ECB05/26/2026ATOI OBSERVED OGOING CONSRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM WITH NEW ELECTRICAL ; WIRING, LIGHTING, EXHAUST FAN & SWITCHES. ALSO OBSERVED INSTALLATION OF NEW WATER HEATER & NEW CENTRALHearing held — result not yet published$1K proposed
ECB05/26/2026ATOI ONGOING CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1ST FLR BOILER ROOM. WORK APRX. 80% COMPLETE. NO PERMIT ON FILE. PSWO ISSUED., OBTAIN ALL PERMITSHearing held — result not yet published$1K proposed
ECB05/26/2026ATOI OBSERVED THE CONSTRUCTION OF STAND-UP SHOWER FRAME INSIDE 1STÂ FLR BOILER ROOM, ALSO GAS PIPE IN CELLAR NOT CAPPED, POSING POTENTIAL HAZARDOUS CONDITION., REPAIR AND/OR REPLACEHearing held — result not yet published$1K proposed
ECB05/26/2026ATOI OBSERVED ONGOING CONSTRUCTION OF STAND-UP SHOWER INSIDE 1STÂ FLR BOILER ROOM WITH NEW PLUMBING CONNECTIONS; COPPER WATER & WASTE LINES EXTENDED TO CELLAR. ASLO, INSTALLATION OF NEW WATER HEATER WITH NEW/EXHearing held — result not yet published$1K proposed
ECB05/26/2026ATOI OBSERVED NEW CENTRAL A/C & HEAT UNITS INSTALLED WITH ITS DUCTING WORK THROUGHOUT. WORK APPEARS 100% COMPLETE. VIOLATION ISSUED., OBTAIN ALL PERMITSHearing held — result not yet published$1K proposed