Elevator apt, semi-fireproof without stores
103-41 120 STREET
QUEENS · BIN 4620913
💬 Discuss this project
2022Year Built
6Stories
D1Building Class
R6AZoning
10,858 sfGross Floor Area
10Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 120 RICHMOND HILL LLC · 2,877 sf lot · 3.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof8p · 2 filings · 20 docs
Floor 65p · 1 filing · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar21p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
120 RICHMOND HILL8807/08/2026
METRO CONTRACTING NY903/22/2026
STELLAR INDUSTRIES103/22/2026
INC CTI CONSTRUCTION603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2019$962K—Private party → 120 RICHMOND HILL LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU NING ARCHITECTURE, PLLC1204/10/2025
SYNERGIC DESIGN ARCHITECTS109/11/2024
ENTHINK ENGINEERS LLC206/16/2023
Z & T ENGINEERING, P.C.805/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LU NING ARCHITECTURE, PLLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CTI CONSTRUCTION INCGeneral Contractor1107/08/2026
B T REFINISHING INCGeneral Contractor1007/08/2026
TLS CONSTRUCTION GROUP I*General Contractor707/08/2026
STELLAR INDUSTRIES INCGeneral Contractor603/21/2026
METRO CONTRACTING NY, INC.General Contractor403/21/2026
VILLAGE P & H NY INCPlumbing207/08/2026
VILLAGE P & H NY INCFire Protection207/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
FLUSHING PLUMBING CORPPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.5911704/10/2025
SYNERGIC DESIGN LLC8561109/11/2024
Building Lifecycle
All (141)Filed (23)Permit Issued (26)Signed Off (12)Violation (13)Inspection (14)Objection (20)Special Inspection (30)Tax Incentive (3)
07/01/2026
421-a(16) construction completed
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2025
Violation issued (HPD, closed)
A
05/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/29/2025
Special inspection requirement — Exterior lighting power
Fei Zeng
04/29/2025
Special inspection requirement — Fenestration air leakage
Fei Zeng
04/29/2025
Special inspection requirement — Lighting controls
Fei Zeng
04/29/2025
Special inspection requirement — Protection of exposed foundation insulation
Fei Zeng
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
04/29/2025
Special inspection requirement — Fenestration areas
Fei Zeng
04/29/2025
Special inspection requirement — Electrical motors and elevators
Fei Zeng
04/29/2025
Special inspection requirement — Interior lighting power
Fei Zeng
04/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fei Zeng
04/29/2025
Special inspection requirement — Maintenance information
Fei Zeng
04/29/2025
Special inspection requirement — Metering
Fei Zeng
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
04/29/2025
Special inspection requirement — Air barrier — testing
Fei Zeng
04/29/2025
Special inspection requirement — Air barrier - visual inspection
Fei Zeng
04/29/2025
Special inspection requirement — Subgrade Inspections
Fei Zeng
04/29/2025
Special inspection requirement — Insulation placement and R values
Fei Zeng
04/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
04/29/2025
Special inspection requirement — Preliminary
Fei Zeng
04/29/2025
Special inspection requirement — Lighting in dwelling units
Fei Zeng
04/29/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fei Zeng
04/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/10/2025
Filed — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-A2
04/09/2025
Special inspection requirement — Preliminary
Fei Zeng
04/09/2025
Special inspection requirement — Subgrade Inspections
Fei Zeng
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
04/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fei Zeng
04/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/22/2025
Filed — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-A1
01/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2024
Signed off — Alteration
Q01109164-I1
10/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Signed off — Alteration
ONE CURB CUT IN CONJUNCTION WITH JOB #Q00567901.
Q00578362-I1
09/26/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S7
09/26/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S4
09/26/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S2
09/26/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S8
09/26/2024
Permit issued — Support of Excavation
Q00567901-S4-SE
09/26/2024
Permit issued — Earth Work
Q00567901-S8-EA
09/26/2024
Permit issued — Foundation
Q00567901-S7-FO
09/19/2024
Permit issued — Solar
Q01109164-I1-SL
09/19/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/11/2024
Filed — Alteration
Q01109164-I1
09/06/2024
Filed — Alteration
ONE CURB CUT IN CONJUNCTION WITH JOB #Q00567901.
Q00578362-P1
07/29/2024
421-a(16) registration filed
07/25/2024
Filed — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-P8
07/08/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/01/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S3
07/01/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S5
06/28/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S1
06/26/2024
Special inspection requirement — Final
Fei Zeng
06/26/2024
Special inspection requirement — Mechanical Systems
Fei Zeng
06/07/2024
Signed off — New Building
PROPOSED NEW 6 STORY RESIDENTIAL BUILDING.
Q00567901-S6
05/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offTLS CONSTRUCTION GROUP I*09/26/2024
DOB NOWEarth WorkSigned-offTLS CONSTRUCTION GROUP I*09/26/2024
DOB NOWFoundationPermit IssuedTLS CONSTRUCTION GROUP I*09/26/2024
DOB NOWSolarSigned-offACCORD POWER INC09/19/2024
DOB NOWCurb CutSigned-offCTI CONSTRUCTION INC04/24/2024
DOB NOWGeneral ConstructionPermit IssuedCTI CONSTRUCTION INC02/16/2024
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC01/16/2024
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC01/16/2024
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.06/16/2023
DOB NOWSupported ScaffoldSigned-offMETRO CONTRACTING NY, INC.06/16/2023
DOB NOWGeneral ConstructionPermit IssuedCTI CONSTRUCTION INC02/15/2023
DOB NOWFoundationPermit IssuedB T REFINISHING INC01/23/2023
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC11/22/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/16/2022
DOB NOWSprinklersSigned-offFLUSHING PLUMBING CORP08/03/2022
DOB NOWMechanical SystemsSigned-offCTI CONSTRUCTION INC08/01/2022
DOB NOWConstruction FenceSigned-offCTI CONSTRUCTION INC07/26/2022
DOB NOWStructuralSigned-offCTI CONSTRUCTION INC07/26/2022
DOB NOWGeneral ConstructionPermit IssuedCTI CONSTRUCTION INC07/19/2022
DOB NOWFoundationPermit IssuedSTELLAR INDUSTRIES INC07/12/2022
DOB NOWConstruction FenceSigned-offSTELLAR INDUSTRIES INC07/12/2022
DOB NOWSupport of ExcavationSigned-offB T REFINISHING INC05/04/2022
DOB NOWEarth WorkSigned-offB T REFINISHING INC05/04/2022
DOB NOWFoundationPermit IssuedB T REFINISHING INC05/04/2022
DOB NOWConstruction FenceSigned-offB T REFINISHING INC04/22/2022
DOB NOWConstruction FenceSigned-offB T REFINISHING INC04/07/2022
1 project · most recent 04/10/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2025Permit IssuedTLS CONSTRUCTION GROUP I*Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-4C36NA3 35,400 BTU · Heat Pump Outdoor ×20
MUZ-WR09NA 9,000 BTU · Heat Pump Outdoor ×2
Fujitsu AOU24RLXFZ 22,000 BTU · Heat Pump Outdoor ×11
Heating
Mitsubishi Electric MXZ-4C36NA3 36,000 BTU · Heat Pump Outdoor ×20
MUZ-WR09NA 10,900 BTU · Heat Pump Outdoor ×2
Fujitsu AOU24RLXFZ 24,000 BTU · Heat Pump Outdoor ×11
Ventilation
Mitsubishi Electric MXZ-4C36NA3 2,287 CFM · Heat Pump Outdoor ×20
MUZ-WR09NA 1,151 CFM · Heat Pump Outdoor ×2
Fujitsu AOU24RLXFZ 1,942 CFM · Heat Pump Outdoor ×11
1 project · most recent 04/10/2025
Sprinkler System
FiledStatusContractorScope
04/10/2025Signed-offPARAMOUNT SERVICES, LLCSprinkler System
1 project · most recent 04/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2025Signed-offVILLAGE P & H NY INCGas, Storm, Water/Sanitary
4 projects · most recent 09/18/2024
General Wiring
FiledStatusContractorScope
09/18/2024CompletePOWER SURGE ELECTRIC, INC—
05/01/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
06/16/2023CompleteRICHARD NEU—
03/21/2023CompleteSTAR ELEC'L CONTRACTORS C—
1 project · most recent 04/10/2025
Steel Concrete
FiledStatusContractorScope
04/10/2025Signed-offTLS CONSTRUCTION GROUP I*Steel, Concrete
1 project · most recent 04/10/2025
Fence
FiledStatusContractorScope
04/10/2025Signed-offTLS CONSTRUCTION GROUP I*Fence
1 project · most recent 04/10/2025
Earthwork
FiledStatusContractorScope
04/10/2025Signed-offTLS CONSTRUCTION GROUP I*Earthwork
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/08/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/03/2023Pass-Final House ConnectionPassView ↗
01/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
04/29/2025Air barrier — testing Fei Zengenergy_progress
04/29/2025Electrical motors and elevatorsFei Zengenergy_progress
04/29/2025Fenestration and door U-factor and product ratingsFei Zengenergy_progress
04/29/2025Maintenance informationFei Zengenergy_progress
04/29/2025Fenestration air leakageFei Zengenergy_progress
04/29/2025Lighting in dwelling unitsFei Zengenergy_progress
04/29/2025Insulation placement and R valuesFei Zengenergy_progress
04/29/2025MeteringFei Zengenergy_progress
04/29/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/29/2025Fire-Resistant Penetrations and JointsFei Zengspecial
04/29/2025Exterior Insulation and Finish Systems (EIFS)Fei Zengspecial
04/29/2025Subgrade InspectionsFei Zengspecial
04/29/2025Energy Code Compliance InspectionsFei Zengprogress
04/29/2025PreliminaryFei Zengprogress
04/29/2025Fire-Resistance Rated ConstructionFei Zengprogress
04/29/2025Air barrier - visual inspectionFei Zengenergy_progress
04/29/2025Interior lighting powerFei Zengenergy_progress
04/29/2025Protection of exposed foundation insulationFei Zengenergy_progress
04/29/2025Exterior lighting powerFei Zengenergy_progress
04/29/2025Fenestration areasFei Zengenergy_progress
04/29/2025Lighting controlsFei Zengenergy_progress
04/09/2025Energy Code Compliance InspectionsFei Zengprogress
04/09/2025Fire-Resistance Rated ConstructionFei Zengprogress
04/09/2025PreliminaryFei Zengprogress
04/09/2025Exterior Insulation and Finish Systems (EIFS)Fei Zengspecial
Latest 25 of 113.
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/26/2026Q00567901-P7Request digital key ↗
08/26/2026Q00567901-S7Request digital key ↗
08/26/2026Q00567901-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
08/07/2024440713710Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/03/2024440713710Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/19/2022440713710Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-I1Open ↗
08/26/2026Q00567901-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/26/2026Q00567901-I1Open ↗
▸Seals & Professional Certifications136
▸DOB NOWProgress Inspector Seal & Signature60
09/22/2026Q00567901-S1Open ↗
09/22/2026Q00567901-S1Open ↗
09/18/2026Q00567901-P8Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature52
09/22/2026Q00567901-S1Open ↗
09/22/2026Q00567901-S1Open ↗
09/22/2026Q00567901-S1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/26/2026Q00567901-S4Open ↗
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-S7Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/09/2022440713710Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF1
10/15/2024440713710Open ↗
▸DOB NOWStreet Tree Sign Off1
08/26/2026Q00567901-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/26/2026Q00567901-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/26/2026Q00567901-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/26/2026Q00567901-I1Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/05/2024440713710Open ↗
08/19/2022440713710Open ↗
05/09/2022440713710Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/26/2026Q00567901-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/26/2026Q00567901-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/03/2024440713710Open ↗
▸BISFINAL1
10/15/2024440713710Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/03/2024440713710Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01109164-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISBPP: ENGINEERS AFFIDAVIT1
12/03/2024440713710Open ↗
▸DOB NOWCertificate of Insurance1
08/26/2026Q00567901-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/26/2026Q00567901-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
09/06/2024440713710Open ↗
08/26/2024440713710Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/09/2022440713710Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial4
08/26/2026Q00567901-I1Open ↗
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026Q00567901-A2Open ↗
08/26/2026Q00567901-A1Open ↗
08/26/2026Q00567901-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/26/2026Q00567901-P5Open ↗
08/26/2026Q00567901-P4Open ↗
08/26/2026Q00567901-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/03/2024440713710Open ↗
05/09/2022440713710Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00567901-S8Open ↗
08/13/2026Q00567901-S4Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
08/19/2022440713710Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/19/2022440713710Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
12/03/2024440713710Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
12/03/2024440713710Open ↗
▸DOB NOWFinal Survey1
08/26/2026Q00567901-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/26/2026Q00567901-I1Open ↗