← Back
BuildNYC
Walk-up apt, over six families with stores
1041 UNIVERSITY AVENUE
BRONX · BIN 2003496
💬 Discuss this project
1927Year Built
5Stories
C7Building Class
R7-1Zoning
99,975 sfGross Floor Area
72Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: NYC Department of Homeless Services · 17,686 sf lot · 5.65 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Department of Homeless Services903/22/2026
NYC Department of Design and Construction503/21/2026
New York City Housing Authority403/21/2026
HRA303/21/2026
DHS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AP Professional Engineering106/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Elmhurst ElectricElectrical203/21/2026
Coast GroupScaffold203/21/2026
Active Fire ExtinguisherFire Protection103/21/2026
Nikolai Design SystemsGeneral Contractor103/21/2026
Danica Plumbing & HeatingPlumbing103/21/2026
Apex MechanicalPlumbing206/10/2016
Danica PLG & HeatingFire Protection112/23/1994
Rashel ConstructionGeneral Contractor307/27/2015
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/29/2026
Atoi observed in basement, corroded junction box with exposed wires and zone valve missing electrical cover allowing wires to be exposed. Creating…
ECB violation · open
03/10/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/23/2025
C-11-01: Failed to provide a person holding a valid Certificate of Fitness for fire protection system at premises, in violation of FC901.6.
FDNY_ORDER violation · closed
10/23/2025
GP-9: Failed to maintain required fire-rated construction of fire barriers and/or horizontal assemblies in good order, in violation of FC703.1.
FDNY_ORDER violation · closed
106 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Coast Group—
BIS—Nikolai Design Systems—
BIS—Apex Mechanical—
BIS—Apex Mechanical—
BIS—Rashel Construction—
BIS—Rashel Construction—
BIS—Rashel Construction—
BIS—Danica Plumbing & Heating—
BIS—Danica Plumbing & Heating—
BIS—Danica Plumbing and Heating—
BIS—M.A. Angeliades—
BIS—Active Fire Extinguisher—
BIS—Danica PLG & Heating—
BIS—Iason Construction—
BIS—Iason Building Construction—
BIS—Iason Construction—
BIS—Iason Building Construction—
BIS—Danica Plumbing and Heating—
BIS—Iason Construction—
BIS—Iason Building Construction—
BIS—Iason Construction—
Nothing on file for this building.
Nothing on file for this building.
97 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account