BuildNYC
Elevator co-op, conversion from loft/warehouse
105 5TH AVENUE
MANHATTAN · BIN 1016144
💬 Discuss this project
1902Year Built
11Stories
D0Building Class
C6-4MZoning
102,017 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized2 Active Violations 1 likely answered ▸FISP: SWARMPFDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: Folio House · 9,850 sf lot · 10.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOrsid Realty CORPUnder Construction25p · 3 filings · 20 docs
Floor 1116p · 1 filing · 20 docs
Floor 10Unit 10AB19p · 1 filing · 20 docs
Floor 9Sprinkler system installation16p · 1 filing · 14 docs
Floor 8Unit 8A, Unit 8D, Unit 9AB24p · 4 filings · 20 docs
Floor 7
Floor 6
Floor 5Unit 5ABUnder Construction11p · 1 filing · 16 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarSidewalk replacement and vault repair7p · 1 filing · 5 docs
Site & exteriorOrsid Realty CORPUnder Construction23p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Folio House15803/22/2026
Andrews Buildings303/21/2026
The Bromley Co303/21/2026
Shareholder203/21/2026
Viles Co203/21/2026
Villes203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs204/03/2026
Construction Management & Safety Con309/12/2025
Francisco D Perez PE202/07/2025
Bone/Levine Architects112/04/2024
PS Engineers212/13/2023
Framework Architecture210/23/2023
Bond Engineering106/07/2023
Adal Engineering702/17/2023
Griffin Ofiesh, R.A209/29/2022
GT Consulting Engineers209/23/2022
Gace105/28/2021
Green Design207/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates1203/21/2026
Big Orange Expediting803/21/2026
Municipal Building Consultants103/21/2026
A K Expediting203/21/2026
Atlantic Building Supply403/21/2026
Framework Architecture203/21/2026
PS Engineers403/21/2026
Severino Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triangle Enterprise NYC IScaffold1007/08/2026
Kings Group NYScaffold409/26/2026
SMD Construction GroupGeneral Contractor407/08/2026
Moonk EnterpriseGeneral Contractor307/08/2026
Vella InteriorsGeneral Contractor309/01/2026
Tribute Restorationspecialty_contractor304/09/2026
Expert Fire SprinklerFire Protection207/08/2026
Olympic Construction & POGeneral Contractor207/08/2026
A.M.NPlumbing207/08/2026
Tribute RestorationScaffold104/09/2026
Master 2 Plumbing & HeatingPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Smart Plumbing & HeatingPlumbing107/08/2026
New York Empire Electrical ConElectrical103/21/2026
Argon ElectricalElectrical103/21/2026
Electrical SolutionsElectrical103/21/2026
Icon ElectricElectrical103/22/2026
Vintage Electric ServiceElectrical103/21/2026
Nicaj GjeloshElectrical103/21/2026
AC Electrical ServicesElectrical103/21/2026
Scientific Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Francisco D. Perez PE3306304/24/2026
CMSC6098309/12/2025
Bone/Levine Architects307112/04/2024
Domani Inspection Service843410/23/2023
Rock Arch Engineering1760106/07/2023
Rock Arch Engineering7831106/07/2023
Adal Engineering4205902/17/2023
Building Lifecycle
All (211)Filed (29)Permit Issued (30)Signed Off (11)Facade (FISP) (16)Violation (60)Inspection (13)Objection (22)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
M01136542-S1-SH
08/31/2026
Permit issued — General Construction
M01255359-I1-GC
07/01/2026
Permit issued — Sidewalk Shed
M01136542-S1-SH
05/08/2026
Permit issued — Suspended Scaffold
M01363136-I1-SC
04/24/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01363136-I1
04/23/2026
Special inspection requirement — Post-installed Anchors
FRANCISCO PEREZ
04/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
04/06/2026
Permit issued — Supported Scaffold
M01136542-S2-SF
04/03/2026
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01136542-S2
03/30/2026
Permit issued — Sidewalk Shed
M01136542-S1-SH
03/26/2026
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01136542-S1
03/19/2026
Permit issued — General Construction
M01136542-I1-GC
03/19/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/24/2026
Signed off — Alteration
FILE TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00945394-I1
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Permit issued — Plumbing
M01255359-S1-PL
10/30/2025
Permit issued — Mechanical Systems
M01255359-S2-MS
09/15/2025
Permit issued — General Construction
M01255359-I1-GC
09/12/2025
Filed — Alteration
FILE PLUMBING WORK FOR FIFTH FLOOR APT. 5AB. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01255359-S1
09/12/2025
Filed — Alteration
FILE PLUMBING WORK FOR FIFTH FLOOR APT. 5AB. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01255359-S2
08/15/2025
Filed — Alteration
FILE PLUMBING WORK FOR FIFTH FLOOR APT. 5AB. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01255359-I1
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
EDUARD GRINFELD
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARD GRINFELD
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
EDUARD GRINFELD
07/14/2025
Special inspection requirement — Lighting in dwelling units
EDUARD GRINFELD
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARD GRINFELD
07/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
EDUARD GRINFELD
07/14/2025
Special inspection requirement — Interior lighting power
EDUARD GRINFELD
04/02/2025
Permit issued — Suspended Scaffold
M01201554-I1-SC
03/26/2025
Filed — Alteration
IRA facade inspection as per plans
M01201554-I1
03/17/2025
Signed off — Alteration
Installation of a new sprinkler head.
M00095158-I1
03/05/2025
Permit issued — Sprinklers
M00095158-I1-EW-SP
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANCISCO PEREZ
02/24/2025
Special inspection requirement — Sprinkler Systems
FRANCISCO PEREZ
02/14/2025
Objection resolved — Addressed
02/14/2025
Objection resolved — Addressed
02/14/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Admin
02/10/2025
Objection raised — Scope
02/10/2025
Objection raised — Scope
02/07/2025
Filed — Alteration
Installation of a new sprinkler head.
M00095158-P1
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANCISCO PEREZ
02/05/2025
Special inspection requirement — Sprinkler Systems
FRANCISCO PEREZ
12/04/2024
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01136542-I1
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Joseph Levine
12/04/2024
Special inspection requirement — Masonry
Joseph Levine
11/12/2024
Violation issued (HPD, open)
C
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, open)
C
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Levine
11/03/2024
Special inspection requirement — Final
Joseph Levine
12/13/2023
Filed — Alteration
FILE TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00945394-P1
11/30/2023
Signed off — Alteration
Mechanical work in conjunction with apartment renovation.
M00773503-I1
11/29/2023
Signed off — Alteration
Mechanical work in conjunction with apartment renovation.
M00773503-S2
11/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2023
Special inspection requirement — Final
Richard Gentzler
10/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
Latest 60 of 211 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/25/2026
DOB NOWGeneral ConstructionPermit IssuedVella Interiors08/31/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY07/01/2026
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration05/08/2026
DOB NOWSupported ScaffoldPermit IssuedKings Group NY04/06/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/30/2026
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration03/19/2026
DOB NOWPlumbingPermit IssuedMaster 2 Plumbing & Heating10/31/2025
DOB NOWMechanical SystemsPermit IssuedVella Interiors10/30/2025
DOB NOWGeneral ConstructionPermit IssuedVella Interiors09/15/2025
DOB NOWSuspended ScaffoldPermit IssuedElite Quality Construction & Contracting04/02/2025
DOB NOWSprinklersSigned-offExpert Fire Sprinkler03/05/2025
DOB NOWConstruction FenceSigned-offTribute Restoration10/23/2023
DOB NOWStructuralPermit IssuedTribute Restoration08/08/2023
DOB NOWGeneral ConstructionSigned-offSMD Construction Group03/20/2023
DOB NOWMechanical SystemsSigned-offSMD Construction Group03/20/2023
DOB NOWMechanical SystemsSigned-offMoonk Enterprise02/24/2023
DOB NOWGeneral ConstructionSigned-offMoonk Enterprise02/24/2023
DOB NOWGeneral ConstructionSigned-offOlympic Construction & PO12/15/2022
DOB NOWMechanical SystemsSigned-offSMD Construction Group11/25/2022
DOB NOWPlumbingSigned-offSmart Plumbing & Heating11/22/2022
DOB NOWGeneral ConstructionSigned-offSMD Construction Group11/21/2022
DOB NOWPlumbingSigned-offA.M.N07/08/2022
DOB NOWPlumbingSigned-offA.M.N02/02/2022
DOB NOWGeneral ConstructionSigned-offOlympic Construction & PO01/26/2022
DOB NOWSprinklersSigned-offExpert Fire Sprinkler03/11/2019
DOB NOWSupported ScaffoldSigned-offTriangle Enterprise NYC I10/26/2018
DOB NOWSidewalk ShedSigned-offTriangle Enterprise NYC I10/24/2018
DOB NOWSupported ScaffoldSigned-offTriangle Enterprise NYC I07/27/2018
DOB NOWSidewalk ShedSigned-offTriangle Enterprise NYC I07/27/2018
BISOTISSUEDHourican10/24/2019
BISPLISSUEDStephen Foy Mechanical Service09/10/2019
BISPLISSUEDMarathon Mechanical05/22/2019
BISPLISSUEDVMC Plumbing & Heating05/16/2019
BISOTISSUEDTsang Construction04/11/2019
BISOTISSUEDTechline Construction03/11/2019
BISPLISSUEDOrbit Plumbing & Heating02/28/2019
BISOTISSUEDRockaway Custom Cabinets02/27/2019
BISPLISSUEDAccurate Mechanical01/04/2019
BISOTISSUEDLti Construction12/19/2018
+ 40 more permits on file
2 projects · most recent 09/12/2025
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Permit IssuedVella InteriorsHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric Model# MXZ-SM48NAMHZ2-U1 48,000 BTU · Vrf Outdoor ×8
Model# PEFY-P18NMAU-E4 18,000 BTU · Vrf Indoor ×4
Model# PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×4
Model# PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×4
05/26/2021——Air Conditioning Systems—
1 project · most recent 09/12/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/12/2025Permit IssuedMaster 2 Plumbing & HeatingGas, Water/Sanitary
10 projects · most recent 03/12/2026
General Wiring
FiledStatusContractorScope
03/12/2026Permit IssuedHigh Quality Electric of NYC—
10/16/2025Permit IssuedMichael Brothers ElectricGeneral Wiring
04/03/2024CompleteLina ElectricGeneral Wiring
06/28/2023CompleteIcon ElectricGeneral Wiring
11/13/2022CompleteFalco Electrical ServicesGeneral Wiring
02/08/2022CompleteBelmont ElectricalGeneral Wiring
10/21/2019CompleteJorob Contracting & Electrical CoGeneral Wiring
10/01/2019CompleteNorlin Electrical ContractorsGeneral Wiring
07/25/2018CompleteRichard Neu—
02/16/2018CompleteDennison Electric—
1 project · most recent 05/28/2021
Steel Concrete
FiledStatusContractorScope
05/28/2021——Steel, Concrete
1 project · most recent 04/03/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/03/2026Permit IssuedKings Group NYScaffold, Sidewalk Shed
2 projects · most recent 04/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/24/2026Permit IssuedTribute RestorationSuspended Scaffold (SC)
03/26/2025Permit IssuedElite Quality Construction & Contracting—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
04/23/2026Post-installed AnchorsFRANCISCO PEREZspecial
04/23/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
07/18/2025Tenant Protection Plan ComplianceEDUARD GRINFELDspecial
07/18/2025Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
07/14/2025Energy Code Compliance InspectionsEDUARD GRINFELDprogress
07/14/2025Lighting in dwelling unitsEDUARD GRINFELDenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
07/14/2025Tenant Protection Plan ComplianceEDUARD GRINFELDspecial
07/14/2025Interior lighting powerEDUARD GRINFELDenergy_progress
02/24/2025Fire-Resistant Penetrations and JointsFRANCISCO PEREZspecial
02/24/2025Sprinkler SystemsFRANCISCO PEREZspecial
02/05/2025Fire-Resistant Penetrations and JointsFRANCISCO PEREZspecial
02/05/2025Sprinkler SystemsFRANCISCO PEREZspecial
12/04/2024Energy Code Compliance InspectionsJoseph Levineprogress
12/04/2024MasonryJoseph Levinespecial
11/04/2024Tenant Protection Plan ComplianceJoseph Levinespecial
11/03/2024FinalJoseph Levineprogress
10/30/2023FinalRichard Gentzlerprogress
10/30/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/30/2023Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/19/2023FinalRichard Gentzlerprogress
10/19/2023Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/19/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/22/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
02/02/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
Latest 25 of 39.
▾Documents — 1,057 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch21
09/06/2026M01363136-I1Request digital key ↗
09/06/2026M00065174-I1Request digital key ↗
09/06/2026M00065163-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00473315-I1Request digital key ↗
09/03/2026M00473315-P3Request digital key ↗
08/15/2026M00473315-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00471876-P1Request digital key ↗
09/03/2026M00471876-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/06/2026M00095158-I1Request digital key ↗
08/14/2026M00095158-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00473389-I1Request digital key ↗
▸Applications & Permits207
▸BISPLAN / WORK APPROVAL APPLICATION96
01/29/2025123077204Open ↗
01/31/2021102499271Open ↗
03/12/2020123782987Open ↗
Showing 3 of 96 on file for this type
▸BISWORK PERMIT APPLICATION91
10/24/2019123782987Open ↗
09/10/2019123782987Open ↗
08/14/2019123782987Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWLPC Approval/Permit19
09/03/2026M00473315-P2Open ↗
09/03/2026M00473315-I1Open ↗
09/03/2026M00518648-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications213
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION114
11/30/2020100803757Open ↗
08/13/2019103865122Open ↗
06/25/2019123782987Open ↗
Showing 3 of 114 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/06/2026M00065174-I1Open ↗
09/06/2026M00095158-P1Open ↗
09/06/2026M00095158-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
10/03/2026M01363136-I1Open ↗
10/03/2026M01363136-I1Open ↗
09/01/2026M00473315-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M01255359-I1Open ↗
09/01/2026M01255359-I1Open ↗
09/01/2026M00471876-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
08/20/2018123533809Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/20/2018123533809Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
02/21/2019140824044Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment96
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
03/13/2020123782987Open ↗
03/12/2020123782987Open ↗
10/16/2019123077204Open ↗
Showing 3 of 27 on file for this type
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING19
02/21/2019140824044Open ↗
Showing 1 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS14
02/04/2025123077204Open ↗
Showing 1 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHEATING SYSTEMS1
02/04/2025123077204Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/04/2025123077204Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes10
06/25/2019123782987Open ↗
10/30/2018123371127Open ↗
08/20/2018123533809Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos66
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
06/25/2019123782987Open ↗
04/17/2019122809648Open ↗
10/30/2018123371127Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/06/2026M00095158-I1Open ↗
09/03/2026M00473315-I1Open ↗
09/03/2026M00473315-P2Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/21/2019140824044Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance52
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
04/19/2019122809648Open ↗
01/14/2019123533809Open ↗
12/19/2018123371127Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
04/22/2019122809648Open ↗
01/14/2019123533809Open ↗
01/03/2018122547841Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/07/2025123077204Open ↗
02/07/2025123077204Open ↗
Showing 2 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/04/2025123077204Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/04/2025123077204Open ↗
▸BISLIGHTING CONTROLS1
02/04/2025123077204Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/04/2025123077204Open ↗
▸BISINTERIOR LIGHTING POWER1
02/04/2025123077204Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY12
02/07/2025123077204Open ↗
02/07/2025123077204Open ↗
10/22/2020123782987Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/12/2018121943665Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
02/04/2025123077204Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/22/2019122809648Open ↗
▸Approvals, Objections & Sign-offs129
▸BISLANDMARKS APPROVAL51
07/17/2019123782987Open ↗
06/25/2019123782987Open ↗
04/22/2019122809648Open ↗
Showing 3 of 51 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
02/07/2025123077204Open ↗
10/22/2020123782987Open ↗
10/16/2020103348101Open ↗
Showing 3 of 43 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
10/24/2019123782987Open ↗
02/28/2018123077204Open ↗
02/12/2018121943665Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLANDMARKS SIGNOFF3
02/04/2025123077204Open ↗
10/16/2020103348101Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER3
02/20/2018123077204Open ↗
01/24/2018104225893Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL1
02/04/2025123077204Open ↗
▸Cost, Insurance & Ownership84
▸BISCOST AFFIDAVIT79
02/06/2025123077204Open ↗
10/22/2020123782987Open ↗
08/13/2019103865122Open ↗
Showing 3 of 79 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026M00095158-I1Open ↗
▸Filing & Intake Forms121
▸BISADDITIONAL INFORMATION49
03/13/2020123782987Open ↗
06/25/2019123782987Open ↗
06/25/2019123782987Open ↗
Showing 3 of 49 on file for this type
▸BISEFILING COVER SHEET39
06/25/2019123782987Open ↗
10/30/2018123371127Open ↗
08/20/2018123533809Open ↗
Showing 3 of 39 on file for this type
▸BISBOROUGH INTAKE FORM27
03/12/2020123782987Open ↗
10/28/2019100803757Open ↗
10/16/2019123077204Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/21/2019140824044Open ↗
Showing 1 of 6 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
03/27/2019140824044Open ↗
01/03/2018122547841Open ↗
Showing 2 of 11 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M00843049-I1Open ↗
08/13/2026M00773503-I1Open ↗
08/13/2026M00773503-P1Open ↗
▸BISMAINTENANCE INFORMATION1
02/04/2025123077204Open ↗
▸DOB NOWCalculations1
09/06/2026M01363136-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01201554-I1Open ↗
▸DOB NOWManufacturer's Specifications1
09/06/2026M01363136-I1Open ↗