← Back
Over six families without stores
Br Affordable
1038 BOSTON ROAD · BIN 2004403
💬 Discuss this project
1910Year Built
6Stories
C1Building Class
R6Zoning
25,578 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FISP: SAFE
Over six families without stores · Owner of record: BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION · 12,500 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES807/08/2026
HKS CONSTRUCTION1407/08/2026
LEMLE WOLFF CONSTRUCTION1007/08/2026
APARTMENT REHABILITATION CORP2007/08/2026
LEMLE & WOLFF, INC.903/22/2026
BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION203/22/2026
BR AFFORDABLE HSING LP1703/22/2026
DR AFFORDABLE HOUSING DEV203/22/2026
BRONX AFFORDABLE HOUSING203/22/2026
AFFORDABLE HOUSING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
PM ARCHITECTURE PC2003/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELTA CONTRACTING GROUP IGeneral Contractor603/21/2026
HKS CONSTRUCTION CORPGeneral Contractor407/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
ACCORD POWER ELECTRIC LLCElectrical103/22/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803706/25/2025
SYNERGIC DESIGN LLC8561103/12/2025
BUTTERFIELD & O'CONNOR4189205/23/2024
MCHENERY TESTING LAB9181112/07/2023
Building Lifecycle
All (140)Filed (15)Permit Issued (11)Signed Off (7)Facade (FISP) (13)Violation (60)Inspection (4)Special Inspection (30)
04/09/2026
Violation issued (ECB, open)
Construction
01/07/2026
Signed off — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X00978232-I1 AND X01047909-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048207-I1
11/24/2025
Signed off — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00978232-I1, X01048207-I1 & INITIAL FILING FOR 1 BOILER REPLACEMENT ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047909-I1
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/01/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X00978232-I1 AND X01047909-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048207-P2
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2025
Signed off — Alteration
Interior renovation work of corridors, cellar, facade work as per plan ,and new roof proposed. Boiler, and water heater replacement under separate filing X00991655-I1 .No change to use, egress, or occupancy under this filing.
X00978232-I1
09/11/2025
Signed off — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00978232-I1, X01048207-I1 & INITIAL FILING FOR 1 BOILER REPLACEMENT ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047909-S1
09/10/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X00978232-I1 AND X01047909-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048207-P1
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00963796-I1
07/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/09/2025
Permit issued — Boiler Equipment
X01047909-S1-BE
06/27/2025
Signed off — Alteration
Installation of 8.91 kw solar energy system on roof. No change of occupancy, use or egress
X01187182-I1
06/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/27/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/27/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
06/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
06/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/25/2025
Filed — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00978232-I1, X01048207-I1 & INITIAL FILING FOR 1 BOILER REPLACEMENT ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047909-P1
06/24/2025
Violation issued (ECB, closed)
Construction
06/22/2025
Filed — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00978232-I1, X01048207-I1 & INITIAL FILING FOR 1 BOILER REPLACEMENT ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047909-S1
05/29/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/23/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
04/18/2025
Permit issued — Plumbing
X01048207-I1-PL
03/27/2025
Permit issued — Solar
X01187182-I1-SL
03/12/2025
Filed — Alteration
Installation of 8.91 kw solar energy system on roof. No change of occupancy, use or egress
X01187182-I1
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
12/30/2024
Violation issued (HPD, closed)
A
12/30/2024
Violation issued (HPD, closed)
A
12/30/2024
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
C
12/13/2024
Permit issued — Boiler Equipment
X01047909-I1-BE
12/06/2024
Violation issued (HPD, closed)
B
12/06/2024
Violation issued (HPD, closed)
C
12/06/2024
Violation issued (HPD, closed)
B
12/06/2024
Violation issued (HPD, closed)
B
12/06/2024
Violation issued (HPD, closed)
C
12/06/2024
Violation issued (HPD, closed)
B
12/06/2024
Violation issued (HPD, closed)
A
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/09/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING04/18/2025
DOB NOWSolarSigned-offACCORD POWER INC03/27/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/13/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR07/09/2024
DOB NOWGeneral ConstructionSigned-offDELTA CONTRACTING GROUP I01/23/2024
DOB NOWGeneral ConstructionSigned-offDELTA CONTRACTING GROUP I12/18/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC12/05/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC11/20/2023
DOB NOWSidewalk ShedPermit IssuedHKS CONSTRUCTION CORP10/02/2020
DOB NOWSidewalk ShedPermit IssuedHKS CONSTRUCTION CORP04/08/2019
BISOTISSUEDBLUE STONE CONSTRUCTION I08/01/2017
BISEQISSUEDHKS CONSTRUCTION CORP02/08/2016
BISEQISSUEDHKS CONSTRUCTION CORP03/31/2015
BISPLISSUEDSKYVIEW HTG&AIR CON CORP07/21/1993
BIS—ISSUEDGREAT AMERICAN CONSTRUCTION CORP09/21/1992
4 projects · most recent 03/27/2025
Boiler Controls
FiledStatusContractorScope
03/27/2025CompleteSTX ELECTRICAL CORPBoiler Controls
03/04/2025CompleteACCORD POWER ELECTRIC LLC—
02/11/2025CompleteSTX ELECTRICAL CORP—
03/03/2021Permit IssuedRICHARD NEU—
1 project · most recent 04/08/2019
Sidewalk Shed
FiledStatusContractorScope
04/08/2019Permit IssuedHKS CONSTRUCTION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
10/02/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/29/2025Tenant Protection Plan Compliance—special
09/05/2025Tenant Protection Plan Compliance—special
06/27/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/27/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/27/2025Heating SystemsSAMI HAJJAR P.Especial
06/27/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/27/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/27/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/29/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/23/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/23/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/23/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/23/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/23/2025Heating SystemsSAMI HAJJAR P.Especial
05/22/2025Heating SystemsSAMI HAJJAR P.Especial
05/22/2025Tenant Protection Plan Compliance—special
05/22/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/22/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/22/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/26/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
02/26/2025FinalMalathi Ananthakrishnanprogress
02/26/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
02/26/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
Latest 25 of 50.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
08/25/2026X00485688-I1Request digital key ↗
08/24/2026X00693927-I1Request digital key ↗
08/22/2026X00963796-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00148967-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
07/27/2017240191840Open ↗
02/23/2016240094214Open ↗
03/30/2015240094214Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/15/2017240191840Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026X00148967-I1Open ↗
08/25/2026X00485688-I1Open ↗
08/22/2026X00963796-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026X01047909-I1Open ↗
09/23/2026X01047909-I1Open ↗
09/23/2026X01047909-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026X01047909-I1Open ↗
09/23/2026X01047909-S1Open ↗
09/23/2026X01047909-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/01/2017240191840Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/27/2017240191840Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/22/2026X00957521-I1Open ↗
08/22/2026X00957521-P1Open ↗
08/21/2026X01048207-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/27/2017240191840Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026X00978232-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/01/2017240191840Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/27/2017240191840Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/01/2017240191840Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/27/2017240191840Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01047909-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/15/2017240191840Open ↗
12/08/2017240191840Open ↗
12/01/2017240191840Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/01/2017240191840Open ↗
▸BISSHED LETTER1
02/23/2016240094214Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01187182-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/08/2017240191840Open ↗
12/01/2017240191840Open ↗
07/27/2017240191840Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
12/15/2017240191840Open ↗
12/08/2017240191840Open ↗
12/01/2017240191840Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/27/2017240191840Open ↗
03/30/2015240094214Open ↗
▸BISADDITIONAL INFORMATION1
11/06/2017240191840Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00978232-P1Open ↗
08/13/2026X00978232-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00148967-I1Open ↗