← Back
Special Inspection Agency
AKIMU GARUBA
Special Inspection Agency
2 projects with open permitsBRONX · 4QUEENS · 2
5 buildings
9
Total Filings
6
Projects on File
5
Buildings Worked
2
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month6 projects all-time
0112Nov '21 · 1Jun '23 · 1Nov '23 · 1Jul '24 · 1Aug '24 · 1Jul '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit233%
Signed off233%
Filed only233%
By project type
Alteration6
Most active buildings
All buildings →
1407 CROSBY AVENUEBRONX · 1 open · latest 09/19/2024
2 projects
3257 PARKSIDE PLACEBRONX · latest 11/16/2023
1 projects
1453 WILLIAMSBRIDGE ROADBRONX · latest 11/16/2021
1 projects
68-15 SELFRIDGE STREETQUEENS · 1 open · latest 01/03/2025
1 projects
102-02 JAMES COURTQUEENS · latest 07/26/2026
1 projects
Key relationships
Everyone →
Filing representatives
Owners
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q01431087 ↗102-02 JAMES COURT
QUEENS
AlterationFiled — no permit on record07/26/2026——
Q00888348 ↗68-15 SELFRIDGE STREET
QUEENS
AlterationPermit Issued06/24/202301/03/2025REPLACING 4 WASHING MACHINE AND 4 GAS DRYERS AND INSTALL 2 SPRINKLER HEAD ABOVE GAS DRYERS.
X01090113 ↗1407 CROSBY AVENUE
BRONX
AlterationPermit Issued08/02/202409/19/2024Removal of Existing Oil Tank and Oil Boiler. Installation of Electric Water Heaters to supply domestic hot water throughout the building
X01070749 ↗1407 CROSBY AVENUE
BRONX
AlterationFiled — no permit on record07/18/2024——
X00934413 ↗3257 PARKSIDE PLACE
BRONX
AlterationSigned-off11/10/202311/16/2023Installation of Gas Condensing Wall Mounted Combi Boilers or equivalent to supply Heating and Domestic hot water throughout the building (fr…
X00615760 ↗1453 WILLIAMSBRIDGE ROAD
BRONX
AlterationSigned-off11/05/202111/16/2021INSTALLATION OF EXHAUST RANGE HOOD AND EXHAUST DUCT SYSTEM
Counts cover all 6 projects (6 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DOUG'S PLBG & HTG SERV CO304/08/2025
J. SIBAJA KITCHEN AND VE*110/17/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Han Tang Realty208/02/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A & D BUILDING SOLUTIONS104/08/2025
6 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 6Open permit 2Signed off 2Filed only 2
6 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q01431087 ↗102-02 JAMES COURT
QUEENS
AlterationFiled — no permit on record07/26/2026——
Q00888348 ↗68-15 SELFRIDGE STREET
QUEENS
AlterationPermit Issued06/24/202301/03/2025REPLACING 4 WASHING MACHINE AND 4 GAS DRYERS AND INSTALL 2 SPRINKLER HEAD ABOVE GAS DRYERS.
X01090113 ↗1407 CROSBY AVENUE
BRONX
AlterationPermit Issued08/02/202409/19/2024Removal of Existing Oil Tank and Oil Boiler. Installation of Electric Water Heaters to supply domestic hot water throughout the building
X01070749 ↗1407 CROSBY AVENUE
BRONX
AlterationFiled — no permit on record07/18/2024——
X00934413 ↗3257 PARKSIDE PLACE
BRONX
AlterationSigned-off11/10/202311/16/2023Installation of Gas Condensing Wall Mounted Combi Boilers or equivalent to supply Heating and Domestic hot water throughout the building (fr…
X00615760 ↗1453 WILLIAMSBRIDGE ROAD
BRONX
AlterationSigned-off11/05/202111/16/2021INSTALLATION OF EXHAUST RANGE HOOD AND EXHAUST DUCT SYSTEM
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
102-02 JAMES COURT ↗107/26/2026
68-15 SELFRIDGE STREET ↗204/08/2025
3257 PARKSIDE PLACE ↗208/06/2024
1407 CROSBY AVENUE ↗208/02/2024
1453 WILLIAMSBRIDGE ROAD ↗210/17/2022
▾Special Inspection Requirements — 20
DateRequirementBuildingInspectorRole
04/25/2025Fire-Resistant Penetrations and Joints68-15 SELFRIDGE STREETAkimu Garubaspecial
04/25/2025Tenant Protection Plan Compliance68-15 SELFRIDGE STREETAkimu Garubaspecial
04/25/2025Sprinkler Systems68-15 SELFRIDGE STREETAkimu Garubaspecial
03/26/2025Tenant Protection Plan Compliance68-15 SELFRIDGE STREETAkimu Garubaspecial
03/26/2025Fire-Resistant Penetrations and Joints68-15 SELFRIDGE STREETAkimu Garubaspecial
03/26/2025Sprinkler Systems68-15 SELFRIDGE STREETAkimu Garubaspecial
08/04/2024HVAC-R and service water piping design and insulation3257 PARKSIDE PLACEAkimu Garubaenergy_progress
08/04/2024HVAC-R and service water heating system controls3257 PARKSIDE PLACEAkimu Garubaenergy_progress
08/04/2024HVAC-R and service water heating equipment3257 PARKSIDE PLACEAkimu Garubaenergy_progress
08/04/2024Energy Code Compliance Inspections3257 PARKSIDE PLACEAkimu Garubaprogress
08/04/2024Fire-Resistant Penetrations and Joints3257 PARKSIDE PLACEAkimu Garubaspecial
08/01/2024HVAC-R and service water heating system controls1407 CROSBY AVENUEAkimu Garubaenergy_progress
08/01/2024HVAC-R and service water piping design and insulation1407 CROSBY AVENUEAkimu Garubaenergy_progress
08/01/2024Fire-Resistant Penetrations and Joints1407 CROSBY AVENUEAkimu Garubaspecial
08/01/2024HVAC-R and service water heating equipment1407 CROSBY AVENUEAkimu Garubaenergy_progress
06/23/2024Final1407 CROSBY AVENUEAkimu Garubaprogress
06/23/2024Mechanical Systems1407 CROSBY AVENUEAkimu Garubaspecial
07/30/2022Duct leakage testing, insulation and design1453 WILLIAMSBRIDGE ROADAkimu Garubaenergy_progress
07/30/2022Final1453 WILLIAMSBRIDGE ROADAkimu Garubaprogress
07/30/2022Mechanical Systems1453 WILLIAMSBRIDGE ROADAkimu Garubaspecial
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026X01070749-I1 · 1407 CROSBY AVENUEOpen ↗
08/24/2026X00615760-P1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
08/24/2026X00615760-P1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/27/2026Q00888348-P2 · 68-15 SELFRIDGE STREETOpen ↗
08/27/2026Q00888348-P2 · 68-15 SELFRIDGE STREETOpen ↗
08/25/2026X01070749-I1 · 1407 CROSBY AVENUEOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00615760-P1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
08/25/2026X00615760-I1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
08/21/2026X01090113-I1 · 1407 CROSBY AVENUEOpen ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026X00615760-I1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
08/25/2026X00615760-P1 · 1453 WILLIAMSBRIDGE ROADOpen ↗
08/21/2026X01090113-I1 · 1407 CROSBY AVENUEOpen ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00615760-I1 · 1453 WILLIAMSBRIDGE ROADOpen ↗