← Back
Two family frame
104-18 37 DRIVE
QUEENS · BIN 4044492
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R5AZoning
1,841 sfGross Floor Area
2Units
1 Open Violation ▸
Two family frame · 3,125 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MB ARCHITECT PC903/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor304/10/2026
KJK ELECTRIC INCElectrical203/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MB ARCHITECT PC8664703/09/2026
ADNAN ENGINEERING, PC6814212/23/2025
Building Lifecycle
All (92)Filed (9)Permit Issued (4)Signed Off (2)Violation (5)Inspection (6)Objection (36)Special Inspection (30)
04/08/2026
Permit issued — Mechanical Systems
Q01070228-S2-MS
04/07/2026
Signed off — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-I1
03/27/2026
Objection resolved — Addressed
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMED BETATACHE
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMED BETATACHE
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMED BETATACHE
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMED BETATACHE
03/27/2026
Special inspection requirement — Maintenance information
MOHAMMED BETATACHE
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMED BETATACHE
03/24/2026
Objection raised — Cost
03/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2026
Filed — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-P6
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMED BETATACHE
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMED BETATACHE
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMED BETATACHE
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMED BETATACHE
03/06/2026
Special inspection requirement — Maintenance information
MOHAMMED BETATACHE
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMED BETATACHE
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/24/2026
Signed off — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-S3
01/23/2026
Objection resolved — Addressed
01/22/2026
Special inspection requirement — Final
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — Mechanical Systems
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — Maintenance information
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMED BETATACHE
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMED BETATACHE
01/21/2026
Objection raised — Admin
01/21/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Scope
01/16/2026
Objection raised — Scope
01/14/2026
Objection raised — Mechanical
01/14/2026
Objection raised — Cost
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/13/2026
Objection raised — Zoning
01/13/2026
Objection raised — Cost
01/10/2026
Filed — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-P4
01/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/24/2025
Filed — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-P3
12/23/2025
Filed — Alteration
Plumbing Work in Conjunction with application Q01070228-I1
Q01070228-P5
12/16/2025
Special inspection requirement — Interior lighting power
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Structural Wood Frame
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Final
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adnan Aljuamily
12/16/2025
Special inspection requirement — Air barrier - visual inspection
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMMED BETATACHE
12/16/2025
Special inspection requirement — Fenestration areas
MOHAMMED BETATACHE
05/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2025
Permit issued — Plumbing
Q01070228-S1-PL
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedURENA CONST & DESIGN INC04/08/2026
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC04/28/2025
DOB NOWConstruction FenceSigned-offURENA CONST & DESIGN INC04/07/2025
DOB NOWStructuralSigned-offURENA CONST & DESIGN INC04/03/2025
1 job · most recent 03/09/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/09/2026Permit IssuedURENA CONST & DESIGN INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GS09NA 9,000 BTU · Fan Coil Indoor ×6
MSZ-GL12NA 12,000 BTU · Fan Coil Indoor ×4
MSZ-GS06NA 6,000 BTU · Fan Coil Indoor ×4
MXZ-5C42NA 42,000 BTU · Condensing Unit ×4
MSZ-GL15NA 15,000 BTU · Fan Coil Indoor ×2
Heating
King King- 3k1207 7,677 BTU · Baseboard ×6
KING - 5k1212 4,265 BTU · Baseboard ×2
King- 4k1210 3,412 BTU · Baseboard ×2
Ventilation
Bv BV-BF-01-PLUS 90 CFM · Exhaust Fan ×6
Samsung ME21DG6300SRAA 400 CFM · Kitchen Exhaust ×4
1 job · most recent 03/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/09/2026Signed-offROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
3 jobs · most recent 05/09/2025
General Wiring
FiledStatusContractorScope
05/09/2025CompleteKJK ELECTRIC INCGeneral Wiring
09/20/2023Permit IssuedCRESCO ELECTRICAL CORP2 meters
06/23/2022CancelledKJK ELECTRIC INCGeneral Wiring
1 job · most recent 03/09/2026
Concrete Wood
FiledStatusContractorScope
03/09/2026Permit IssuedURENA CONST & DESIGN INCConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
03/27/2026Energy Code Compliance InspectionsMOHAMMED BETATACHEprogress
03/27/2026Fire-Resistant Penetrations and JointsMOHAMMED BETATACHEspecial
03/27/2026HVAC-R and service water piping design and insulationMOHAMMED BETATACHEenergy_progress
03/27/2026HVAC-R and service water heating system controlsMOHAMMED BETATACHEenergy_progress
03/27/2026HVAC-R and service water heating equipmentMOHAMMED BETATACHEenergy_progress
03/27/2026Maintenance informationMOHAMMED BETATACHEenergy_progress
03/06/2026HVAC-R and service water heating system controlsMOHAMMED BETATACHEenergy_progress
03/06/2026Fire-Resistant Penetrations and JointsMOHAMMED BETATACHEspecial
03/06/2026Maintenance informationMOHAMMED BETATACHEenergy_progress
03/06/2026HVAC-R and service water heating equipmentMOHAMMED BETATACHEenergy_progress
03/06/2026HVAC-R and service water piping design and insulationMOHAMMED BETATACHEenergy_progress
03/06/2026Energy Code Compliance InspectionsMOHAMMED BETATACHEprogress
01/22/2026HVAC-R and service water piping design and insulationMOHAMMED BETATACHEenergy_progress
01/22/2026Mechanical SystemsMOHAMMED BETATACHEspecial
01/22/2026FinalMOHAMMED BETATACHEprogress
01/22/2026Maintenance informationMOHAMMED BETATACHEenergy_progress
01/22/2026Energy Code Compliance InspectionsMOHAMMED BETATACHEprogress
01/22/2026HVAC-R and service water heating equipmentMOHAMMED BETATACHEenergy_progress
01/22/2026HVAC-R and service water heating system controlsMOHAMMED BETATACHEenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsMOHAMMED BETATACHEspecial
12/16/2025Interior lighting powerMOHAMMED BETATACHEenergy_progress
12/16/2025Concrete - Cast-In-PlaceMOHAMMED BETATACHEspecial
12/16/2025Fire-Resistant Penetrations and JointsMOHAMMED BETATACHEspecial
12/16/2025MasonryMOHAMMED BETATACHEspecial
12/16/2025Structural Stability – Alterations of existing buildingsAdnan Aljuamilyspecial
Latest 25 of 62.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026Q01070228-P5Request digital key ↗
08/18/2026Q01070228-P6Request digital key ↗
08/18/2026Q01070228-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature37
09/05/2026Q01070228-P6Open ↗
09/05/2026Q01070228-P6Open ↗
09/05/2026Q01070228-P6Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/05/2026Q01070228-P6Open ↗
08/28/2026Q01070228-P1Open ↗
08/28/2026Q01070228-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026Q01070228-S1Open ↗
08/13/2026Q01070228-P3Open ↗
08/13/2026Q01070228-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026Q01070228-S1Open ↗
08/13/2026Q01070228-P6Open ↗
08/13/2026Q01070228-P5Open ↗
Showing 3 of 8 on file for this type
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01070228-P1Open ↗
08/13/2026Q01070228-I1Open ↗
08/13/2026Q01070228-P5Open ↗