103 MOSCO STREET
MANHATTAN · BIN 1001819
💬 Discuss this project
1899Year Built
4Stories
S3Building Class
C6-1Zoning
2,913 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: MOSCO I LLC · 990 sf lot · 2.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 42p · 2 filings · 13 docs
Floor 35p · 3 filings · 19 docs
Floor 21p · 1 filing · 11 docs
Floor 1
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RINSE 1032707/08/2026
ROCKSOLID PM703/22/2026
MOSCO I LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2025$1.5M—— → —$515/sf building
09/05/2018$2.9M—103 MOSCO LLC → RINSE 103, LLC$994/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIN LEE, RA104/16/2025
FRANK DENNER ARCHITECT203/11/2025
REVANS DESIGN PE PC709/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING103/21/2026
SUSKA1403/21/2026
I L CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDIRECTING LIC INCGeneral Contractor603/21/2026
DEMAR MECHANICAL INCPlumbing407/08/2026
DEMAR PLUMBING CORPPlumbing407/08/2026
I.P. ELECTRIC INCElectrical103/22/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES JH CHAI & ASSOCIATE6481104/16/2025
YANG ENGINEERING LLC8376203/11/2025
REVANS DESIGN PE PC4617709/07/2023
Building Lifecycle
All (45)Filed (10)Permit Issued (11)Signed Off (6)Violation (5)Inspection (13)
06/30/2025
Signed off — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT ON 2ND AND 3RD FLOOR. REMOVE AND CONSTRUCT NEW PARTITIONS DOORS, FLOOR FINISHES AND CEILING ALL AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01186806-I1
06/04/2025
Violation issued (HPD, closed)
A
05/27/2025
Signed off — Alteration
INSTALL, REMOVE AND RELOCATE PLUMBING FIXTURES , IN CONJUNCTION WITH THE INTERIOR RENOVATION ON THE APARTMENT AT 2ND AND 3RD FLOOR FILE AUNDER APPLICATION # M01186806, INSTALL 2C HOT WATER HEATER AT CELLAR LEVEL all as per plan.
M01188068-I1
05/08/2025
Signed off — Alteration
MECHANICAL WORK FOR APT UNITS #1 & #2 ON 2ND & 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01211857-I1
05/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2025
Permit issued — Mechanical Systems
M01211857-I1-MS
04/16/2025
Filed — Alteration
MECHANICAL WORK FOR APT UNITS #1 & #2 ON 2ND & 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01211857-I1
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2025
Permit issued — General Construction
M01186806-I1-GC
03/26/2025
Permit issued — Plumbing
M01188068-I1-PL
03/11/2025
Filed — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT ON 2ND AND 3RD FLOOR. REMOVE AND CONSTRUCT NEW PARTITIONS DOORS, FLOOR FINISHES AND CEILING ALL AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01186806-I1
03/11/2025
Filed — Alteration
INSTALL, REMOVE AND RELOCATE PLUMBING FIXTURES , IN CONJUNCTION WITH THE INTERIOR RENOVATION ON THE APARTMENT AT 2ND AND 3RD FLOOR FILE AUNDER APPLICATION # M01186806, INSTALL 2C HOT WATER HEATER AT CELLAR LEVEL all as per plan.
M01188068-I1
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
09/26/2023
Signed off — Alteration
REPLACE NEW LOW PRESSURE GAS PIPING AND GAS FIRED EQUIPMENT AS PER PLANS. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00554710-I1
09/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2023
Signed off — Alteration
INSTALL NEW COMBINATION HEAT & DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 2ND FLOOR. NO CHANGE IN MEANS OF EGRESS, USE GROUP. OR OCCUPANCY.
M00559030-I1
09/07/2023
Signed off — Alteration
INSTALL NEW COMBINATION HEAT &DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 3RD FLOOR NO CHANGE INMEANS OF EGRESS, USE GROUP, OROCCUPANCY,
M00565511-I1
09/07/2023
Filed — Alteration
REPLACE NEW LOW PRESSURE GAS PIPING AND GAS FIRED EQUIPMENT AS PER PLANS. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00554710-P1
04/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/05/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/29/2022
Filed — Alteration
INSTALL NEW COMBINATION HEAT & DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 2ND FLOOR. NO CHANGE IN MEANS OF EGRESS, USE GROUP. OR OCCUPANCY.
M00559030-P1
06/15/2022
Filed — Alteration
INSTALL NEW COMBINATION HEAT &DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 3RD FLOOR NO CHANGE INMEANS OF EGRESS, USE GROUP, OROCCUPANCY,
M00565511-P1
05/23/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/17/2022
Permit issued — Boiler Equipment
M00559030-I1-BE
05/17/2022
Permit issued — Plumbing
M00554710-I1-PL
05/16/2022
Permit issued — Boiler Equipment
M00565550-I1-BE
05/16/2022
Permit issued — Boiler Equipment
M00565511-I1-BE
02/16/2022
Violation issued (HPD, closed)
A
11/03/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/09/2021
Permit issued — Boiler Equipment
M00559030-I1-BE
08/05/2021
Permit issued — Plumbing
M00554710-I1-PL
08/05/2021
Permit issued — Boiler Equipment
M00565550-I1-BE
08/05/2021
Permit issued — Boiler Equipment
M00565511-I1-BE
07/30/2021
Filed — Alteration
REPLACE NEW LOW PRESSURE GAS PIPING AND GAS FIRED EQUIPMENT AS PER PLANS. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00554710-I1
07/30/2021
Filed — Alteration
INSTALL NEW COMBINATION HEAT & DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 2ND FLOOR. NO CHANGE IN MEANS OF EGRESS, USE GROUP. OR OCCUPANCY.
M00559030-I1
07/30/2021
Filed — Alteration
INSTALL NEW COMBINATION HEAT &DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENTS ON 3RD FLOOR NO CHANGE INMEANS OF EGRESS, USE GROUP, OROCCUPANCY,
M00565511-I1
07/30/2021
Filed — Alteration
INSTALL NEW COMBINATION HEAT &DOMESTIC HOT WATER BOILER IN RESIDENTIAL APARTMENT ON 4TH FLOOR NO CHANGE INMEANS OF EGRESS, USE GROUP, OROCCUPANCY,
M00565550-I1
10/25/2019
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offREDIRECTING LIC INC04/21/2025
DOB NOWGeneral ConstructionSigned-offREDIRECTING LIC INC03/26/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/26/2025
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC05/17/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC05/17/2022
DOB NOWBoiler EquipmentPermit IssuedDEMAR MECHANICAL INC05/16/2022
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC05/16/2022
DOB NOWBoiler EquipmentSigned-offDEMAR PLUMBING CORP08/09/2021
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP08/05/2021
DOB NOWBoiler EquipmentPermit IssuedDEMAR PLUMBING CORP08/05/2021
DOB NOWBoiler EquipmentSigned-offDEMAR PLUMBING CORP08/05/2021
3 projects · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025Permit IssuedL J ELEC'L SERV. INC.5 meters, 5 new_meters
03/31/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
10/26/2021CompleteI.P. ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2022Pass-Final Boiler Equipment InspectionPassView ↗
05/23/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
11/03/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/16/2025Mechanical SystemsJoon Ho Chaispecial
04/16/2025Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
04/16/2025Tenant Protection Plan ComplianceJoon Ho Chaispecial
04/16/2025FinalJIN WOO LEEprogress
04/16/2025Energy Code Compliance InspectionsJoon Ho Chaiprogress
04/16/2025Maintenance informationJoon Ho Chaienergy_progress
04/16/2025HVAC-R and service water piping design and insulationJoon Ho Chaienergy_progress
04/16/2025HVAC-R and service water heating system controlsJoon Ho Chaienergy_progress
04/16/2025HVAC-R and service water heating equipmentJoon Ho Chaienergy_progress
02/26/2025Fire-Resistant Penetrations and JointsJian Yangspecial
02/26/2025Tenant Protection Plan ComplianceJian Yangspecial
02/26/2025Finalfrank dennerprogress
02/26/2025Energy Code Compliance Inspectionsfrank dennerprogress
02/26/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
02/26/2025Lighting controlsfrank dennerenergy_progress
02/26/2025Lighting in dwelling unitsfrank dennerenergy_progress
09/08/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/06/2023Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/01/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
07/01/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/01/2022Heating SystemsPAUL REVANSspecial
07/01/2022Maintenance informationPAUL REVANSenergy_progress
07/01/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
06/15/2022Heating SystemsPAUL REVANSspecial
06/15/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
Latest 25 of 38.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00554710-I1Request digital key ↗
09/03/2026M00554710-P1Request digital key ↗
09/03/2026M00559030-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M00565511-I1Open ↗
09/23/2026M00559030-I1Open ↗
09/23/2026M00565550-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00554710-I1Open ↗
09/03/2026M00554710-P1Open ↗
09/03/2026M00559030-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00565550-I1Open ↗
09/23/2026M00559030-I1Open ↗
09/23/2026M00565511-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00554710-P1Open ↗
09/03/2026M00554710-I1Open ↗
09/03/2026M00559030-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00565511-I1Open ↗
08/13/2026M00559030-I1Open ↗