← Back
Miscellaneous asylum / home
102-10 DITMARS BOULEVARD
QUEENS · BIN 4040898
💬 Discuss this project
1960Year Built
3Stories
N9Building Class
C4-2Zoning
21,554 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations 0 unresolved · 3 paperwork only ▸
Miscellaneous asylum / home · Owner of record: BROADWAY-SKYWAY LAGUARDIA CO · 23,344 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIBERTY 1 CONSTRUCTION507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MILTIADIS LEPTOURGOS, PE602/25/2025
MA ENGINEERING, P.C.105/03/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.N.H. CONSTRUCTION CORPGeneral Contractor307/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
CURRENT MECHS ELEC CONTSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508602/25/2025
Building Lifecycle
All (91)Filed (7)Permit Issued (5)Signed Off (3)Violation (46)Inspection (3)Special Inspection (27)
12/08/2025
Violation issued (ECB, open)
Construction
11/03/2025
Signed off — Alteration
REPLACE ONE OLD EXISTING BOILER WITH 1 NEW LAARS HOT WATER BOILER AT BOILER ROOM LOCATED IN THE BASEMENT FLOOR AS PER ATTACHED PLANS. OBTAIN BE PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE PL APPLICATION FOR A PROPOSED 1 INDIRECT
Q01079265-I1
03/20/2025
Signed off — Alteration
INSTALL NEW 1 INDIRECT HOT WATER HEATER (TURBOMAX) AT BOILER ROOM IN BASEMENT FLOOR AS PER ATTACHED PLANS. MODIFY EXISTING GAS AND WATER LINES TO CONNECT TO NEW BOILER. OBTAIN PL PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE BOILER
Q01080029-I1
03/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
02/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Miltiadis Leptourgos
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
02/25/2025
Filed — Alteration
INSTALL NEW 1 INDIRECT HOT WATER HEATER (TURBOMAX) AT BOILER ROOM IN BASEMENT FLOOR AS PER ATTACHED PLANS. MODIFY EXISTING GAS AND WATER LINES TO CONNECT TO NEW BOILER. OBTAIN PL PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE BOILER
Q01080029-P2
02/18/2025
Violation issued (ECB, open)
Construction
02/14/2025
Violation issued (ECB, closed)
Unknown
02/14/2025
Violation issued (ECB, closed)
Construction
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
02/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Miltiadis Leptourgos
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — Heating Systems
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
01/28/2025
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
01/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/09/2025
Filed — Alteration
REPLACE ONE OLD EXISTING BOILER WITH 1 NEW LAARS HOT WATER BOILER AT BOILER ROOM LOCATED IN THE BASEMENT FLOOR AS PER ATTACHED PLANS. OBTAIN BE PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE PL APPLICATION FOR A PROPOSED 1 INDIRECT
Q01079265-P2
01/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — Heating Systems
Miltiadis Leptourgos
01/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
11/29/2024
Violation issued (HPD, closed)
C
11/15/2024
Filed — Alteration
REPLACE ONE OLD EXISTING BOILER WITH 1 NEW LAARS HOT WATER BOILER AT BOILER ROOM LOCATED IN THE BASEMENT FLOOR AS PER ATTACHED PLANS. OBTAIN BE PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE PL APPLICATION FOR A PROPOSED 1 INDIRECT
Q01079265-P1
11/15/2024
Filed — Alteration
INSTALL NEW 1 INDIRECT HOT WATER HEATER (TURBOMAX) AT BOILER ROOM IN BASEMENT FLOOR AS PER ATTACHED PLANS. MODIFY EXISTING GAS AND WATER LINES TO CONNECT TO NEW BOILER. OBTAIN PL PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE BOILER
Q01080029-P1
11/13/2024
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — Heating Systems
Miltiadis Leptourgos
11/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
Miltiadis Leptourgos
09/24/2024
Permit issued — Boiler Equipment
Q01079265-I1-BE
09/24/2024
Permit issued — Plumbing
Q01080029-I1-PL
08/05/2024
Filed — Alteration
REPLACE ONE OLD EXISTING BOILER WITH 1 NEW LAARS HOT WATER BOILER AT BOILER ROOM LOCATED IN THE BASEMENT FLOOR AS PER ATTACHED PLANS. OBTAIN BE PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE PL APPLICATION FOR A PROPOSED 1 INDIRECT
Q01079265-I1
08/05/2024
Filed — Alteration
INSTALL NEW 1 INDIRECT HOT WATER HEATER (TURBOMAX) AT BOILER ROOM IN BASEMENT FLOOR AS PER ATTACHED PLANS. MODIFY EXISTING GAS AND WATER LINES TO CONNECT TO NEW BOILER. OBTAIN PL PERMIT. THIS APPLICATION IS TO BE FILED IN CONJUNCTION WITH THE BOILER
Q01080029-I1
02/13/2024
Violation issued (ECB, open)
Boilers
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/14/2022
Violation issued (ECB, closed)
Construction
09/02/2021
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
Q00036820-I1
08/16/2021
Permit issued — Construction Fence
Q00036820-I1-FN
05/25/2021
Permit issued — Construction Fence
Q00036820-I1-FN
01/30/2020
Violation issued (ECB, closed)
Construction
05/04/2018
Permit issued — Construction Fence
Q00036820-I1-FN
05/03/2018
Filed — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
Q00036820-I1
10/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/17/2017
Violation issued (ECB, closed)
Construction
07/11/2017
Violation issued (ECB, closed)
Construction
07/11/2017
Violation issued (ECB, closed)
Construction
07/11/2017
Violation issued (ECB, closed)
Unknown
05/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDPH PLUMBING & HTG CORP09/24/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP09/24/2024
DOB NOWConstruction FenceSigned-offJ.N.H. CONSTRUCTION CORP08/16/2021
DOB NOWConstruction FenceSigned-offJ.N.H. CONSTRUCTION CORP05/25/2021
DOB NOWConstruction FenceSigned-offJ.N.H. CONSTRUCTION CORP05/04/2018
BIS—ISSUEDLIBERTY ONE CONSTRUCTION04/26/2021
BIS—ISSUEDLIBERTY ONE CONSTRUCTION04/20/2020
BISOTISSUEDLIBERTY ONE CONSTRUCTION05/02/2019
BISSPISSUEDSAFETY FIRE SPRINKLER CORP04/18/2019
BISMHISSUEDENER-CON TECHNICAL SERVIC08/21/2018
BIS—ISSUEDLIBERTY ONE CONSTRUCTION07/12/2018
BISOTISSUEDJ.N.H. CONSTRUCTION CORP04/26/2018
BISOTISSUEDLIBERTY ONE CONSTRUCTION04/20/2018
BISPLISSUEDDPH PLUMBING & HTG CORP02/12/2018
BISSPISSUEDSAFETY FIRE SPRINKLER CORP01/19/2018
BISOTISSUEDJ.N.H. CONSTRUCTION CORP12/18/2017
BIS—ISSUEDLIBERTY ONE CONSTRUCTION07/11/2017
BISPLISSUEDDPH PLUMBING & HTG CORP05/08/2017
BISOTISSUEDLIBERTY ONE CONSTRUCTION04/27/2017
BISSPISSUEDSAFETY FIRE SPRINKLER CORP01/12/2017
BIS—ISSUEDLIBERTY ONE CONSTRUCTION05/13/2016
BIS—ISSUEDJ.A.M. CUSTOM CONSTRUCTIO05/26/2015
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING CO08/11/2006
BISOTISSUEDLAGURDIA FAMILY CENTER03/24/2004
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO.INC.05/06/1991
6 projects · most recent 09/17/2025
General Wiring Lighting
FiledStatusContractorScope
09/17/2025CompleteABSOLUTE ELECL SVCE INCGeneral Wiring
03/06/2025CompleteABSOLUTE ELECL SVCE INCGeneral Wiring
09/29/2024Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
10/14/2022CompleteCURRENT MECHS ELEC CONTS—
10/08/2021CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
01/29/2020CompleteFOSTER ELEC'L SVC., INC.General Wiring, Lighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/27/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
02/27/2025Tenant Protection Plan ComplianceMiltiadis Leptourgosspecial
02/27/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
02/10/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
02/10/2025Tenant Protection Plan ComplianceMiltiadis Leptourgosspecial
02/10/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
01/28/2025HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
01/28/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
01/28/2025Heating SystemsMiltiadis Leptourgosspecial
01/28/2025Tenant Protection Plan ComplianceMiltiadis Leptourgosspecial
01/28/2025HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
01/28/2025HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
01/28/2025Maintenance informationMiltiadis Leptourgosenergy_progress
01/08/2025HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
01/08/2025Maintenance informationMiltiadis Leptourgosenergy_progress
01/08/2025HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
01/08/2025HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
01/08/2025Tenant Protection Plan ComplianceMiltiadis Leptourgosspecial
01/08/2025Heating SystemsMiltiadis Leptourgosspecial
01/08/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
11/13/2024Maintenance informationMiltiadis Leptourgosenergy_progress
11/13/2024HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
11/13/2024HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
11/13/2024HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
11/13/2024Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
LA Guardia Family CenterOtherBasement
Project Q01079265 Alteration · LOC Issued · 08/05/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026Q00036820-I1Request digital key ↗
08/21/2026Q01079265-P2Request digital key ↗
08/21/2026Q01079265-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION26
05/03/2021400186516Open ↗
05/03/2021400186516Open ↗
03/17/2021400186516Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION11
08/02/2018440498365Open ↗
05/01/2018421627485Open ↗
02/13/2018421579054Open ↗
Showing 3 of 11 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
01/25/2021421585797Open ↗
11/10/2018421627485Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/26/2020420371742Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
03/11/2021420371742Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/22/2021420371742Open ↗
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
03/26/2020421431588Open ↗
03/26/2020421579054Open ↗
11/08/2019421221966Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026Q00036820-I1Open ↗
08/21/2026Q01079265-P2Open ↗
08/21/2026Q01079265-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/02/2018440498365Open ↗
05/01/2018421627485Open ↗
02/08/2018421579054Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/01/2018421627485Open ↗
02/08/2018421579054Open ↗
12/20/2017421585797Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/19/2026Q01079265-I1Open ↗
08/26/2026Q01079265-P1Open ↗
08/25/2026Q01079265-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/19/2026Q01079265-I1Open ↗
08/26/2026Q01079265-P1Open ↗
08/25/2026Q01079265-P2Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/02/2018440498365Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2018440498365Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
05/15/2018421221966Open ↗
02/20/2018421579054Open ↗
02/08/2018421579054Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/20/2018440498365Open ↗
10/09/2018440498365Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
05/03/2021420371742Open ↗
06/17/2020421665497Open ↗
▸BISEQUIPMENT USE PERMITS1
10/19/2018440498365Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/30/2021420371742Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/30/2021420371742Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
05/03/2021420371742Open ↗
▸Safety & Tenant Protection15
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist7
08/29/2026Q00036820-I1Open ↗
08/13/2026Q01079265-I1Open ↗
08/13/2026Q01079265-P1Open ↗
Showing 3 of 7 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST5
08/02/2018440498365Open ↗
05/01/2018421627485Open ↗
12/20/2017421585797Open ↗
Showing 3 of 5 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
02/12/2018421579054Open ↗
▸BISTenant Protection Plan and Notes1
04/17/2017421431588Open ↗
▸BISSTREET TREE CHECKLIST1
06/28/2011420371742Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01079265-P1Open ↗
08/21/2026Q01079265-P2Open ↗
08/21/2026Q01079265-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/04/2018421665497Open ↗
05/01/2018421627485Open ↗
02/08/2018421579054Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/30/2011420371742Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
11/10/2018421627485Open ↗
10/09/2018440498365Open ↗
05/01/2018421627485Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/25/2021421585797Open ↗
03/26/2020421431588Open ↗
11/10/2018421627485Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/25/2021420371742Open ↗
08/02/2018440498365Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/02/2018440498365Open ↗
▸BISNYCECC ANALYSIS1
08/02/2018440498365Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/11/2021420371742Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/28/2011420371742Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q01079265-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/28/2021420371742Open ↗
01/27/2021421585797Open ↗
01/27/2021421585797Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
01/15/2016421221966Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/15/2016421221966Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
02/01/2021421585797Open ↗
01/28/2021420371742Open ↗
07/14/2020421665497Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
07/22/2020420371742Open ↗
07/20/2020420371742Open ↗
01/05/2019420371742Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/03/2021421431588Open ↗
04/28/2021421431588Open ↗
03/17/2021400186516Open ↗
Showing 3 of 5 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
03/15/2021420371742Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
01/27/2021421585797Open ↗
03/26/2020421579054Open ↗
01/27/2020421221966Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/11/2021420371742Open ↗
07/14/2020421665497Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION11
03/15/2021420371742Open ↗
08/06/2020420371742Open ↗
05/14/2019420371742Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET7
09/04/2018421665497Open ↗
05/01/2018421627485Open ↗
02/08/2018421579054Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
10/27/2018420371742Open ↗
10/24/2018440498365Open ↗
10/09/2018440498365Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2018440498365Open ↗
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
05/03/2021420371742Open ↗
04/19/2021400186516Open ↗
02/01/2021421585797Open ↗
▸BISPLOT DIAGRAM2
11/22/2021420371742Open ↗
Showing 1 of 2 on file for this type
▸BISNYC SANCTIONED CHILD DAYCARE SERVICE FOR THE HOMELESS1
03/15/2021420371742Open ↗