19 Active Violations 1 unresolved · 18 paperwork only ▸FDNY Report ↗
Home for indigent children, aged, homeless · Owner of record: NYC Department of Homeless Services · 3.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Department of Homeless Services203/21/2026
VOA103/22/2026
NYC Department of Design and Construction103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cobra Electrical NYCElectrical103/22/2026
Building Lifecycle
All (67)Violation (61)
03/05/2026
GP-8: Failed to provide and/or maintain openings through fire-resistance-rated assemblies with self-closing/automatic-closing doors of approved…
FDNY_ORDER violation · closed
01/30/2026
Closed: Failure to file 2024 external low pressure inspection
DOB violation · closed on the city's record
01/30/2026
Closed: Failure to file 2022 external low pressure inspection
DOB violation · closed on the city's record
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · closed
11/04/2025
Boiler inspection report filed
Initial · no defects · Accepted
04/07/2025
GP-9: Failed to maintain required fire-rated construction of fire barriers and/or horizontal assemblies in good order, in violation of FC703.1.
FDNY_ORDER violation · closed
07/26/2024
Observed at exposure 1 and exposure 4 multiple cracks at facade. Also i observed at 3RD window screen wedged between wall and fire escape, also…
ECB violation · open
06/27/2024
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39110057L issued on 03/27/2024 and to file a…
ECB violation · open
05/29/2024
Multiple cracks were found on the facade and window lentels throughout the building., repair and/replace
ECB violation · open
05/29/2024
Observed slight water leak on the sprinkler piping in the laundry room located on the first floor. As per 102.3 of the plumbing code maintenance.…
ECB violation · closed
03/28/2024
Observed in the boiler room located in the basement/cellar excessive amounts of garbage( poor housekeeping)., repair and/or replace
ECB violation · closed
03/14/2024
EG-21-03: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3.
FDNY_ORDER violation · closed
03/14/2024
C-13-02: Failed to provide and/or maintain sufficient personnel holding a Certificate of Fitness as a fire guard for building impairment, in…
FDNY_ORDER violation · closed
03/14/2024
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
03/13/2024
EG-21-03: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3.
FDNY_ORDER violation · closed
11/13/2023
Boiler inspection report filed
Initial · defects found · Accepted
04/25/2023
Failure to file 2022 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
03/27/2023
Observed corroded gas piping installed to the boilers located in the boilers., repair and/or replace
ECB violation · open
03/27/2023
Observed residential gas flex on commercial cooking equipment. As per fgc 411.1 rigid metallic pipe and fittings shall be used., repair and/or replace
ECB violation · open
02/27/2023
Correct all violating conditions and submit a certificate of correction.
ECB violation · open
07/07/2022
FPS-02-01: Failed to obtain approval from agency having jurisdiction for fire protection and/or communication system, in violation of FC901.5.
FDNY_ORDER violation · closed
06/08/2022
Noted: roofing material has become porous allowing water to enter into unit 4-a and around roof skylight and around stair windows., repair and/or…
ECB violation · open
06/08/2022
Noted: observed in unit 4-a a 2FT. X 2FT opening in ceiling, spalling plaster around stair windows and roof skylight, due to water damage…
ECB violation · open
06/08/2022
Noted: observed vertical and horizontal cracks throughout exposure #1,2,3 and 4, bulging and missing cement stucco at rear exposure 3 at various…
ECB violation · open
04/12/2022
Exterminator needed@blr/light defect/illegal draft inducer@base of masonry chimney/louver@wall of blr room to next room/#1 hwh incorrect draft…
ECB violation · open
12/14/2021
Noted: observed at exposure #3(rear)vertical cracks and bulging cement stucco above windows, at exposure #1 and #4, cracks through bricks at…
ECB violation · open
11/16/2021
Noted: roof material has become porous allowing water to penetrate into unit 4A., repair and/or replace
ECB violation · open
11/16/2021
Noted: observed in unit 4A, ceiling has a 2FT. X 2FT. Opening in gypsum fire rated board, damaged due to water penetration, also water damage at…
ECB violation · open
06/23/2021
Boiler inspection report filed
Initial · no defects · Accepted
11/23/2020
Closed: Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed on the city's record
10/06/2020
Boiler inspection report filed
Initial · no defects · Accepted
11/08/2019
Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed · Issued 2019; DOB's record still lists it as active
09/05/2019
I observed on the "a" side of the building the improper installation of emergency light fixtures with exposed and energized conductors. Photos…
ECB violation · closed
09/05/2019
I observed in the slop sinks throughout the building and in the laundry room convenience receptacles not of the gfci type nor gfci protected within…
ECB violation · closed
09/05/2019
Noted: observed at rear exposure #3, vertical cracks and bulging cement stucco under corner row of windows of the "a" side from the first floor up…
ECB violation · open
03/07/2019
Electrical work without a permit.i observed on the roof a new exhaust fan installed at the department of building covering this electrical…
ECB violation · closed
03/07/2019
Failure to maintain building wall(s) or appurtenances; noted: observedat rear of building "a" vertical and horizontal cracks under corner row of…
ECB violation · open
02/12/2019
Boiler inspection report filed
Initial · no defects · Accepted
06/29/2018
As per class 2 (B254) 28-301.1. Failure to maintain. 50)relief valves on water heaters not to be black iron pipe to be approved material only.…
ECB violation · open
05/24/2018
Boiler inspection report filed
Initial · no defects · Accepted
02/05/2018
Failure to maintain building wall(s) or appurtenances. Noted: observed at rear of property of the "a" side. Vertical and horizontal cracks in…
ECB violation · open
11/25/2017
Failure to comply with the commissioner's order contained in summons/ violation #35286910N issued on 08/03/17 and to file a certificate of…
ECB violation · closed
08/03/2017
Work without a permit. Observed on 08/03/17 at above address no permits on file for removal of gas dryer in laundry room. Rem: obtain all required…
ECB violation · closed
08/03/2017
Fgc 401.1 gas piping not labeled. Observed on 08/03/2017 at above gas pipe in basement not labeled. *photos taken* rem: comply with summons.
ECB violation · closed
08/03/2017
Failure to maintain building in code-compliant manner. Observed on 08/03/17 at above address jim caps are installed throughout basement. Blind…
ECB violation · closed
02/24/2017
Failure to maintain bldg in code-compliant manner.noted:at rear adjacent to cellar ramp,cracked and bulging cement coating over 2ND flr…
ECB violation · open
10/03/2016
Sec: fgc 408.2, 411.1. Drips-future connects exist down stream of appliance. Observed on 10/3/16 @ 10:00AM future gas connection in basement(misc…
ECB violation · closed
04/26/2016
Failure to maintain bldg code compliant. Noted: @ rear adjacent to cellar ramp, cracked & bulging cement coating over 2ND flr lintel. Cracks…
ECB violation · open
04/26/2016
Failure to maintain bldg code compliant: no fire stopping per bc 712.3; 27-345. Noted: @ celllar electric meter room & boiler room, no fire…
ECB violation · closed
02/25/2015
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
10/15/2014
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY…
HPD violation · closed
10/15/2014
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER IN THE FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th…
HPD violation · closed
01/15/2010
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
02/14/2008
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
01/19/2007
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2007; DOB's record still lists it as active
01/06/2006
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2006; DOB's record still lists it as active
07/07/2004
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
02/13/2004
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2004; DOB's record still lists it as active
03/19/2003
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2003; DOB's record still lists it as active
06/01/1998
Work w/o a permit. Work noted: having erected a sidewalk shed on central ave side of bldg that has collapsed to sidewalk blocking pedestrian…
ECB violation · closed
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—T.pericic Construction*—
BIS—Ace Scaffold Co—
BIS—Seville Construction Co—
BIS—Seville Construction Co—
BIS—K.J. Plumbing & Heating—
BIS—Seville Construction Co—
BIS—Seville Construction Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 7 on file (BIS + DOB NOW)
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/05/2018321449900Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/03/2023321449900Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/22/2023321449900Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/25/2023321449900Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/14/2016321449900Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/25/2023321449900Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/14/2016321449900Open ↗