphin Construction ManagementGeneral Contractor1307/08/2026
Lod ConstructionGeneral Contractor1007/08/2026
Skyline Restorationspecialty_contractor504/09/2026
Everest ScaffoldingScaffold407/08/2026
J.west ContractorsGeneral Contractor407/08/2026
Jabbie Industries Incorporated*General Contractor303/21/2026
Loyveta ConstructionGeneral Contractor303/21/2026
Mauceri Sign CoSign hanger307/08/2026
AM Glassspecialty_contractor303/21/2026
Ridge ConstructionGeneral Contractor207/08/2026
City Code ConstructionGeneral Contractor203/21/2026
A.M.A. HoldingsSign hanger207/08/2026
A Plus PlumbingFire Protection207/17/2026
Moma Construction GroupGeneral Contractor207/02/2026
RRP PlumbingPlumbing107/08/2026
Q.Y. ElectricElectrical103/21/2026
Rugova GroupPlumbing107/08/2026
Citywide Electrical WiringElectrical103/21/2026
George Holness G.CElectrical103/21/2026
Kontorouhas EmanuelElectrical103/21/2026
Lens ElectricElectrical103/21/2026
Torres IvanElectrical103/21/2026
Exo IndustriesGeneral Contractor107/08/2026
Ridge ConstructionScaffold107/08/2026
A Plus PlumbingPlumbing106/28/2026
Aranda Plumbing & HeatingPlumbing107/08/2026
Crown PlumbingPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Precision Sprinkler ServicesFire Protection107/08/2026
RRP PlumbingFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819205/22/2026
SWL Engineering Inspectio6912301/26/2026
Catalpa Special Inspectio2004605/22/2025
MEP Inspections1102105/21/2025
AK Engineering678702/20/2025
Jack Green Associates422102/20/2025
Leo Y Lee Associates2481102/05/2025
Project Tactical Solution58591108/07/2024
Mancini Duffy Architectur2985405/14/2024
Building Lifecycle
All (294)Filed (64)Permit Issued (55)Signed Off (24)Facade (FISP) (23)Violation (60)Inspection (26)Objection (12)Special Inspection (30)
10/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/16/2026
Permit issued — Sprinklers
M01207528-I1-EW-SP
06/30/2026
Permit issued — Mechanical Systems
M01218033-S1-MS
06/30/2026
Permit issued — General Construction
M01218033-I1-GC
06/26/2026
Permit issued — Sprinklers
M01207528-I1-EW-SP
06/26/2026
Permit issued — Plumbing
M01218033-S2-PL
06/15/2026
Violation issued (ECB, open)
Construction
06/15/2026
Violation issued (ECB, open)
Construction
06/03/2026
Objection raised — Other
06/03/2026
Objection resolved — Addressed
06/03/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/03/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
05/22/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection.Amend #1,change in tieback and outrigger detail
M01362454-P1
04/28/2026
Permit issued — General Construction
M00687131-I1-GC
04/28/2026
Violation issued (ECB, closed)
Construction
02/25/2026
Permit issued — Suspended Scaffold
M01362454-I1-SC
02/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
02/23/2026
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
02/23/2026
Special inspection requirement — Final
Yakov Weinstein
02/20/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection.Amend #1,change in tieback and outrigger detail
M01362454-I1
02/12/2026
Objection resolved — Addressed
02/12/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Admin
02/09/2026
Objection raised — Scope
01/26/2026
Filed — Alteration
GENERAL CONSTRUCTION CONSISTING OF BALCONY SLAB AND RAILING REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00687131-P2
01/12/2026
Permit issued — Sidewalk Shed
M00668974-I1-SH
12/21/2025
Filed — Alteration
M01337260-I1
12/21/2025
Filed — Alteration
M01337260-S1
10/20/2025
Signed off — Alteration
8853- Plumbing work associated with build out of Blinds To Go Retail Space. No change in egress use group or occupancy.
M01019815-I1
10/16/2025
Permit issued — Sign
M01276047-I1-SG
10/16/2025
Permit issued — Sign
M01276035-I1-SG
09/26/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON PART OF CELLAR, 1ST AND 2ND FLOORS IN RETAIL SPACE, BLINDS TO GO. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01018935-I1
09/26/2025
Signed off — Alteration
M01021707-I1
09/19/2025
Filed — Alteration
M01276035-I1
09/19/2025
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (VAURA)
M01276047-I1
09/02/2025
Filed — Alteration
M01277676-I1
08/11/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2025
Cycle 10 facade report signed — UNSAFE
07/08/2025
Cycle 10 facade inspection completed
05/30/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON PART OF CELLAR, 1ST AND 2ND FLOORS IN RETAIL SPACE, BLINDS TO GO. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01018935-S1
05/22/2025
Filed — Alteration
VAURA-- MECHANICAL MODIFICATIONS AND INSTALLATION FOR COMMERCIAL GYM.
M01218033-S1
05/21/2025
Filed — Alteration
VAURA-- Modifications to existing sprinkler system as per plans filed.
M01207528-I1
05/20/2025
Filed — Alteration
VAURA-- MECHANICAL MODIFICATIONS AND INSTALLATION FOR COMMERCIAL GYM.
M01218033-S2
05/20/2025
Filed — Alteration
VAURA-- MECHANICAL MODIFICATIONS AND INSTALLATION FOR COMMERCIAL GYM.
M01218033-I1
05/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
05/07/2025
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
04/30/2025
Permit issued — Sprinklers
M01018935-S2-EW-SP
04/09/2025
Cycle 9 facade report submitted
04/08/2025
Cycle 9 facade report signed — UNSAFE
04/08/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
04/01/2025
Permit issued — General Construction
M00687131-I1-GC
04/01/2025
Cycle 10 facade report submitted
03/31/2025
Cycle 9 facade inspection completed
03/05/2025
Signed off — Alteration
Interior renovation of existing bathrooms
M00930675-S1
02/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 294 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedA Plus Plumbing07/16/2026
DOB NOWMechanical SystemsPermit IssuedMoma Construction Group06/30/2026
DOB NOWGeneral ConstructionPermit IssuedMoma Construction Group06/30/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing06/26/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing06/26/2026
DOB NOWGeneral ConstructionPermit IssuedExo Industries04/28/2026
DOB NOWSuspended ScaffoldPermit IssuedExo Industries02/25/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/12/2026
DOB NOWSignPermit IssuedA.M.A. Holdings10/16/2025
DOB NOWSignPermit IssuedA.M.A. Holdings10/16/2025
DOB NOWSprinklersPermit IssuedRalph W. Landolfi JR04/30/2025
DOB NOWGeneral ConstructionPermit IssuedSkyline Restoration04/01/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/07/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/17/2025
DOB NOWStructuralSigned-offAM Glass12/03/2024
DOB NOWPlumbingSigned-offRRP Plumbing10/15/2024
DOB NOWMechanical SystemsPermit IssuedRidge Construction10/10/2024
DOB NOWGeneral ConstructionSigned-offRidge Construction09/23/2024
DOB NOWConstruction FenceSigned-offRidge Construction09/20/2024
DOB NOWPlumbingSigned-offCrown Plumbing04/22/2024
DOB NOWStructuralSigned-offLod Construction02/28/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration02/27/2024
DOB NOWGeneral ConstructionPermit IssuedSkyline Restoration02/21/2024
DOB NOWGeneral ConstructionSigned-offJ.west Contractors02/08/2024
DOB NOWMechanical SystemsSigned-offLod Construction01/26/2024
DOB NOWPlumbingSigned-offRugova Group01/26/2024
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/22/2024
DOB NOWGeneral ConstructionSigned-offJ.west Contractors01/19/2024
DOB NOWSprinklersSigned-offPrecision Sprinkler Services01/12/2024
DOB NOWGeneral ConstructionSigned-offDolphin Construction Management01/05/2024
DOB NOWStructuralSigned-offDolphin Construction Management01/03/2024
DOB NOWMechanical SystemsSigned-offDolphin Construction Management01/03/2024
DOB NOWGeneral ConstructionSigned-offLod Construction12/13/2023
DOB NOWGeneral ConstructionSigned-offLod Construction11/20/2023
DOB NOWPlumbingSigned-offAranda Plumbing & Heating07/12/2023
DOB NOWGeneral ConstructionSigned-offLoyveta Construction06/27/2023
DOB NOWGeneral ConstructionPermit IssuedCity Code Construction06/01/2023
DOB NOWGeneral ConstructionSigned-offDolphin Construction Management05/05/2023
DOB NOWGeneral ConstructionPermit IssuedSkyline Restoration02/16/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/25/2023
+ 60 more permits on file
2 projects · most recent 05/22/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2025Permit IssuedMoma Construction GroupHeating and Air Conditioning Systems
Heat / Cool
Daikin Daiken REMQ120PBTJ Daiken REMQ120PBTJ 120,000 BTU · Condensing Unit ×2
10/01/2024Permit IssuedRidge ConstructionHeating and Air Conditioning Systems
Heat / Cool
Trane TRANE EXHG042B 43,150 BTU · Heat Pump Outdoor ×8
TRANE EXHG048B 48,940 BTU · Heat Pump Outdoor ×6
TRANE EXG042B 43,150 BTU · Heat Pump Outdoor ×2
TRANE EXHG0428 43,150 BTU ×2
Trane EXHG042B 43,150 BTU · Heat Pump Outdoor ×2
Trane XHG042B 41,350 BTU · Fan Coil Indoor ×2
Berner BERNER AC10-E-1060-E 14 kW · Air Curtain ×2
BERNER AC10-E-1060E 14 kW · Air Curtain ×2
2 projects · most recent 05/21/2025
FiledStatusContractorScope
05/21/2025Permit IssuedA Plus Plumbing46 heads
02/20/2025Permit IssuedRRP Plumbing—
2 projects · most recent 05/22/2025
Water/Sanitary
FiledStatusContractorScope
05/22/2025Permit IssuedA Plus PlumbingWater/Sanitary
01/20/2023——Water/Sanitary
10 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026CompleteConductor Electrical Services—
10/14/2025Permit IssuedA.M.A. Holdings Inc.d/B/A—
10/17/2024Permit IssuedL&B Electrical InternationalGeneral Wiring
11/22/2023CompleteAni Electric—
04/13/2023Permit IssuedJte Electrical Services—
03/11/2023CompleteBorrelli ElectricGeneral Wiring
07/11/2022CompleteStar Electrical Contractors—
07/05/2022CompleteCity ElectricGeneral Wiring
11/06/2019CompleteA&E Electrical Systems CoGeneral Wiring
02/14/2019Permit IssuedBorowide Elect'l Contractors—
2 projects · most recent 05/22/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/22/2026Permit IssuedExo IndustriesSuspended Scaffold (SC)
02/05/2025Permit IssuedSkyline RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
10/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 132
DateRequirementInspectorRole
06/03/2026Post-installed Anchorsnayan sonispecial
06/03/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
02/23/2026Post-installed AnchorsJOSHUA LUCKRITZspecial
02/23/2026FinalYakov Weinsteinprogress
02/23/2026Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
05/12/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
05/12/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
05/07/2025Post-installed AnchorsNicolas Crosettospecial
04/08/2025Sprinkler SystemsNicolas Crosettospecial
01/31/2025Post-installed AnchorsLeo Leespecial
01/31/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
10/31/2024Post-installed AnchorsAri Kamospecial
10/11/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
10/11/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
10/11/2024Fire-Resistant Penetrations and JointsAri Kamospecial
10/11/2024Tenant Protection Plan ComplianceAri Kamospecial
10/11/2024Energy Code Compliance InspectionsAri Kamoprogress
10/11/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
10/07/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
10/07/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
10/07/2024Energy Code Compliance InspectionsAri Kamoprogress
10/07/2024Tenant Protection Plan Compliance—special
10/07/2024Fire-Resistant Penetrations and JointsAri Kamospecial
10/07/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
10/02/2024Tenant Protection Plan ComplianceAri Kamospecial
Latest 25 of 132.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Vaura PilatesFitness / RecreationFloor 1
Project M01276035 Alteration · Permit Entire · 09/19/2025
Project M01276047 Alteration · Permit Entire · 09/19/2025
Blinds to GoRetailCellar, Floors 1, 2
Project M01021707 Alteration · LOC Issued · 11/18/2024
Project M01021704 Alteration · Permit Entire · 05/01/2024
Project M01019815 Alteration · LOC Issued · 04/16/2024
Project M01018935 Alteration · Permit Entire · 04/15/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,483 on file (BIS + DOB NOW)
▸Plans & Drawings64
▸DOB NOWPlans/Sketch63
09/01/2026M00783271-I1Request digital key ↗
09/01/2026M00783273-I1Request digital key ↗
09/01/2026M00783272-I1Request digital key ↗
Showing 3 of 63 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00128728-I1Request digital key ↗
▸Applications & Permits280
▸BISPLAN / WORK APPROVAL APPLICATION147
11/30/2022121939288Open ↗
09/14/2022121939288Open ↗
06/30/2022122167939Open ↗
Showing 3 of 147 on file for this type
▸BISWORK PERMIT APPLICATION119
05/18/2020123530223Open ↗
05/11/2020123530223Open ↗
11/08/2019123710546Open ↗
Showing 3 of 119 on file for this type
▸BISPLACE OF ASSEMBLY8
12/06/2017123336853Open ↗
12/06/2017123336853Open ↗
Showing 2 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
01/25/2018123092508Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications364
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION146
10/09/2019123710546Open ↗
05/09/2019123507963Open ↗
03/01/2019121968433Open ↗
Showing 3 of 146 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature60
09/01/2026M00783272-I1Open ↗
09/01/2026M00786398-I1Open ↗
09/01/2026M00786398-P1Open ↗
Showing 3 of 60 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST38
08/02/2018123530223Open ↗
Showing 1 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
10/08/2026M08051115-I1Open ↗
10/08/2026M01174741-I1Open ↗
10/08/2026M01174741-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
10/08/2026M08051115-I1Open ↗
10/08/2026M08051115-I1Open ↗
10/04/2026M00959903-I1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
04/30/2019140846011Open ↗
08/02/2018123530223Open ↗
Showing 2 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/30/2019140846011Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/30/2019140846011Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment124
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE31
12/19/2018123511690Open ↗
08/02/2018123530223Open ↗
12/05/2017123332606Open ↗
Showing 3 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
06/26/2019122061268Open ↗
06/04/2018123310167Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes11
10/09/2019123710546Open ↗
12/19/2018123511690Open ↗
11/09/2018123507963Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos126
▸BISASBESTOS: CERTIFICATION (DEP ACP5)58
10/09/2019123710546Open ↗
10/09/2019123710546Open ↗
12/19/2018123511690Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report47
09/01/2026M00783272-I1Open ↗
09/01/2026M00786398-I1Open ↗
09/01/2026M00786398-P1Open ↗
Showing 3 of 47 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/30/2026M08052291-I1Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance94
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS49
10/09/2019123710546Open ↗
12/19/2018123511690Open ↗
11/09/2018123507963Open ↗
Showing 3 of 49 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS26
08/12/2023123710546Open ↗
03/29/2023121939288Open ↗
02/14/2023123710546Open ↗
Showing 3 of 26 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/12/2023123710546Open ↗
03/29/2023121939288Open ↗
03/29/2023121939288Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
08/12/2023123710546Open ↗
03/29/2023121939288Open ↗
03/29/2023121939288Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs99
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
04/07/2023121939288Open ↗
12/22/2021120115776Open ↗
06/22/2020123507963Open ↗
Showing 3 of 56 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/08/2017122167939Open ↗
12/07/2017122167939Open ↗
Showing 2 of 6 on file for this type
▸BISSUPERSEDING LETTER2
09/23/2019123507963Open ↗
Showing 1 of 2 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership118
▸BISCOST AFFIDAVIT116
08/12/2023123710546Open ↗
02/14/2023123710546Open ↗
12/22/2021120115776Open ↗
Showing 3 of 116 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/29/2023121939288Open ↗
▸Filing & Intake Forms154
▸BISEFILING COVER SHEET67
10/08/2019123710546Open ↗
12/19/2018123511690Open ↗
11/09/2018123507963Open ↗
Showing 3 of 67 on file for this type
▸BISBOROUGH INTAKE FORM51
07/02/2019122061268Open ↗
03/27/2019123332606Open ↗
03/01/2019121968433Open ↗
Showing 3 of 51 on file for this type
▸BISADDITIONAL INFORMATION27
12/22/2021120115776Open ↗
12/19/2017123336853Open ↗
11/30/2017123336853Open ↗
Showing 3 of 27 on file for this type
▸BISeFiling Job Application Cover Sheet9
04/30/2019140846011Open ↗
Showing 1 of 9 on file for this type
▸Other Documents25
▸BISDepartment of Consumer Affairs (DCA) Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
01/15/2019123511690Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/17/2026M01362454-I1Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWCalculations5
08/17/2026M01362454-I1Open ↗
Showing 1 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type