| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00709562 | 2080 CRUGER AVENUE BRONX | New Building | Permit Issued | 05/12/2022 | 11/24/2026 | Contractor EAGLE 1 MECHANICAL, INC | SUBSEQUENT FILING FOR PLUMBING WORK AS PER THE PLANS FILED HEREWITH. |
| M00976470 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 09/12/2024 | 11/23/2026 | Contractor TISHMAN CONSTRUCTION CORP Filer MUNICIPAL EXPEDITING INC | WCM INTERIOR 2 & 3: PLUMBING, SPRINKLER, STANDPIPE MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE,… |
| X00702754 | 1300 BOYNTON AVENUE BRONX | Alteration | Permit Issued | 04/12/2022 | 11/20/2026 | Contractor ACS SYSTEM ASSOCIATES INC. | Structural filing for swimming pool renovation |
| S00821742 | 140 PALMA DRIVE STATEN ISLAND | Alteration | Permit Issued | 02/09/2023 | 11/19/2026 | Contractor VENUS GROUP INC | Work includes per the filed plans removal of existing plumbing fixtures, provide new ada toilets, lavatories, sinks & drinking fountains wit… |
| X00678506 | 1020 ANDERSON AVENUE BRONX | Alteration | Permit Issued | 02/16/2022 | 11/19/2026 | Contractor AKM CONSTRUCTION SERVICE* | Work includes per the filed plans provide new fixtures and risers on each floor for new toilet rooms, replace water closets, lavatories and … |
| M01433586 | 170 WILLIAM STREET MANHATTAN | Alteration | Permit Issued | 08/05/2026 | 11/18/2026 | Contractor HELLMAN CONSTRUCTION CO Filer MUNICIPAL EXPEDITING INC | LMH PeriOp: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO… |
| Person | Filings | Most recent |
|---|---|---|
| Bruce Lilker | 968 | 11/05/2026 |
| Steven Hammer | 424 | 11/13/2026 |
| BRUCE LILKER | 141 | 10/20/2026 |
| David Tanenbaum | 23 | 10/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| DI Domenico + Partners | 20 | 10/26/2026 |
| Superstructures Engineering + | 19 | 11/17/2026 |
| Cta Architects | 18 | 03/26/2026 |
| Heritage Architecture | 11 | 05/05/2026 |
| Salam & Giacalone Architects | 11 | 06/01/2026 |
| Hartland Engineering | 10 | 09/12/2025 |
| KPFF Consulting Engineers | 10 | 11/19/2026 |
| Gilsanz Murray Steficek | 7 | 10/09/2026 |
| Gruskin Architecture + Design | 7 | 09/01/2026 |
| Ysrael A. Seinuk | 7 | 09/12/2025 |
| McAlpine Associates Architects | 6 | 07/23/2026 |
| Severud Associates | 5 | 10/27/2026 |
| Studio A+T Architects | 4 | 02/19/2026 |
| Afridi Associates | 3 | 03/26/2026 |
| Halsey McCormack Helmer | 3 | 01/20/2026 |
| IMEG Consulting | 3 | 08/28/2025 |
| Nadaskay Kopelson Architects | 3 | 08/28/2025 |
| Ssuperette Design | 3 | 02/24/2025 |
| Dattner Architects | 2 | 10/06/2026 |
| Eme Consulting Engineering Group | 2 | 11/21/2024 |
| Giuseppe Tulumello, AIA | 2 | 08/28/2023 |
| Horacio Repetto | 2 | 10/08/2026 |
| Langan Engineering | 2 | 10/27/2026 |
| Nelson Architecture & Interiors | 2 | 11/17/2026 |
| Pennoni Associates | 2 | 09/01/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| PAR Plumbing | 45 | 11/17/2026 |
| Sirina Fire Protection | 37 | 10/08/2026 |
| Cardoza Plumbing | 25 | 10/08/2026 |
| ABCO-Peerless Sprinkler | 21 | 07/02/2026 |
| Five Borough NYC | 21 | 09/25/2026 |
| A & M Warshaw Plumbing & Heating | 17 | 12/17/2025 |
| Full Capacity Fire | 15 | 08/24/2026 |
| JT Magen & Company | 15 | 07/02/2026 |
| PAR Fire Protection | 15 | 10/13/2026 |
| Structure Tone | 15 | 10/06/2026 |
| Agressive Fire Protection | 14 | 10/09/2026 |
| Cma Plumbing & Heating | 14 | 03/01/2023 |
| Pace Plumbing | 14 | 05/12/2026 |
| 7 Hanover Fee Owner | 12 | 08/24/2021 |
| Allstate Sprinkler | 12 | 07/24/2026 |
| Clune Construction | 12 | 03/23/2026 |
| John Gallin & Son | 12 | 10/23/2026 |
| Tristate Plumbing Services | 12 | 08/17/2022 |
| A&A Plumbing | 11 | 07/09/2025 |
| Consigli Construction | 11 | 07/07/2026 |
| Riehm Plumbing | 11 | 12/18/2025 |
| Alba Group | 10 | 11/07/2024 |
| Bedrock Plumbing & Heating | 10 | 10/14/2026 |
| Capitol Fire Sprinkler | 9 | 09/25/2026 |
| Gilbane Building Company | 9 | 02/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GFP Real Estate | 59 | 06/05/2026 |
| Vornado Realty Trust | 58 | 10/27/2026 |
| NYC School Construction Authority | 38 | 11/19/2026 |
| Omnispective | 29 | 11/24/2026 |
| New York Presbyterian Hospital | 27 | 10/08/2026 |
| NYC School Construction | 26 | 05/05/2026 |
| Brookfield Properties | 20 | 10/13/2026 |
| New York Presbyterian | 20 | 09/19/2024 |
| Hylan Plaza 1339 | 15 | 12/18/2025 |
| Stellar Management | 14 | 08/15/2023 |
| Kimco Realty | 12 | 10/09/2026 |
| Urban Edge Properties | 10 | 07/24/2024 |
| 608 Company | 9 | 06/03/2022 |
| Cannon Hill Capital Partners | 9 | 10/30/2026 |
| Mount Sinai Hospital | 9 | 02/22/2024 |
| RXR Realty | 9 | 08/24/2023 |
| 410 Park Ave. Associates | 8 | 01/05/2023 |
| Douglas Elliman | 8 | 11/11/2024 |
| General Leasing & Management | 8 | 05/03/2023 |
| Jemb Realty | 8 | 10/06/2026 |
| Tishman Speyer Properties | 8 | 05/27/2022 |
| 61 West 23rd St Associates | 7 | 11/04/2021 |
| District Council 37 | 7 | 05/12/2026 |
| One Fordham Plaza | 7 | 11/17/2026 |
| Taconic Management Company | 7 | 05/23/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Archetype Consultants | 61 | 11/24/2026 |
| Milrose Consultants | 60 | 09/09/2025 |
| Jam Consultants | 50 | 11/17/2026 |
| Metropolis Group | 49 | 06/02/2026 |
| Municipal Expediting | 46 | 10/30/2026 |
| William Vitacco Associates | 36 | 11/11/2024 |
| Municipal Building Consultants | 34 | 05/07/2026 |
| Outsource Consultants | 28 | 09/25/2026 |
| Walter T. Gorman, PE | 28 | 06/05/2026 |
| Rizzo Group | 26 | 06/10/2025 |
| Gillman Consulting | 23 | 10/27/2026 |
| KM Associates of New York | 22 | 11/19/2026 |
| Superstructures Engineering + | 18 | 11/17/2026 |
| Bohler Engineering | 13 | 10/09/2026 |
| Precision 3Sixty NYC | 13 | 06/01/2026 |
| Heritage Architecture | 10 | 05/05/2026 |
| Empire City Consultants | 9 | 05/27/2026 |
| SBLM | 8 | 04/29/2026 |
| Brookbridge Consulting Services | 6 | 10/24/2023 |
| Burnham Nationwide | 6 | 06/04/2025 |
| Caso & Associates | 6 | 02/02/2024 |
| DI Domenico + Partners | 6 | 08/18/2025 |
| McAlpine Associates Architects | 6 | 07/23/2026 |
| GGONZALEZ@BOHLERENG | 5 | 12/03/2024 |
| JM Zoning | 5 | 05/13/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X00709562 | 2080 CRUGER AVENUE BRONX | New Building | Permit Issued | 05/12/2022 | 11/24/2026 | Contractor EAGLE 1 MECHANICAL, INC | SUBSEQUENT FILING FOR PLUMBING WORK AS PER THE PLANS FILED HEREWITH. |
| M00976470 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 09/12/2024 | 11/23/2026 | Contractor TISHMAN CONSTRUCTION CORP Filer MUNICIPAL EXPEDITING INC | WCM INTERIOR 2 & 3: PLUMBING, SPRINKLER, STANDPIPE MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE,… |
| X00702754 | 1300 BOYNTON AVENUE BRONX | Alteration | Permit Issued | 04/12/2022 | 11/20/2026 | Contractor ACS SYSTEM ASSOCIATES INC. | Structural filing for swimming pool renovation |
| S00821742 | 140 PALMA DRIVE STATEN ISLAND | Alteration | Permit Issued | 02/09/2023 | 11/19/2026 | Contractor VENUS GROUP INC | Work includes per the filed plans removal of existing plumbing fixtures, provide new ada toilets, lavatories, sinks & drinking fountains wit… |
| X00678506 | 1020 ANDERSON AVENUE BRONX | Alteration | Permit Issued | 02/16/2022 | 11/19/2026 | Contractor AKM CONSTRUCTION SERVICE* | Work includes per the filed plans provide new fixtures and risers on each floor for new toilet rooms, replace water closets, lavatories and … |
| M01433586 | 170 WILLIAM STREET MANHATTAN | Alteration | Permit Issued | 08/05/2026 | 11/18/2026 | Contractor HELLMAN CONSTRUCTION CO Filer MUNICIPAL EXPEDITING INC | LMH PeriOp: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO… |
| M01392956 ↗ | 520 WEST 30TH STREET MANHATTAN | Alteration | Permit Issued | 06/29/2026 | 11/13/2026 | Contractor LINKED MECHANICAL LLC | MECHANICAL WORK FOR AN INTERIOR FIT OUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00692119 | 111 COLUMBIA STREET MANHATTAN | Alteration | Permit Issued | 03/10/2022 | 11/13/2026 | Owner NYCSCA Contractor NATIONAL ENVIROMENTAL SAF | Work includes per the filed plans remove / install sprinkler heads in cellar, sprinkler tamper switches, sprinkler water flow switches, clas… |
| M01467071 | 26 EAST 64TH STREET MANHATTAN | Alteration | Permit Issued | 10/27/2026 | 11/12/2026 | Owner SEDESCO Contractor TURNER CONSTRUCTION COMPANY | REPLACE EXISTING LAV AND INSTALL DRAIN. |
| Q01033560 | 67-54 80TH STREET QUEENS | Alteration | Permit Issued | 04/15/2024 | 11/09/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor FIRST CONSTRUCTION GROUP | Steel support for roof top equipment |
| M00888167 ↗ | 67 IRVING PLACE MANHATTAN | Alteration CO | Permit Issued | 06/13/2023 | 11/04/2026 | Owner 67 IRVING (NY), LLC Contractor CAVAN BUILDERS CORP Filer JM ZONING, LLC. | Support of Excavation Work as per plans filed. |
| X00850763 | 1700 MACOMBS ROAD BRONX | Alteration | Permit Issued | 03/29/2023 | 10/30/2026 | Contractor A.T.J. ELECTRICAL CO INC | REMOVE EXISTING UNIT VENTILATOR ALONG WITH ALL ASSOCIATED PIPING, INSTALLATION OF NEW ENERGY RECOVERY VENTILATOR. |
| M01433731 | 520 WEST 28TH STREET MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 10/27/2026 | Contractor POWERGEN DEVELOPMENT GROUP | MECHANICAL WORK FILING FOR A RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGR… |
| M00455211 ↗ | 1133 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 01/21/2021 | 10/26/2026 | Owner ABC REALTY Contractor SUPERIOR PLUMBING,HEATING | For installation of gas piping and riser on building exterior (floors 001-016) with new gas vents as per plans submitted herewith. No chang… |
| B01105639 | 1625 11TH AVENUE BROOKLYN | Alteration | Permit Issued | 09/16/2024 | 10/22/2026 | Contractor N.B.A CONSTRUCTION INC | PS 154 - K REPLACEMENT OF ALL OF ROOF NO.2 AND PARTIAL OF ROOF NO.1 INCLUDING FLASHINGAROUND PERIMETER OF ROOF NO.1 AND GUARDRAIL AT ROOF NO… |
| X01240021 | 3400 BAINBRIDGE AVENUE BRONX | Alteration | Permit Issued | 08/26/2025 | 10/15/2026 | Contractor DEVO FIRE PROTECTION INC | MAP MRI - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01369454 ↗ | 424 ALBEE SQUARE BROOKLYN | Alteration | Permit Issued | 05/14/2026 | 10/13/2026 | Owner JEMB REALTY Contractor DEPENDABLE MECHANICAL COR Filer JAM CONSULTANTS, INC. | FILING FOR SPRINKLERS INTERIOR ALTERATION FOR TENANT FITOUT AS PER PLANS NO TO CHANGE USE EGRESS OR OCCUPANCY |
| M01094079 | 21 AUDUBON AVENUE MANHATTAN | Alteration | Permit Issued | 05/28/2026 | 10/06/2026 | Contractor REIDY CONTRACTING GROUP Filer MUNICIPAL EXPEDITING INC | Remove and replace ductwork and equipment on partial 1st, 2nd and 3rd floors in the medical offices as per plans filed herewith only. |
| Q00931838 | 21-21 DITMARS BOULEVARD QUEENS | Alteration | Permit Issued | 09/13/2023 | 10/02/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor AKM CONSTRUCTION SERVICE* | work includes remove/replace existing roof drains, reflash existing vents, clean roof drains/storm piping. |
| M01288184 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2025 | 10/01/2026 | Contractor WESBUILT CONSTRUCTION MAN Filer MUNICIPAL EXPEDITING INC | WCM INTERIOR 4 PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE T… |
| B00677375 | 88 WOODBINE STREET BROOKLYN | Alteration | Permit Issued | 03/01/2022 | 10/01/2026 | Contractor AKM CONSTRUCTION SERVICE* | Plumbing work as per plans submitted. No change to use, egress or occupancy. |
| Q01206398 ↗ | 61-35 JUNCTION BOULEVARD QUEENS | Alteration | Signed-off | 06/23/2025 | 09/29/2026 | Owner VORNADO REALTY TRUST Contractor CENSOR COMMERCIAL CONSTR Filer GILLMAN CONSULTING INC | Modification/additions to existing sprinkler system and related sprinkler piping. No change in use, egress or occupancy under this applicati… |
| M01452172 ↗ | 435 7TH AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 09/25/2026 | — | Owner VORNADO REALTY TRUST Filer GILLMAN CONSULTING INC | — |
| M00867021 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 04/12/2024 | 09/16/2026 | Contractor TISHMAN CONSTRUCTION CORP Filer MUNICIPAL EXPEDITING INC | WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building. |
| B00570513 | 1106 EAST 95TH STREET BROOKLYN | Alteration | Permit Issued | 08/17/2021 | 09/14/2026 | Contractor CENTRAL MECHANICAL SYSTEM | DISTRICT OFFICE# 18/Structural work related to COVID Ventilation |
| Q00932631 | 218-01 116TH AVENUE QUEENS | Alteration | Permit Issued | 09/18/2023 | 09/11/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EURO CASTLE CONSTRUCTION | work includes remove/replace roof drains, reflash vents, clean roof drains/storm piping. |
| X01004916 ↗ | 1690 WATSON AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 08, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004932 ↗ | 1040 SOUNDVIEW AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 09, Remove & replace existing domestic water supply tank, freeze protection/flow temperature maintenance system for all expos… |
| X01004950 ↗ | 1720 WATSON AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 10, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| Q01414292 ↗ | 61-35 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 07/07/2026 | 09/11/2026 | Owner VORNADO REALTY TRUST Contractor CAPITAL IMPROVEMENT SERVICES Filer GILLMAN CONSULTING INC | REMOVE AND REBUILD LOADING DOCK RAISED SLAB AS PER PLANS FILED HEREWITH. NO CHNAGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| X01004958 ↗ | 1730 WATSON AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/11/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 11, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004861 ↗ | 1050 SOUNDVIEW AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/10/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 06, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X01004896 ↗ | 1670 WATSON AVENUE BRONX | Alteration | Permit Issued | 02/27/2024 | 09/10/2026 | Contractor J & N CONSTRUCTION GROUP | Sotomayor Bldg 07, Removal/replacement of existing roof mounted toilet exhaust fans, gravity ventilators, wall mounted exhaust fan for MER a… |
| X00838239 | 3710 BARNES AVENUE BRONX | Alteration | Permit Issued | 03/23/2023 | 09/08/2026 | Contractor LAWRENCE'S CONTRACTOR,INC | Removal of existing & installation of new light fixtures & controls in rooms 257, 259, and 359 |
| M01408151 ↗ | 432 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 09/02/2026 | Owner First Services Contractor JRM CONSTRUCTION MGMT LLC Filer GILLMAN CONSULTING INC | Removal and construction of non-bearing partitions, doors, ceilings and finishes, demountable partitions, interconnecting stair as shown on … |
| Q00818135 | 93-06 63RD DRIVE QUEENS | Alteration | Permit Issued | 01/25/2023 | 09/01/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor FORSYTHE P&H CORP Filer HERITAGE ARCHITECTURE | WATER INFILTRATION PREVENTION, PARTIAL FACADE REPAIRS, AND PARTIAL INTERIOR FINISH UPGRADE. |
| M01154825 | 1293 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/07/2025 | 09/01/2026 | Owner JEMB REALTY Contractor CARDOZA PLUMBING WMBE Filer JAM CONSULTANTS, INC. | Plumbing modification to existing system and alteration for new tenant fit-out |
| Q00833695 | 28-01 41ST AVENUE QUEENS | Alteration | Permit Issued | 02/23/2023 | 09/01/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor VARSITY PLBG AND HTG INC Filer HERITAGE ARCHITECTURE | Drinking fountain replacement |
| B00611035 | 185 ELLERY STREET BROOKLYN | Alteration | Permit Issued | 12/22/2021 | 08/31/2026 | Contractor NEELAM CONSTRUCTION CORP Filer HERITAGE ARCHITECTURE | New elevator and elevator shaft addition with access to floors basement through 4th floor and providing compliant accessible ramp at the bas… |
| M01435668 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/26/2026 | Owner OMNISPECTIVE Contractor TRI-STAR CONSTRUCTION CORP | American Gem (Suite 601) - Mechanical work on the 6th floor as indicated on drawings. |
| M01435677 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/26/2026 | Owner OMNISPECTIVE Contractor BEDROCK PLBG. & HTG., INC | American Gem (Suite 601) - Plumbing work on the 6th floor as indicated on drawings. |
| M01435689 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/25/2026 | Owner OMNISPECTIVE Contractor FULL CAPACITY FIRE CORP | American Gem (Suite 601) - Sprinkler work on the 6th floor as indicated on drawings. |
| S00881156 | 355 BARD AVENUE STATEN ISLAND | Alteration | Signed-off | 07/05/2023 | 08/25/2026 | Contractor AMERICON CONSTRUCTION INC. | RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Out… |
| M01420460 | 2 PENN PLAZA MANHATTAN | Alteration | Permit Issued | 07/01/2026 | 08/18/2026 | Owner VORNADO REALTY TRUST Contractor ABCO-PEERLESS SPRKLR CORP Filer GILLMAN CONSULTING INC | Hereby filing to remove and install sprinkler heads with related piping and add two (2) remote Fire Hose Valve Cabinets for office renovatio… |
| Q01197034 | 57-12 94TH STREET QUEENS | Alteration | Permit Issued | 04/30/2025 | 08/13/2026 | Contractor ENSOME BUILDERS INC | REMOVE EXISTING SPRINKLER HEADS TO ALLOW FOR WORK; INSTALL NEW SPRINKLER HEADS. |
| X00906447 | 725 BRADY AVENUE BRONX | Alteration | Permit Issued | 07/27/2023 | 08/10/2026 | Contractor SPENCER CONTRACTING, LLC | MECHANICAL WORK AS PER PLANS FILED. WORK INCLUDES REMOVAL OF EXISTING GRILLE, PNEUMATIC THERMOSTAT & PNEUMATIC CONTROL VALVE, & TO EXTEND EX… |
| M01408579 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/03/2026 | Owner OMNISPECTIVE Contractor PFL MECHANICAL CORP | Plumbing changes on the 5th floor as indicated on drawings. |
| M01408595 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/03/2026 | Owner OMNISPECTIVE Contractor GRUSHINSKY PIPNG & HTG IN | Sprinkler changes on the 5th floor as indicated on drawings. |
| M01177036 | 177 FORT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/07/2025 | 07/30/2026 | Contractor CARDOZA PLUMBING WMBE Filer MUNICIPAL EXPEDITING INC | MHB GN BEHAVIORAL HEALTH: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE BEHAVIORAL HEALTH RENOVATION IN THE EXISTING HOSPITAL BUIL… |
| X01379645 ↗ | 1 FORDHAM PLAZA BRONX | Alteration | Signed-off | 04/13/2026 | 07/30/2026 | Contractor JD MASTERS P & H, INC | HEREBY FILING FOR THE REPLACEMENT OF SPRINKLER HEADS. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| B00734081 | 2202 60TH STREET BROOKLYN | Alteration | Permit Issued | 07/28/2022 | 07/28/2026 | Contractor V. C. VITANZA SONS INC | RENOVATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. POST APPROVAL AMENDMENT TO CHANGE ASBESTOS… |
| M01408566 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/27/2026 | — | Owner OMNISPECTIVE | — |
| X01004717 | 3400 BAINBRIDGE AVENUE BRONX | Alteration | Permit Issued | 03/13/2024 | 07/27/2026 | Contractor DIKER A & V CONTRACTING C | Herewith filing sprinkler modifications for Montefiore Medical Center, Orthopedic Surgery Suite Renovation. No change in use, egress, or occ… |
| M01235011 | 1293 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/09/2025 | 07/22/2026 | Owner JEMB REALTY Contractor SIRINA FIRE PROT CORP Filer JAM CONSULTANTS, INC. | FILING FOR SPRINKLER MODIFICATION AND ALTERATION FOR TENANT FIT-OUT |
| B00551143 | 346 AVENUE P BROOKLYN | Alteration | Permit Issued | 07/21/2021 | 07/20/2026 | Contractor NORTHEAST ATLANTIC BUSINE | PS177/ Mechanical work related to COVID Ventilation project |
| M00851959 | 285 DELANCEY STREET MANHATTAN | Alteration | Permit Issued | 03/31/2023 | 07/16/2026 | Owner NYCSCA Contractor FORSYTHE PLBG & HTG CORP Filer GIUSEPPE TULUMELLO, AIA | Remove and replace 8 roof drains. Re-flashing for existing vents at roof level. |
| S00992007 | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Permit Issued | 01/23/2024 | 07/15/2026 | Owner NORTHWELL HEALTH (SIUH) Contractor CAPITAL CONTR P&H CORP Filer DAVID J DARCY, ARCHITECT | Removal and replacement of gas fire kitchen cooking equipment such as 6 burner range, griddle, oven and skillet. Modification of existing an… |
| M08034415 | 210 WEST 61ST STREET MANHATTAN | Alteration | Permit Issued | 11/04/2022 | 07/10/2026 | Owner NYCSCA Contractor ABC CONSTRUCTION CONT INC | STRUCTURAL DESIGN OF NEW ELEVATOR FOR ADA ACCESSIBILITY. |
| M01394200 ↗ | 36 GRAMERCY PARK EAST MANHATTAN | Alteration | Signed-off | 04/30/2026 | 07/10/2026 | Contractor PETER SIMON RESTORATION.C | Removal of ACCU-1 and related components and refrigerant piping and replacing with Fan Coil Units and related components in apartment 2SW as… |
| Q01017811 | 248-05 86TH AVENUE QUEENS | Alteration | Permit Issued | 03/14/2024 | 07/08/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor MAVEN CONSTRUCTION, CORP Filer HERITAGE ARCHITECTURE | Soil excavation to accommodate new stormwater retention system, backfill, and associated work. |
| X01405725 ↗ | 1 FORDHAM PLAZA BRONX | Alteration | Signed-off | 06/04/2026 | 06/30/2026 | Owner ONE FORDHAM PLAZA LLC Contractor HARLEY CONSTRUCTION MANAGEMENT Filer JAM CONSULTANTS, INC. | Union Community Space- Installation of new concrete slab on grade. No change in use, occupancy or egress. |
| M01386272 ↗ | 7 HANOVER SQUARE MANHATTAN | Alteration | Signed-off | 06/05/2026 | 06/24/2026 | Owner GFP REAL ESTATE LLC Contractor DLS MECHANICAL CORP Filer WALTER T. GORMAN, PE, PC | Propose to perform install mechanical condensing units. No change in use, egress or occupancy. |
| B00916346 | 2840 WEST 12TH STREET BROOKLYN | Alteration | Permit Issued | 08/11/2023 | 06/24/2026 | Contractor ARMY CONSTRUCTION LLC | work includes remove/replace face brick, spall/patch repairs, concrete crack repairs, replace existing sealant at all masonry openings, remo… |
| M00610647 ↗ | 331 EAST 91ST STREET MANHATTAN | Alteration | Permit Issued | 10/15/2021 | 06/18/2026 | Owner NYCSCA Contractor RIGHT PRICE GENERAL CONST | SUBSEQUENT APPLICATION TO SUBMIT ENERGY SHEET AND LIGHTING SCOPPE WITH ADDED TR8 INSPECTIONS FOR REVIEW AS PER PLAN FILED HEREWITH. NO CHAN… |
| M00551102 | 411 PEARL STREET MANHATTAN | Alteration | Permit Issued | 07/22/2021 | 06/15/2026 | Owner NYCSCA Contractor AWL INDUSTRIES INC | M520/Mechanical work related to COVID Ventilation project |
| M01262630 ↗ | 608 5TH AVENUE MANHATTAN | Alteration | Signed-off | 05/28/2026 | 06/11/2026 | Owner OMNISPECTIVE Contractor PANKO MC LLC | Mechanical work to replace AC unit on the 5th floor (Suite 503) as indicated on drawings. |
| Q08041039 | 109-15 98TH STREET QUEENS | Alteration | Permit Issued | 11/21/2022 | 06/11/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor RAZALINE BUILDERS INC | REMOVE THEN REPLACE EXISTING SUPPLY AND EXHAUST WITH DUCTWORK. |
| X01358379 ↗ | 193 WEST 237TH STREET BRONX | Alteration | Signed-off | 02/25/2026 | 06/09/2026 | Contractor A.G.S IMPROVEMENTS INC Filer JAM CONSULTANTS, INC. | REPLACEMENT OF 1 HVAC UNIT ON ROOF AND ASSOCIATED DUCT WORK TO RECONNECT TO EXISTING. |
| M01397728 ↗ | 50 WEST 57TH STREET MANHATTAN | Alteration | Filed — no permit on record | 06/05/2026 | — | Owner VORNADO REALTY TRUST | — |
| X01135184 ↗ | 1223 SPOFFORD AVENUE BRONX | Alteration | Signed-off | 12/10/2024 | 05/28/2026 | Contractor FLINT MECHANICAL CORP Filer DESIGN 2147, LTD | MPP-191: FILING HEREWITH INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION OF DAYCARE SPACE AS PER PLANS. NO CHANGE I… |
| M01079390 | 411 PEARL STREET MANHATTAN | Alteration | Permit Issued | 08/01/2024 | 05/28/2026 | Owner NYCSCA Contractor ABC CONSTRUCTION CONT INC | Mechanical work related to a hydroponics lab. |
| M01210090 ↗ | 36 GRAMERCY PARK EAST MANHATTAN | Alteration | Filed — no permit on record | 05/22/2026 | — | Filer RAND ENG & ARCH, DPC | — |
| M01210103 ↗ | 36 GRAMERCY PARK EAST MANHATTAN | Alteration | Filed — no permit on record | 05/22/2026 | — | Filer RAND ENG & ARCH, DPC | — |
| M01396103 ↗ | 11 PENN PLAZA MANHATTAN | Alteration | Permit Issued | 05/14/2026 | 05/21/2026 | Owner VORNADO REALTY TRUST Contractor PLESCIA CONSTR & DEV LLC | Mechanical work on the 17th through 22nd floor (AMC) as indicated on drawings. |
| X01058125 ↗ | 184 WEST 237TH STREET BRONX | Alteration | Signed-off | 08/06/2024 | 05/20/2026 | Contractor NEW YORK PARK PLBG&HTG CO Filer JAM CONSULTANTS, INC. | HEREWITH FILING FOR REPLACEMENT OF PLUMBING FIXTURES AND PIPING. PAA SUBMISSION TO REMOVE GAS SCOPE OF WORK FROM APPLICATION, NO WORK REQUIR… |
| B00916716 | 2840 WEST 12TH STREET BROOKLYN | Alteration | Permit Issued | 08/11/2023 | 05/20/2026 | Contractor ARMY CONSTRUCTION LLC | Work includes providing structural framing/slabs for elevator extension, opening in roof slab and landing for stair extension, structural fr… |
| M01396106 ↗ | 11 PENN PLAZA MANHATTAN | Alteration | Permit Issued | 05/14/2026 | 05/20/2026 | Owner VORNADO REALTY TRUST Contractor CAPITOL FIRE SPRINKLER CO | Sprinkler work on the 17th through 22nd floor (AMC) as indicated on drawings. |
| M01355035 | 170 WILLIAM STREET MANHATTAN | Alteration | Permit Issued | 03/09/2026 | 05/15/2026 | Contractor ALLIANCE PLUMBING CORP Filer MUNICIPAL EXPEDITING INC | LMH CT 187: Plumbing and sprinkler modifications to accommodate the CT upgrade in the existing hospital building as per plans filed herewith… |
| M01293077 ↗ | 1540 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/23/2025 | 05/15/2026 | Owner VORNADO REALTY TRUST Contractor CAPITAL IMPROVEMENT SERVI Filer GILLMAN CONSULTING INC | REMOVAL AND CONSTRUCTION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, FRAMES, CEILINGS, MILLWORK, LIGHTING , FLOORING, NEW CONVENIENCE ST… |
| M01310518 | 525 EAST 68TH STREET MANHATTAN | Alteration | Signed-off | 12/18/2025 | 05/05/2026 | Contractor SIRINA FIRE PROTECTION CORP Filer MUNICIPAL EXPEDITING INC | L-4 CARDIOLOGY Phase 4 : PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS P… |
| X01393995 | 701 ST ANN'S AVENUE BRONX | Alteration | Filed — no permit on record | 05/04/2026 | — | — | |
| B00967855 | 2045 LINDEN BOULEVARD BROOKLYN | Alteration | Permit Issued | 12/12/2023 | 04/23/2026 | Contractor NIKHI CONTRACTING CORP | Removal/Installation of ceiling. flooring, doors, interior partitions, and removal skylight related to Elevator modernization, and conversio… |
| B00733989 | 2202 60TH STREET BROOKLYN | Alteration | Permit Issued | 07/26/2022 | 04/22/2026 | Contractor ACS SYSTEM ASSOCIATES INC. | Here with submitting mechanical work consisting removal of existing work associated with proposed design including ductwork, valves, piping … |
| X01195080 | 600 EAST 233RD STREET BRONX | Alteration | Permit Issued | 05/27/2025 | 04/21/2026 | Contractor PARKVIEW P&H INC | MONTEFIORE - ORTHOPEDIC RENO 6TH FLOOR - SPRINKLER MODIFICTIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00846987 ↗ | 125 BARCLAY STREET MANHATTAN | Alteration | Permit Issued | 04/10/2023 | 04/21/2026 | Owner DISTRICT COUNCIL 37 Contractor HUNTER ROBERTS CONSTRUCTION Filer METROPOLIS GROUP INC | SPRINKLER WORK ON FLOORS 2-10, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. FIT-OUT WORK FILED IN CONJUNCTION WITH CORE & SHE… |
| M01006828 ↗ | 1 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/11/2024 | 04/15/2026 | Owner DIRECTOR ENGINEERING Contractor TRANE U.S. INC Filer INTEGRATED | Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There … |
| X00745958 | 725 BRADY AVENUE BRONX | Alteration | Permit Issued | 05/31/2022 | 04/14/2026 | Contractor NORTH SHORE CLIMATE CONTR | SUBSEQUENT FILING TO REMOVE EXISTING RADIATOR AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. ADJACENT NB FILED UNDER APPLICATION #X007… |
| X01036412 ↗ | 1223 SPOFFORD AVENUE BRONX | Alteration | Permit Issued | 06/25/2024 | 04/03/2026 | Contractor BROADWAY BUILDERS LLC Filer DESIGN 2147, LTD | FILING HEREWITH PLUMBING WORK FOR DAYCARE FIOUT AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00995171 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 04/16/2024 | 04/02/2026 | Contractor CARDOZA PLUMBING WMBE Filer MUNICIPAL EXPEDITING INC | WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building. |
| S01187297 | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/18/2025 | 04/01/2026 | Contractor UNITY CONSTR. SVCS INC Filer METROPOLIS GROUP INC | STRUCTURAL REINFORCEMENT OF EXISTING FRAMING TO SUPPORT NEW MEDICAL EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00689656 | 345 VAN SICKLEN STREET BROOKLYN | Alteration | Permit Issued | 03/02/2022 | 03/30/2026 | Contractor ENSOME BUILDERS INC | RENOVATION OF BOYS AND GIRLS BATHROOM FOR ADA COMPLIANCE. REPLACING 1 DRINKING FOUNTAIN.. |
| B01353820 ↗ | 1401 KINGS HIGHWAY BROOKLYN | Alteration | Permit Issued | 03/02/2026 | 03/30/2026 | Owner KIMCO REALTY Contractor DIMENSIONAL CONCEPTS INC Filer BOHLER ENGINEERING | Structural framing for new mechanical units |
| M07993476 | 525 EAST 68TH STREET MANHATTAN | Alteration | Signed-off | 11/15/2024 | 03/27/2026 | Contractor RIEHM PLUMBING CORP Filer MUNICIPAL EXPEDITING INC | L-4 CARDIOLOGY Phase 3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PE… |
| M07993468 | 525 EAST 68TH STREET MANHATTAN | Alteration | Signed-off | 11/21/2024 | 03/26/2026 | Contractor CONSIGLI CONSTRUCTION CO Filer MUNICIPAL EXPEDITING INC | L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HERE… |
| M07993457 | 525 EAST 68TH STREET MANHATTAN | Alteration | Signed-off | 01/09/2024 | 03/25/2026 | Contractor RIEHM PLUMBING CORP Filer MUNICIPAL EXPEDITING INC | L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER… |
| Q00548727 | 195-15 73RD AVENUE QUEENS | Alteration | Permit Issued | 07/08/2021 | 03/23/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor NAVILLUS TILE INC | STRUCTURAL - FOR NEW 4-STORY BUILDING FILED UNDER DOB BIS 421899930 |
| M00978777 ↗ | 575 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/05/2025 | 03/23/2026 | Contractor WESBUILT CONSTRUCTION MAN | WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. … |
| B00625296 | 1401 EMMONS AVENUE BROOKLYN | Alteration | Permit Issued | 11/10/2021 | 03/20/2026 | Contractor ZARCO CONTRACTING INC | Remove two existing wall mounted condensing units and existing compressor, replace with new AC units on 1st floor and refrigerant piping to … |
| M00777833 ↗ | 80 NORTH MOORE STREET MANHATTAN | Alteration | Permit Issued | 08/15/2023 | 03/13/2026 | Owner STELLAR MANAGEMENT Contractor EG MUNOZ CONSTRUCTION.LLC Filer METROPOLIS GROUP INC | Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,044 sq.ft. Lobby space. No change of u… |
| M00777887 ↗ | 310 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 08/15/2023 | 03/13/2026 | Owner STELLAR MANAGEMENT Contractor EG MUNOZ CONSTRUCTION.LLC Filer METROPOLIS GROUP INC | Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4.044 sq.ft. Lobby. No change of use, eg… |