← Back
Miscellaneous asylum / home
1041 BERGEN STREET
BROOKLYN · BIN 3030352
💬 Discuss this project
1931Year Built
4Stories
N9Building Class
R6BZoning
6,304 sfGross Floor Area
20Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Miscellaneous asylum / home · Owner of record: ANCHOR HOUSE INC · 4,050 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof8p · 3 filings · 20 docs
Floor 43p · 2 filings · 20 docs
Floor 37p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 1Under Construction3p · 2 filings · 20 docs
CellarUnder Construction17p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAHN ARCHITECTS607/15/2026
LERA CONSULTING STRUCTURAL ENGINEER105/12/2026
BLACK SHEEP ENGINEERING GROUP112/18/2025
O&S ASSOCIATES407/15/2025
BKH ARCHITECT, PLLC111/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE MECHANICAL CORPGeneral Contractor303/21/2026
CS BRIDGE CORPGeneral Contractor104/09/2026
THE J. PILLA GROUP LTDGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344407/15/2026
BKH ARCHITECT, PLLC6255211/16/2023
Building Lifecycle
All (138)Filed (13)Permit Issued (3)Signed Off (1)Violation (60)Objection (31)Special Inspection (30)
07/15/2026
Filed — Alteration CO
REMOVE AND INSTALL PLUMBING FIXTURES, SPRINKLER HEADS AND PIPING. INSTALL NEW BOOSTER PUMP. INSTALL NEW SIAMESE CONNECTION.
B00789457-P4
05/28/2026
Objection raised — Other
05/21/2026
Objection raised — Other
05/12/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH WINDOW REMOVAL/TEMP INFILL PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01382636-S1
05/01/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH WINDOW REMOVAL/TEMP INFILL PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01382636-I1
05/01/2026
Violation issued (HPD, open)
A
05/01/2026
Special inspection requirement — Air barrier - visual inspection
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Special inspection requirement — Insulation placement and R values
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Admin
04/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/03/2026
Special inspection requirement — Final
04/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/21/2026
Permit issued — General Construction
B01324719-I1-GC
01/02/2026
Special inspection requirement — Final
MINA HANNA
01/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
12/31/2025
Filed — Alteration
REMOVE EXISTING WINDOW, MASONRY AND SLAB, AND INSTALL DOOR AND STAIRS FOR TEMPORARY 2ND MEANS OF EGRESS FROM CELLAR TO BERGEN STREET. RELATED ALT-CO #B00789457.
B01324719-P1
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/30/2025
Special inspection requirement — Final
12/24/2025
Filed — Alteration
REMOVE EXISTING WINDOW, MASONRY AND SLAB, AND INSTALL DOOR AND STAIRS FOR TEMPORARY 2ND MEANS OF EGRESS FROM CELLAR TO BERGEN STREET. RELATED ALT-CO #B00789457.
B01324719-I1
12/18/2025
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01328003-I1
12/18/2025
Permit issued — Sidewalk Shed
B01328003-I1-SH
08/28/2025
Objection raised — Mechanical
08/28/2025
Objection raised — Fire_Protection
07/25/2025
Objection raised — Zoning
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
07/16/2025
Filed — Alteration CO
REMOVE AND INSTALL PLUMBING FIXTURES, SPRINKLER HEADS AND PIPING. INSTALL NEW BOOSTER PUMP. INSTALL NEW SIAMESE CONNECTION.
B00789457-P1
07/15/2025
Filed — Alteration CO
REMOVE AND INSTALL PLUMBING FIXTURES, SPRINKLER HEADS AND PIPING. INSTALL NEW BOOSTER PUMP. INSTALL NEW SIAMESE CONNECTION.
B00789457-P2
07/15/2025
Filed — Alteration CO
REMOVE AND INSTALL PLUMBING FIXTURES, SPRINKLER HEADS AND PIPING. INSTALL NEW BOOSTER PUMP. INSTALL NEW SIAMESE CONNECTION.
B00789457-P3
07/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
07/14/2025
Special inspection requirement — Shutoff dampers
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/14/2025
Special inspection requirement — Sprinkler Systems
07/14/2025
Special inspection requirement — Standpipe Systems
07/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/14/2025
Special inspection requirement — Maintenance information
07/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/14/2025
Special inspection requirement — Heating Systems
07/14/2025
Special inspection requirement — Mechanical Systems
07/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/06/2025
Violation issued (HPD, closed)
A
07/17/2024
Objection resolved — Addressed
04/19/2024
Objection resolved — Addressed
04/09/2024
Violation issued (HPD, closed)
A
03/05/2024
Objection resolved — Addressed
02/12/2024
Objection resolved — Addressed
02/12/2024
Objection resolved — Addressed
01/31/2024
Violation issued (FDNY_NOV, closed)
01/30/2024
Objection raised — Admin
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTHE J. PILLA GROUP LTD01/21/2026
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP12/18/2025
DOB NOWMechanical SystemsSigned-offUNIQUE MECHANICAL CORP11/21/2023
BISPLISSUEDBAYRIDGE MECHANICAL CORP10/16/1996
BIS—RE-ISSUEDCOSA DEVELOPMENT CO04/04/1996
BIS—ISSUEDCOSA DEVELOPMENT CO03/14/1996
BISPLISSUEDBAY RIDGE MECHANICAL, CORPORATIO02/07/1995
BISEQISSUEDCOSA DEVELOPMENT CO01/17/1995
BIS—ISSUEDCOSA DEVELOPMENT CO01/17/1995
1 project · most recent 07/15/2026
Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/15/2026——Air Conditioning Systems, Refrigeration Systems
Cooling
Oxygen8 C220U 2,100 CFM ×2
Refrigeration
Omniteam OTKC-AC-H-4-0-3-4 9,400,000 BTU · Refrigeration Unit ×4
1 project · most recent 07/15/2026
Sprinkler System
FiledStatusContractorScope
07/15/2026——Sprinkler System
1 project · most recent 07/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2026——Gas, Water/Sanitary
3 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedCOUNTY ELECL CONTRACTOR I—
03/30/2026Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
12/19/2025Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 05/12/2026
FiledStatusContractorScope
05/12/2026——1 scope_items
1 project · most recent 12/18/2025
Sidewalk Shed
FiledStatusContractorScope
12/18/2025Permit IssuedCS BRIDGE CORPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/01/2026Air barrier - visual inspection—energy_progress
04/30/2026Insulation placement and R values—energy_progress
04/03/2026Structural Stability – Alterations of existing buildings—special
04/03/2026Final—progress
04/03/2026Tenant Protection Plan Compliance—special
01/02/2026FinalMINA HANNAprogress
01/02/2026Tenant Protection Plan ComplianceMINA HANNAspecial
12/30/2025Tenant Protection Plan Compliance—special
12/30/2025Final—progress
07/24/2025Tenant Protection Plan ComplianceMINA HANNAspecial
07/24/2025Energy Code Compliance InspectionsMINA HANNAprogress
07/24/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
07/24/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
07/14/2025Duct leakage testing, insulation and design—energy_progress
07/14/2025Shutoff dampers—energy_progress
07/14/2025Fire-Resistant Penetrations and Joints—special
07/14/2025Sprinkler Systems—special
07/14/2025Standpipe Systems—special
07/14/2025Tenant Protection Plan Compliance—special
07/14/2025HVAC-R and service water heating system controls—energy_progress
07/14/2025Maintenance information—energy_progress
07/14/2025HVAC-R and service water heating equipment—energy_progress
07/14/2025HVAC-R and service water piping design and insulation—energy_progress
07/14/2025HVAC-R and service water heating equipment—energy_progress
07/14/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 46.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00962775-I1Request digital key ↗
08/21/2026B00789457-S1Request digital key ↗
08/21/2026B00789457-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026B00962775-I1Open ↗
08/21/2026B00789457-P4Open ↗
08/21/2026B00789457-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026B00789457-I1Open ↗
08/25/2026B00789457-I1Open ↗
08/22/2026B01324719-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/25/2026B00789457-I1Open ↗
08/25/2026B00789457-I1Open ↗
08/22/2026B01324719-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026B00789457-S1Open ↗
08/13/2026B00789457-P2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/21/2026B00789457-P4Open ↗
08/13/2026B00789457-I1Open ↗
08/13/2026B00789457-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00789457-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01324719-I1Open ↗
08/13/2026B01324719-P1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/21/2026B00789457-P4Open ↗
08/19/2026B01324719-I1Open ↗
08/17/2026B01382636-I1Open ↗
Showing 3 of 13 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/21/2026B00789457-P4Open ↗
08/21/2026B00789457-P1Open ↗
08/21/2026B00789457-I1Open ↗