Elevator apt, fireproof with stores
Tribeca Tower
105 DUANE STREET · BIN 1001650
💬 Discuss this project
1988Year Built
53Stories
D6Building Class
C6-4Zoning
434,418 sfGross Floor Area
443Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: TRIBECA EQUITY PARTNERS L P · 25,831 sf lot · 16.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 17p · 6 filings · 20 docs
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIBECA EQUITY PARTNERS11107/08/2026
RELATED MANAGEMENT2007/08/2026
GOLF V2303/22/2026
RELATED303/22/2026
JDA RESTORATIONS INC103/22/2026
CRESCENT DUANE COMPANY103/22/2026
DEMATTEIS CONSTRUCTION203/22/2026
XLO CONCRETE CO.803/22/2026
SIMPSON ELECTRIC CORP103/22/2026
FEDEX103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO CONSULTING MANAGEMENT1803/21/2026
MESZAROS ENGINEERING PLLC203/21/2026
JAM CONSULTANTS, INC.803/21/2026
D R BROWN203/21/2026
ROBERT S SCHNITZER403/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERGEN DEVELOPMENT GROUPGeneral Contractor603/21/2026
KSW MECHANICAL,LLCGeneral Contractor603/21/2026
LINKED MECHANICAL LLCGeneral Contractor507/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor403/21/2026
PUMPING SOL PLBG & MECH IPlumbing207/08/2026
WILLIAM C. GERAKARIS P&HPlumbing207/08/2026
MILL BROOK FIRE PROTECTIONFire Protection107/08/2026
RIGHTWAY PLBG & HTG INCFire Protection107/08/2026
SBA NETWORK SERVICES LLCGeneral Contractor107/08/2026
TORLINA CONSTRUCTIONGeneral Contractor107/08/2026
PARAMOUNT PLBG & HTG CORPPlumbing107/08/2026
E.C. ELECL CONTRACTOR INCElectrical103/22/2026
N Y SIGN ARTScaffold107/08/2026
KRAFT ELECTRIC CORPElectrical103/22/2026
PARRISH, FENIQUEElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
ROCCO PROGANO IIIElectrical103/21/2026
SCIACCHITANO, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCALPINE ARCHITECTURE PC5694304/29/2024
GREGORY V. PEROTTO, P.E.9471004/29/2024
VINCENT J. LIOTTA P. E.1974104/01/2024
MEP INSPECTIONS, INC1102101/11/2024
CATALPA SPECIAL INSPECTIO2004401/11/2024
MESZAROS ENGINEERING PLLC963108/23/2023
LILKER ASSOCIATES CONSULT816404/14/2023
R MARSAC CONSULTING LLC329111/27/2018
Building Lifecycle
All (177)Filed (20)Permit Issued (20)Signed Off (14)Facade (FISP) (12)Violation (60)Inspection (13)Objection (8)Special Inspection (30)
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Accessibility
07/28/2026
Objection raised — Accessibility
07/28/2026
Objection raised — Accessibility
07/28/2026
Objection raised — Accessibility
06/29/2026
Filed — Alteration
Renovation of existing exterior plaza as approved City Planning Commission Special Permit number C190510ZSM to resolve ECB violation #35084549X. No structural modifications to existing slab are proposed.
M01416802-I1
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Final
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
09/25/2025
Violation issued (HPD, closed)
C
01/09/2025
Violation issued (ECB, closed)
Zoning
01/09/2025
Violation issued (ECB, closed)
Zoning
11/27/2024
Signed off — Alteration
#8824 Modification of Retail space with installation of non-load bearing partitions and replacement of existing split HVAC system. No change of Use occupancy or egress.
M01030051-I1
11/27/2024
Signed off — Alteration
M01030076-I1
10/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Signed off — Alteration
M01019337-I1
08/21/2024
Signed off — Alteration
INSTALLATION OF HVAC DUCTWORK AND DUCT SUPPORTS. NO CHANGE IN EGRESS OR OCCUPANCY.
M08028512-I1
07/24/2024
Signed off — Alteration
(AKA 109 DUANE STREET) F45-- Installation of plumbing fixtures in conjunction with health/fitness establishment build-out.
M00917465-I1
07/24/2024
Signed off — Alteration
M00960387-I1
07/24/2024
Signed off — Alteration
(AKA 109 DUANE STREET) F45--Installation of mechanical equipment and related distribution. No change to use, egress, or occupancy.
M00960408-I1
07/18/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2024
Permit issued — Sprinklers
M00920998-I1-EW-SP
06/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2024
Signed off — Alteration
Reface illuminated sign with new copy- F45 Training- No change of use, egress or occupancy
M01039715-I1
06/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2024
Permit issued — Sign
M01039715-I1-SG
06/12/2024
Permit issued — Plumbing
M01030076-I1-PL
06/10/2024
Filed — Alteration
Reface illuminated sign with new copy- F45 Training- No change of use, egress or occupancy
M01039715-I1
05/24/2024
Permit issued — Mechanical Systems
M01030051-I1-MS
05/15/2024
Permit issued — Mechanical Systems
M01019337-I1-MS
05/02/2024
Permit issued — General Construction
M01030051-I1-GC
04/29/2024
Filed — Alteration
#8824 Modification of Retail space with installation of non-load bearing partitions and replacement of existing split HVAC system. No change of Use occupancy or egress.
M01030051-I1
04/29/2024
Filed — Alteration
M01030076-I1
04/24/2024
Special inspection requirement — Lighting controls
David McAlpine
04/24/2024
Special inspection requirement — Interior lighting power
David McAlpine
04/22/2024
Special inspection requirement — Final
Richard Wainer
04/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
David McAlpine
04/03/2024
Special inspection requirement — Final
David McAlpine
04/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
David McAlpine
04/03/2024
Special inspection requirement — Mechanical Systems
David McAlpine
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McAlpine
04/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
04/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2024
Filed — Alteration
M01019337-I1
01/22/2024
Permit issued — Sprinklers
M00920998-I1-EW-SP
01/22/2024
Violation issued (HPD, closed)
C
01/19/2024
Signed off — Alteration
M00908366-I1
01/17/2024
Permit issued — General Construction
M00960387-I1-GC
01/17/2024
Permit issued — Mechanical Systems
M00960408-I1-MS
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC07/11/2024
DOB NOWSignSigned-offSKANSKA BUILDING INC06/17/2024
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP06/12/2024
DOB NOWMechanical SystemsSigned-offKSW MECHANICAL,LLC05/24/2024
DOB NOWMechanical SystemsSigned-offKSW MECHANICAL,LLC05/15/2024
DOB NOWGeneral ConstructionSigned-offPOWERGEN DEVELOPMENT GROUP05/02/2024
DOB NOWSprinklersSigned-offWILLIAM C. GERAKARIS P&H01/22/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND01/17/2024
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND01/17/2024
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H01/17/2024
DOB NOWGeneral ConstructionSigned-offTORLINA CONSTRUCTION11/28/2023
DOB NOWGeneral ConstructionSigned-offLINKED MECHANICAL09/27/2023
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL05/19/2023
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL03/16/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG & HTG INC03/10/2023
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL03/10/2023
DOB NOWGeneral ConstructionSigned-offPOWERGEN DEVELOPMENT GROUP02/28/2023
DOB NOWGeneral ConstructionSigned-offPOWERGEN DEVELOPMENT GROUP01/03/2023
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL07/15/2022
DOB NOWAntennaSigned-offSBA NETWORK SERVICES LLC07/31/2019
BISSPISSUEDSTANDARD FIRE PROTECT LLC12/13/2022
BISEQISSUEDROCK GROUP NY CORP03/23/2017
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/23/2016
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT05/23/2016
BISEQISSUEDROCK GROUP NY CORP04/12/2016
BISEQISSUEDROCK GROUP NY CORP03/22/2016
BISPLISSUEDJAG PLBG & MECH INC03/03/2016
BIS—ISSUEDACTIVE SIGNS INC02/04/2016
BIS—ISSUEDACTIVE SIGNS INC02/04/2016
BIS—ISSUEDACTIVE SIGNS INC02/04/2016
BISMHISSUEDTALISEN CONSTRUCTION CORP08/20/2015
BISBLISSUEDA. M. PLUMBING COMPANY08/20/2015
BISPLISSUEDA. M. PLUMBING COMPANY08/20/2015
BISOTISSUEDTALISEN CONSTRUCTION CORP08/20/2015
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP07/02/2015
BISMHISSUEDLEGACY BUILDERS/DEVELOPERS CORP07/02/2015
BISMHISSUEDLEGACY BUILDERS/DEVELOPERS CORP03/03/2015
BISMHISSUEDLINKED MECHANICAL LLC10/29/2014
BISPLISSUEDJAG PLBG & MECH INC10/10/2014
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP09/11/2014
+ 30 more permits on file
1 project · most recent 03/03/2023
FiledStatusContractorScope
03/03/2023Signed-offRIGHTWAY PLBG & HTG INC—
1 project · most recent 03/03/2023
Water/Sanitary
FiledStatusContractorScope
03/03/2023Signed-offPUMPING SOL PLBG & MECH IWater/Sanitary
9 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteP.S. MARCATO ELEV. CO INC—
05/14/2024CompleteWISE ELECTRICAL SVCS INCGeneral Wiring
01/18/2024CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
12/22/2023CompleteSUPREME ELECTRIC CORPGeneral Wiring
11/16/2022Permit IssuedWISE ELECTRICAL SVCS INC—
10/11/2022Permit IssuedROBERT CHIMENTI8 meters, 1 new_meters
11/12/2021CancelledKRAFT ELECTRIC CORP—
06/11/2019CompleteE.C. ELECL CONTRACTOR INCGeneral Wiring
03/01/2018CompleteDEMAND ELECTRIC INC—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
06/16/2026Tenant Protection Plan Compliance—special
06/15/2026Final—progress
04/24/2024Lighting controlsDavid McAlpineenergy_progress
04/24/2024Interior lighting powerDavid McAlpineenergy_progress
04/22/2024FinalRichard Wainerprogress
04/03/2024HVAC-R and service water heating equipmentDavid McAlpineenergy_progress
04/03/2024FinalDavid McAlpineprogress
04/03/2024HVAC-R and service water heating system controlsDavid McAlpineenergy_progress
04/03/2024Mechanical SystemsDavid McAlpinespecial
04/03/2024Fire-Resistant Penetrations and JointsDavid McAlpinespecial
04/03/2024Tenant Protection Plan ComplianceGregory Perottospecial
01/02/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
12/18/2023Sprayed fire-resistant materialsERIC BERLENTspecial
12/18/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/15/2023Tenant Protection Plan ComplianceERIC BERLENTspecial
11/15/2023Tenant Protection Plan ComplianceERIC BERLENTspecial
11/15/2023Tenant Protection Plan ComplianceERIC BERLENTspecial
11/09/2023FinalERIC BERLENTprogress
08/23/2023Post-installed AnchorsChristian Meszarosspecial
08/23/2023PreliminaryChristian Meszarosprogress
08/17/2023Sprinkler SystemsNicolas Crosettospecial
08/01/2023Tenant Protection Plan ComplianceChristian Meszarosspecial
08/01/2023FinalChristian Meszarosprogress
07/05/2023FinalDavid McAlpineprogress
07/05/2023Tenant Protection Plan Compliance—special
Latest 25 of 56.
▾Documents — 433 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/06/2026M00899932-I1Request digital key ↗
09/06/2026M00087907-I1Request digital key ↗
09/02/2026M00763619-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION55
12/27/2024122073898Open ↗
11/02/2022101232239Open ↗
09/27/2022101232239Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION37
12/14/2022101232239Open ↗
04/03/2017140465958Open ↗
06/02/2016122654001Open ↗
Showing 3 of 37 on file for this type
▸Seals & Professional Certifications137
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
02/01/2018122654001Open ↗
02/01/2018122654001Open ↗
04/13/2017140465958Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M00845668-I1Open ↗
09/02/2026M00845668-I1Open ↗
09/02/2026M00845668-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026M00920998-I1Open ↗
09/23/2026M00920998-I1Open ↗
09/23/2026M00920998-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00899932-I1Open ↗
09/02/2026M00763619-I1Open ↗
09/02/2026M00763619-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
02/11/2016122618006Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
02/11/2016122618006Open ↗
02/11/2016122617999Open ↗
02/11/2016122617980Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment43
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
03/08/2016122126074Open ↗
03/08/2016122126074Open ↗
02/16/2016122126074Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
05/25/2016121905420Open ↗
03/26/2015122088515Open ↗
03/26/2015122088515Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS8
05/25/2016121905420Open ↗
03/26/2015122088515Open ↗
01/22/2015140196650Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
10/13/2015140223942Open ↗
04/13/2015122126074Open ↗
03/31/2015122126074Open ↗
Showing 3 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE3
02/11/2016122618006Open ↗
02/11/2016122617980Open ↗
02/11/2016122617999Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
11/05/2025122073898Open ↗
▸BISBOILER APPROVAL : 900A1
11/02/2015140223942Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
12/07/2022101232239Open ↗
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
03/05/2015122276045Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
02/01/2018122654001Open ↗
06/02/2016122654001Open ↗
12/03/2015140223942Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
02/01/2018122654001Open ↗
12/03/2015140223942Open ↗
11/24/2015140223728Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
03/06/2015122276045Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
Showing 2 of 4 on file for this type
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
11/05/2025122073898Open ↗
01/03/2023101232239Open ↗
02/01/2018122654001Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/09/2015140223942Open ↗
09/09/2015140223728Open ↗
07/31/2015140223942Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
09/04/2019122276045Open ↗
▸BISSHED LETTER1
04/03/2017140465958Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT26
02/01/2018122654001Open ↗
02/11/2016122618006Open ↗
02/11/2016122617999Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/30/2025122073898Open ↗
01/12/2023122276045Open ↗
01/12/2023122126074Open ↗
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET16
02/11/2016122618006Open ↗
02/11/2016122617999Open ↗
02/11/2016122617980Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION15
02/15/2018122276045Open ↗
06/29/2017140465958Open ↗
04/20/2017140465958Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM7
12/14/2022101232239Open ↗
12/05/2022101232239Open ↗
11/01/2022101232239Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
04/11/2016140480405Open ↗
03/21/2016140465958Open ↗
Showing 2 of 6 on file for this type
▸Other Documents3
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
03/21/2016140465958Open ↗
▸BISINTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
11/27/2015140223942Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type