| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01359186 ↗ | 437 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 03/05/2026 | 09/29/2026 | Owner SAGE REALTY CORP Contractor JAMES E FITZGERALD INC Filer MBE CODE & ZONING LLC | REMOVE 19 SPRINKLER HEADS & INSTALL 309 NEW SPRINKLER HEADS AND PIPING. |
| M00643592 ↗ | 989 AVENUE OF THE AMERICAS MANHATTAN | New Building | Permit Issued | 12/15/2021 | 09/29/2026 | Design MG ENGINEERING D.P.C. Owner FY & SONS TIC LLC. Contractor VERTCON BUILDERS LLC | Propose Support of Excavation work for 68-story mix-used building filed in conjunction with NB # M00643592-I1 |
| X01350303 ↗ | 3830 PAULDING AVENUE BRONX | Alteration | Permit Issued | 04/17/2026 | 09/28/2026 | Design DEMERARA ENGINEERING, PLLC Contractor TONY CASALE INC | HEREWITH FILING FOR REPAIRS TO EXISTING RETAINING WALL AT LAVELLE SCHOOL FORTHE BLIND. THIS SCOPE ALSO INVOLVES REMOVAL AND ERECTION OF A ME… |
| B01028230 ↗ | 351 DEGRAW STREET BROOKLYN | Alteration CO | Permit Issued | 06/21/2024 | 09/28/2026 | Design JOSEPH GIANNETTI ARCHITECT Contractor WTC PLBG & HEATING CORP Filer JOSEPH GIANNETTI, RA | SUPPORT OF EXCAVATION FOR CONSTRUCTION OF FOUNDATIONS. |
| Q01417324 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 08/18/2026 | 09/23/2026 | Design COSENTINI ASSOCIATES Owner LeFrak Contractor BLACK BULL BULDERS LLC | MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01321817 ↗ | 1 NORTH END AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2026 | 09/22/2026 | Design AKF ENGINEERS, LLP Owner CBRE Contractor JRM CONSTRUCTION MGMT LLC Filer DVA Advisors | Relocation of conduit |
| Name | Projects together | Most recent |
|---|---|---|
| COSENTINI ASSOCIATES | 83 | 08/26/2026 |
| TROLYDIA ENGINEERING PLLC | 76 | 05/20/2026 |
| MG ENGINEERING D.P.C. | 64 | 07/13/2026 |
| DOSHI CONSULTANT | 35 | 08/31/2026 |
| CARLTON ARCHITECTURE,PC | 25 | 08/26/2026 |
| URBAN DESIGN ENGINEERING | 25 | 10/07/2025 |
| SEVERUD ASSOCIATES | 23 | 08/11/2026 |
| GENE KAUFMAN ARCHITECT, PC | 22 | 04/09/2026 |
| OMDEX INC | 21 | 01/12/2026 |
| WSP | 18 | 08/18/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 16 | 08/17/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 14 | 06/16/2026 |
| BAUER DERMEL ARCHITECT | 13 | 08/17/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 13 | 10/03/2025 |
| GERALD CALIENDO ARCHITECTS | 12 | 04/20/2026 |
| ROBERT DERECTOR ASSOCIATES | 12 | 08/01/2024 |
| COMBINED RESOURCES CONSULTING & DE | 11 | 08/19/2026 |
| DANIEL HYMAN ARCHITECT | 10 | 05/20/2026 |
| A&D ENGINEERING, PLLC | 8 | 06/02/2026 |
| SETH P. ROYE ARCHITECT PC | 8 | 04/29/2024 |
| AMA CONSULTING ENGINEERS, PC | 6 | 02/03/2026 |
| ANTHONY JOHNSON ARCHITECTS | 6 | 04/09/2026 |
| DESIMONE CONSULTING ENGINEERS | 6 | 02/12/2026 |
| GOLDMAN COPELAND ASSOCIATES | 6 | 02/22/2024 |
| LIZARDOS ENGINEERING | 6 | 03/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RFP CONSTRUCTION INC | 38 | 04/20/2026 |
| BLACK BULL BULDERS LLC | 30 | 08/19/2026 |
| PRACTICAL PLBG & HTG INC | 25 | 03/25/2026 |
| OMNIBUILD CONSTRUCTION IN | 23 | 06/23/2026 |
| COOK & KRUPA LLC | 22 | 08/19/2026 |
| BEDROCK PLUMBING & HEATING INC | 15 | 08/31/2026 |
| REAL LAND GROUP LLC | 15 | 04/27/2026 |
| CLUNE CONSTRUCTION CO LP | 14 | 06/16/2026 |
| AMSCOAIR LLC | 12 | 02/17/2026 |
| FINALY GENL CONTR CORP | 11 | 08/26/2026 |
| QUEST BUILDERS GROUP INC | 11 | 08/01/2024 |
| A&A PLUMBING CORP | 9 | 08/26/2026 |
| ASTOR & STONE INC | 9 | 11/18/2025 |
| CAPITOL FIRE SPRINKLER CO | 9 | 06/20/2025 |
| MPS PLUMBING & HEATING IN | 9 | 05/07/2025 |
| ASC METRO FIRE INSP LLC | 8 | 04/09/2026 |
| FULL CAPACITY FIRE CORP | 8 | 03/05/2025 |
| GO PRO FIRE PROTECTION C | 8 | 08/11/2026 |
| LIS PIPING SOLUTION INC | 8 | 08/17/2026 |
| PSI PARTNERS, LLC | 8 | 06/15/2026 |
| TWO-TONE CONTRACTING CORP | 8 | 03/27/2026 |
| FOREMOST CONSTRUCTION LLC | 7 | 12/07/2022 |
| INTER-COUNTY MECHANICAL C | 7 | 04/14/2026 |
| TOWER FIRE PROTECTION INC | 7 | 03/08/2023 |
| UNITED AIR CONDITIONING | 7 | 10/12/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| LEFRAK PROPERTY MANAGEMENT | 69 | 08/17/2026 |
| LEFRAK ORGANIZATION | 68 | 07/02/2026 |
| EMPIRE AUTOMOTIVE GROUP | 13 | 03/14/2025 |
| KINGS AND QUEENS MAINTENANCE SRVS | 12 | 08/04/2025 |
| SAGE REALTY CORP | 12 | 06/16/2026 |
| INDUSTRY CITY | 10 | 11/26/2024 |
| LEFRAK | 10 | 08/26/2026 |
| TSGL 8TH AVENUE LLC | 10 | 06/15/2023 |
| 1330 AOA Management LLC | 8 | 01/18/2023 |
| 319 WEST 38TH STREET LLC | 8 | 11/03/2025 |
| SKY BLU HOLDINGS LLC | 8 | 04/27/2026 |
| OMNIBUILD CONSTRUCTION | 7 | 04/27/2026 |
| COLUMBIA PROPERTY TRUST | 6 | 12/02/2024 |
| DCO QOZB 38-15 QB, LLC | 6 | 12/15/2025 |
| HERALD TOWERS, INC. | 6 | 02/22/2024 |
| WALDMAN PARTNERS, LLC | 6 | 10/13/2022 |
| COLLIERS | 5 | 01/29/2024 |
| JEMB REALTY | 5 | 08/07/2025 |
| REAL LAND GROUP | 5 | 02/05/2025 |
| 1163 FULTON REALTY LLC | 4 | 10/03/2025 |
| APF PROPERTIES | 4 | 01/17/2023 |
| C/O ROSE ASSOCIATES, INC. | 4 | 02/13/2025 |
| EAST END CAPITAL LLC | 4 | 04/15/2025 |
| FY & SONS TIC LLC. | 4 | 07/13/2026 |
| OMNI BUILD INC | 4 | 04/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 148 | 08/26/2026 |
| MBE CODE & ZONING LLC | 71 | 06/16/2026 |
| JAM CONSULTANTS, INC. | 42 | 08/31/2026 |
| A1 EXPEDITING SERVICE CORP. | 29 | 04/27/2026 |
| GERALD J. CALIENDO R.A., P.C. | 25 | 04/20/2026 |
| GENE KAUFMAN ARCHITECT | 17 | 04/09/2026 |
| MODERN DESIGN | 17 | 04/08/2025 |
| XPDITE GROUP LLC (104) | 14 | 04/27/2026 |
| EXPEDIENT CONSULTING LLC | 9 | 08/22/2023 |
| WILLIAM VITACCO ASSOCIATES | 9 | 02/12/2025 |
| BROOKLYN SWEDISH CARS LLC | 7 | 05/31/2022 |
| SPEEDY EXPEDITING INC | 7 | 06/02/2026 |
| ADVANCED BUILDERS SERVICES | 6 | 06/02/2026 |
| CORE CONSULTANTS NYC | 5 | 04/14/2026 |
| GILLMAN CONSULTING INC | 5 | 08/06/2026 |
| JM ZONING, LLC. | 5 | 08/24/2026 |
| BMB BUILDING CONSULTING INC. | 4 | 07/13/2026 |
| JACK JAFFA & ASSOCIATES | 4 | 12/03/2025 |
| MARIN ARCHITECTS, P.C. | 4 | 05/13/2024 |
| BURNHAM NATIONWIDE INC | 3 | 10/21/2024 |
| CONVERSANO ASSOCIATES, INC. | 3 | 07/13/2021 |
| EC BUILDING CONSULTANTS, INC. | 3 | 08/17/2026 |
| GEORGE E. BERGER & ASS. LLC | 3 | 10/16/2025 |
| RIZZO GROUP | 3 | 03/08/2022 |
| ROBERT S. SCHNITZER | 3 | 11/14/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01359186 ↗ | 437 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 03/05/2026 | 09/29/2026 | Owner SAGE REALTY CORP Contractor JAMES E FITZGERALD INC Filer MBE CODE & ZONING LLC | REMOVE 19 SPRINKLER HEADS & INSTALL 309 NEW SPRINKLER HEADS AND PIPING. |
| M00643592 ↗ | 989 AVENUE OF THE AMERICAS MANHATTAN | New Building | Permit Issued | 12/15/2021 | 09/29/2026 | Design MG ENGINEERING D.P.C. Owner FY & SONS TIC LLC. Contractor VERTCON BUILDERS LLC | Propose Support of Excavation work for 68-story mix-used building filed in conjunction with NB # M00643592-I1 |
| X01350303 ↗ | 3830 PAULDING AVENUE BRONX | Alteration | Permit Issued | 04/17/2026 | 09/28/2026 | Design DEMERARA ENGINEERING, PLLC Contractor TONY CASALE INC | HEREWITH FILING FOR REPAIRS TO EXISTING RETAINING WALL AT LAVELLE SCHOOL FORTHE BLIND. THIS SCOPE ALSO INVOLVES REMOVAL AND ERECTION OF A ME… |
| B01028230 ↗ | 351 DEGRAW STREET BROOKLYN | Alteration CO | Permit Issued | 06/21/2024 | 09/28/2026 | Design JOSEPH GIANNETTI ARCHITECT Contractor WTC PLBG & HEATING CORP Filer JOSEPH GIANNETTI, RA | SUPPORT OF EXCAVATION FOR CONSTRUCTION OF FOUNDATIONS. |
| Q01417324 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 08/18/2026 | 09/23/2026 | Design COSENTINI ASSOCIATES Owner LeFrak Contractor BLACK BULL BULDERS LLC | MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01321817 ↗ | 1 NORTH END AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2026 | 09/22/2026 | Design AKF ENGINEERS, LLP Owner CBRE Contractor JRM CONSTRUCTION MGMT LLC Filer DVA Advisors | Relocation of conduit |
| Q01417327 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 08/18/2026 | 09/21/2026 | Design COSENTINI ASSOCIATES Owner LeFrak Contractor BLACK BULL BULDERS LLC | MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01427051 ↗ | 107-15 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 07/28/2026 | 09/18/2026 | Contractor COOK & KRUPA LLC Filer JAM CONSULTANTS, INC. | Hereby filing to demolish and construct interior partitions to provide new office and exam rooms in existing medical office space. No change… |
| M01207512 ↗ | 345 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 09/25/2025 | 09/10/2026 | Design HILL WEST ARCHITECTS Contractor ASTOR & STONE INC | Mechanical scope for interior renovations as per plans filed herewith. No change to use, egress, or occupancy. |
| M01207524 ↗ | 345 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 09/25/2025 | 09/10/2026 | Design HILL WEST ARCHITECTS Contractor ASTOR & STONE INC | Mechanical scope for interior renovations as per plans filed herewith. No change to use, egress, or occupancy. |
| M01207520 ↗ | 345 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 09/25/2025 | 09/10/2026 | Design HILL WEST ARCHITECTS Contractor ASTOR & STONE INC | Interior renovation of partial 1st floor lobbies, corridors, mail rooms and elevator vestibules. Remove/replace non-load bearing partitions,… |
| M01437266 ↗ | 11 AVENUE MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 09/09/2026 | Design WOODS BAGOT ARCHITECTS, P.C. Contractor SUFFOLK CONSTRUCTION COMP Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS AND CARPENTRY AS PER PLANS FILED HEREWITH. DEMO PORTION OF EXISTING WALL TO P… |
| M01442989 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/08/2026 | Design COSENTINI ASSOCIATES Owner LEFRAK Contractor FINALY GENL CONTR CORP | SPRINKLER WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01422095 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 07/10/2026 | 09/01/2026 | Design COSENTINI ASSOCIATES Owner LEFRAK Contractor TRI-STAR CONSTRUCTION CORP | STRUCTURAL WORK TO REMOVE EXISTING STAIR FROM 30TH TO 31ST FL AND INFILL STAIR OPENING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS… |
| X01296728 ↗ | 290 EAST 149TH STREET BRONX | Alteration | Signed-off | 11/03/2025 | 09/01/2026 | Design SAHEB ARCHITECTURE Contractor STREAM PLUMBING INC | Plumbing Work for I-4 daycare use, ages 0-13, 58 children and 19 adults. No change in use, zoning, or occupancy. |
| Q01448467 ↗ | 107-15 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 08/31/2026 | 09/01/2026 | Design DOSHI CONSULTANT Contractor BEDROCK PLBG. & HTG., INC Filer JAM CONSULTANTS, INC. | Filing for the removal and installation of plumbing fixtures and piping related to the interior Alteration of Medical Office. |
| M00930243 ↗ | 34 WEST 38 STREET MANHATTAN | Alteration | Permit Issued | 09/08/2023 | 08/31/2026 | Contractor LIS PIPING SOLUTION INC | INSTALL NEW STANDPIPE AND SPRINKLER COMBINED SYSTEM AS SHOWN ON DRAWINGS. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION NUMBER 12133266… |
| M00848346 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 04/24/2023 | 08/27/2026 | Design COSENTINI ASSOCIATES Contractor FINALY GENL CONTR CORP | MECHANICAL WORK TO INSTALL GAS METER ROOM VENT AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01204500 ↗ | 989 AVENUE OF THE AMERICAS MANHATTAN | Alteration | Permit Issued | 04/23/2025 | 08/27/2026 | Design MG ENGINEERING D.P.C. Owner FY & SONS TIC LLC. Contractor ARMON MECHANICAL INC | Boiler filing in conjunction with NB-GC # M00643592-P3. |
| S01320161 ↗ | 2655 RICHMOND AVENUE STATEN ISLAND | Alteration | Permit Issued | 01/06/2026 | 08/24/2026 | Design SIMPSON GUMPERTZ & HEGER Owner BROOKFIELD PROPERTIES Contractor THE WHITING-TURNER CONTRA Filer ANDREW KATZ ENGINEERS | SPACE 1100: LL WORK. STRUCTURAL FRAMING MODIFICATIONS FOR FUTURE TENANT SPACE. |
| Q01260714 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 08/05/2025 | 08/21/2026 | Design BAUER DERMEL ARCHITECT Owner LEFRAK ORGANIZATION Contractor 1ST CLASS CONTRACTING OF | General construction work as per plans filed herewith. No change to use egress or occupancy. |
| M01435733 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 08/18/2026 | Design DOSHI CONSULTANT Contractor BEDROCK MECHANICAL INC Filer JAM CONSULTANTS, INC. | Sprinkler work as shown on plans submitted herewith. No change to use, occupancy or egress as of right. |
| M01435730 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 08/11/2026 | 08/18/2026 | Design DOSHI CONSULTANT Contractor BEDROCK PLBG. & HTG., INC Filer JAM CONSULTANTS, INC. | Plumbing work as shown on the plans submitted herewith. No change to use egress or occupancy as of right, |
| M01435727 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 08/18/2026 | Design DOSHI CONSULTANT Contractor COOK & KRUPA LLC Filer JAM CONSULTANTS, INC. | HVAC modifications as shown on the plans submitted herewith. No change to egress, use of occupancy as of right. |
| M01435725 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/10/2026 | 08/18/2026 | Contractor COOK & KRUPA LLC Filer JAM CONSULTANTS, INC. | Interior renovation of existing 6th floor medical office space for outpatient oncology use, including architectural modifications no change … |
| Q00854828 ↗ | 205-01 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 04/21/2023 | 07/28/2026 | Design DOSHI CONSULTANT Contractor STAT FIRE SPRINKLER NYC C | Description: Herewith filing for the installation of new sprinkler system for commercial building expansion. Filed in conjunction with Q0078… |
| Q01378441 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Permit Issued | 06/25/2026 | 07/22/2026 | Design COSENTINI ASSOCIATES Contractor D.D.S. MECHANICAL PLUMB | INSTALLATION OF AN EMERGENCY GENERATOR AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01420614 ↗ | 97-77 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/21/2026 | 07/21/2026 | Design COSENTINI ASSOCIATES Contractor THE METRO GROUP, INC | HVAC WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01287581 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 11/19/2025 | 07/17/2026 | Design CARLTON ARCHITECTURE,PC Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | DEP Core Bathroom - 11TH FLOOR CORE BATHROOM RENOVATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01287674 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 03/24/2026 | 07/17/2026 | Design COSENTINI ASSOCIATES Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | DEP BATHROOM - MECHANICAL VENTILATION WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01319501 ↗ | 97-77 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 12/18/2025 | 07/02/2026 | Design BAUER DERMEL ARCHITECT Owner LEFRAK PROPERTY MGMT Contractor N.E.G. TECHNOLOGY, INC | TEMPORARY SHORING AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01264107 ↗ | 97-05 HORACE HARDING EXPWY QUEENS | Alteration | Permit Issued | 08/04/2025 | 07/02/2026 | Design BAUER DERMEL ARCHITECT Contractor ASTOR & STONE INC | 14K: Plumbing work as per plans filed herewith. no change to use, egress or occupancy. |
| M01373076 ↗ | 5 WEST 93 STREET MANHATTAN | Alteration CO | Permit Issued | 03/27/2026 | 06/24/2026 | Design KOHLER RONAN, LLC Owner COLUMBIA GRAMMAR SCHOOL Contractor ARCHSTONE BUILDERS LLC Filer JM ZONING, LLC. | Filing herewith Structural work as per plans. |
| X01350241 ↗ | 3830 PAULDING AVENUE BRONX | Alteration | Permit Issued | 04/17/2026 | 06/23/2026 | Design DEMERARA ENGINEERING, PLLC Contractor CIVIL PROJECTS DEVELOPERS | HEREWITH FILING FOR REPAIR OF EXISTING RAMP AT THE NORTH SIDE FACADE LOCATED ON 221TH STREET FOR LAVELLE SCHOOL FOR THE BLIND AS PER PLANS. … |
| Q01288031 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 09/30/2025 | 06/23/2026 | Contractor N.E.G. TECHNOLOGY, INC | Mechanical work - Corrective work in conjunction with MS #Q00876012 as per the plans filed herewith. No change to use, egress or occupancy. |
| M01110498 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 06/22/2026 | Design COSENTINI ASSOCIATES Contractor FULL CAPACITY FIRE CORP | Sprinkler modification of the existing system including sprinkler head and associated piping replacement. No change to occupancy, use or eg… |
| M01403512 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2026 | 06/17/2026 | Design DOSHI CONSULTANT Contractor BEDROCK PLBG. & HTG., INC Filer JAM CONSULTANTS, INC. | Plumbing work as shown on the plans submitted herewith. No change to use egress or occupancy as of right, |
| Q01400208 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 06/04/2026 | 06/16/2026 | Design SEVERUD ASSOCIATES Contractor CROSSLAND MECHANICAL INC | Structural work including partial demo of metal stairs and slab for new construction as per plans filed herewith. No change to use egress or… |
| M01403506 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2026 | 06/11/2026 | Design DOSHI CONSULTANT Contractor COOK & KRUPA LLC Filer JAM CONSULTANTS, INC. | HVAC modifications as shown on the plans submitted herewith. No change to egress, use of occupancy as of right. |
| M01385853 ↗ | 363 7 AVENUE MANHATTAN | Alteration | Permit Issued | 05/18/2026 | 06/11/2026 | Design MCNAMARA SALVIA Owner FY & SONS TIC LLC. Contractor PRECISE CONSTRUCTION CONR | REPLACE SLAB ON TOP OF EXISTING SIDEWALK VAULT. |
| M01403520 ↗ | 210 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2026 | 06/11/2026 | Design DOSHI CONSULTANT Contractor BEDROCK MECHANICAL INC Filer JAM CONSULTANTS, INC. | Sprinkler work as shown on plans submitted herewith. No change to use, occupancy or egress as of right. |
| Q01213677 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Permit Issued | 05/30/2025 | 06/10/2026 | Design CARLTON ARCHITECTURE,PC Owner LEFRAK ORGANIZATION Contractor TWO-TONE CONTRACTING CORP. | Plumbing plans show core bathroom renovation on first floor of office building. No change to use, egress, or occupancy. |
| Q01069806 ↗ | 205-01 NORTHERN BOULEVARD QUEENS | Alteration CO | Permit Issued | 06/21/2024 | 06/10/2026 | Design GERALD CALIENDO ARCHITECTS Contractor RFP CONSTRUCTION INC | HEREWITH FILED ALTERATION C/O TO PROPOSE AN ACCESSORY OFFICE MEZZANINE IN THE EXISTING FIRST FLOOR OF AN AUTOMOBILE SHOWROOM AND TO UPDATE T… |
| B01007955 ↗ | 262 VAN BRUNT STREET BROOKLYN | Alteration CO | Permit Issued | 03/29/2024 | 06/09/2026 | Design LIZARDOS ENGINEERING Owner PB XPRESS KINGS, LLC Contractor BAYBERRY BUILDING CO LLC | INTERIOR RENOVATION OF EXISTING BUILDING INTO NEW PICKLE BALL FACILITY (B OCCUPANCY, ZONING USE GROUP 9A). NO CHANGE IN EXISTING BULK OR EGR… |
| M01339122 ↗ | 320 WEST 13 STREET MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 06/04/2026 | Owner SAGE REALTY CORP Contractor CHAMPION COMBUSTION CORP Filer MBE CODE & ZONING LLC | REMOVAL OF BREECHING, FUEL OIL PUMPS,FUEL OIL PIPING AND CONTROLS. NEW DUAL FUEL BURNERS TO BE RETROFITTED TO EXISTING BOILERS. FUEL OIL PU… |
| B00571785 ↗ | 589 FULTON STREET BROOKLYN | New Building | Permit Issued | 08/27/2021 | 05/27/2026 | Design BEYER BLINDER BELLE Contractor SUFFOLK CONSTRUCTION COMP Filer JAM CONSULTANTS, INC. | support of excavation |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Contractor OMNIBUILD CONSTRUCTION IN Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| B01349137 ↗ | 589 FULTON STREET BROOKLYN | Alteration | Permit Issued | 02/04/2026 | 05/21/2026 | Contractor SUFFOLK CONSTRUCTION COMP | Hereby filing to construct slab openings and structural framing for new sump pit, elevator opening, staircase and load bearing walls as show… |
| Q01354211 ↗ | 34-01 38 AVENUE QUEENS | Alteration | Permit Issued | 03/05/2026 | 05/20/2026 | Design JACK GREEN ASSOCIATES Contractor EL-ROC CONTG OF BKLYN INC | STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY. |
| Q01319665 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 03/05/2026 | 05/15/2026 | Design BAUER DERMEL ARCHITECT Owner LEFRAK ORGANIZATION Contractor TWO-TONE CONTRACTING CORP. | MECHANICAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01287704 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 03/25/2026 | 05/15/2026 | Design COSENTINI ASSOCIATES Owner LEFRAK ORGANIZATION Contractor GO PRO FIRE PROTECTION C | DEP CORE BATHROOM: Modification of the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy. |
| Q00789074 ↗ | 205-01 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 08/11/2022 | 05/08/2026 | Design TROLYDIA ENGINEERING PLLC Contractor RFP CONSTRUCTION INC | STRUCTURAL DRAWINGS FOR THE VERTICAL EXTENSION OF AN EXIST. 1 STORY BUILDING. MAIN GRAVITY SYSTEM CONSISTS OF METAL ROOF DECK BEARING ON STE… |
| M01380645 ↗ | 437 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/20/2026 | 05/01/2026 | Owner SAGE REALTY CORP Contractor HVAC CONSTRUCTION INC Filer MBE CODE & ZONING LLC | REMOVE EXISTING PLATE AND FRAME HEAT EXCHANGER AND REPLACE WITH NEW. RECONNECT EXISTING PIPING TO NEW HEAT EXCHANGER. REPLACE PUMP MOTORS. … |
| B01382647 ↗ | 168 2 AVENUE BROOKLYN | Alteration | Signed-off | 04/14/2026 | 05/01/2026 | Design HRM ENGINEERING SERVICES, PC Owner Milea Associates Contractor INTER-COUNTY MECHANICAL CORP Filer CORE CONSULTANTS NYC | REMOVE AND REPLACE EXISTING HVAC UNIT WITH NEW UNIT. NO CHANGE TO USE, OCCUPANCY AND EGRESS PROPOSED UNDER THIS APPLICATION. |
| M01061922 ↗ | 34 WEST 38 STREET MANHATTAN | Alteration | Permit Issued | 06/26/2024 | 04/24/2026 | Contractor TRV MECHANICAL CONTRACTOR | INSTALL NEW 300 GALLONS FUEL OIL STORAGE TANK IN CONJUNCTION WITH EMERGENCY GENERATOR AND NEW BUILDING APPLICATION NUMBER 121332664. |
| M01383727 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 04/20/2026 | 04/23/2026 | Design SEVERUD ASSOCIATES Owner LEFRAK Contractor SPECIALTY CONSTRUCTION SY | STRUCTURAL WORK TO REPAIR DETERIORATED GARAGE RAMP AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01349179 ↗ | 589 FULTON STREET BROOKLYN | Alteration | Permit Issued | 01/30/2026 | 04/23/2026 | Design COSENTINI ASSOCIATES Contractor TT MECHANICAL CORP Filer Witkoff | Hereby filing to modify piping as shown on plans filed herewith. No change to use, occupancy or egress. |
| Q01374402 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 04/02/2026 | 04/21/2026 | Design SEVERUD ASSOCIATES Owner LEFRAK ORGANIZATION Contractor MERIDIAN CONSTRUCTION GRP | NEW CONCRETE MAT SUPPORTING BY HELICAL PILE FOR GENERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01161065 ↗ | 205-01 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 01/02/2025 | 04/21/2026 | Design DOSHI CONSULTANT Contractor PRACTICAL PLBG & HTG INC | INSTALLATION OF NEW PLUMBING FIXTURES AND PIPING FOR COMMERCIAL BUILDING EXPANSION. Filed in conjunction with Q00789074-I1. |
| B01237067 ↗ | 5101 1 AVENUE BROOKLYN | Alteration | Permit Issued | 09/05/2025 | 04/17/2026 | Design TROLYDIA ENGINEERING PLLC Contractor AMSCOAIR LLC Filer JACK JAFFA & ASSOCIATES | MECHANICAL WORK AS PER PLANS FILED HEREWITH |
| B01237064 ↗ | 5101 1 AVENUE BROOKLYN | Alteration | Permit Issued | 10/21/2025 | 04/17/2026 | Design TROLYDIA ENGINEERING PLLC Contractor PRACTICAL PLBG & HTG INC | PLUMBING WORK AS PER PLANS FILED HEREWITH |
| B01289621 ↗ | 5101 1 AVENUE BROOKLYN | Alteration | Permit Issued | 10/21/2025 | 04/17/2026 | Design TROLYDIA ENGINEERING PLLC Contractor PRACTICAL PLBG & HTG INC | SPRINKLER WORK AS PER PLANS FILED HEREWITH |
| B01318906 ↗ | 5101 1 AVENUE BROOKLYN | Alteration | Permit Issued | 12/03/2025 | 04/16/2026 | Design TROLYDIA ENGINEERING PLLC Contractor RFP CONSTRUCTION INC Filer JACK JAFFA & ASSOCIATES | MODIFICATION TO EXISTING MEZZANINE FRAMING TO ADD NEW STAIR OPENING. FRAMING FOR ADDITION OF A NEW 873 SF MEZZANINE FLOOR. NO CHANGE TO EGRE… |
| Q01374609 ↗ | 97-77 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 04/06/2026 | 04/14/2026 | Design SEVERUD ASSOCIATES Owner LEFRAK PROPERTY MGMT Contractor 1ST CLASS CONTRACTING OF | GENERAL CONSTRUCTION FOR EXTERIOR ENCLOSURE OF THE PIPES AND CONDUITS AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANC… |
| M01380640 ↗ | 437 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/09/2026 | 04/13/2026 | Owner SAGE REALTY CORP Contractor HVAC CONSTRUCTION INC Filer MBE CODE & ZONING LLC | PARTIALLY DEMOLISH EXISTING MECHANICAL SYSTEMS, DUCTWORK, PIPING, EQUIPMENT, ETC. FURNISH AND INSTALL NEW MECHANICAL PIPING AND VALVES, ACCE… |
| M01132538 ↗ | 224 WEST 47 STREET MANHATTAN | Alteration | Signed-off | 11/13/2024 | 04/09/2026 | Design GENE KAUFMAN ARCHITECT, PC Contractor OMNIBUILD CONSTRUCTION IN | HEREWITH FILING FOR NEW EMERGENCY GENERATOR. APPLICATION FILED IN CONJUNCTION WITH ALT 1 #122106318 |
| S01298029 ↗ | 1630 FOREST AVENUE STATEN ISLAND | Alteration | Permit Issued | 10/07/2025 | 03/24/2026 | Design URBAN DESIGN ENGINEERING Contractor ULTRA GENERAL CONTRACTING INC. | INTERIOR RENOVATION TO AN EXISTIN ONE STORY COMMERCIAL BUILDING AS PER PLANS. NO CHANGE IS USE, OCCUPANCY, OR EGRESS |
| X01193041 ↗ | 3900 BAILEY AVENUE BRONX | Alteration | Signed-off | 04/09/2025 | 03/23/2026 | Design SIMPSON GUMPERTZ & HEGER Owner MATTHEW ADAM PROPERTIES Contractor F&S CONTRACTING GROUP INC | structural repair of concrete column at level A |
| Q01194518 ↗ | 205-01 NORTHERN BOULEVARD QUEENS | Alteration | Permit Issued | 06/17/2025 | 03/18/2026 | Design DOSHI CONSULTANT Contractor RFP CONSTRUCTION INC | HEREWITH FILING FOR MECHANICAL SYSTEMS FOR COMMERCIAL BUILDING EXPANSION AND INTERIOR ALTERATION IN CONJUNCTION WITH APPLICATION #Q00789074-… |
| Q01338801 ↗ | 34-01 38 AVENUE QUEENS | Alteration | Permit Issued | 01/27/2026 | 03/18/2026 | Design LEVIN BROWN ARCHITECTS Contractor RFP CONSTRUCTION INC | Removal of exiting sprinkler heads and respective piping as shown on drawings. |
| B00819325 ↗ | 638 BEDFORD AVENUE BROOKLYN | Alteration | Permit Issued | 01/30/2023 | 03/17/2026 | Design ZAMBRANO ARCHITECTURAL Owner YKY CONSTRUCTION Contractor DETAILED CONSTRUCTION INC Filer RELIABLE EXPEDITING | New bond beams on existing CMU bearing walls on roof, Build back parapet wall up to 3'-6, reconfigure roof access platform for egress purpos… |
| Q01342765 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 01/23/2026 | 03/09/2026 | Design MG ENGINEERING D.P.C. Owner LEFRAK ORGANIZATION Contractor A&A PLUMBING CORP | PLUMBING WORK FOR THE B2 SPACE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X01027380 ↗ | 3222 JEROME AVENUE BRONX | Alteration | Signed-off | 08/14/2024 | 02/11/2026 | Design TROLYDIA ENGINEERING PLLC Contractor CONSTRUAI | Structural slab repair work to install bases of car lifts. Work includes installing new steel beams and concrete slab along with masonry rep… |
| Q00976971 ↗ | 36-01 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 05/06/2024 | 02/04/2026 | Design TROLYDIA ENGINEERING PLLC Contractor AMSCOAIR | MECHANICAL WORK AS PER PLANS |
| M08054007 ↗ | 79 GANSEVOORT STREET MANHATTAN | Alteration | Permit Issued | 12/15/2022 | 01/26/2026 | Design BUROHAPPOLD Contractor C.A.C. INDUSTRIES, INC Filer JAM CONSULTANTS, INC. | Foundations for future electric light pole installation and modified existing gate and fence pole. |
| M00848323 ↗ | 38 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 04/24/2023 | 01/23/2026 | Design COSENTINI ASSOCIATES Owner LEFRAK Contractor MAGIC MECHANICAL INC | PLUMBING WORK FOR NEW GAS SERVICE AND ASSOCIATED METER AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08031243 ↗ | 79 GANSEVOORT STREET MANHATTAN | Alteration | Permit Issued | 11/15/2022 | 01/23/2026 | Design BUROHAPPOLD Contractor C.A.C. INDUSTRIES, INC Filer JAM CONSULTANTS, INC. | Replace existing walkway bonded aggregate paving with cast-in-place-concrete. No change to walkway layout, occupancy, or egress. Equipment … |
| Q01213727 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Permit Issued | 09/10/2025 | 01/20/2026 | Design SYDNESS ARCHITECTS, PC Owner LEFRAK ORGANIZATION Contractor ASTOR & STONE INC | MECHANICAL SYSTEM WORK TO LOBBY (A5) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01331105 ↗ | 97-77 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 12/23/2025 | 01/14/2026 | Design CARLTON ARCHITECTURE,PC Contractor 1ST CLASS CONTRACTING OF | CONSTRUCTION AT EXISTING FIRESTAIR S OF NEW NON-LOAD BEARING PARTITIONS AND NEW 2 HRRATED GYP SOFFIT, FROM 1ST FLOOR TO TOWER FLOOR. NO CHA… |
| Q01286750 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 10/15/2025 | 01/09/2026 | Design MG ENGINEERING D.P.C. Contractor BLACK BULL BULDERS LLC | Mechanical system renovations (B1) as per plans filed herewith. No change to use, egress or occupancy. |
| Q00919605 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 09/15/2023 | 01/09/2026 | Design MG ENGINEERING D.P.C. Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | Mechanical system renovations as per plans filed herewith. No change to use, egress or occupancy. |
| Q01286552 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 10/15/2025 | 01/09/2026 | Design MG ENGINEERING D.P.C. Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | Mechanical system renovations (A4) as per plans filed herewith. No change to use, egress or occupancy. |
| Q00657608 ↗ | 59-17 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 02/01/2022 | 01/08/2026 | Design CARLTON ARCHITECTURE,PC Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | DEP Core Bathroom - MULTI-FLOOR CORE BATHROOM RENOVATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01105171 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 12/04/2024 | 01/08/2026 | Design SEVERUD ASSOCIATES Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | Structural application to remove existing 4 slab on grade and replace it with new 8 reinforced concrete slab on grade as per the plans filed… |
| Q00919587 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 09/25/2023 | 01/08/2026 | Design ANTHONY JOHNSON ARCHITECTS Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | General construction of interior office space as per plans filed herewith. No change to use, egress or occupancy. |
| Q00940195 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 12/05/2023 | 01/07/2026 | Design ANTHONY JOHNSON ARCHITECTS Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | General construction of interior office space including demo of non-load bearing partitions. No change to use, egress or occupancy. |
| Q00940285 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 12/01/2023 | 01/07/2026 | Design MG ENGINEERING D.P.C. Owner LEFRAK ORGANIZATION Contractor BLACK BULL BULDERS LLC | Mechanical application to renovate existing mechanical systems including demo of fans, ductwork and associated piping. No change use, egress… |
| B01140071 ↗ | 306 23 STREET BROOKLYN | Alteration | Permit Issued | 11/17/2024 | 01/06/2026 | Design PBDW ARCHITECTS Contractor LEECO CONSTRUCTION CORP | WATER AND SANITARY PIPING FOR NEW AND RELOCATED PLUMBING FIXTURES. ALTERATION TO ROOF GUTTER AND LEADER. NO CHANGE TO USE, EGRESS, OR OCCUP… |
| Q00872004 ↗ | 38-15 QUEENS BOULEVARD QUEENS | New Building | Permit Issued | 06/05/2023 | 01/06/2026 | Owner DCO QOZB 38-15 QB, LLC Contractor RFP CONSTRUCTION INC | SPRINKLER WORK , AS PER PLANS. FILE IN CONJUNCTION WITH NB # Q00872004 |
| B00698115 ↗ | 2201 BEVERLY ROAD BROOKLYN | New Building | Permit Issued | 03/21/2022 | 12/24/2025 | Design S. WIEDER ARCHITECT P.C. Contractor MANHATTAN MANAGEMENT Filer SPEEDY EXPEDITING INC | STRUCTURAL FILED IN CONJUNCTION WITH NB # B00698115-I1 |
| M01285552 ↗ | 777 3 AVENUE MANHATTAN | Alteration | Permit Issued | 10/28/2025 | 12/22/2025 | Design ROY GEE ASSOCIATES LLC Owner SAGE REALTY CORP Contractor CORE FOUR CONSTRUCTION IN Filer MBE CODE & ZONING LLC | REMOVE EXISTING PANTRY FIXTURES AND CAP LINES AT SOURCE. INSTALL 1 SINK, 1 DISHWASHER, 1 HWH NON GAS, 1 FUNNEL DRAIN, 1 WATER FILTER, 1 SANI… |
| M01255835 ↗ | 777 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/11/2025 | 12/19/2025 | Owner SAGE REALTY CORP Contractor CLUNE CONSTRUCTION CO LP Filer MBE CODE & ZONING LLC | REMOVE AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS. |
| B00698117 ↗ | 2359 BEDFORD AVENUE BROOKLYN | New Building | Permit Issued | 03/22/2022 | 12/19/2025 | Design S. WIEDER ARCHITECT P.C. Contractor MANHATTAN MANAGEMENT Filer SPEEDY EXPEDITING INC | STRUCTURE FILED IN CONJUNCTION WITH NB # B00698117-I1 |
| B01217321 ↗ | 9013 4 AVENUE BROOKLYN | Alteration | Permit Issued | 12/16/2025 | 12/18/2025 | Design TROLYDIA ENGINEERING PLLC Contractor RFP CONSTRUCTION INC | MECHANICAL WORK AT 1ST- 2ND FLOORS AND ROOF AS PER PLANS FILED HEREWITH |
| Q01300807 ↗ | 96-05 HORACE HARDING EXPRE QUEENS | Alteration | Signed-off | 11/18/2025 | 12/16/2025 | Design SEVERUD ASSOCIATES Contractor DOUBLE A CONCRETE CORP | NEW CONCRETE MAT SUPPORTING BY HELICAL PILE FOR RELOCATED GENERATOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00616950 ↗ | 7-20 BEACH 20 STREET QUEENS | Alteration | Permit Issued | 04/05/2022 | 12/11/2025 | Design JOHN F. CAPOBIANCO ARCHITECT Contractor HM HUGHES CO INC | INSTALLATION OF PARTITION SHAFT WALLS FOR ELEVATOR AND REPAIRS TO EXISTING ROOF AS SHOWN ON DRAWINGS FILED HEREWITH. |
| Q01289053 ↗ | 38-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/25/2025 | 12/10/2025 | Design JZN ENGINEERING, PC. Owner DCO QOZB 38-15 QB, LLC Contractor GI ENDURANT LLC Filer URBAN EXPEDITING LLC | TEMPORARY SUPPORT OF EXCAVATION, SCOPE INCLUDES PIPE PILE SOLDIER PILE AND TIMBER LAGGING. SOE FOR INSTALLATION OF THE PROPOSED CON EDISION … |
| Q00491584 ↗ | 94-15 MERRICK BOULEVARD QUEENS | Alteration CO | Permit Issued | 04/08/2021 | 12/03/2025 | Design GERALD CALIENDO ARCHITECTS Owner ROYAL WASTE SERVICES Contractor RFP CONSTRUCTION INC | HEREWITH FILING ST APPLICATION FOR CANOPY STRUCTURE DESIGN ON EXIST ALT-1BLDG FILED IN CONJUNCTION TO DOB JOB# Q00491584-I1 |
| Q01315339 ↗ | 97-77 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 11/18/2025 | 12/02/2025 | Design CARLTON ARCHITECTURE,PC Owner LEFRAK PROPERTY MGMT Contractor ASTOR & STONE INC | CONSTRUCTION AT EXISTING FIRESTAIR T OF NEW NON-LOAD BEARING PARTITIONS AND NEW 2 HRRATED GYP SOFFIT, FROM CELLAR LEVEL TO TOWER FLOOR. |
| M00936949 ↗ | 357 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 10/25/2023 | 12/01/2025 | Owner MAXWELL-KATES, INC. Contractor SPEEDWAY PLUMBING CORP | FILING FOR MODIFICATION TO EXIST. GAS PLMBG. SYSTEM INVOLVING THE INSTALLATION OF 1 NEW GAS METER & 7 GAS METERS AT CELLAR, AND NEW GAS PIPI… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/27/2026 | Fire-Resistant Penetrations and Joints | 107-15 JAMAICA AVENUE | EDWARD TOROSSIAN | special |
| 08/24/2026 | Heating Systems | 989 AVENUE OF THE AMERICAS | EDWARD TOROSSIAN | special |
| 08/24/2026 | HVAC-R and service water heating equipment | 989 AVENUE OF THE AMERICAS | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | HVAC-R and service water piping design and insulation | 989 AVENUE OF THE AMERICAS | EDWARD TOROSSIAN | energy_progress |
| 08/24/2026 | HVAC-R and service water heating system controls | 989 AVENUE OF THE AMERICAS | EDWARD TOROSSIAN | energy_progress |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | 107-15 JAMAICA AVENUE | EDWARD TOROSSIAN | special |
| 08/20/2026 | Final | 107-15 JAMAICA AVENUE | EDWARD TOROSSIAN | progress |
| 08/20/2026 | Interior lighting power | 107-15 JAMAICA AVENUE | EDWARD TOROSSIAN | energy_progress |
| 08/20/2026 | Lighting controls | 107-15 JAMAICA AVENUE | EDWARD TOROSSIAN | energy_progress |
| 08/20/2026 | Sprinkler Systems | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | special |
| 08/19/2026 | Final | 1 NORTH END AVENUE | JONAR MADRIAGA | progress |
| 08/19/2026 | Footing and Foundation | 1 NORTH END AVENUE | JONAR MADRIAGA | progress |
| 08/19/2026 | Structural Steel - Welding | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/19/2026 | Structural Steel - High Strength Bolting | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/19/2026 | Structural Steel - Details | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/19/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 1 NORTH END AVENUE | EDWARD TOROSSIAN | special |
| 08/19/2026 | Subsurface Investigations (Borings/Test Pits) | 1 NORTH END AVENUE | Ahmed Abdelmohsen | special |
| 08/19/2026 | Structural Stability – Alterations of existing buildings | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/19/2026 | Subgrade Inspections | 1 NORTH END AVENUE | EDWARD TOROSSIAN | special |
| 08/19/2026 | Concrete - Cast-In-Place | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/18/2026 | Post-installed Anchors | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Sprinkler Systems | 34 WEST 38 STREET | JAIME MOYA | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 34 WEST 38 STREET | JAIME MOYA | special |
| 08/18/2026 | Standpipe Systems | 34 WEST 38 STREET | JAIME MOYA | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Post-installed Anchors | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Post-installed Anchors | 59-17 JUNCTION BOULEVARD | EDWARD TOROSSIAN | special |
| 08/18/2026 | Footing and Foundation | 1 NORTH END AVENUE | JONAR MADRIAGA | progress |
| 08/18/2026 | Final | 1 NORTH END AVENUE | JONAR MADRIAGA | progress |
| 08/18/2026 | Subsurface Investigations (Borings/Test Pits) | 1 NORTH END AVENUE | Ahmed Abdelmohsen | special |
| 08/18/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 1 NORTH END AVENUE | EDWARD TOROSSIAN | special |
| 08/18/2026 | Subgrade Inspections | 1 NORTH END AVENUE | EDWARD TOROSSIAN | special |
| 08/18/2026 | Structural Steel - Welding | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/18/2026 | Structural Steel - High Strength Bolting | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/18/2026 | Structural Steel - Details | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/18/2026 | Structural Stability – Alterations of existing buildings | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/18/2026 | Concrete - Cast-In-Place | 1 NORTH END AVENUE | JONAR MADRIAGA | special |
| 08/12/2026 | Concrete - Cast-In-Place | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | special |
| 08/12/2026 | Deep Foundation Elements | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | special |
| 08/12/2026 | Structural Stability – Alterations of existing buildings | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | special |
| 08/12/2026 | Final | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | progress |
| 08/12/2026 | Footing and Foundation | 2655 RICHMOND AVENUE | EDWARD TOROSSIAN | progress |
| 08/12/2026 | Final | 97-77 QUEENS BOULEVARD | BAUER DERMEL | progress |
| 08/12/2026 | Masonry | 97-77 QUEENS BOULEVARD | EDWARD TOROSSIAN | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | 97-77 QUEENS BOULEVARD | EDWARD TOROSSIAN | special |
| 08/11/2026 | Sprinkler Systems | 38 WEST 57 STREET | — | special |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | 38 WEST 57 STREET | — | special |
| 08/11/2026 | Post-installed Anchors | 38 WEST 57 STREET | — | special |