ECB03/27/2023Observed corroded gas piping installed to the boilers located in the boilers., repair and/or replace$3K due
ECB07/26/2024Observed at exposure 1 and exposure 4 multiple cracks at facade. Also i observed at 3RD window screen wedged between wall and fire escape, also observed window screen dislodged from window also at 3RD floor., rNothing owed — awaiting certificate of correction
ECB06/27/2024Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39110057L issued on 03/27/2024 and to file a certificate of correction pursuant to 28-201.1 and 1RCNY 102-01., complNothing owed — awaiting certificate of correction
ECB05/29/2024Multiple cracks were found on the facade and window lentels throughout the building., repair and/replaceNothing owed — awaiting certificate of correction
ECB03/27/2023Observed residential gas flex on commercial cooking equipment. As per fgc 411.1 rigid metallic pipe and fittings shall be used., repair and/or replaceNothing owed — awaiting certificate of correction
ECB02/27/2023Correct all violating conditions and submit a certificate of correction.Nothing owed — awaiting certificate of correction
ECB06/08/2022Noted: observed vertical and horizontal cracks throughout exposure #1,2,3 and 4, bulging and missing cement stucco at rear exposure 3 at various locations., maintain exterior building wallNothing owed — awaiting certificate of correction
ECB06/08/2022Noted: roofing material has become porous allowing water to enter into unit 4-a and around roof skylight and around stair windows., repair and/or replaceNothing owed — awaiting certificate of correction
ECB06/08/2022Noted: observed in unit 4-a a 2FT. X 2FT opening in ceiling, spalling plaster around stair windows and roof skylight, due to water damage penetrating from roof., repair and/or replaceNothing owed — awaiting certificate of correction
ECB04/12/2022Exterminator needed@blr/light defect/illegal draft inducer@base of masonry chimney/louver@wall of blr room to next room/#1 hwh incorrect draft hood+flue damper/incorrect safety discharge@hwh's/hot water storageNothing owed — awaiting certificate of correction
ECB12/14/2021Noted: observed at exposure #3(rear)vertical cracks and bulging cement stucco above windows, at exposure #1 and #4, cracks through bricks at various locations at window corners and between floors., maintain extNothing owed — awaiting certificate of correction
ECB11/16/2021Noted: roof material has become porous allowing water to penetrate into unit 4A., repair and/or replaceNothing owed — awaiting certificate of correction
ECB11/16/2021Noted: observed in unit 4A, ceiling has a 2FT. X 2FT. Opening in gypsum fire rated board, damaged due to water penetration, also water damage at roof bulkhead around skylight and stairwell between floors 3 andNothing owed — awaiting certificate of correction
ECB09/05/2019Noted: observed at rear exposure #3, vertical cracks and bulging cement stucco under corner row of windows of the "a" side from the first floor up to the fourth floor., maintain exterior building wallNothing owed — awaiting certificate of correction
ECB03/07/2019Failure to maintain building wall(s) or appurtenances; noted: observedat rear of building "a" vertical and horizontal cracks under corner row of windows, from lintel to under window sills on floors 1,2,3.alsoNothing owed — awaiting certificate of correction
ECB06/29/2018As per class 2 (B254) 28-301.1. Failure to maintain. 50)relief valves on water heaters not to be black iron pipe to be approved material only. Correct conditions and submit certificate of correction.Nothing owed — awaiting certificate of correction
ECB02/05/2018Failure to maintain building wall(s) or appurtenances. Noted: observed at rear of property of the "a" side. Vertical and horizontal cracks in cement stucco underneath and at the corners of each window from flooNothing owed — awaiting certificate of correction
ECB02/24/2017Failure to maintain bldg in code-compliant manner.noted:at rear adjacent to cellar ramp,cracked and bulging cement coating over 2ND flr lintel,cracks continue 1ST thru 3RD flr.rem:comply with notice of violatioNothing owed — awaiting certificate of correction
ECB04/26/2016Failure to maintain bldg code compliant. Noted: @ rear adjacent to cellar ramp, cracked & bulging cement coating over 2ND flr lintel. Cracks continue 1ST to 3RD flr including 3RD flr sill. Rem: comply w/ code,Nothing owed — awaiting certificate of correction
Home for indigent children, aged, homeless · Owner of record: NYC Department of Homeless Services · 3.56 FAR built · Flood zone X