← Back
Walk-up cooperative
104 PIERREPONT STREET
BROOKLYN · BIN 3001998
💬 Discuss this project
1858Year Built
4Stories
C6Building Class
R7-1Zoning
7,675 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Walk-up cooperative · 2,500 sf lot · 3.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Floor 22p · 1 filing · 15 docs
Floor 15p · 2 filings · 20 docs
Basement8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
104 PIERREPONT OWNERS CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POVERO AND COMPANY507/19/2022
A DEGREE OF FREEDOM STRUCTURAL ENGI202/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DP FLYNN PLBG & HTG INCPlumbing507/08/2026
MARTANY TILE CORPGeneral Contractor307/08/2026
MARIO SCANDURAElectrical103/21/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827202/09/2022
Building Lifecycle
All (39)Filed (7)Permit Issued (5)Signed Off (3)Violation (11)Inspection (5)Special Inspection (8)
11/04/2022
Violation issued (HPD, closed)
I
09/09/2022
Signed off — Alteration
ENLARGEMENT OF EXISTING DOOR OPENINGS IN EXISTING INTERMEDIATE BRICK MASONRY LOAD BEARING WALL AT 1st FLOOR AND BASEMENT (GARDEN) FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00557688-I1
08/31/2022
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522750-I1
08/31/2022
Signed off — Alteration
INTERIOR DEMOLITION AND INSTALLATION OF PARTITIONS, DOORS, WINDOW FRAMES AND CEILING MODIFICATIONS ON THE FIRST AND BASEMENT FLOORS AND FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522048-I1
07/19/2022
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522750-P2
05/11/2022
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522750-P1
04/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/28/2022
Permit issued — Plumbing
B00522750-I1-PL
03/23/2022
Special inspection requirement — Final
Jeffery Povero
03/17/2022
Filed — Alteration
INTERIOR DEMOLITION AND INSTALLATION OF PARTITIONS, DOORS, WINDOW FRAMES AND CEILING MODIFICATIONS ON THE FIRST AND BASEMENT FLOORS AND FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522048-P1
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2022
Filed — Alteration
ENLARGEMENT OF EXISTING DOOR OPENINGS IN EXISTING INTERMEDIATE BRICK MASONRY LOAD BEARING WALL AT 1st FLOOR AND BASEMENT (GARDEN) FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00557688-P1
02/08/2022
Special inspection requirement — Masonry
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
02/08/2022
Special inspection requirement — Final
JONAR MADRIAGA
12/22/2021
Violation issued (ECB, closed)
Construction
11/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2021
Permit issued — Structural
B00557688-I1-ST
08/03/2021
Filed — Alteration
ENLARGEMENT OF EXISTING DOOR OPENINGS IN EXISTING INTERMEDIATE BRICK MASONRY LOAD BEARING WALL AT 1st FLOOR AND BASEMENT (GARDEN) FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00557688-I1
08/02/2021
Permit issued — Plumbing
B00522750-I1-PL
07/21/2021
Permit issued — Plumbing
B00522750-I1-PL
07/13/2021
Permit issued — General Construction
B00522048-I1-GC
07/06/2021
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522750-I1
07/06/2021
Filed — Alteration
INTERIOR DEMOLITION AND INSTALLATION OF PARTITIONS, DOORS, WINDOW FRAMES AND CEILING MODIFICATIONS ON THE FIRST AND BASEMENT FLOORS AND FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00522048-I1
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
01/24/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/31/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDP FLYNN PLBG & HTG INC03/28/2022
DOB NOWStructuralSigned-offMARTANY TILE CORP08/13/2021
DOB NOWPlumbingSigned-offDP FLYNN PLBG & HTG INC08/02/2021
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP07/21/2021
DOB NOWGeneral ConstructionSigned-offMARTANY TILE CORP07/13/2021
BISPLISSUEDCHINATOWN PLBG & HTG INC05/11/1999
BISOTISSUEDICI CONSTRUCTION04/30/1999
1 project · most recent 05/12/2022
General Wiring
FiledStatusContractorScope
05/12/2022CompleteUPDATE SYSTEMS ELECTRICALGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/23/2022FinalJeffery Poveroprogress
02/08/2022MasonryJONAR MADRIAGAspecial
02/08/2022Post-installed AnchorsJONAR MADRIAGAspecial
02/08/2022Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
02/08/2022Structural Steel - DetailsJONAR MADRIAGAspecial
02/08/2022Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
02/08/2022Structural Steel - WeldingJONAR MADRIAGAspecial
02/08/2022FinalJONAR MADRIAGAprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00522750-I1Request digital key ↗
09/01/2026B00522750-P2Request digital key ↗
09/01/2026B00522750-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
09/01/2026B00522048-P1Open ↗
09/01/2026B00522048-I1Open ↗
08/13/2026B00557688-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00522750-P2Open ↗
09/01/2026B00522750-P1Open ↗
09/01/2026B00522750-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00557688-P1Open ↗
09/01/2026B00557688-P1Open ↗
09/01/2026B00557688-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00557688-P1Open ↗
08/29/2026B00522048-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00522750-P2Open ↗
09/01/2026B00522750-P1Open ↗
09/01/2026B00522750-I1Open ↗
Showing 3 of 7 on file for this type