| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00873067 | 216 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 05/26/2023 | 09/21/2026 | Design MOTT MACDONALD Contractor INPRO PLUMBING CORP Filer CPS | Removal of existing fixtures and replace with new in 1st and 2nd floor bathrooms. Modification of existing sprinkler system . No change in … |
| M00253162 | 2724 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/21/2019 | 02/12/2026 | Design MOTT MACDONALD Contractor VARSITY PLBG AND HTG INC | Herewith filing for plumbing and sprinkler work as per the drawings. No change in use, egress or occupancy. |
| M00886783 | 216 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/12/2023 | 01/20/2026 | Design MOTT MACDONALD Contractor HIGH POINT CONSTRUCTION Filer CPS | Herewith filing for replacement of existing flooring, subfloor & trim. Painting of walls and existing hard ceilings, soffits, and built-ins,… |
| M00828898 | 333 BOWERY MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 12/02/2025 | Design MOTT MACDONALD Contractor RICHARDS PLUM & HTG CO,IN | Herewith filing to remove and replace the boiler flue and replace the gas line to the boiler. Install new shaft interior to facilitate the n… |
| M00292548 | 78 CATHERINE STREET MANHATTAN | Alteration | Permit Issued | 02/04/2020 | 12/01/2023 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NSP ENTERPRISES INC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00488185 | 8 EAST 3RD STREET MANHATTAN | Alteration | Signed-off | 04/29/2021 | 10/14/2022 | Design MOTT MACDONALD Contractor EMPIRE CONTROL ABATEMENT Filer CPS | Herewith filing for demo and repair and replace structural floor in the basement and cellar as per the plans. No change in use, egress or oc… |
| Name | Projects together | Most recent |
|---|---|---|
| Mott Macdonald | 5 | 05/19/2026 |
| Gregory V. Perotto, P.E. | 1 | 09/08/2021 |
| Paul Perdek, Professional Engineering | 1 | 04/16/2021 |
| Vincent J. Liotta P.E. | 1 | 08/07/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Absolute Special Insptn | 1 | 05/30/2023 |
| Crescent Contracting | 1 | 09/08/2021 |
| Empire Control Abatement | 1 | 12/08/2022 |
| G.A.M.C.N.Y. | 1 | 08/07/2020 |
| High Point Construction | 1 | 06/12/2023 |
| I.M.P. Plumbing & Heating | 1 | 11/21/2019 |
| Inpro Plumbing | 1 | 05/30/2023 |
| NSP Enterprises | 1 | 04/16/2021 |
| Richards P and H | 1 | 05/19/2026 |
| Richards Plum & Heating | 1 | 05/19/2026 |
| Sienia Construction | 1 | 05/30/2023 |
| Varsity Plumbing & Heating | 1 | 11/21/2019 |
| Varsity Plumbing and Heating | 1 | 11/21/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| DHS | 1 | 05/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CPS | 3 | 06/12/2023 |
| Construction Permit Services | 1 | 05/19/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00873067 | 216 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 05/26/2023 | 09/21/2026 | Design MOTT MACDONALD Contractor INPRO PLUMBING CORP Filer CPS | Removal of existing fixtures and replace with new in 1st and 2nd floor bathrooms. Modification of existing sprinkler system . No change in … |
| M00253162 | 2724 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/21/2019 | 02/12/2026 | Design MOTT MACDONALD Contractor VARSITY PLBG AND HTG INC | Herewith filing for plumbing and sprinkler work as per the drawings. No change in use, egress or occupancy. |
| M00886783 | 216 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/12/2023 | 01/20/2026 | Design MOTT MACDONALD Contractor HIGH POINT CONSTRUCTION Filer CPS | Herewith filing for replacement of existing flooring, subfloor & trim. Painting of walls and existing hard ceilings, soffits, and built-ins,… |
| M00828898 | 333 BOWERY MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 12/02/2025 | Design MOTT MACDONALD Contractor RICHARDS PLUM & HTG CO,IN | Herewith filing to remove and replace the boiler flue and replace the gas line to the boiler. Install new shaft interior to facilitate the n… |
| M00292548 | 78 CATHERINE STREET MANHATTAN | Alteration | Permit Issued | 02/04/2020 | 12/01/2023 | Design PAUL PERDEK, PROF. ENG. PLLC Contractor NSP ENTERPRISES INC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00488185 | 8 EAST 3RD STREET MANHATTAN | Alteration | Signed-off | 04/29/2021 | 10/14/2022 | Design MOTT MACDONALD Contractor EMPIRE CONTROL ABATEMENT Filer CPS | Herewith filing for demo and repair and replace structural floor in the basement and cellar as per the plans. No change in use, egress or oc… |
| M00374538 | 8 EAST 3RD STREET MANHATTAN | Alteration | Signed-off | 08/07/2020 | 09/14/2020 | Design VINCENT J. LIOTTA P.E. Contractor GAMCNY Filer VINCENT J. LIOTTA P.E. | THIS APPLICATION HAS BEEN FILED TO REPLACE EXPIRED Job No: 140741883. REPLACEMENT OF A/C SYSTEM ON THE FIRST FLOOR. THERE WILL BE NO CHANGE … |
| M00187219 | 189 EAST 100TH STREET MANHATTAN | Alteration | Permit Issued | 08/08/2019 | 09/24/2019 | Design GREGORY V. PEROTTO, P.E. Contractor CRESCENT CONTRACTING CORP Filer LEWSAN CONSULTANTS | Filing herewith plumbing work in conjunction with the boilers filed and signed off under BIS# 123693681. |
| Building | Filings | Most Recent |
|---|---|---|
| 333 BOWERY ↗ | 2 | 10/29/2025 |
| 216 FORT WASHINGTON AVENUE ↗ | 3 | 06/07/2023 |
| 8 EAST 3RD STREET ↗ | 3 | 12/05/2022 |
| 189 EAST 100TH STREET ↗ | 2 | 07/01/2021 |
| 78 CATHERINE STREET ↗ | 1 | 01/07/2020 |
| 2724 BROADWAY ↗ | 1 | — |