| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01420571 ↗ | 3250 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 06/30/2026 | 07/14/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of one RTU with a similar unit in conjunction with Alt-1. No … |
| M01399838 ↗ | 245 WEST 99 STREET MANHATTAN | Alteration | Signed-off | 06/07/2026 | 07/01/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of one 10-ton RTU with a similar unit. No change in use, egre… |
| B01341167 ↗ | 110 LIVINGSTON STREET BROOKLYN | Alteration | Signed-off | 03/30/2026 | 06/12/2026 | Design AG ENGINEERING PLLC | REPLACEMENT IN KIND OF ONE (1) 10-TON WSHP UNIT WITH ONE SIMILAR TEN-TON WSHP UNIT. |
| M01358175 ↗ | 54 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 03/06/2026 | 05/28/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of two make-up air units, two cooling tower units, four modul… |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| B01361836 ↗ | 1218 AVENUE P BROOKLYN | Alteration | Signed-off | 03/04/2026 | 04/16/2026 | Design AG ENGINEERING PLLC | HVACE WORK FOR THE INSTALLATION OF 3 NEW 5 TON HEAT PUMP SYSTEMS-REPLACEMENT OF ONE 4 TON HEAT PUMP SYSTEM IN KIND AND ASSOCIATED DUCT AND … |
| Name | Projects together | Most recent |
|---|---|---|
| AG ENGINEERING PLLC | 25 | 06/30/2026 |
| V. SHAMES, P.E. | 16 | 07/22/2021 |
| A&B WORLD CONSULTING | 11 | 10/05/2023 |
| DJ ASSOCIATES ARCHITECT,PC | 7 | 05/19/2020 |
| MESZAROS ENGINEERING PLLC | 5 | 12/03/2025 |
| TSF ENGINEERING, PC | 3 | 10/27/2021 |
| ANZ CONSULTING ENGINEERING, PLLC | 2 | 06/10/2022 |
| FRIEDMAN ENGINEERING, PC | 2 | 11/10/2025 |
| SIDERIS KEFALAS ENGINEERS PC | 2 | 04/23/2025 |
| ALTA INDELMAN ARCHITECT | 1 | 07/10/2026 |
| ASDA ARCHITECTURE + DESIGN | 1 | 12/28/2021 |
| BP ARCHITECTS | 1 | 11/10/2025 |
| CHARLES DIEHL ARCHITECT LLC | 1 | 06/02/2026 |
| DAGHER ENGINEERING PLLC | 1 | 07/31/2024 |
| DANIEL R. WAPNER PE., P.C. | 1 | 10/21/2021 |
| DANIEL SCHUNKEWITZ ARCHITECT | 1 | 10/27/2021 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 04/06/2022 |
| FMC ENGINEERING | 1 | 06/23/2026 |
| GARFINKEL ARCHITECT, PLLC | 1 | 02/21/2023 |
| ICOR ASSOCIATES | 1 | 05/16/2023 |
| ISSAC & STERN ARCHITECTS, P.C | 1 | 06/23/2026 |
| JACK GREEN ASSOCIATES | 1 | 07/10/2026 |
| LAWLESS & MANGIONE | 1 | 08/15/2024 |
| LEHR ENGINEERING, DPC | 1 | 10/21/2020 |
| LUNA ENGINEERING INC. | 1 | 06/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| AKI RENOVATIONS GROUP INC | 1 | 03/11/2025 |
| ALPHA SCAFFOLDING INC | 1 | 06/23/2026 |
| ARCH PLUMBING & HTNG CORP | 1 | 11/10/2025 |
| ARCO PLBG AND HTG INC | 1 | 04/23/2025 |
| BAYPORT CONSTRUCTION CORP | 1 | 06/23/2026 |
| BROOKLYN MECH WORKS CORP | 1 | 10/27/2021 |
| FRANKIE PLBG & HTG L.L.C | 1 | 04/23/2025 |
| H & D MAINTENANCE CO INC | 1 | 12/03/2025 |
| HENRY MYERS P & H, INC | 1 | 07/10/2026 |
| JASA NYC GROUP INC | 1 | 04/23/2025 |
| LIBERTY MGTM & CONSTRUCTI | 1 | 06/02/2026 |
| LIS PIPING SOLUTION INC | 1 | 06/23/2026 |
| MANHATTAN CONCRETE LLC | 1 | 06/23/2026 |
| NYC AFFORDALE HOUSING PRE | 1 | 11/10/2025 |
| OMNIBUILD CONSTRUCTION IN | 1 | 06/23/2026 |
| PLATINUM TNT LLC | 1 | 10/27/2021 |
| SAFETY FIRE SPRINKLER COR | 1 | 10/27/2021 |
| STREAM PLUMBING INC | 1 | 06/23/2026 |
| TORRES & BUILDERS GROUP | 1 | 07/10/2026 |
| WNW & SONS PLBG & HTG INC | 1 | 11/10/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BOWLING GREEN ASSOCIATES | 4 | 05/19/2020 |
| SOLSTICE RESIDENTIAL GROUP, LLC | 4 | 06/07/2026 |
| STELLAR MANAGEMENT | 4 | 11/10/2025 |
| LACONIA NURSING HOME | 3 | 12/20/2021 |
| 151 WEST 136 EQUITY GROUP LLC | 2 | 12/14/2020 |
| JEM REALTY | 2 | 12/10/2019 |
| MODELLS SPORTING GOODS | 2 | 01/18/2022 |
| MYRCB | 2 | 04/07/2022 |
| ORSID REALTY CORP | 2 | 12/03/2025 |
| 145 EAST 15TH STREET TENANTS CORP. | 1 | 05/29/2024 |
| 19 WEST 44TH STREET | 1 | 10/21/2020 |
| 63-53 FRESH POND RD LLC | 1 | 04/30/2025 |
| 75 E. END AVE OWNER | 1 | 07/20/2021 |
| AKI RENOVATIONS GROUP INC | 1 | 03/11/2025 |
| BAC Developers Group | 1 | 08/23/2023 |
| COMJEM ASSOCIATES LTD | 1 | 06/18/2024 |
| CONG. DARCHEI TORAH | 1 | 09/30/2023 |
| CONGREGATION K'HAL ADATH JESHURUN I | 1 | 06/08/2023 |
| Fresh Space of Williamsburg LLC | 1 | 06/02/2026 |
| HALSTEAD MANAGEMENT | 1 | 05/14/2025 |
| INFINITY REAL ESTATE | 1 | 04/16/2020 |
| J14 LLC | 1 | 08/15/2023 |
| JEWISH CENTER OF KINGS HIGHWAY | 1 | 03/04/2026 |
| Kalmon Dolgin Affiliates Inc. | 1 | 06/13/2022 |
| LIVWRK | 1 | 06/10/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| SUMMIT CONSULTING & EXPEDITING | 21 | 06/07/2026 |
| MESZAROS ENGINEERING PLLC | 5 | 12/03/2025 |
| SKY MANAGEMENT GROUP, LLC. | 3 | 01/18/2022 |
| WILLIAM VITACCO ASSOCIATES | 3 | 11/10/2025 |
| 4444 PPPP CORP | 2 | 06/02/2026 |
| JM ZONING, LLC. | 2 | 06/23/2026 |
| GEORGE E. BERGER & ASS. LLC | 1 | 07/10/2026 |
| NEW YORK ENGINEERING | 1 | 06/13/2023 |
| RAYMOND HO ARCHITECT, PLLC | 1 | 08/15/2024 |
| REDCUT EXPEDITING | 1 | 10/27/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01420571 ↗ | 3250 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 06/30/2026 | 07/14/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of one RTU with a similar unit in conjunction with Alt-1. No … |
| M01399838 ↗ | 245 WEST 99 STREET MANHATTAN | Alteration | Signed-off | 06/07/2026 | 07/01/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of one 10-ton RTU with a similar unit. No change in use, egre… |
| B01341167 ↗ | 110 LIVINGSTON STREET BROOKLYN | Alteration | Signed-off | 03/30/2026 | 06/12/2026 | Design AG ENGINEERING PLLC | REPLACEMENT IN KIND OF ONE (1) 10-TON WSHP UNIT WITH ONE SIMILAR TEN-TON WSHP UNIT. |
| M01358175 ↗ | 54 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 03/06/2026 | 05/28/2026 | Design AG ENGINEERING PLLC | Filing for mechanical work for the direct replacement and in-kind installation of two make-up air units, two cooling tower units, four modul… |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| B01361836 ↗ | 1218 AVENUE P BROOKLYN | Alteration | Signed-off | 03/04/2026 | 04/16/2026 | Design AG ENGINEERING PLLC | HVACE WORK FOR THE INSTALLATION OF 3 NEW 5 TON HEAT PUMP SYSTEMS-REPLACEMENT OF ONE 4 TON HEAT PUMP SYSTEM IN KIND AND ASSOCIATED DUCT AND … |
| Q00763366 ↗ | 94-00 DITMARS BOULEVARD QUEENS | Alteration | Signed-off | 08/25/2022 | 02/27/2026 | Design A&B WORLD CONSULTING Filer KMA DESIGNS LLC | Replacement of outdoor HVAC equipment. |
| B01340424 ↗ | 1607 BURNETT STREET BROOKLYN | Alteration | Signed-off | 01/11/2026 | 02/19/2026 | Design AG ENGINEERING PLLC | Filing for the installation of two 12-Ton Heat Pump Systems. No change in use, egress or occupancy. |
| B01295656 ↗ | 63 GUERNSEY STREET BROOKLYN | Alteration | Signed-off | 10/01/2025 | 01/23/2026 | Design CHARLES DIEHL ARCHITECT LLC Filer 4444 PPPP CORP | PROPOSED INTERIOR RENOVATION OF AN EXISTING COMMERCIALSPACE TO CREATE AN OFFICE @ PARTIAL 2ND FLOOR.WORK INCLUDES INSTALLATION OF NEW CONDEN… |
| M01314255 ↗ | 1325 FIFTH AVENUE MANHATTAN | Alteration | Signed-off | 12/03/2025 | 01/07/2026 | Design MESZAROS ENGINEERING PLLC Owner ORSID REALTY CORP | INSTALLATION OF NEW LAUNDRY ROOM EXHAUST SHAFT AND (1) NEW DRYER EXHAUST FAN AND NEW BATHROOM EXHAUST SHAFT FAN AND (1) NEW BATHROOM EXHAUST… |
| M01318630 ↗ | 251 WEST 19 STREET MANHATTAN | Alteration | Signed-off | 11/17/2025 | 12/23/2025 | Design AG ENGINEERING PLLC | Filing herewith for the replacement of one split HVAC system with one 4 TON Heat Pump Split System. No change in use, egress, or occupancy. |
| X01326074 ↗ | 4000 BOSTON ROAD BRONX | Alteration | Signed-off | 12/08/2025 | 12/19/2025 | Design AG ENGINEERING PLLC | Filing for installation in kind of 10-Ton gas-fired rooftop unit with similar 10-Ton gas fired rooftop unit. |
| X01014979 ↗ | 781 EAST 142 STREET BRONX | Alteration | Signed-off | 11/14/2025 | 11/18/2025 | Design MOTTOLA RINI ENGINEERS | IT IS PROPOSED TO MODIFY MECHANICAL SYSTEM AS SHOWN ON PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| Q01204084 ↗ | 35-01 36 AVENUE QUEENS | Alteration | Signed-off | 04/17/2025 | 09/22/2025 | Design SIDERIS KEFALAS ENGINEERS PC Owner STELLAR MANAGEMENT | Plumbing work for 5th floor fitout |
| M01190147 ↗ | 44 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 04/09/2025 | 07/16/2025 | Design BP ARCHITECTS Owner STELLAR MANAGEMENT | Modification of plumbing system as shown on plans |
| B01143650 ↗ | 226 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 11/27/2024 | 06/24/2025 | Design JACK GREEN ASSOCIATES | It is proposed to modify existing plumbing system to remove, relocate and/or install new plumbing fixtures & modify SP system off domestic P… |
| M01216375 ↗ | 1220 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2025 | 06/18/2025 | Design MESZAROS ENGINEERING PLLC Owner ORSID REALTY CORP | REPLACEMENT OF (2) ROOFTOP EXHAUST FANS. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M01203885 ↗ | 218 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/01/2025 | 06/16/2025 | Design FRIEDMAN ENGINEERING, PC | Relocation / replacement of 18th Floor air-source heat pump /condenser, for cooling only, from 18th Floor interior MER to 20th Floor / Roof… |
| M01217323 ↗ | 309 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 05/14/2025 | 05/22/2025 | Design MESZAROS ENGINEERING PLLC Owner HALSTEAD MANAGEMENT, LLC | INSTALLATION OF NEW SPLIT SYSTEM AIR CONDITIONING SYSTEM FOR LOBBY. UNITS TO BE USED FOR HEATING AND COOLING. NO CHANGE IN EGRESS OR OCCUPAN… |
| Q01217913 ↗ | 38-02 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 04/30/2025 | 05/22/2025 | Design AG ENGINEERING PLLC Owner 63-53 FRESH POND RD LLC | Mechanical work is being filed herewith for the replacement in-kind of HVAC system. No change in use, egress or occupancy. |
| B01142239 ↗ | 63 GUERNSEY STREET BROOKLYN | Alteration | Signed-off | 11/18/2024 | 12/24/2024 | Design AG ENGINEERING PLLC | HVAC work to replace existing RTU with new in kind. |
| Q01113851 ↗ | 124-50 METROPOLITAN AVENUE QUEENS | Alteration | Signed-off | 09/23/2024 | 09/30/2024 | Design AG ENGINEERING PLLC | Filing for HVAC work for direct replacement of two 20-ton condenser units and two 20-ton air handler units. |
| M01100323 ↗ | 2131 FREDRICK DOUGLASS BL MANHATTAN | Alteration | Signed-off | 08/27/2024 | 09/11/2024 | Design AG ENGINEERING PLLC | Direct replacement of HVAC unit with new in kind. |
| B01077373 ↗ | 194 TILLARY STREET BROOKLYN | Alteration | Signed-off | 07/09/2024 | 09/09/2024 | Design AG ENGINEERING PLLC | FILING FOR THE REPLACEMENT OF THREE TON WATER COOLED PACKAGED UNITS. |
| M01092815 ↗ | 31 WEST 31 STREET MANHATTAN | Alteration | Signed-off | 08/15/2024 | 09/06/2024 | Design LAWLESS & MANGIONE | Installation of a split-system to cool the elevator machine room. |
| M01085665 ↗ | 218 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/15/2024 | 08/27/2024 | Design ST ENGINEERING SERVICES LLP Owner STELLAR MANAGEMENT | MECHANICAL WORKS AS SHOWN IN PLANS AT THE 10th FLOOR COMMERCIAL SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE. |
| B01072250 ↗ | 110 LIVINGSTON STREET BROOKLYN | Alteration | Signed-off | 07/23/2024 | 08/15/2024 | Design AG ENGINEERING PLLC | REPLACEMENT IN KIND OF ONE (1) FIVE-TON CONDENSER UNIT WITH ONE SIMILAR FIVE-TON CONDENSER. |
| M01056384 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Signed-off | 06/18/2024 | 07/10/2024 | Design AG ENGINEERING PLLC Owner COMJEM ASSOCIATES LTD | Filing for HVAC work to replace two (2) RTU units. |
| B00899474 ↗ | 2402 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2023 | 07/01/2024 | Design AG ENGINEERING PLLC | Filing herewith for new exhaust and duct work. |
| M01053252 ↗ | 64 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 05/29/2024 | 06/28/2024 | Design AG ENGINEERING PLLC | INSTALLATION OF HVAC SYSTEM TO INCLUDE BUT NOT LIMITED TO NEW CONDENSER AND ASSOCIATED PIPING. |
| B01020010 ↗ | 69 NORTH 6 STREET BROOKLYN | Alteration | Signed-off | 03/19/2024 | 05/16/2024 | Design AG ENGINEERING PLLC | FILING FOR THE REPLACEMENT OF EXISTING HVAC SYSTEM. WORK TO INCLUDE BUT NOT LIMITED TO THE REPLACEMENTS OF CONDENSERS, AIR HANDLER, DUCT HEA… |
| Q00353515 ↗ | 35-01 36 AVENUE QUEENS | Alteration | Signed-off | 09/09/2020 | 03/26/2024 | Design SIDERIS KEFALAS ENGINEERS PC Filer QUICK FILING OF NY INC | PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 420666915 |
| B00958759 ↗ | 1202 AVENUE P BROOKLYN | Alteration | Signed-off | 11/07/2023 | 11/24/2023 | Design AG ENGINEERING PLLC | Filing to replace condensing units in kind on existing support. |
| B00870853 ↗ | 385 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 08/15/2023 | 11/22/2023 | Design A&B WORLD CONSULTING Owner J14 LLC | MS ALTERATION TYPE 2 FOR REPLACEMENT OF THREE ROOFTOP AC UNITS. |
| X00876370 ↗ | 2922 3 AVENUE BRONX | Alteration | Signed-off | 10/05/2023 | 11/22/2023 | Design A&B WORLD CONSULTING Owner S/T REALTY | Alt 2, ME, to replace five (5) air-cooled condensers on the roof. |
| M00955251 ↗ | 30 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2023 | 11/01/2023 | Design AG ENGINEERING PLLC | No work. Filing to correct the previously approved Certificate of Compliance. All work done and COC issued under Job# M00950205-I1. |
| M00950205 ↗ | 30 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/19/2023 | 10/24/2023 | Design AG ENGINEERING PLLC | Direct replacement of HVAC systems. |
| Q00905762 ↗ | 21-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 07/19/2023 | 10/18/2023 | Design AG ENGINEERING PLLC | DIRECT REPLACE OF EXISTING HVAC UNITS WITH NEW UNITS IN KIND. REUSING EXISTING SUPPORT AND CONNECTING TO EXISTING PIPING. |
| M00289859 ↗ | 351 WEST 14TH STREET MANHATTAN | Alteration | Signed-off | 05/01/2020 | 10/10/2023 | Design DAGHER ENGINEERING PLLC Owner Tavros | Mechanical work in conjunction with alt 1 application # 121206667. |
| Q00892945 ↗ | BEACH 17TH STREET QUEENS | Alteration | Signed-off | 09/30/2023 | 10/10/2023 | Design A&B WORLD CONSULTING Owner CONG. DARCHEI TORAH | HVAC UNITS REPLACEMENT ON THE ROOF |
| Q00922761 ↗ | 72-05 ASTORIA BOULEVARD N QUEENS | Alteration | Signed-off | 08/22/2023 | 09/06/2023 | Design AG ENGINEERING PLLC | DIRECT REPLACEMENT OF AC UNIT, REUSING EXISTING SUPPORT, AND CONNECTING TO EXISTING DUCTWORK. |
| B00751732 ↗ | 1000 DEAN ST BROOKLYN | Alteration | Signed-off | 06/10/2022 | 09/05/2023 | Owner LIVWRK Filer JM ZONING, LLC. | APPLICATION FILED FOR REPLACEMENT OF ROOFTOP CHILLERS. TO OBTAIN EQUIPMENT USE PERMITS. NO CHANGE IN USE, EGRESS AND OCCUPANCY |
| B00921796 ↗ | 770 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 08/23/2023 | 09/01/2023 | Design AG ENGINEERING PLLC Owner BAC Developers Group | Direct replacement of existing HVAC units. Reusing existing supports and connecting to existing ductwork. |
| X00879537 ↗ | 3518 BAINBRIDGE AVENUE BRONX | Alteration | Signed-off | 06/13/2023 | 08/15/2023 | Owner MEDCO Filer NEW YORK ENGINEERING | REGISTER HVAC UNITS PER PLANS |
| M00870333 ↗ | 1230 MADISON AVE MANHATTAN | Alteration | Signed-off | 05/16/2023 | 07/07/2023 | Design ICOR ASSOCIATES | Mechanical work for retail fitout |
| M00886966 ↗ | 90 BENNETT AVENUE MANHATTAN | Alteration | Signed-off | 06/08/2023 | 06/12/2023 | Design AG ENGINEERING PLLC | DIRECT REPLACEMENT OF (2) ROOFTOP HVAC UNITS. |
| B00802941 ↗ | 1214 EAST 15 STREET BROOKLYN | Alteration | Signed-off | 02/08/2023 | 03/01/2023 | Design GARFINKEL ARCHITECT, PLLC | REPLACE 2 HVAC UNIT |
| B00703195 ↗ | 1302 AVENUE I BROOKLYN | Alteration | Signed-off | 04/07/2022 | 02/10/2023 | Design A&B WORLD CONSULTING Owner MYRCB | FILED FOR REPLACEMENT OF SEVEN (7) NEW 3 TONS GAS FIRED ROOFTOP UNITS REUSING EXISTING ROOF CURB AND CONNECTING TO EXISTING DUCTWORK. |
| M08014428 ↗ | 22 HOWARD STREET MANHATTAN | Alteration | Permit Issued | 01/06/2023 | 01/31/2023 | Design ROSINI ENGINEERING, PC | Installation of refrigerant piping, reroute condensate pipe , New Rooftop HVAC to be installed on existing steel dunnage & New HVAC Units a… |
| M00617837 ↗ | 418 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/18/2022 | 11/02/2022 | Design MESZAROS ENGINEERING PLLC | INSTALLATION OF NEW AC SYSTEM FOR LOBBY AND SUPERINTENDENT'S OFFICE. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M00790390 ↗ | 1501 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 09/07/2022 | 09/13/2022 | Design A&B WORLD CONSULTING | Direct replacement of 4 ton air cooled condenser |
| B00751179 ↗ | 63 GUERNSEY STREET BROOKLYN | Alteration | Signed-off | 06/13/2022 | 06/15/2022 | Design A&B WORLD CONSULTING Owner KALMON DOLGIN AFFILIATES | Alt2 for replacement of packaged rooftop ac unit |
| B00568533 ↗ | 6010 BAY PARKWAY BROOKLYN | Alteration | Permit Issued | 08/05/2021 | 04/25/2022 | Design DANIEL SCHUNKEWITZ ARCHITECT Filer REDCUT EXPEDITING | SPRINKLER APPLICATION IS FOR PROPOSED NINTH FLOOR INTERIOR RENOVATION OF AN EXISTING NINE STORY BUILDING.PROPOSED INTERIOR WORK INCLUDES THE… |
| B00651332 ↗ | 1302 AVENUE I BROOKLYN | Alteration | Signed-off | 12/27/2021 | 03/28/2022 | Design A&B WORLD CONSULTING Owner MYRCB | FILED FOR REPLACEMENT OF (1) NEW 15 TONS GAS FIRED ROOFTOP UNIT REUSING EXISTING ROOF CURB AND CONNECTING TO EXISTING DUCTWORK. REPLACEMENT … |
| B00661721 ↗ | 2183 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 01/18/2022 | 02/09/2022 | Design A&B WORLD CONSULTING Owner MODELLS SPORTING GOODS | FILING HEREWITH DRAWINGS TO REPLACE ONE (1) EXISTING 10 TONS ROOFTOP GAS FIRED UNIT WITH ONE (1) NEW 10 TONS GAS FIRED ROOFTOP UNIT REUSING … |
| X00639336 ↗ | 1050 EAST 230 STREET BRONX | Alteration | Signed-off | 12/20/2021 | 12/30/2021 | Design A&B WORLD CONSULTING Owner LACONIA NURSING HOME | FILED FOR REPLACEMENT OF (5) NEW 5 TONS GAS FIRED ROOFTOP UNIT REUSING EXISTING ROOF CURB AND CONNECTING TO EXISTING DUCTWORK. REPLACEMENT (… |
| B00399201 ↗ | 277 SOUTH 5TH STREET BROOKLYN | Alteration | Signed-off | 11/03/2020 | 12/09/2021 | Installation of mechanical system as shown on plans filed herewith | |
| B00618247 ↗ | 235 PARK AVENUE BROOKLYN | Alteration | Signed-off | 10/29/2021 | 11/08/2021 | Design ASDA ARCHITECTURE + DESIGN | Install AC condenser units , associated piping and components on 2nd floor roof, Air handlers and components in Cellar, 1st to 3rd floors. N… |
| 321995800BIS | 2820 AVENUE I BROOKLYN | — | ISSUED | 01/07/2020 | 11/02/2021 | — | OT |
| X00412405 ↗ | 1050 EAST 230 STREET BRONX | Alteration | Signed-off | 10/23/2020 | 10/29/2021 | Design MEY ASSOCIATES Owner LACONIA NURSING HOME Filer M.W. EXPEDITING INC | Install new HVAC equipment in elevator machine room on the roof. No change to use, egress or occupancy. |
| X00614290 ↗ | 1050 EAST 230 STREET BRONX | Alteration | Signed-off | 10/19/2021 | 10/25/2021 | Design A&B WORLD CONSULTING Owner LACONIA NURSING HOME | FILED FOR REPLACEMENT OF THREE (3) EXISTING 10 TONS ROOFTOP GAS FIRED UNITS WITH THREE (3) EXISTING 10 TONS ROOFTOP GAS FIRED UNITS WITH TH… |
| M00510805 ↗ | 61 7 AVENUE MANHATTAN | Alteration | Signed-off | 07/20/2021 | 08/17/2021 | Design MESZAROS ENGINEERING PLLC Owner 75 E. END AVE OWNER | INSTALLATION OF NEW SPLIT SYSTEM AC SYSTEM FOR LOBBY. NO CHANGE IN EGRESS OR OCCUPANCY. |
| M00534046 ↗ | 165 CHARLES STREET MANHATTAN | Alteration | Signed-off | 06/22/2021 | 07/28/2021 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO INSTALL TWO (2) NEW MAKE-UP AIR FURNACES WITH GAS HEAT TO REPLACE EXISTING UNITS TO PROVIDE HEATING AND VENTILAT… |
| Q00534052 ↗ | 16-00 CENTRAL AVENUE QUEENS | Alteration | Signed-off | 07/22/2021 | 07/23/2021 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO INSTALL ONE (1) NEW (20) TONS PACKAGED ROOFTOP UNIT AND INSTALL OF ONE (1) NEW (5) TONS SPLIT SYSTEM AIR CONDITI… |
| B00544837 ↗ | 1593 CONEY ISLAND AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2021 | 07/14/2021 | Design DANIEL R. WAPNER PE., P.C. Filer 4444 PPPP CORP | Installation of mechanical units as per the attached plans job to move BIS job #321790479 |
| B00513528 ↗ | 800 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 06/22/2021 | 07/07/2021 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE (2) PACKAGED ROOFTOP AIR COOLED AIR CONDITIONING UNITS (10 TONS & 15 TONS) WITH ELECTRIC HEAT TO PROVID… |
| B00534038 ↗ | 1567 CONEY ISLAND AVENUE BROOKLYN | Alteration | Signed-off | 06/21/2021 | 07/07/2021 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE WITH ONE (1) NEW 20 TONS GAS FIRED ROOFTOP UNIT REUSING EXISTING ROOF CURB AND CONNECTING TO EXISTING D… |
| B00423456 ↗ | 2183 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 12/16/2020 | 12/17/2020 | Design V. SHAMES, P.E. Owner MODELLS SPORTING GOODS | FILING HEREWITH DRAWINGS TO REPLACE ONE (1) EXISTING 10 TONS ROOFTOP GAS FIRED UNIT WITH ONE (1) NEW 10 TONS GAS FIRED ROOFTOP UNIT REUSING … |
| M00439518 ↗ | 155 WEST 136 STREET MANHATTAN | Alteration | Signed-off | 12/14/2020 | 12/15/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE ONE (1) EXISTING (25) TONS ROOFTOP GAS FIRED UNIT WITH ONE (1) NEW (25) TONS GAS FIRED ROOFTOP UNITS REU… |
| B00257267 ↗ | 1000 DEAN ST BROOKLYN | Alteration | Signed-off | 01/09/2020 | 12/02/2020 | INSTALL NEW HVAC FAN COIL UNITS, DUCTWORK, AND DIFFUSERS TO SERVE NEW FIRST FLOOR CONFERENCE ROOMS. MODIFY EXISTING HVAC DIFFUSERS AT FIRST … | |
| M00423471 ↗ | 1710 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/24/2020 | 11/25/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE WITH (5) NEW (5) TONS & (1) NEW (4) TONS AIR COOLED PACKAGED INDOOR UNITS REUSING EXISTING STEEL SUPPORT… |
| B00423468 ↗ | 770 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 11/23/2020 | 11/23/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE ONE (1) EXISTING (17.5) TONS AND ONE (1) EXG. (10) TONS ROOFTOP GAS FIRED UNITS WITH ONE (1) NEW (17.5) … |
| M00423465 ↗ | 155 WEST 136 STREET MANHATTAN | Alteration | Signed-off | 11/20/2020 | 11/23/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE TWO (2) EXISTING (15) TONS ROOFTOP GAS FIRED UNITS WITH TWO (2) NEW (15) TONS GAS FIRED ROOFTOP UNITS RE… |
| M00405351 ↗ | 19 WEST 44 STREET MANHATTAN | Alteration | Signed-off | 10/21/2020 | 10/22/2020 | Design LEHR ENGINEERING, DPC Owner 19 WEST 44TH STREET | FILING HEREWITH DRAWINGS FOR MECHANICAL WORK WITHIN AN EXISTING SPACE ON FLOORS CEL. 1, 2 AND ROOF, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00395656 ↗ | 167-41 147 AVENUE QUEENS | Alteration | Signed-off | 09/15/2020 | 09/30/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE TWO (2) EXISTING 5 TONS ROOFTOP GAS FIRED UNIT AND ONE (1) EXISTING 4 TONS ROOFTOP GAS FIRED UNIT WITH T… |
| M00376656 ↗ | 1710 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2020 | 08/20/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE FOUR (4) NEW AIR COOLED CONDENSER UNITS & AIR HANDLING UNITS OF SAME CAPACITY REUSING EXISTING STEEL SUP… |
| M00340191 ↗ | 11 BROADWAY MANHATTAN | Alteration | Signed-off | 05/19/2020 | 06/12/2020 | Design DJ ASSOCIATES ARCHITECT,PC Owner BOWLING GREEN ASSOCIATES | Replace HVAC units and ductwork per plan. No change to egress, use or occupancy. |
| M00307219 ↗ | 1710 3 AVENUE MANHATTAN | Alteration | Signed-off | 01/31/2020 | 02/25/2020 | Design V. SHAMES, P.E. | FILING HEREWITH DRAWINGS TO REPLACE WITH OF ONE (1) COOLED CONDENSER UNIT REUSING EXISTING STEEL SUPPORTS AND CONNECTION TO EXISTING REFRIGE… |
| Q00231769 ↗ | 55-03 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 10/01/2019 | 01/22/2020 | Design TSF ENGINEERING, PC Owner INFINITY REAL ESTATE | Proposed mechanical work in conjunction with proposed interior tenant build-out at first floor of new commercial building as indicated on pl… |
| M00290435 ↗ | 225 BROADWAY MANHATTAN | Alteration | Signed-off | 01/08/2020 | 01/14/2020 | Design DJ ASSOCIATES ARCHITECT,PC Owner BOWLING GREEN ASSOCIATES | Replace existing mechanical units on the 24th floor to the 32nd floor. No change to egress, use or occupancy. |
| M00285751 ↗ | 11 BROADWAY MANHATTAN | Alteration | Signed-off | 01/08/2020 | 01/13/2020 | Design DJ ASSOCIATES ARCHITECT,PC | REPLACE EXISTING MECHANICAL UNITS ON THE ROOF OF THE 17TH FLOOR. REPLACE INDOOR MECHANICAL UNITS ON THE 18TH AND 19TH FLOOR. NO CHANGE TO U… |
| M00292527 ↗ | 225 BROADWAY MANHATTAN | Alteration | Signed-off | 01/08/2020 | 01/10/2020 | Design DJ ASSOCIATES ARCHITECT,PC Owner BOWLING GREEN ASSOCIATES | Replace existing mechanical unit on the 43rd floor. No change to egress. use or occupancy |
| X00272924 ↗ | 384 EAST 149 STREET BRONX | Alteration | Signed-off | 12/10/2019 | 12/11/2019 | Design V. SHAMES, P.E. Owner JEM REALTY | HEREBY FILING FOR INSTALLATION OF 2(TWO) NEW PACKAGED SPLIT SYSTEM (10 TONS AND 15 TONS) AIR COOLED AIR CONDITIONING UNITS TO PROVIDE AIR CO… |
| B00211790 ↗ | 3044 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 10/23/2019 | 10/25/2019 | Design V. SHAMES, P.E. | Hereby filing for replacement of one 5-ton air cooled condenser with 5-ton condenser on an existing steel beams. No change in use egress or … |
| M00228067 ↗ | 1474 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2019 | 10/25/2019 | Design V. SHAMES, P.E. | Hereby filing for replacement of one 7.5-ton split system with new split unit on an existing location and to be connected to existing duct w… |
| M00241957 ↗ | 11 BROADWAY MANHATTAN | Alteration | Signed-off | 10/17/2019 | 10/24/2019 | Design DJ ASSOCIATES ARCHITECT,PC | Replace existing mechanical units on roof of 1st and 17th floors. Replace indoor mechanical units on 4th, and 20th floors. No change to use,… |
| M00234042 ↗ | 11 BROADWAY MANHATTAN | Alteration | Signed-off | 10/17/2019 | 10/23/2019 | Design DJ ASSOCIATES ARCHITECT,PC Owner BOWLING GREEN ASSOCIATES | Replace existing mechanical units on roof of 1st and 17th floors. Replace indoor mechanical units on 3rd, 21, & 22nd floors. No change to us… |
| M00234216 ↗ | 65 BROADWAY MANHATTAN | Alteration | Signed-off | 10/10/2019 | 10/18/2019 | Design DJ ASSOCIATES ARCHITECT,PC Owner PLAZA MANAGEMENT USA INC | Replace existing mechanical units on third floor roof. No change to Egress, Use or Occupancy. |
| B00217603 ↗ | 2361 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 09/26/2019 | 10/09/2019 | Design TSF ENGINEERING, PC | REARRANGE EXISTING MECHANICAL FOR TENANT ON SEVERAL TENANTS ON FLOORS 004, 006, 008. FILED IN CONJUNCTION TO DOB BIS RELATED JOB. |
| 340698873BIS | 1716 AVENUE O BROOKLYN | — | ISSUED | 09/30/2019 | 09/30/2019 | — | OT |
| M00227382 ↗ | 2108 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 09/26/2019 | 09/27/2019 | Design V. SHAMES, P.E. Owner JEM REALTY | Hereby filing to install new air conditioning system. Installation of 7 VRF air handler units with related ductwork, 3 cassette units on 3rd… |
| 340682611BIS | 639 2 AVENUE BROOKLYN | — | ISSUED | 06/18/2019 | 06/18/2019 | — | MH |
| 440551074BIS | BEACH 17TH STREET QUEENS | — | ISSUED | 06/06/2019 | 06/06/2019 | — | MH |
| 140852398BIS | 1501 LEXINGTON AVENUE MANHATTAN | — | ISSUED | 06/05/2019 | 06/05/2019 | — | MH |
| 321955531BIS | 3005 AVENUE J BROOKLYN | — | ISSUED | 04/15/2019 | 05/31/2019 | — | MH, OT, PL, SP |
| 321939747BIS | 2361 NOSTRAND AVENUE BROOKLYN | — | ISSUED | 05/21/2019 | 05/21/2019 | — | MH |
| 140841454BIS | 611 WEST 114 STREET MANHATTAN | — | ISSUED | 04/08/2019 | 04/08/2019 | — | MH |
| 140834051BIS | 41 EAST HOUSTON STREET MANHATTAN | — | ISSUED | 03/08/2019 | 03/08/2019 | — | MH |
| 340662973BIS | 581 2 AVENUE BROOKLYN | — | ISSUED | 03/08/2019 | 03/08/2019 | — | MH |
| 340663017BIS | 627 2 AVENUE BROOKLYN | — | ISSUED | 03/08/2019 | 03/08/2019 | — | MH |