← Back
BuildNYC
Unlicensed parking lot
104-28 MERRICK BOULEVARD
QUEENS · South Jamaica · BIN 4216420
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M1-2AZoning
0 sfGross Floor Area
0Units
4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Unlicensed parking lot · Owner of record: Metropolitan Transportation Authority · 83,891 sf lot · 0 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEmpire Automotive Group, Empire Hyundai Servic6p · 2 filings · 20 docs
Floor 1Empire Automotive Group, Empire Hyundai Servic7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Empire Automotive Group604/09/2026
Therese Enterprises203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Trolydia Engineering301/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Witkin Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AmscoairGeneral Contractor104/09/2026
Practical Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Trolydia Testing & Inspec4422301/02/2023
Building Lifecycle
All (23)Filed (3)Permit Issued (2)Inspection (2)Special Inspection (16)
01/06/2023
Permit issued — Mechanical Systems
Q08037693-I1-MS
01/02/2023
Filed — Alteration
REPLACEMENT OF ONE (1) HWH, JOB FILED IN CONJUCTION WITH MECHANICAL FILING Q08037693-I1. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
Q08041102-P1
01/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
01/02/2023
Special inspection requirement — Post-installed Anchors
JAIME MOYA
12/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/08/2022
Filed — Alteration
REPLACEMENT OF ONE (1) HWH, JOB FILED IN CONJUCTION WITH MECHANICAL FILING Q08037693-I1. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
Q08041102-I1
12/08/2022
Permit issued — Plumbing
Q08041102-I1-PL
11/18/2022
Filed — Alteration
INSTALLATION OF THREE (3) AC UNITS/CONDENSING UNITS ON THE ROOF WITH ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.
Q08037693-I1
11/18/2022
Special inspection requirement — Shutoff dampers
JAIME MOYA
11/18/2022
Special inspection requirement — Duct leakage testing, insulation and design
JAIME MOYA
11/18/2022
Special inspection requirement — Lighting controls
JAIME MOYA
11/18/2022
Special inspection requirement — Maintenance information
JAIME MOYA
11/18/2022
Special inspection requirement — Ventilation and air distribution system
JAIME MOYA
11/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
JAIME MOYA
11/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
JAIME MOYA
11/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JAIME MOYA
11/18/2022
Special inspection requirement — Interior lighting power
JAIME MOYA
11/09/2022
Special inspection requirement — Heating Systems
JAIME MOYA
11/09/2022
Special inspection requirement — Mechanical Systems
JAIME MOYA
11/09/2022
Special inspection requirement — Energy Code Compliance Inspections
JAIME MOYA
11/09/2022
Special inspection requirement — Final
JAIME MOYA
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAIME MOYA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAmscoair01/06/2023
DOB NOWPlumbingPermit IssuedPractical Plumbing & Heating12/08/2022
BISFPISSUEDChief Fire Prevention04/19/2005
BISOTISSUEDComet Fire & Safety Equipment10/29/2004
1 project · most recent 01/02/2023
Gas
FiledStatusContractorScope
01/02/2023Permit IssuedPractical Plumbing & HeatingGas
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/02/2023Fire-Resistant Penetrations and JointsJAIME MOYAspecial
01/02/2023Post-installed AnchorsJAIME MOYAspecial
11/18/2022Shutoff dampersJAIME MOYAenergy_progress
11/18/2022Duct leakage testing, insulation and designJAIME MOYAenergy_progress
11/18/2022Lighting controlsJAIME MOYAenergy_progress
11/18/2022Maintenance informationJAIME MOYAenergy_progress
11/18/2022Ventilation and air distribution systemJAIME MOYAenergy_progress
11/18/2022HVAC-R and service water heating equipmentJAIME MOYAenergy_progress
11/18/2022HVAC-R and service water heating system controlsJAIME MOYAenergy_progress
11/18/2022HVAC-R and service water piping design and insulationJAIME MOYAenergy_progress
11/18/2022Interior lighting powerJAIME MOYAenergy_progress
11/09/2022Heating SystemsJAIME MOYAspecial
11/09/2022Mechanical SystemsJAIME MOYAspecial
11/09/2022Energy Code Compliance InspectionsJAIME MOYAprogress
11/09/2022FinalJAIME MOYAprogress
11/09/2022Fire-Resistant Penetrations and JointsJAIME MOYAspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Empire Hyundai ServicAutomotive / fuelFloor 1, Roof
Project Q08041102 Alteration · Permit Entire · 12/08/2022
Empire Automotive GroupRetailFloor 1, Roof
Project Q08037693 Alteration · Permit Entire · 11/18/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08037693-I1Request digital key ↗
08/25/2026Q08041102-I1Request digital key ↗
08/25/2026Q08041102-P1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/26/2019401991626Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature11
08/24/2026Q08037693-I1Open ↗
08/24/2026Q08037693-I1Open ↗
08/24/2026Q08037693-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q08041102-P1Open ↗
08/31/2026Q08041102-P1Open ↗
08/24/2026Q08037693-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08041102-I1Open ↗
08/13/2026Q08037693-I1Open ↗
08/13/2026Q08041102-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWOER: Notice to Proceed2
08/13/2026Q08041102-I1Open ↗
08/13/2026Q08037693-I1Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
01/26/2019401991626Open ↗