← Back
BuildNYC
Unlicensed parking lot
Timbale Terrace
105 EAST 118TH STREET · BIN 1803104
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R10Zoning
0 sfGross Floor Area
0Units
2 Active Violations ▸
Unlicensed parking lot · Owner of record: NYC Police Department · 23,172 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction1 filing
Floor 161p · 1 filing
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Afro-Latin Jazz Alliance El Barrio's Art Space P.S. 1092p · 1 filing
Floor 1Afro-Latin Jazz Alliance El Barrio's Art Space P.S. 1098p · 1 filing
CellarAfro-Latin Jazz Alliance El Barrio's Art Space P.S. 10913p · 1 filing
Site & exteriorConstruction fence installationUnder Construction1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Timbale Terrace HDFC309/02/2026
Housing of Preservation Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mega Contracting GPGeneral Contractor1109/10/2026
Dynamic Hoisting ScaffScaffold310/20/2026
G.N.T. MechanicalFire Protection308/26/2026
G.N.T. MechanicalPlumbing107/08/2026
Mega Contracting GPScaffold107/08/2026
MB Mechanical of NYspecialty_contractor108/20/2026
Moore GroupScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18031705/06/2026
GEI Consultants1047111/02/2022
Building Lifecycle
All (124)Filed (27)Permit Issued (19)Violation (3)Inspection (4)Objection (41)Special Inspection (30)
10/19/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-Z4
10/19/2026
Permit issued — Protection and Mechanical Methods
M08028552-Z4-PMM
10/13/2026
Permit issued — Sidewalk Shed
M08028552-Z2-SH
09/09/2026
Permit issued — General Construction
M08028552-I1-GC
09/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/28/2026
Violation issued (ECB, open)
Construction
08/28/2026
Violation issued (ECB, open)
Construction
08/18/2026
Permit issued — Mechanical Systems
M08028552-S4-MS
08/18/2026
Permit issued — Standpipe
M08028552-S9-EW-SD
08/14/2026
Permit issued — Standpipe
M08028552-S6-EW-SD
08/14/2026
Permit issued — Standpipe
M08028552-S6-EW-SP
07/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-Z2
07/16/2026
Permit issued — Sidewalk Shed
M08028552-Z2-SH
07/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/22/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-A1
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Ventilation and air distribution system
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Metering
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Air barrier — testing
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Air barrier continuity plan testing
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/02/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
05/29/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/26/2026
Permit issued — Foundation
M08028552-S1-FO
05/18/2026
Permit issued — Structural
M08028552-S2-ST
05/06/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-P8
05/06/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-P6
05/05/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-P5
04/28/2026
Objection raised — Other
04/24/2026
Filed — New Building
Proposed plumbing system for NB # M08028552-I1.
M08028552-P7
04/22/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/13/2026
Objection raised — Admin
04/13/2026
Objection raised — Scope
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedDynamic Hoisting Scaff10/19/2026
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff10/13/2026
DOB NOWGeneral ConstructionPermit IssuedMega Contracting GP09/09/2026
DOB NOWMechanical SystemsPermit IssuedMB Mechanical of NY08/18/2026
DOB NOWStandpipePermit IssuedG.N.T. Mechanical08/18/2026
DOB NOWStandpipePermit IssuedG.N.T. Mechanical08/14/2026
DOB NOWSprinklersPermit IssuedG.N.T. Mechanical08/14/2026
DOB NOWSidewalk ShedPermit IssuedDynamic Hoisting Scaff07/16/2026
DOB NOWFoundationPermit IssuedMega Contracting GP05/26/2026
DOB NOWStructuralPermit IssuedMega Contracting GP05/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMoore Group03/24/2026
DOB NOWGeneral ConstructionPermit IssuedMega Contracting GP02/24/2026
DOB NOWGeneral ConstructionPermit IssuedMega Contracting GP01/20/2026
DOB NOWStructuralPermit IssuedMega Contracting GP01/20/2026
DOB NOWFoundationPermit IssuedMega Contracting GP01/12/2026
DOB NOWPlumbingPermit IssuedG.N.T. Mechanical12/22/2025
DOB NOWFoundationPermit IssuedMega Contracting GP12/18/2025
DOB NOWSupport of ExcavationPermit IssuedMega Contracting GP12/18/2025
DOB NOWConstruction FencePermit IssuedMega Contracting GP12/02/2025
2 projects · most recent 10/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026Permit IssuedDynamic Hoisting ScaffHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM192BTE5 216,000 BTU · Vrf Outdoor ×12
ARUM168BTE5 189,000 BTU · Vrf Outdoor ×7
ARUM241BTE5 243,000 BTU · Vrf Outdoor ×4
ARUM144BTE5 162,000 BTU · Vrf Outdoor ×2
ARUM216BTE5 243,000 BTU · Vrf Outdoor ×2
ARUM072BTE5 81,000 BTU · Vrf Outdoor ×1
ARUM121BTE5 135,000 BTU · Vrf Outdoor ×1
ARUN038GSS4 43,000 BTU · Vrf Outdoor ×1
LSU243HLV3 26,000 BTU · Condensing Unit ×1
Ventilation
Zoo Fans JETVENT JVEC-ULP 1,396 CFM · Exhaust Fan ×7
— AX-80-275-0611-A75 10,000 CFM ×2
AX-80-275-0620-B30 10,700 CFM · Exhaust Fan ×2
AX-63-160-0625-B7 5,400 CFM · Exhaust Fan ×1
Enervex BEF 500X 6 kW · Exhaust Fan ×1
MDVS500X 4,400 CFM · Exhaust Fan ×1
Swegon GOLD F RX 070 11,440 CFM · Erv ×2
03/26/2026——Heating and Air Conditioning Systems
Heat / Cool
Mafna ×4
Daikin REYQ96AATJA 96,000 BTU · Vrf Outdoor ×2
2 projects · most recent 10/19/2026
Sprinkler System
FiledStatusContractorScope
10/19/2026Permit IssuedG.N.T. MechanicalSprinkler System
03/26/2026——Sprinkler System
2 projects · most recent 10/19/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/19/2026Permit IssuedG.N.T. MechanicalGas, Storm, Water/Sanitary
03/26/2026——Water/Sanitary
4 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedNash Electric Services—
07/09/2026Permit IssuedNash Electric Services—
11/17/2025Permit IssuedCounty Electrical Contractor I1 meters, 1 new_meters
11/17/2025Permit IssuedCounty Electrical Contractor IGeneral Wiring
2 projects · most recent 10/19/2026
Steel Concrete
FiledStatusContractorScope
10/19/2026Permit IssuedDynamic Hoisting Scaff5 scope_items
03/26/2026——Steel, Concrete
2 projects · most recent 10/19/2026
Sidewalk Shed Fence
FiledStatusContractorScope
10/19/2026Permit IssuedDynamic Hoisting ScaffSidewalk Shed
01/13/2026Permit IssuedMega Contracting GPFence
1 project · most recent 10/19/2026
Earthwork
FiledStatusContractorScope
10/19/2026Permit IssuedDynamic Hoisting ScaffEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/02/2026Pass-Final PL - UndergroundPassView ↗
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 148
DateRequirementInspectorRole
06/02/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
06/02/2026Air barrier — testing SAMI HAJJAR P.Eenergy_progress
06/02/2026Electric vehicle service equipment requirementsSAMI HAJJAR P.Eenergy_progress
06/02/2026Ventilation and air distribution systemSAMI HAJJAR P.Eenergy_progress
06/02/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
06/02/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
06/02/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
06/02/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
06/02/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
06/02/2026MasonrySAMI HAJJAR P.Especial
06/02/2026Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
06/02/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/02/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
06/02/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
06/02/2026Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
06/02/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
06/02/2026MeteringSAMI HAJJAR P.Eenergy_progress
06/02/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
06/02/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
06/02/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/02/2026VestibulesSAMI HAJJAR P.Eenergy_progress
06/02/2026Air barrier continuity plan testingSAMI HAJJAR P.Eenergy_progress
06/02/2026Fenestration areasSAMI HAJJAR P.Eenergy_progress
05/29/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
05/29/2026Mechanical SystemsSAMI HAJJAR P.Especial
Latest 25 of 148.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Afro-Latin Jazz Alliance El Barrio's Art Space P.S. 109Arts / Culture / EntertainmentCellar, Floors 1, 2
Project M01309696 Alteration · Approved · 03/26/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch26
08/20/2026M01309568-P1Request digital key ↗
08/20/2026M01309568-I1Request digital key ↗
08/18/2026M01309696-S2Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M01341642-I1Request digital key ↗
▸Applications & Permits4
▸DOB NOWDEP Stormwater Construction Permit3
08/13/2026M08028552-P1Open ↗
08/13/2026M08028552-I1Open ↗
08/13/2026M08028552-P6Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026M08028552-I1Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026M08028552-P6Open ↗
08/17/2026M08028552-I1Open ↗
08/13/2026M08028552-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026M08028552-P1Open ↗
08/13/2026M08028552-I1Open ↗
08/13/2026M08028552-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M08028552-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/20/2026M01309568-I1Open ↗
08/20/2026M01309568-P1Open ↗
08/18/2026M01309696-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026M01309696-S4Open ↗
08/31/2026M08028552-P6Open ↗
08/31/2026M08028552-P6Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026M01309696-S4Open ↗
09/02/2026M01309696-S4Open ↗
09/01/2026M08028552-P8Open ↗
Showing 3 of 19 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026M08028552-P1Open ↗
08/13/2026M08028552-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026M08028552-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026M08028552-P1Open ↗
08/13/2026M08028552-I1Open ↗
08/13/2026M08028552-P6Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/16/2025141027751Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M08028552-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/17/2026M08028552-P7Open ↗
08/17/2026M08028552-P9Open ↗
08/17/2026M08028552-P8Open ↗
Showing 3 of 24 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/16/2025141027751Open ↗
▸Filing & Intake Forms1
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/16/2025141027751Open ↗
▸Other Documents11
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M08028552-I1Open ↗
08/13/2026M08028552-P1Open ↗
08/13/2026M08028552-P6Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026M08028552-P6Open ↗
08/17/2026M08028552-P1Open ↗
08/17/2026M08028552-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026M08028552-I1Open ↗
08/13/2026M08028552-P6Open ↗
08/13/2026M08028552-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/16/2025141027751Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M08028552-S7Open ↗