| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M08028552 ↗ | 101 EAST 118 STREET MANHATTAN | New Building | Permit Issued | 10/31/2022 | 09/09/2026 | Owner Timbale Terrace HDFC | PROPOSE STRUCTURAL SCOPE OF WORKS IN CONJUNCTION WITH 20-STORY NB # M08028552-I1. |
| M01419714 ↗ | 809 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 08/20/2026 | Design OSPINO ENGINEERING PLLC Owner MOORE GROUP CORP Filer Hierarch-E LLC | Gantry System installation for Alt 1 work approved under M01262427-I1 |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP | Wall Bracket as per plans filed herewith. |
| Q00763375 ↗ | 28-90 REVIEW AVENUE QUEENS | New Building | Permit Issued | 07/15/2022 | 04/03/2026 | Design KSS ARCHITECTS LLP | The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories… |
| M01337325 ↗ | 126 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 02/14/2026 | 02/19/2026 | INSTALLATION AND USE OF TEMPORARY ARTICULATING BOOM CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| 420999879BIS | 135 BEACH 143 STREET QUEENS | — | ISSUED | 09/22/2017 | 10/28/2025 | — | EQ, PL |
| Name | Projects together | Most recent |
|---|---|---|
| LOMBARDO PROFESSIONAL ENGINEERING | 21 | 07/16/2026 |
| OSPINO ENGINEERING PLLC | 6 | 07/16/2026 |
| SCALAR ARCHITECTURE PC | 3 | 03/12/2019 |
| VALJATO ENGINEERING PC | 3 | 02/03/2025 |
| COSENTINI ASSOCIATES | 1 | 06/29/2026 |
| DENCITYWORKS ARCHITECTURE PLLC. | 1 | 06/29/2026 |
| DEROSIER ENGINEERING, LLC | 1 | 07/16/2026 |
| DESIMONE CONSULTING ENGINEERS | 1 | 06/02/2026 |
| DOKA USA | 1 | 02/26/2024 |
| EXDEM ENGINEERING SERVICES | 1 | 06/02/2026 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 07/16/2026 |
| GACE DPC | 1 | 07/16/2026 |
| GEI CONSULTANTS, INC. | 1 | 07/16/2026 |
| HM LOKE CONSULTING ENGINEERING PC | 1 | 01/06/2021 |
| HOWARD I SHAPIRO & ASSOCIATES | 1 | 06/24/2024 |
| KSS ARCHITECTS LLP | 1 | 06/02/2026 |
| LANGAN ENGINEERING | 1 | 06/29/2026 |
| LUNA ENGINEERING INC. | 1 | 04/19/2023 |
| ME ENGINEERS | 1 | 06/02/2026 |
| MOROZOV | 1 | 07/16/2026 |
| PHILIP HABIB & ASSOCIATES | 1 | 06/29/2026 |
| PLAN B ENGINEERING | 1 | 10/18/2018 |
| RA ENGINEERING LLP | 1 | 06/02/2026 |
| RGCE | 1 | 06/29/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 07/16/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CM AND ASSOCIATES CONST | 1 | 06/29/2026 |
| DYNAMIC HOISTING SCAFF IN | 1 | 07/16/2026 |
| FORWARD MECHANICAL CORP | 1 | 06/02/2026 |
| G.N.T. MECHANICAL LLC | 1 | 07/16/2026 |
| JEM CONTRACTING CORP | 1 | 06/24/2024 |
| LEEDING BUILDERS GROUP LL | 1 | 06/02/2026 |
| MB MECHANICAL OF NY INC | 1 | 07/16/2026 |
| MEGA CONTRACTING GP LLC | 1 | 07/16/2026 |
| NEW LINE STRUCTURES & DEV | 1 | 06/29/2026 |
| TITAN INDUSTRIAL SVC CORP | 1 | 06/02/2026 |
| TT MECHANICAL CORP | 1 | 06/29/2026 |
| VIK XS SERVICES INC | 1 | 06/24/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| LIONS GROUP II, LLC. | 2 | 01/03/2023 |
| 1298 INWOOD DEVELOPERS | 1 | 02/03/2025 |
| 28-90 REVIEW AVE PROPERTY OWNER | 1 | 06/02/2026 |
| Circle F Capital | 1 | 06/24/2024 |
| HOUSING IS A HUMAN RIGHT LLC | 1 | 12/04/2024 |
| INSITE PROPERTY GROUP | 1 | 05/28/2025 |
| JEM CONTRACTING CORP | 1 | 06/24/2024 |
| QUEENS BUDDHIST CENTER LLC | 1 | 01/06/2021 |
| Timbale Terrace HDFC | 1 | 07/16/2026 |
| VIK XS SERVICES INC | 1 | 06/24/2024 |
| WILLIAM MACKLOWE COMPANY | 1 | 02/27/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| LOMBARDO BUILDING CONSULTANTS | 14 | 05/28/2025 |
| Hierarch-E LLC | 6 | 07/16/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 4 | 07/16/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 06/02/2026 |
| AE DESIGN SOLUTION INC. | 1 | 02/27/2019 |
| AO CONSULTING AND DRAFTING | 1 | 06/24/2024 |
| BMB BUILDING CONSULTING INC. | 1 | 07/16/2026 |
| HOWARD I. SHAPIRO & ASSOCIATES | 1 | 06/24/2024 |
| JM ZONING, LLC. | 1 | 04/19/2023 |
| Rigid Structural Design, LLC | 1 | 07/16/2026 |
| VALJATO ENGINEERING P.C | 1 | 02/03/2025 |
| WILLIAM VITACCO ASSOCIATES | 1 | 06/29/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M08028552 ↗ | 101 EAST 118 STREET MANHATTAN | New Building | Permit Issued | 10/31/2022 | 09/09/2026 | Owner Timbale Terrace HDFC | PROPOSE STRUCTURAL SCOPE OF WORKS IN CONJUNCTION WITH 20-STORY NB # M08028552-I1. |
| M01419714 ↗ | 809 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 08/20/2026 | Design OSPINO ENGINEERING PLLC Owner MOORE GROUP CORP Filer Hierarch-E LLC | Gantry System installation for Alt 1 work approved under M01262427-I1 |
| B00580365 ↗ | 737 4TH AVENUE BROOKLYN | New Building | Permit Issued | 09/23/2021 | 06/09/2026 | Design COSENTINI ASSOCIATES Owner MOORE GROUP CORP | Wall Bracket as per plans filed herewith. |
| Q00763375 ↗ | 28-90 REVIEW AVENUE QUEENS | New Building | Permit Issued | 07/15/2022 | 04/03/2026 | Design KSS ARCHITECTS LLP | The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories… |
| M01337325 ↗ | 126 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 02/14/2026 | 02/19/2026 | INSTALLATION AND USE OF TEMPORARY ARTICULATING BOOM CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| 420999879BIS | 135 BEACH 143 STREET QUEENS | — | ISSUED | 09/22/2017 | 10/28/2025 | — | EQ, PL |
| 410157538BIS | 240-51 DEPEW AVENUE QUEENS | — | ISSUED | 09/09/2009 | 07/29/2025 | — | PL |
| X01248722 ↗ | 1760 JEROME AVENUE BRONX | Alteration | Permit Issued | 07/09/2025 | 07/10/2025 | Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy. | |
| M01210307 ↗ | 609 WEST 46 STREET MANHATTAN | Alteration | Signed-off | 05/28/2025 | 05/28/2025 | Owner INSITE PROPERTY GROUP | Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy. |
| M01193529 ↗ | 255 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 04/25/2025 | 04/28/2025 | INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M01173424 ↗ | 9TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/29/2025 | 01/31/2025 | Owner MOORE GROUP CORP | Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy. |
| X01148310 ↗ | 1298 INWOOD AVENUE BRONX | Alteration | Permit Issued | 12/06/2024 | 12/09/2024 | Design VALJATO ENGINEERING PC Owner 1298 INWOOD DEVELOPERS Filer VALJATO ENGINEERING P.C | USE OF TEMPORARY TELEHANDLER CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-X08008823 |
| M01144148 ↗ | 9TH AVENUE MANHATTAN | Alteration | Permit Issued | 12/04/2024 | 12/05/2024 | Installation and use of telehandler as per plans filed herewith. No change in use, egress, or occupancy. | |
| Q01143231 ↗ | 15-18 VILLAGE LANE QUEENS | Alteration | Signed-off | 11/19/2024 | 11/21/2024 | Design VALJATO ENGINEERING PC | USE OF TEMPORARY TELEHANDLER CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-421134187 |
| Q01067569 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 07/01/2024 | 08/26/2024 | Owner MOORE GROUP CORP | INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01088717 ↗ | 270 EAST 2 STREET MANHATTAN | Alteration | Signed-off | 08/01/2024 | 08/02/2024 | Design VALJATO ENGINEERING PC | Installation of catwalk secured to exterior shear wall to facilitate formwork installation. No change in use, egress, or occupancy under thi… |
| Q01081803 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 07/26/2024 | 07/26/2024 | Owner MOORE GROUP CORP | Application for the installation and use of material platform as per plans filed herein. No change in egress, use or occupancy. |
| Q01069718 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 06/21/2024 | 06/24/2024 | Owner MOORE GROUP CORP | Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy. |
| M00856578 ↗ | 1 PARK ROW MANHATTAN | Alteration | Signed-off | 05/12/2023 | 06/13/2024 | Owner Circle F Capital | Use of Mini Picker/ Mini Crane as per plans filed herewith. No change in use, egress or occupancy |
| Q01054586 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 05/22/2024 | 05/22/2024 | Owner MOORE GROUP CORP | Installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy. |
| B00990797 ↗ | 47 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 02/26/2024 | 05/14/2024 | Design DOKA USA | INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01043605 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 05/03/2024 | 05/03/2024 | Owner MOORE GROUP CORPORATION | INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00990550 ↗ | 28-90 REVIEW AVENUE QUEENS | Alteration | Signed-off | 03/20/2024 | 04/26/2024 | Design OSPINO ENGINEERING PLLC Owner MOORE GROUP CORP Filer Hierarch-E LLC | ULMA Loading Platform as per dwgs filed herewith. |
| B00990791 ↗ | 47 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 04/19/2024 | 04/19/2024 | INSTALLATION AND USE OF TEMPORARY CANTILEVER FORMWORK DECK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| X01027636 ↗ | 580 GERARD AVENUE BRONX | Alteration | Signed-off | 04/09/2024 | 04/10/2024 | Design OSPINO ENGINEERING PLLC Owner MOORE GROUP CORP Filer Hierarch-E LLC | Wall Bracket installation as per plans filed herewith. No change in use, egress or occupancy. |
| X07999739 ↗ | 580 GERARD AVENUE BRONX | Alteration | Signed-off | 09/07/2022 | 09/27/2023 | Owner MOORE GROUP CORP | APPLICATION FOR THE INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00805457 ↗ | 1 PARK ROW MANHATTAN | Alteration | Signed-off | 05/24/2023 | 05/25/2023 | Design OSPINO ENGINEERING PLLC Owner MOORE GROUP CORP Filer Hierarch-E LLC | Wall Bracket installation as per plans filed herewith. No change in use, egress or occupancy. |
| X00859917 ↗ | 617 WALTON AVENUE BRONX | Alteration | Signed-off | 04/19/2023 | 04/27/2023 | Design LUNA ENGINEERING INC. Filer JM ZONING, LLC. | Support and repair of western building foundations. To correct violations # 031023C23-00646. |
| Q00819348 ↗ | 27-01 JACKSON AVENUE QUEENS | Alteration | Signed-off | 01/30/2023 | 01/30/2023 | Owner MOORE GROUP CORPORATION | Application for the installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy. |
| Q00819354 ↗ | 27-01 JACKSON AVENUE QUEENS | Alteration | Signed-off | 01/30/2023 | 01/30/2023 | Owner MOORE GROUP CORPORATION | Application for the installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy. |
| Q00803025 ↗ | 27-01 JACKSON AVENUE QUEENS | Alteration | Signed-off | 01/03/2023 | 01/04/2023 | Owner LIONS GROUP II, LLC. | INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00793862 ↗ | 27-01 JACKSON AVENUE QUEENS | Alteration | Signed-off | 10/25/2022 | 10/26/2022 | Owner LIONS GROUP II, LLC. | INSTALLTION AND USE OF TEMPORARY CLIMBING PLATFORMS AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00714842 ↗ | 25-34 JACKSON AVENUE QUEENS | Alteration | Signed-off | 05/05/2022 | 07/21/2022 | Owner MOORE GROUP CORPORATION | INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00711815 ↗ | 2226 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2022 | 07/12/2022 | Owner MOORE GROUP CORP | INSTALLATINO AND USE OF TEMPORARY WORKING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00710457 ↗ | 25-34 JACKSON AVENUE QUEENS | Alteration | Signed-off | 03/31/2022 | 04/01/2022 | Owner MOORE GROUP CORPORATION | INSTALLATION AND USE OF TEMPORARY GALLOW SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 421891554BIS | 136 BEACH 144 STREET QUEENS | — | ISSUED | 01/26/2022 | 01/26/2022 | — | OT |
| Q00139227 ↗ | 40-40 24 STREET QUEENS | Alteration | Signed-off | 03/12/2019 | 10/06/2021 | Design SCALAR ARCHITECTURE PC | INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 440682922BIS | 17-20 VILLAGE LANE QUEENS | — | ISSUED | 07/30/2021 | 07/30/2021 | — | EQ |
| Q00426237 ↗ | 40-40 24 STREET QUEENS | Alteration | Signed-off | 11/17/2020 | 11/17/2020 | INSTALLATION AND USE OF SCAFFOLD AS PER PLANSSUBMITTED.SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYCBUILDING CODE. THIS APPLICATION INVOLVES… | |
| 140946109BIS | 50 TRINITY PLACE MANHATTAN | — | ISSUED | 09/02/2020 | 09/02/2020 | — | EQ |
| 340751396BIS | 282 DINSMORE PLACE BROOKLYN | — | ISSUED | 08/05/2020 | 08/05/2020 | — | EQ |
| B00088807 ↗ | 881 ERSKINE STREET BROOKLYN | Alteration | Signed-off | 10/18/2018 | 04/21/2020 | Design SCALAR ARCHITECTURE PC | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00124505 ↗ | 323 EAST 61ST STREET MANHATTAN | Alteration | Signed-off | 02/27/2019 | 11/04/2019 | Design SCALAR ARCHITECTURE PC Owner WILLIAM MACKLOWE CO. Filer AE DESIGN SOLUTION INC. | INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00088811 ↗ | 702 VANDALIA AVENUE BROOKLYN | Alteration | Signed-off | 10/18/2018 | 03/29/2019 | Design PLAN B ENGINEERING | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 123302452BIS | 57 MURRAY STREET MANHATTAN | — | ISSUED | 09/27/2017 | 03/01/2019 | — | OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 809 MADISON AVENUE ↗ | 1 | 08/21/2026 |
| 27-01 JACKSON AVENUE ↗ | 6 | 07/08/2026 |
| 40-40 24 STREET ↗ | 6 | 07/08/2026 |
| 702 VANDALIA AVENUE ↗ | 3 | 07/08/2026 |
| 737 4TH AVENUE ↗ | 3 | 07/08/2026 |
| 28-90 REVIEW AVENUE ↗ | 16 | 07/08/2026 |
| 2226 3 AVENUE ↗ | 3 | 07/08/2026 |
| 47 WILLOUGHBY STREET ↗ | 2 | 07/08/2026 |
| 1 PARK ROW ↗ | 2 | 07/08/2026 |
| 881 ERSKINE STREET ↗ | 3 | 07/08/2026 |
| 101 EAST 118 STREET ↗ | 1 | 04/09/2026 |
| 126 LAFAYETTE STREET ↗ | 1 | 04/09/2026 |
| 9TH AVENUE ↗ | 2 | 04/09/2026 |
| 609 WEST 46 STREET ↗ | 1 | 04/09/2026 |
| 1760 JEROME AVENUE ↗ | 1 | 04/09/2026 |
| 255 WEST 34 STREET ↗ | 1 | 04/09/2026 |
| 1298 INWOOD AVENUE ↗ | 1 | 04/08/2026 |
| 25-34 JACKSON AVENUE ↗ | 6 | 03/21/2026 |
| 323 EAST 61 STREET ↗ | 4 | 03/21/2026 |
| 580 GERARD AVENUE ↗ | 6 | 03/21/2026 |
| 270 EAST 2 STREET ↗ | 2 | 03/21/2026 |
| 15-18 VILLAGE LANE ↗ | 2 | 03/21/2026 |
| 617 WALTON AVENUE ↗ | 2 | 03/21/2026 |