Elevator apt, semi-fireproof without stores
1049 EAST GUN HILL ROAD
BRONX · Williamsbridge-Olinville · BIN 2094953
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R6AZoning
53,738 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: 1039 GUN HILL ROAD I LLC · 18,000 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof11p · 2 filings · 20 docs
Floor 722p · 2 filings · 20 docs
Floor 619p · 2 filings · 20 docs
Floor 518p · 2 filings · 20 docs
Floor 418p · 2 filings · 20 docs
Floor 378p · 2 filings · 20 docs
Floor 277p · 2 filings · 20 docs
Floor 188p · 7 filings · 20 docs
Site & exterior69p · 3 filings · 20 docs
Filed — no permit issued10p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RBA DEVELOPERS5709/13/2026
APO REALTY903/21/2026
KINGS GROUP NY407/08/2026
J&H ELECTRICAL CONTRACTING INC103/22/2026
1039 GUN HILL ROAD I LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2024$27.0M—— → —$503/sf building
12/27/2021$4.2M—APO REALTY INC. → 1039 GUN HILL LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & R HOME IMPROVEMENT &General Contractor1207/08/2026
J H ELECTRICAL CONT INC 004807General Contractor303/22/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
CHRISTOPHER DUNLEAVYElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
NEW LINE CONSTRUCTION LLCGeneral Contractor104/08/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
J&E SMOOTH TRANSFORMATIONGeneral Contractor107/08/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
NEW YORK PARK PLBG&HTG COElectrical103/21/2026
YOLAND CONSTRUCTION & METElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC62321108/18/2026
AUTOMATED DESIGN CONSULTA895304/10/2024
G ENGINEERING PC7778109/19/2022
Building Lifecycle
All (100)Filed (20)Permit Issued (15)Signed Off (10)Violation (3)Inspection (16)Objection (6)Special Inspection (30)
08/21/2026
Special inspection requirement — Lighting in dwelling units
Darlyn Alvarez
08/21/2026
Special inspection requirement — Exterior lighting power
Darlyn Alvarez
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
08/21/2026
Special inspection requirement — Fenestration areas
Darlyn Alvarez
08/21/2026
Special inspection requirement — Insulation placement and R values
Darlyn Alvarez
08/21/2026
Special inspection requirement — Metering
Darlyn Alvarez
08/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Darlyn Alvarez
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Darlyn Alvarez
08/21/2026
Special inspection requirement — Interior lighting power
Darlyn Alvarez
08/21/2026
Special inspection requirement — Maintenance information
Darlyn Alvarez
08/21/2026
Special inspection requirement — Electric vehicle service equipment requirements
Darlyn Alvarez
08/21/2026
Special inspection requirement — Protection of exposed foundation insulation
Darlyn Alvarez
08/21/2026
Special inspection requirement — Permanent certificate
Darlyn Alvarez
08/21/2026
Special inspection requirement — Fenestration air leakage
Darlyn Alvarez
08/21/2026
Special inspection requirement — Subgrade Inspections
Darlyn Alvarez
08/21/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Darlyn Alvarez
08/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Darlyn Alvarez
08/21/2026
Special inspection requirement — Masonry
Darlyn Alvarez
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Darlyn Alvarez
08/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Darlyn Alvarez
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Darlyn Alvarez
08/21/2026
Special inspection requirement — Lighting controls
Darlyn Alvarez
08/21/2026
Special inspection requirement — Air barrier - visual inspection
Darlyn Alvarez
08/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Darlyn Alvarez
08/21/2026
Special inspection requirement — Vestibules
Darlyn Alvarez
08/21/2026
Special inspection requirement — Air barrier — testing
Darlyn Alvarez
08/21/2026
Special inspection requirement — Air barrier continuity plan testing
Darlyn Alvarez
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Darlyn Alvarez
08/21/2026
Special inspection requirement — Electrical motors and elevators
Darlyn Alvarez
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Darlyn Alvarez
08/18/2026
Filed — New Building
New 7 Story Residential Building
X00693446-P8
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2026
Signed off — Alteration
X01384318-I1
05/19/2026
Signed off — Alteration
X01377831-I1
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/30/2026
Permit issued — Plumbing
X01384318-I1-PL
04/28/2026
Permit issued — Mechanical Systems
X01377831-I1-MS
04/27/2026
Filed — Alteration
X01384318-I1
04/27/2026
Filed — Alteration
X01377831-I1
11/18/2025
Filed — New Building
New 7 Story Residential Building
X00693446-P7
08/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Permit issued — General Construction
X00693446-I1-GC
06/23/2025
Objection raised — Admin
06/23/2025
Objection resolved — Addressed
06/19/2025
Filed — New Building
New 7 Story Residential Building
X00693446-P6
06/16/2025
Violation issued (HPD, closed)
A
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2025
Filed — New Building
New 7 Story Residential Building
X00693446-P5
09/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/16/2024
Objection raised — Other
05/16/2024
Objection resolved — Addressed
05/13/2024
Filed — New Building
New 7 Story Residential Building
X00693446-P4
05/07/2024
Signed off — Alteration
Temporary construction fence to secure property (560.00lf). Construction fence filed in Conjunction with NB#X00693446.
X00703165-I1
05/06/2024
Signed off — New Building
New 7 Story Residential Building
X00693446-S2
05/06/2024
Signed off — New Building
New 7 Story Residential Building
X00693446-S1
05/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2024
Signed off — Alteration
X00859289-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC04/30/2026
DOB NOWMechanical SystemsSigned-offJ&E SMOOTH TRANSFORMATION04/28/2026
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC07/07/2025
DOB NOWCurb CutSigned-offA & R HOME IMPROVEMENT &04/02/2024
DOB NOWMechanical SystemsSigned-offA & R HOME IMPROVEMENT &03/25/2024
DOB NOWGeneral ConstructionPermit IssuedA & R HOME IMPROVEMENT &10/19/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN08/11/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/10/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/10/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC05/10/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/25/2023
DOB NOWStructuralSigned-offA & R HOME IMPROVEMENT &11/15/2022
DOB NOWFoundationSigned-offA & R HOME IMPROVEMENT &06/02/2022
DOB NOWGeneral ConstructionSigned-offA & R HOME IMPROVEMENT &04/21/2022
DOB NOWConstruction FenceSigned-offA & R HOME IMPROVEMENT &04/07/2022
BISMHISSUEDCITYWIDE GENERAL CONSTRUC04/14/2016
BISPLISSUEDPROGRAM UNLIMITED P&H INC03/25/2016
BISMHISSUEDCITYWIDE GENERAL CONSTRUC03/23/2016
BISOTISSUEDPRO LINE INDUSTRIES INC05/20/2011
BISEQISSUEDPRO LINE INDUSTRIES INC05/20/2011
BISPLISSUEDHYDRO MECHANICAL INC05/19/2003
BISOTISSUEDPIECE MANAGEMENT INC05/14/2003
1 project · most recent 08/18/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedNEW LINE CONSTRUCTION LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Amana PTH073G35AXXX 7,600 BTU · Heat Pump Outdoor ×121
PTH123G50AXXX 12,000 BTU · Heat Pump Outdoor ×39
PTH153G50AXXX 14,000 CFM · Heat Pump Outdoor ×7
Cadet CEC163TW 5,115 BTU · Electric Heater ×22
Ventilation
Broan Series 423001 150 CFM · Kitchen Exhaust ×79
Fantech REC8XL 320 CFM · Erv ×13
REC6 180 CFM · Erv ×10
REC10XL 675 CFM · Erv ×1
1 project · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Signed-offA M B MECHANICAL INCStorm, Water/Sanitary
2 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
07/25/2023CompleteJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/17/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
08/21/2026HVAC-R and service water heating equipmentDarlyn Alvarezenergy_progress
08/21/2026Exterior lighting powerDarlyn Alvarezenergy_progress
08/21/2026MeteringDarlyn Alvarezenergy_progress
08/21/2026Fenestration air leakageDarlyn Alvarezenergy_progress
08/21/2026Electrical motors and elevatorsDarlyn Alvarezenergy_progress
08/21/2026Permanent certificateDarlyn Alvarezenergy_progress
08/21/2026HVAC-R and service water piping design and insulationDarlyn Alvarezenergy_progress
08/21/2026Air barrier continuity plan testingDarlyn Alvarezenergy_progress
08/21/2026Insulation placement and R valuesDarlyn Alvarezenergy_progress
08/21/2026Protection of exposed foundation insulationDarlyn Alvarezenergy_progress
08/21/2026Air barrier — testing Darlyn Alvarezenergy_progress
08/21/2026VestibulesDarlyn Alvarezenergy_progress
08/21/2026Electric vehicle service equipment requirementsDarlyn Alvarezenergy_progress
08/21/2026Fenestration and door U-factor and product ratingsDarlyn Alvarezenergy_progress
08/21/2026Air barrier - visual inspectionDarlyn Alvarezenergy_progress
08/21/2026Subgrade InspectionsDarlyn Alvarezspecial
08/21/2026Subsurface Investigations (Borings/Test Pits)Darlyn Alvarezspecial
08/21/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDarlyn Alvarezspecial
08/21/2026Excavations - Sheeting, Shoring, and BracingDarlyn Alvarezspecial
08/21/2026MasonryDarlyn Alvarezspecial
08/21/2026Concrete - Cast-In-PlaceDarlyn Alvarezspecial
08/21/2026Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
08/21/2026Energy Code Compliance InspectionsDarlyn Alvarezprogress
08/21/2026Fire-Resistance Rated ConstructionDarlyn Alvarezprogress
08/21/2026Interior lighting powerDarlyn Alvarezenergy_progress
Latest 25 of 93.
▾Documents — 246 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/24/2026X00703165-I1Request digital key ↗
08/24/2026X00709007-I1Request digital key ↗
08/24/2026X00717040-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
03/24/2025200787853Open ↗
05/16/2024200794532Open ↗
09/21/2023240346979Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
04/19/2016220520201Open ↗
03/29/2016220520201Open ↗
03/23/2016220520201Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/22/2023240346979Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram7
08/19/2026X00693446-P8Open ↗
08/13/2026X00693446-P6Open ↗
08/13/2026X00693446-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/19/2026X00693446-P8Open ↗
08/13/2026X00693446-P4Open ↗
08/13/2026X00693446-P7Open ↗
Showing 3 of 7 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/22/2023240346979Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00693446-I1Open ↗
▸Seals & Professional Certifications114
▸DOB NOWProgress Inspector Seal & Signature56
09/01/2026X00717040-I1Open ↗
08/28/2026X00717040-P1Open ↗
08/28/2026X00693446-S1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/01/2026X00717040-I1Open ↗
08/28/2026X00717040-P1Open ↗
08/28/2026X00693446-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026X00709007-I1Open ↗
08/24/2026X00717040-I1Open ↗
08/24/2026X00717040-P1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/15/2016220520201Open ↗
06/12/2012220120018Open ↗
05/21/2012220120018Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/15/2016220520201Open ↗
05/25/2011220120018Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/15/2016220520201Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/26/2023240346979Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/25/2011220120018Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026X00693446-P6Open ↗
08/13/2026X00693446-P5Open ↗
08/13/2026X00693446-P7Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/06/2016220520201Open ↗
03/15/2016220520201Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist7
08/19/2026X00693446-P8Open ↗
08/13/2026X00693446-P7Open ↗
08/13/2026X00693446-P4Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
09/22/2023240346979Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/22/2023240346979Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/22/2023240346979Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00693446-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00693446-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00693446-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026X00717040-I1Open ↗
08/24/2026X00717040-P1Open ↗
08/24/2026X00744184-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/24/2011220120018Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/15/2016220520201Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00693446-S2Open ↗
08/13/2026X00693446-S1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/15/2016220520201Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00693446-I1Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT8
08/19/2026X00693446-P8Open ↗
08/13/2026X00744184-I1Open ↗
08/13/2026X00693446-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00693446-I1Open ↗
08/13/2026X00744184-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00693446-I1Open ↗
08/13/2026X00744184-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00744184-I1Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026X00731906-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/26/2012220120018Open ↗
06/12/2012220120018Open ↗
05/31/2012220120018Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/25/2011220120018Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/15/2016220520201Open ↗
05/21/2012220120018Open ↗
05/25/2011220120018Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
06/30/2016220520201Open ↗
06/30/2016220520201Open ↗
06/16/2016220520201Open ↗
▸BISEFILING COVER SHEET2
03/15/2016220520201Open ↗
05/25/2011220120018Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2023240346979Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial7
08/19/2026X00693446-P8Open ↗
08/13/2026X00693446-P6Open ↗
08/13/2026X00693446-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/19/2026X00693446-P8Open ↗
08/13/2026X00693446-P1Open ↗
08/13/2026X00693446-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/23/2026X00693446-P7Open ↗
08/23/2026X00693446-I1Open ↗
08/23/2026X00693446-P5Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
09/22/2023240346979Open ↗
09/22/2023240346979Open ↗
09/22/2023240346979Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00693446-I1Open ↗