| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01459362 ↗ | 130 BARROW STREET MANHATTAN | — | Permit Issued | — | 09/25/2026 | Design HALSEY MCCORMACK HELMER INC Contractor JOHN FITZGERALD PLBG &HTG | LEGALIZATION OF PLUMBING WORK ASSOCIATED WITH THE UPPER-LEVEL BATHROOM IN APARTMENT 312. ALL WORK WAS PREVIOUSLY COMPLETED. NO NEW WORK PROP… |
| M01438273 ↗ | 455 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 09/11/2026 | Design PORTELL ARCHITECTURE, PLLC Contractor GARRITY CONTRACTING LLC | INTERIOR RENOVATION OF APARTMENT 5L DUE TO SPRINKLER MAIN FLOOD DAMAGE, INCLUDING DEMOLITION AND REPLACEMENT OF NON-BEARING PARTITIONS, FINI… |
| M01399331 ↗ | 30 JONES STREET MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/10/2026 | Design THREAD COLLECTIVE Contractor ARDSON CONSTRUCTION CORP | REPAIR AND RESTORATION OF EXISTING EXTERIOR WOOD CORNICE, INCLUDING LOCALIZED IN-KIND REPLACEMENT, SURFACE PREPARATION, PRIMING AND PAINTING… |
| M01399024 ↗ | 28 JONES STREET MANHATTAN | Alteration | Filed — no permit on record | 08/20/2026 | — | Design THREAD COLLECTIVE | — |
| M01404917 ↗ | 84 THOMAS STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/23/2026 | Contractor LG ELITE PLUMBING INC | INTERIOR RENOVATION OF APARTMENT # 3 AS PER THE ARCHITECT'S DRAWINGS, INCLUDING NON-STRUCTURAL PARTITION MODIFICATIONS, DOOR REPLACEMENTS, F… |
| M01376631 ↗ | 160 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 04/29/2026 | 05/26/2026 | Design HALSEY MCCORMACK HELMER INC Owner THE LOVETT GROUP Contractor MIDTOWN PLBG & HTNG CORP | FILING TO SUPERSEDE APPLICATION 101044371 FOR APARTMENT 7-AE. NO WORK PROPOSED. THERE IS NO CHANGE TO THE USE, OCCUPANCY OR EGRESS. SEE COMM… |
| Person | Filings | Most recent |
|---|---|---|
| MICHAEL GENARI | 155 | 09/14/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HALSEY MCCORMACK HELMER INC | 28 | 04/29/2026 |
| BECKER ENGINEERING, P.C. | 12 | 07/11/2022 |
| ZACHARY GIDICH ARCHITECTURE AND DES | 12 | 07/30/2026 |
| ALLEN PHILIP ROBINSON ARCHITECTURE | 8 | 07/27/2026 |
| HANSEN ENGINEERING, PC | 5 | 08/28/2025 |
| JD Engineering PC | 5 | 05/05/2026 |
| COLOMBO ARCHITECTURAL STUDIO PC | 3 | 10/11/2024 |
| ALLIED CONSULTING ENGINEERS, PLLC | 2 | 05/16/2023 |
| EJC ENGINEERING, PLLC | 2 | 12/09/2025 |
| JOSH GOLDSTEIN ARCHITECT | 2 | 11/29/2022 |
| KAHN ARCHITECTURE & DESIGN PC | 2 | 12/09/2025 |
| RMM DESIGN STUDIO | 2 | 04/27/2025 |
| THREAD COLLECTIVE | 2 | 08/20/2026 |
| ABS ENGINEERING, PLLC | 1 | 06/05/2026 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 09/15/2021 |
| ANCORA ENGINEERING, PLLC | 1 | 09/16/2021 |
| BO LEE ARCHITECT PC | 1 | 12/15/2025 |
| BRICK CITY RECONSTRUCTION | 1 | 12/30/2021 |
| CELIN MUNOZ CONSULTING ENGINEER, PC | 1 | 02/19/2021 |
| CHONG ENGINEERING, P.C. | 1 | 12/15/2025 |
| DOMINICK R. PILLA ASSOCIATES, PC | 1 | 08/31/2018 |
| KEYOWNER ENGINEERING, P.C. | 1 | 12/15/2025 |
| MADSEN CONSULTING ENGINEERING | 1 | 11/17/2025 |
| PIRO STUDIO LLC | 1 | 05/13/2024 |
| PORTELL ARCHITECTURE, PLLC | 1 | 08/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ABIGAIL H HESS INTERIORS | 6 | 03/03/2025 |
| COW BAY SPRINKLER CORP | 6 | 08/22/2023 |
| #1 LORZA RENOVATIONS INC | 3 | 04/29/2026 |
| AQUEDUCT MECHANICAL CORP | 3 | 11/17/2025 |
| ATLAS SUPREME SERVICE INC | 3 | 04/13/2026 |
| KDL CONSTRUCTION & DEVELO | 3 | 02/01/2023 |
| LOXTON INC | 3 | 02/01/2023 |
| ADVANCE TEAM CONSULTANT * | 2 | 12/09/2025 |
| ARANDA PLBG & HTG CORP | 2 | 05/14/2024 |
| ASE HVAC INC | 2 | 07/30/2026 |
| DNA PLUMBING CONTR. INC | 2 | 03/03/2025 |
| DONATO PLUMBING, INC | 2 | 06/05/2026 |
| GIANCOLA CONTRACTORS INC | 2 | 09/29/2023 |
| GOLDEN CONSTRUCTION NY CO | 2 | 11/17/2025 |
| HI-TECH PLUMBING & HEATIN | 2 | 10/16/2024 |
| HIGHLINE CONSTRUCTION GR | 2 | 06/05/2026 |
| JVR PLBG AND HEATING INC | 2 | 12/19/2024 |
| KRK HOME IMPROVEMENT LLC | 2 | 05/31/2025 |
| LLOYD G DRUMMOND PLBG&GEN | 2 | 05/03/2021 |
| MASTER 2 PLBG & HTG INC | 2 | 05/20/2024 |
| NEW YORK PARK PLBG&HTG CO | 2 | 09/29/2023 |
| PRESS BUILDERS INC | 2 | 12/30/2021 |
| SAFEPIPE PLUMBING INC | 2 | 12/09/2025 |
| SCG AMERICA CONST. INC | 2 | 12/09/2025 |
| WATSON'S PLBG, HTG, & BDG | 2 | 11/17/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 3 | 05/31/2025 |
| COLLIERS | 3 | 04/13/2026 |
| CONCORD HOSPITALITY ENTERPRISES | 3 | 05/16/2023 |
| NEW LIFE HOLDING CORP. | 3 | 08/22/2023 |
| 11 NORTH MOORE STREET UNIT 4C LLC | 2 | 03/16/2023 |
| 11 SUTTON LLC | 2 | 05/03/2021 |
| BORDEN HOUSE CONDOMINIUM | 2 | 06/21/2023 |
| FIRST SERVICE RESIDENTIAL | 2 | 10/16/2024 |
| Greenwich House Coop. Apts., Inc. | 2 | 08/20/2026 |
| MAXWELL-KATES, INC. | 2 | 05/14/2024 |
| MRR 76 LLC | 2 | 11/17/2025 |
| OPUS INTERIORS LLC | 2 | 05/05/2026 |
| 720-730 FORT WASHINGTON AVE OWNERS | 1 | 10/11/2024 |
| BENENSON CAPITAL PARTNERS, LLC | 1 | 08/31/2018 |
| BROWN HARRIS STEVENS | 1 | 09/29/2023 |
| CHARLES H. GREENTHAL MANAGEMENT\ | 1 | 04/29/2024 |
| Candor Capital LLC | 1 | 03/24/2025 |
| GPG MANAGEMENT | 1 | 08/28/2025 |
| KEHILA CHAPELS | 1 | 05/03/2022 |
| NATIONAL REALTY INVESTMENT ADVISORS | 1 | 02/19/2021 |
| PIERMONT PROPERTIES | 1 | 11/11/2020 |
| PSC | 1 | 02/26/2020 |
| SHEFFIELD FABRICATORS, CORP. | 1 | 03/05/2021 |
| THE LOVETT GROUP | 1 | 04/29/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01459362 ↗ | 130 BARROW STREET MANHATTAN | — | Permit Issued | — | 09/25/2026 | Design HALSEY MCCORMACK HELMER INC Contractor JOHN FITZGERALD PLBG &HTG | LEGALIZATION OF PLUMBING WORK ASSOCIATED WITH THE UPPER-LEVEL BATHROOM IN APARTMENT 312. ALL WORK WAS PREVIOUSLY COMPLETED. NO NEW WORK PROP… |
| M01438273 ↗ | 455 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 09/11/2026 | Design PORTELL ARCHITECTURE, PLLC Contractor GARRITY CONTRACTING LLC | INTERIOR RENOVATION OF APARTMENT 5L DUE TO SPRINKLER MAIN FLOOD DAMAGE, INCLUDING DEMOLITION AND REPLACEMENT OF NON-BEARING PARTITIONS, FINI… |
| M01399331 ↗ | 30 JONES STREET MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/10/2026 | Design THREAD COLLECTIVE Contractor ARDSON CONSTRUCTION CORP | REPAIR AND RESTORATION OF EXISTING EXTERIOR WOOD CORNICE, INCLUDING LOCALIZED IN-KIND REPLACEMENT, SURFACE PREPARATION, PRIMING AND PAINTING… |
| M01399024 ↗ | 28 JONES STREET MANHATTAN | Alteration | Filed — no permit on record | 08/20/2026 | — | Design THREAD COLLECTIVE | — |
| M01404917 ↗ | 84 THOMAS STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/23/2026 | Contractor LG ELITE PLUMBING INC | INTERIOR RENOVATION OF APARTMENT # 3 AS PER THE ARCHITECT'S DRAWINGS, INCLUDING NON-STRUCTURAL PARTITION MODIFICATIONS, DOOR REPLACEMENTS, F… |
| M01376631 ↗ | 160 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 04/29/2026 | 05/26/2026 | Design HALSEY MCCORMACK HELMER INC Owner THE LOVETT GROUP Contractor MIDTOWN PLBG & HTNG CORP | FILING TO SUPERSEDE APPLICATION 101044371 FOR APARTMENT 7-AE. NO WORK PROPOSED. THERE IS NO CHANGE TO THE USE, OCCUPANCY OR EGRESS. SEE COMM… |
| M01368886 ↗ | 104 EAST 25 STREET MANHATTAN | Alteration | Permit Issued | 04/13/2026 | 05/07/2026 | Design JD Engineering PC Owner COLLIERS Contractor NICE PLUMBING CORP | PLUMBING WORK FOR 10TH FLOOR OFFICE BUILD-OUT INCLUDING NEW SANITARY, WASTE, VENT, AND DOMESTIC WATER PIPING CONNECTIONS AND PLUMBING FIXTUR… |
| M01264035 ↗ | 52 EAST 76 STREET MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 05/01/2026 | Owner MRR 76 LLC Contractor AQUEDUCT MECHANICAL CORP | REMOVAL OF EXISTING PLUMBING FIXTURES, PIPING, AND RELATED EQUIPMENT AT CELLAR, 1ST, 2ND, 3RD, AND 4TH FLOORS TO PREPARE FOR FUTURE RENOVATI… |
| M01308106 ↗ | 52 EAST 76 STREET MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 05/01/2026 | Design JD Engineering PC Owner MRR 76 LLC Contractor RAF GENERAL CONTRACTING C | STRUCTURAL JOIST REPAIR AND NEW ROOF DUNNAGE FOR HVAC UNITS ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING MULTI-FAMILY TOWNHOUSE, AS PER … |
| M01381690 ↗ | 5 EAST 78 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 05/01/2026 | — | Owner OPUS INTERIORS LLC | — |
| M01381714 ↗ | 5 EAST 78 STREET MANHATTAN | Alteration | Filed — no permit on record | 04/30/2026 | — | Owner OPUS INTERIORS LLC | — |
| M01390904 ↗ | 106 3 AVENUE MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 04/28/2026 | Contractor #1 LORZA RENOVATIONS INC | INTERIOR RENOVATION OF FIRST AND SECOND FLOORS OF EXISTING EATING/DRINKING ESTABLISHMENT INCLUDING PARTITION MODIFICATIONS, FINISHES, FIXTUR… |
| M01348787 ↗ | 104 EAST 25 STREET MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 04/22/2026 | Owner COLLIERS Contractor SHANNON CONTRACTING LLC | NON-STRUCTURAL INTERIOR DEMOLITION AT EXISTING 10TH FLOOR OFFICE SPACE. REMOVE EXISTING FLOOR FINISHES AND NON-LOAD-BEARING PARTITIONS. NO C… |
| M01331601 ↗ | 104 EAST 25 STREET MANHATTAN | Alteration | Permit Issued | 04/03/2026 | 04/09/2026 | Owner COLLIERS Contractor ATLAS SUPREME SERVICE INC | STRUCTURAL WORK AT EXISTING FIRST FLOOR LOBBY: PROVIDE NEW WALL OPENING AND INSTALL NEW STEEL FRAMING WITH BASE PLATE AND POST-INSTALLED ADH… |
| M01375298 ↗ | 106 3 AVENUE MANHATTAN | Alteration | Permit Issued | 03/23/2026 | 04/02/2026 | Contractor #1 LORZA RENOVATIONS INC | INTERIOR NON-STRUCTURAL DEMOLITION OF 1ST AND 2ND FLOORS, INCLUDING REMOVAL OF NON-LOAD BEARING PARTITIONS, FINISHES, DOORS, STOREFRONT ELEM… |
| M01228554 ↗ | 431 WEST 121 STREET MANHATTAN | Alteration | Permit Issued | 05/28/2025 | 02/10/2026 | Design JD Engineering PC Contractor ALGOL GROUP | INTERIOR RENOVATION OF EXISTING FIRST-FLOOR RESTAURANT, INCLUDING NEW EQUIPMENT INSTALLATION, NON-LOAD-BEARING WALLS, LIGHTING UPGRADES, MIL… |
| M01305853 ↗ | 1045 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 01/21/2026 | Design EJC ENGINEERING, PLLC Contractor SCG AMERICA CONST. INC | SPRINKLER WORK ON THE 26TH FL RENOVATIONS. WORK INCLUDES NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, CEILINGS, DOORS, FINISHES, MILLWORK, NO … |
| B01291578 ↗ | 1717 BROADWAY BROOKLYN | Alteration | Signed-off | 09/25/2025 | 01/20/2026 | Design HALSEY MCCORMACK HELMER INC Contractor N AND S PLUMBING INC | APPLICATION FILING FOR RENOVATION OF THE RETAIL SPACE THE TINY CUPBOARD. WORK INCLUDES NEW PLUMBING FIXTURES AND PIPING AS PER ARCHITECT'S P… |
| M01305854 ↗ | 1045 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/09/2025 | 01/20/2026 | Design EJC ENGINEERING, PLLC Contractor BELLEROSE PLBG & HTG | SPRINKLER WORK ON THE 27TH FL RENOVATIONS. WORK INCLUDES NON-STRUCTURAL DEMOLITION, NEW PARTITIONS, CEILINGS, DOORS, FINISHES, MILLWORK, NO … |
| M01022260 ↗ | 151 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 05/13/2024 | 01/07/2026 | Design PIRO STUDIO LLC Contractor ABIGAIL H HESS INTERIORS | INSTALLATION OF HVAC UNITS AND ASSOCIATED DUCTWORK AT APARTMENT 12-W, AS PER ENGINEER'S DRAWINGS. THERE IS NO CHANGE TO THE USE, EGRESS OR O… |
| M01011904 ↗ | 151 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/08/2024 | 01/06/2026 | Design HALSEY MCCORMACK HELMER INC Contractor ABIGAIL H HESS INTERIORS | PLUMBING APPLICATION FOR APARTMENT 12-W TO INCLUDE THE REPLACEMENT AND INSTALLATION OF NEW BATHROOM PLUMBING FIXTURES AS PER THE ARCHITECTS … |
| M01088978 ↗ | 45 EAST 66 STREET MANHATTAN | Alteration | Permit Issued | 08/09/2024 | 12/23/2025 | Design ABS ENGINEERING, PLLC Contractor HIGHLINE CONSTRUCTION GR | RENOVATION AT THE PENTHOUSE APARTMENT ON THE 11TH AND 12TH FLOORS TO INCLUDE NEW FLOORS, CABINETS, WINDOWS, MILLWORK, KITCHEN AND BATHROOMS … |
| B01322929 ↗ | 490 MAC DONOUGH STREET BROOKLYN | Alteration | Permit Issued | 11/25/2025 | 12/18/2025 | Design CHONG ENGINEERING, P.C. Contractor PENINSULA CONSTRUCTION IN | REMOVAL, RELOCATION, REPLACEMENT OF KITCHEN, BATHROOM, LAUNDRY FIXTURES THROUGHOUT THE CELLAR, BASEMENT, FIRST AND SECOND FLRS. NEW SUPPLY… |
| M01305030 ↗ | 5 BRYANT PARK MANHATTAN | Alteration | Permit Issued | 10/27/2025 | 11/05/2025 | Contractor ASE HVAC INC | INTERIOR RENOVATION OF EXISTING FIRST-FLOOR RESTAURANT SPACE INCLUDING NON-STRUCTURAL INTERIOR DEMOLITION, NEW INTERIOR FINISHES, MILLWORK, … |
| M01124510 ↗ | 66 LEONARD STREET MANHATTAN | Alteration | Signed-off | 10/16/2024 | 10/21/2025 | Design HALSEY MCCORMACK HELMER INC Contractor HI-TECH PLUMBING & HEATIN | APPLICATION FILING FOR THE RENOVATION OF KITCHEN AND BATHROOMS AT APARTMENT 2-E TO INCLUDE NEW PLUMBING FIXTURES AS PER ARCHITECT'S DRAWINGS… |
| M01124505 ↗ | 66 LEONARD STREET MANHATTAN | Alteration | Signed-off | 10/13/2024 | 09/16/2025 | Design HALSEY MCCORMACK HELMER INC Contractor A1-TECH-CONSTRUCTION CORP | APPLICATION FILING FOR THE RENOVATION OF KITCHEN AND BATHROOMS AT APARTMENT 2-E AS PER PLANS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUP… |
| M01263542 ↗ | 242 WEST 10 STREET MANHATTAN | Alteration | Signed-off | 08/28/2025 | 09/10/2025 | Design HANSEN ENGINEERING, PC Owner GPG Management Contractor NEW WORLD EURO CONSTRUCTI | INSTALLATION OF A VENTLESS KITCHEN HOOD FOR THE FIRST FLOOR EATING AND DRINKING ESTABLISHMENT AS PER THE ENGINEER'S DRAWINGS. THERE IS NO CH… |
| M01249869 ↗ | 125 GRAND STREET MANHATTAN | Alteration | Permit Issued | 07/10/2025 | 07/30/2025 | Design HALSEY MCCORMACK HELMER INC Contractor CITY CODE CONSTRUCTION LL | INSTALLATION OF A TEMPORARY ROOFTOP MOCK UP AS PER ARCHITECT'S DRAWINGS REQUESTED BY THE LANDMARK PRESERVATION COMMISSION. THERE IS NO CHAN… |
| M01067618 ↗ | 1206 1 AVENUE MANHATTAN | Alteration | Signed-off | 10/01/2024 | 05/19/2025 | Design HALSEY MCCORMACK HELMER INC Owner AKAM ASSOCIATES, INC. Contractor KRK HOME IMPROVEMENT LLC | APPLICATION FILING FOR THE INSTALLATION OF A WALL MOUNTED YORK SPLIT AIR CONDITIONING SYSTEM AT APARTMENT 3-DE AS PER PLANS. THERE IS NO CHA… |
| M01181576 ↗ | 119 SOUTH STREET MANHATTAN | Alteration | Signed-off | 03/24/2025 | 05/16/2025 | Owner Candor Capital LLC Contractor CCW SHEET METAL | INTERIOR ALTERATIONS INCLUDE OPENING OF CEILINGS IN THE BASEMET, PARTITIONS, NEW FLOORING, NEW LIGHT FIXTURES, PLUMBING FIXTURES AND NEW FIN… |
| M01059507 ↗ | 1206 1 AVENUE MANHATTAN | Alteration | Signed-off | 06/20/2024 | 04/10/2025 | Design HALSEY MCCORMACK HELMER INC Owner AKAM ASSOCIATES, INC. Contractor JVR PLBG AND HEATING INC | APPLICATION FILING FOR THE COMBINATION OF APARTMENTS 3-D AND 3-E AS PER TPPN 3 OF 97 ASSOCIATED WITH APPLICATION M01037455. WORK TO INCLUDE … |
| M01037455 ↗ | 1206 1 AVENUE MANHATTAN | Alteration | Signed-off | 05/07/2024 | 03/27/2025 | Design HALSEY MCCORMACK HELMER INC Owner AKAM ASSOCIATES, INC. Contractor KRK HOME IMPROVEMENT LLC | APPLICATION FILING FOR THE COMBINATION OF APARTMENTS 3-D AND 3-E AS PER TPPN 3 OF 97. WORK TO INCLUDE NON-STRUCTURAL OPENINGS, REMOVAL OF ON… |
| M01165858 ↗ | 883 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/24/2025 | 02/13/2025 | Contractor WILLIAM PASTER, INC | RENOVATION OF APARTMENT 7-C TO INCLUDE NEW PLUMBING FIXTURES FOR THE KITCHEN, LAUNDRY ROOM AND BATHROOMS, WITH ASSOCIATED PIPING. THERE IS … |
| M01023466 ↗ | 151 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/08/2024 | 01/03/2025 | Design SERMAN ENGINEERING Contractor ABIGAIL H HESS INTERIORS | INSTALLATION OF ROOFTOP STEEL DUNNAGE FOR HVAC UNITS AT APARTMENT 12-W AS PER ENGINEER'S DRAWINGS. THERE IS NO CHANGE TO THE USE, EGRESS OR … |
| M01075001 ↗ | 438 BROOME STREET MANHATTAN | Alteration | Signed-off | 08/23/2024 | 09/04/2024 | Design SU ARCHITECT, P.C. Contractor KLE CONSTRUCTION INC | Filing to supersede Application 102549315 and show as built conditions. Cap and remove one residential gas range and gas dryer at apartment… |
| M01008710 ↗ | 2 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 03/06/2024 | 07/22/2024 | Design HALSEY MCCORMACK HELMER INC Contractor SF CONSTRUCTION SVCS INC | FILING FOR THE COMBINATION OF APARTMENTS 17-DE AND APT 17-G. WORK TO INCLUDE THE CAPPING AND REMOVAL OF ONE GAS RANGE AND METER, AND THE REP… |
| M01062299 ↗ | 45 EAST 66 STREET MANHATTAN | Alteration | Signed-off | 06/13/2024 | 07/12/2024 | Contractor DONATO PLUMBING, INC | INTERIOR NON-STRUCTURAL DEMOLITION WORK AT THE 11TH AND 12TH FLOORS TO INCLUDE THE REMOVAL OF KITCHEN AND BATHROOM PLUMBING FIXTURES AS PER … |
| M00929985 ↗ | 935 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/12/2023 | 05/31/2024 | Design RMM DESIGN STUDIO Contractor P.S.I. MECHANICAL | PLUMBING APPLICATION FOR APARTMENT 6-BC. WORK TO INCLUDE THE REPLACEMENT AND INSTALLATION OF NEW PLUMBING FIXTURES FOR THE KITCHEN AND BATHR… |
| M00934357 ↗ | 112 EAST 74 STREET MANHATTAN | Alteration | Signed-off | 09/29/2023 | 05/10/2024 | Owner BROWN HARRIS STEVENS Contractor GIANCOLA CONTRACTORS INC | Filing for the renovation and cosmetic updates to Apartment PHS as per Architect's plans. Work to include new non-bearing walls, floors, new… |
| M00929894 ↗ | 935 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/12/2023 | 05/02/2024 | Design RMM DESIGN STUDIO Contractor STREETS & AVENUES DEVELOP | APPLICATION FILING FOR GENERAL CONSTRUCTION WORK AT APARTMENT 6-BC. WORK TO INCLUDE THE REMOVAL OF NON BEARING WALLS, NEW CEILINGS, MILLWORK… |
| M08026257 ↗ | 993 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/26/2022 | 01/25/2024 | Design HALSEY MCCORMACK HELMER INC Contractor ABIGAIL H HESS INTERIORS | APPLICATION FILING AT APT 5-E INCLUDES GENERAL CONSTRUCTION AND COSMETIC UPDATES TO THE KITCHEN AND BATHROOMS AND A THROUGH WALL OPENING FOR… |
| B07995024 ↗ | 1601 AVENUE H BROOKLYN | Alteration | Permit Issued | 11/29/2022 | 01/11/2024 | Design JOSH GOLDSTEIN ARCHITECT Contractor A.M.N. CORPORATION | INSTALL AND REPLACE NEW PLUMBING FIXTURES AS PER ARCHITECT'S DRAWINGS. FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION B07995003.… |
| M08026436 ↗ | 993 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/26/2022 | 12/08/2023 | Design HALSEY MCCORMACK HELMER INC Contractor MASTER 2 PLBG & HTG INC | APPLICATION FILING AT APT 5-E INCLUDES NEW AND THE RELOCATION OF PLUMBING FIXTURES TO THE KITCHEN AND BATHROOMS AS PER PLANS. THERE IS NO CH… |
| M00842548 ↗ | 104 HUDSON STREET MANHATTAN | Alteration | Signed-off | 06/21/2023 | 09/19/2023 | Design HALSEY MCCORMACK HELMER INC Owner BORDEN HOUSE CONDOMINIUM Contractor JVR PLBG AND HEATING INC | SUPERSEDE 2005 APPLICATION 104217232 AND PERFORM THE FOLLOWING WORK: REMOVE WASHER/DRYER, REMOVE EXISTING EXTERIOR CONDENSING UNITS, REMOVE … |
| M00842429 ↗ | 104 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 06/21/2023 | 09/11/2023 | Design HALSEY MCCORMACK HELMER INC Owner BORDEN HOUSE CONDOMINIUM Contractor COW BAY SPRINKLER CORP | SUPERSEDE 2005 APPLICATION 104217232 AND PERFORM THE FOLLOWING WORK: REMOVE WASHER/DRYER, REMOVE EXISTING EXTERIOR CONDENSING UNITS, REMOVE … |
| B07995003 ↗ | 1601 AVENUE H BROOKLYN | Alteration CO | Permit Issued | 11/29/2022 | 08/24/2023 | Design JOSH GOLDSTEIN ARCHITECT Contractor HARD SAFARI CORP | INTERIOR GENERAL CONSTRUCTION WORK FOR THE RE-CONFIGURATION OF TWO UNITS, WITHIN A TWO FAMILY DWELLING. OBTAIN NEW CERTIFICATE OF OCCUPANCY… |
| X00909799 ↗ | 1618 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 08/14/2023 | 08/24/2023 | Design HALSEY MCCORMACK HELMER INC Owner NEW LIFE HOLDING CORP. Contractor COW BAY SPRINKLER CORP | HEREWITH FILING TO SUPERSEDE AND WITHDRAW APPLICATION 220256158. NO CONSTRUCTION WORK IS PROPOSED. THERE IS NO CHANGE TO THE USE, EGRESS OR … |
| M00875527 ↗ | 308 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 07/15/2023 | 08/10/2023 | Design HALSEY MCCORMACK HELMER INC Contractor DNA PLUMBING CONTR. INC | PLUMBING APPLICATION FILING FOR THE COMBINATION OF APARTMENTS 16-E AND F. WORK INCLUDES THE INSTALLATION AND THE RELOCATION OF PLUMBING FIXT… |
| M08052292 ↗ | 200 EAST 61 STREET MANHATTAN | Alteration | Signed-off | 05/02/2023 | 07/12/2023 | Design HALSEY MCCORMACK HELMER INC Owner MAXWELL-KATES, INC. Contractor ARANDA PLBG & HTG CORP | APPLICATION AND PLANS FILED HEREWITH FOR APARTMENT 35-E. WORK TO INCLUDE KITCHEN AND BATHROOM UPDATES, THE INSTALLATION, REPLACEMENT AND REL… |
| M00841800 ↗ | 15 EAST 30TH STREET MANHATTAN | Alteration | Signed-off | 05/30/2023 | 06/27/2023 | Contractor ALVA RENOVATIONS AND PAIN | APPLICATION FILING FOR GENERAL CONSTRUCTION WORK AT APARTMENT 45-B. REMOVAL OF NON LOAD BEARING WALL, CLOSET AND MILLWORK. CONSTRUCT A NEW … |
| M08052291 ↗ | 200 EAST 61 STREET MANHATTAN | Alteration | Signed-off | 05/02/2023 | 06/27/2023 | Design HALSEY MCCORMACK HELMER INC Owner MAXWELL-KATES, INC. Contractor LOYVETA CONSTRUCTION | Application filing for General Construction work and cosmetic updated to apartment 35-E. Work to include new flooring, cabinets and mill wor… |
| M00810159 ↗ | 438 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 01/30/2023 | 04/27/2023 | Design HALSEY MCCORMACK HELMER INC Contractor AJ RENOVATION GROUP INC | GENERAL CONSTRUCTION WORK IN APARTMENT 8-B WHICH INCLUDES THE RENOVATION OF THE KITCHEN AND BATHROOMS WITH NEW MILLWORK, NON-BEARING PARTITI… |
| M00810212 ↗ | 438 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 01/30/2023 | 04/27/2023 | Design HALSEY MCCORMACK HELMER INC Contractor DPH PLUMBING & HTG CORP | PLUMBING APPLICATION FOR APARTMENT 8-B WHICH INCLUDES THE RENOVATION OF THE KITCHEN AND BATHROOMS WITH THE REPLACEMENT OF PLUMBING FIXTURES … |
| M00841908 ↗ | 24 VARICK STREET MANHATTAN | Alteration | Signed-off | 03/16/2023 | 04/18/2023 | Contractor LEGUCI PIPING&HEATING LLC | APPLICATION FILING AT APARTMENT 4-C FOR THE RELOCATION OF TWO SPRINKLER HEADS. FILED IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION M0… |
| M00841907 ↗ | 24 VARICK STREET MANHATTAN | Alteration | Signed-off | 03/16/2023 | 04/11/2023 | Contractor GIANCOLA CONTRACTORS INC | GENERAL CONSTRUCTION WORK FOR COSMETIC UPDATES AT APARTMENT 4-C. FILED IN CONJUNCTION WITH SPRINKLER APPLICATION M00841908. THERE IS NO CHAN… |
| B00771067 ↗ | BIN 3430412 | Alteration | Signed-off | 07/11/2022 | 03/29/2023 | Design HANSEN ENGINEERING, PC Contractor KDL CONSTRUCTION & DEVELO | APPLICATION FILING FOR THE SUPPORT OF EXCAVATION (SOE) AS PER ENGINEER'S PLANS IN CONJUNCTION WITH NEW BUILDING APPLICATION 321786901. |
| B00771255 ↗ | 712 39 STREET BROOKLYN | Alteration | Signed-off | 07/11/2022 | 03/29/2023 | Design HANSEN ENGINEERING, PC Contractor KDL CONSTRUCTION & DEVELO | APPLICATION FILING FOR THE SUPPORT OF EXCAVATION (SOE) AS PER ENGINEER'S DRAWINGS IN CONJUNCTION WITH NEW BUILDING APPLICATION 321786901. |
| B08035801 ↗ | BIN 3430412 | Alteration | Signed-off | 11/16/2022 | 03/27/2023 | Design HANSEN ENGINEERING, PC Contractor KDL CONSTRUCTION & DEVELO | FILING FOR UNDERPINNING, EARTHWORK AND STRUCTURAL RELATED WORK AS PER ENGINEER'S DRAWINGS AT 732 39 STREET, IN CONJUNCTION WITH NEW BUILDING… |
| M00577826 ↗ | 441 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2021 | 11/14/2022 | Design HALSEY MCCORMACK HELMER INC Contractor ABIGAIL H HESS INTERIORS | PLUMBING APPLICATION FILED HEREWITH ASSOCIATED WITH GENERAL CONSTRUCTION WORK AT APARTMENT 7-JF. WORK TO INCLUDE NEW AND RELOCATED PLUMBING … |
| M00341756 ↗ | 173 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 12/17/2020 | 11/04/2022 | Design BRICK CITY RECONSTRUCTION Contractor PRESS BUILDERS INC | MECHANICAL APPLICATION IN CONJ. WITH GENERAL CONSTRUCTION AND PLUMBING WORK. NEW INSTALLATION OF AIR HANDLER (SPLIT SYSTEM) AND CONDENSER U… |
| M00728605 ↗ | 100 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 06/23/2022 | 10/13/2022 | Contractor PROFAIR CORP | MODIFICATION TO THE EXISTING HVAC SYSTEM AS PER ENGINEER'S PLANS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00727499 ↗ | 100 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 06/08/2022 | 07/14/2022 | Contractor P.H. WORKS INC | RENOVATION AND UPDATES TO THE LOBBY, BATHROOMS AND FITNESS ROOM. WORK TO INCLUDE NEW PLUMBING FIXTURES AS PER ENGINEER'S DRAWINGS AT THE INP… |
| M00727364 ↗ | 100 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 06/06/2022 | 06/23/2022 | Contractor ALLIED CONSTRUCTION MANAG | FILING FOR GENERAL COSMETIC UPDATES TO LOBBY, BATHROOMS AND FITNESS ROOM. REMOVAL OF NON-BEARING WALLS, NEW LAYOUT CHANGES AS PER ARCHITECT… |
| B00693079 ↗ | 60 BRIGHTON 11 STREET BROOKLYN | Alteration | Filed — no permit on record | 05/03/2022 | — | Design HANSEN ENGINEERING, PC Owner KEHILA CHAPELS | — |
| M00612744 ↗ | 35 SUTTON PLACE MANHATTAN | Alteration | Signed-off | 11/30/2021 | 04/19/2022 | Contractor VALIANT DESIGN BUILD INC | RENOVATION TO APT 19-A. WORK TO INCLUDE NEW FLOORS, DOORS, MILLWORK, REMOVAL OF NON-BEARING PARTITIONS, REPLACEMENT OF WINDOWS, ENLARGEMENT … |
| X00692592 ↗ | 1823 NARRAGANSETT AVENUE BRONX | Alteration | Signed-off | 03/09/2022 | 03/16/2022 | Contractor BALKAN CONSTRUCTION LLC | COMPLYING WITH THE Quality of Life Request for Corrective Action 2315971 DATED 1/24/22. REMOVE EXISTING DOOR, WOOD POSTS & WOOD DECK & RESTO… |
| M00688165 ↗ | 385 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 02/28/2022 | 03/11/2022 | Design HALSEY MCCORMACK HELMER INC Contractor HI-TECH PLUMBING & HEATIN | APPLICATION FILING FOR THE KITCHEN AND BATHROOM RENOVATIONS OF APARTMENT 4-E. WORK INCLUDES THE REMOVAL, RELOCATION AND THE REPLACEMENT OF P… |
| B00627648 ↗ | 732 39 STREET BROOKLYN | Alteration | Filed — no permit on record | 11/09/2021 | — | Design BECKER ENGINEERING, P.C. | — |
| M00590698 ↗ | 173 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 09/16/2021 | 10/01/2021 | Design ANCORA ENGINEERING, PLLC Contractor PRESS BUILDERS INC | APPLICATION FILING FOR STRUCTURAL SLAB REPAIRS AT APARTMENT 16-D AS PER ENGINEER'S DRAWINGS, ASSOCIATED GENERAL CONSTRUCTION WORK FILED UND… |
| X00593407 ↗ | 3080 DECATUR AVENUE BRONX | Alteration | Filed — no permit on record | 09/15/2021 | — | — | |
| M00483408 ↗ | 230 EAST 73 STREET MANHATTAN | Alteration | Signed-off | 03/23/2021 | 07/21/2021 | Contractor IMMEDIATE REMODELING INC | Filing for plumbing work as per drawings in apartment 2-G. Work includes new plumbing fixtures for the kitchen and bathroom as per architect… |
| B00547898 ↗ | 28 DOUGLASS STREET BROOKLYN | Alteration | Signed-off | 06/28/2021 | 07/06/2021 | Design BECKER ENGINEERING, P.C. Contractor COW BAY SPRINKLER CORP | NO WORK APPLICATION FILING TO SUPERSEDE ALTERATION 300345035 WHEREAS THE ORIGINAL APPLICANT RETIRED & LEFT THE JOB OPEN. ORIGINAL SCOPE WAS … |
| B00530967 ↗ | 245 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 06/01/2021 | 06/17/2021 | Design BECKER ENGINEERING, P.C. Contractor 5 POINTS REHAB LLC | APPLICATION FILING FOR FACADE REPAIRS AND RENOVATION UPDATES FROM THE 1ST FLOOR THROUGH THE ROOF LEVEL AS PER ENGINEER'S DRAWINGS. THERE IS … |
| B00238236 ↗ | 717 40 STREET BROOKLYN | Alteration | Signed-off | 10/02/2019 | 05/06/2021 | Design BECKER ENGINEERING, P.C. Contractor LOXTON INC | INSTALLATION OF NEW FLOWABLE FILL, AND A NEW SLAB ON GRADE AS PER DRAWINGS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUPANCY. |
| M00486964 ↗ | 143 EAST 49 STREET MANHATTAN | Alteration | Permit Issued | 03/18/2021 | 04/21/2021 | Design HALSEY MCCORMACK HELMER INC Contractor N.Y. EMS MECHANICAL CORP | Subsequent boiler application, to cross reference the initial plumbing application where the gas meter and related piping were replaced. No … |
| B00479272 ↗ | 204 SHEFFIELD AVENUE BROOKLYN | Alteration | Signed-off | 03/03/2021 | 04/06/2021 | Design HALSEY MCCORMACK HELMER INC Contractor R&L CONCRETE INC | NO WORK APPLICATION TO COMPLY WITH VACATE ORDER, LEGALIZE TWO PIECE BATHROOM AT CELLAR, AND COMPLY WITH 6/21/2019 AUDIT ORIGINALLY FILED UND… |
| M00466257 ↗ | 2162 3 AVENUE MANHATTAN | Alteration | Permit Issued | 02/22/2021 | 03/24/2021 | Design BECKER ENGINEERING, P.C. Owner NEW LIFE HOLDING CORP. Contractor COW BAY SPRINKLER CORP | STRUCTURAL REPAIRS AT CELLAR AS PER ENGINEER'S DRAWINGS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUPANCY. |
| B00426042 ↗ | 37 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 11/25/2020 | 03/11/2021 | Design BECKER ENGINEERING, P.C. Owner 11 SUTTON LLC Contractor ARANDA PLBG & HTG CORP | APPLICATION FILING TO INSTALL ONE DOUBLE CHECK VALVE ASSEMBLY FOR 3 COMBINED SPRINKLER/DOMESTIC WATER SERVICE. FILED IN CONJUNCTION WITH SPR… |
| B00464634 ↗ | 494 7TH STREET BROOKLYN | Alteration | Signed-off | 02/19/2021 | 02/24/2021 | Contractor U.S. CONSTRUCTION INC | NO WORK PROPOSED. THIS APPLICATION IS BEING FILED TO SUPERSEDE APPLICATION 321799194 WHERE WORK TOOK PLACE. TEMPORARY SHORING SUPPORT FILED… |
| B00401118 ↗ | 37 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 10/21/2020 | 02/02/2021 | Design BECKER ENGINEERING, P.C. Owner 11 SUTTON LLC Contractor LLOYD G. DRUMMOND | APPLICATION FILING FOR THE INSTALLATION OF NEW SPRINKLER SYSTEM AT FIRST FLOOR. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00388810 ↗ | 41 BARROW STREET MANHATTAN | Alteration | Signed-off | 08/24/2020 | 11/30/2020 | Design HALSEY MCCORMACK HELMER INC Contractor AERIAL DESIGN BUILD SVCS | STRUCTURAL APPLICATION FILING ASSOCIATED WITH GENERAL CONSTRUCTION WORK, FOR THE REMOVAL OF TWO COLUMNS AND REPLACEMENT WITH A BEAM AS PER S… |
| B00422885 ↗ | 2615 WEST 13 STREET BROOKLYN | Alteration | Signed-off | 11/11/2020 | 11/13/2020 | Design Z & T ENGINEERING, P.C. Owner PIERMONT PROPERTIES Contractor COW BAY SPRINKLER CORP | APPLICATION FILING TO COMPLY WITH EMERGENCY WORK ORDER (DOB VIOLATIONS 102720FEU31301FF AND 102720FEU31302FF) AND REMOVE ENTIRE MONOPOLE ST… |
| M00250413 ↗ | 533 WEST 147 STREET MANHATTAN | Alteration | Signed-off | 01/27/2020 | 07/17/2020 | Design BECKER ENGINEERING, P.C. Contractor MDG DESIGN & CONSTR LLC | No Work Structural application being filed in conjunction with New Building Application 104078631 to support Forensic Analysis. There is no … |
| B00357063 ↗ | 3915 7 AVENUE BROOKLYN | Alteration | Signed-off | 06/11/2020 | 06/19/2020 | Design BECKER ENGINEERING, P.C. Contractor MING MAI CONSTRUCTION INC | APPLICATION FILING TO PROVIDE REAR YARD REPAIRS AS PER ENGINEER'S DRAWINGS, AND COMPLY WITH PARTIAL VACATE ORDER. THERE IS NO CHANGE TO THE … |
| X00311747 ↗ | 25 METROPOLITAN OVAL BRONX | Alteration | Signed-off | 02/26/2020 | 05/05/2020 | Design BECKER ENGINEERING, P.C. Owner PSC Contractor TWO-TONE CONTRACTING CORP | APPLICATION FILING FOR ROOF LEVEL, SLAB OPENING AS PER STRUCTURAL DRAWINGS. THERE IS NO CHANGE TO THE USE, EGRESS OR OCCUPANCY. |
| M00274682 ↗ | 710 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 01/27/2020 | — | Design BECKER ENGINEERING, P.C. | — |
| M00023326 ↗ | 2162 3 AVENUE MANHATTAN | Alteration | Permit Issued | 03/22/2018 | 08/01/2019 | Design BECKER ENGINEERING, P.C. Owner NEW LIFE HOLDING CORP. Contractor COW BAY SPRINKLER CORP | INSTALLATION OF TEMPORARY WOODEN FENCE ASSOCIATED WITH APPLICATION 122607312. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00074781 ↗ | 592 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 08/31/2018 | 09/28/2018 | Contractor UP CONSTRUCTION AND RESTO | INSTALLATION OF TEMPORARY WOODEN FENCE, ASSOCIATED WITH ALTERATION TYPE II 122607269. THERE IS NO CHANGE TO THE USE, EGRESS OF OCCUPANCY. |
| M00900293 | 935 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | — | — | Design HALSEY MCCORMACK HELMER INC | — |
| M00915071 | 935 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | — | — | Design HALSEY MCCORMACK HELMER INC | — |